Attachment 1

Performance Requirement Summary (PRS)

Required Service
PWS

Paragraph Performance

Standard Acceptable Quality

Levels

Incentive

(Negative)

(Impact on Contractor Payments)

Contractor shall operate Range Residue Accumulation Point
5.2
The Contractor shall segregate metals from hazards, process and prepare scrap metal for shipment, perform appropriate documentation
100%

For failed hazardous waste inspections by the State of New Mexico the contractor will pay the fines levied on the installation that they were responsible for

Contractor shall sell scrap metal
5.3
Contractor shall ensure that the material is packaged so as to obtain the maximum achievable price possible and minimum liability to WSMR.
95% of all shipments must be at maximum. 95% is calculated by the number of shipments at maximum divided by the total number of shipment *100 per month
First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO
Contractor shall support munitions recovery
5.4
Support all missions according to the schedule and the Test Officer/Range Engineers requirements. Recover all items in a safe manner, efficiently and effectively, returning the item to the customer or processing for range scrap.
100% of recoveries will have no impact on the supporting the following mission
First failure will result in the issuance of a contractor deficiency report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO
Contractor shall support Range Operations (RO) on all missions requiring UXO/EOD support.
5.5

The UXO/EOD mission provides support for every test and training mission, range clearance activities, small arms ranges, surface clearance, UXO/EOD briefings and UXO/EOD escorts.

Coordinates on a regular basis with all range elements and customers.

100%
First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO

Management Tasks

5.1
Work Plan and SOPs are current and changes are given to the KO within 10 calendar days

EOD documentation is current (PWS 5.1.3.)

Cost report submitted on time with correct charge codes and shall exceed estimate by greater than thirty percent (30%) Information provided on ORs are on time per the Range Engineer’s suspense date

Documents are current and submitted on time 100% of the time
First failure will result in a letter to the COR and will be handled with the contractor POC, the second discrepancy will issue a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO
Environment Requirements
5.1.9
Environmental requirements are adhered to
Recoveries are coordinated with WSTC -Environmental 100% of the time

Hazardous Waste inspections are 100% in compliance

Solid waste generated is taken to the appropriate location for disposal or recycle 100% of the time

First failure will result in the issuance of a contractor deficiency report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO