SCIF Solicitation Questions 9-14-2025 (version 1).xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- 3ID G2 Electronic Security System (ESS) Upgrade
- Solicitation number
- W9124M26QA024
About this file
This file is a Questions and Answers document for solicitation W9124M26QA024, the 3rd Infantry Division G2 Electronic Security System (ESS) Upgrade at Fort Stewart, Georgia. The Q&A addresses 29 questions submitted by potential quoters regarding facility specifications, existing infrastructure, equipment requirements, and contract terms. Key facility details include a SCIF constructed in 2007 with approximately 22,255 total square feet across four locations (HQ: 13,800 sq ft; 1B: 3,020 sq ft; 2B: 2,835 sq ft; REACH: 2,600 sq ft), featuring dropped ceilings, raised floors, aluminum concrete perimeter walls, and adequate backup power. The Government clarified that existing cable and wiring cannot be assumed for reuse and that contractors must provide all materials, labor, and cabling necessary to complete requirements per the Performance Work Statement and Bill of Materials attachment.
The Government established critical contracting parameters: this is a firm-fixed-price purchase order with no progress payments, advance payments, or part-arrival invoicing permitted; payment follows Government acceptance of deliverables. The solicitation imposes a 120-calendar-day period of performance post-award and requires integration with the Government's existing DAQ-based electronic security architecture, with no proprietary system-configuration information provided. Equipment substitutions require written Government approval via formal solicitation amendment. The Government withheld independent estimates and budget ranges, directing quoters to submit competitive pricing. Quoters have after-hours facility access if pre-coordinated and must monitor SAM.gov for amendments and additional clarifications. Quote deadline was 9:00 a.m. Eastern Time on September 18, 2026, with award to the lowest evaluated total price quoter deemed technically acceptable.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| W9124M26QA024 3ID SCIF EES Upgrade Solicitation Questions | |||
| Date Received | Question No. | Question | Government Response / Disposition |
| 9/13/26 | 1 | How old is the facility? | SCIF was constructed in 2007 |
| 9/13/26 | 2 | How much square footage is in the facility? | HQ=13800, 1B=3020, 2B=2835, REACH=2600 sq ft |
| 9/13/26 | 3 | How stable is the power? | The power grid is sufficient to conduct the service. Back up power is on-site. |
| 9/13/26 | 4 | Is there a dropped ceiling in all areas of installation? | Yes |
| 9/13/26 | 5 | What type of walls are in the perimeter areas? | Aluminum concrete, fully insulated for sound and has three 5/8" metal studswith two layers on eacxh side of gypsum board. |
| 9/13/26 | 6 | Do we need to drill between the walls to run cable infrastructure? | Not anticipated |
| 9/13/26 | 7 | Do we need to use conduit? If yes, what is the estimated total conduit footage? | Not anticipated |
| 9/13/26 | 8 | Are the door frames metal and concrete filled? | Yes |
| 9/13/26 | 9 | Please provide a comprehensive list of quantities of all IDS items needed per location, such as motion sensors and glass-break sensors. | See Attachment 1, Bill of Materials, for the Government’s identified equipment and quantities. No separate location-by-location sensor schedule will be provided. The contractor shall include all labor, materials, integration, testing, and ancillary items necessary to meet the PWS requirements. |
| 9/13/26 | 10 | Are there existing IDS sensors in the doors? If so, identify the applicable doors. | Yes - Main Entrances/Exit and Secured or Communication Rooms |
| 9/13/26 | 11 | What is the manufacturer of the existing IDS system? | The proposed solution must integrate with the Government’s existing DAQ-based electronic security architecture. Additional proprietary system-configuration information will not be provided. |
| 9/13/26 | 12 | May the contractor reuse existing cable? If so, what type of cable is currently installed? | The Government does not guarantee that existing cable is suitable for reuse. The contractor shall evaluate existing conditions and include all materials, labor, and cabling necessary to complete the requirement. |
| 9/13/26 | 13 | Are ceilings suspended or hard-lid? | Yes, Drop Ceilings and Raised Floors |
| 9/13/26 | 14 | Are existing cable trays available for wiring above ceilings? | Possibly; however, most network cable is run along the floor |
| 9/13/26 | 15 | May existing wiring be utilized? | See response to Question 12. Offerors shall not assume that existing wiring may be reused. |
| 9/13/26 | 16 | Is an uninterruptible power supply required? If so, what power-duration requirement applies? | Yes, must hold for at least 2424 |
| 9/13/26 | 17 | Are “or equal” equipment substitutions allowed? | Proposed equipment must comply with the PWS and Attachment 1. Any proposed substitution or deviation from identified equipment must be submitted in writing and is subject to Government approval by formal solicitation amendment. |
| 9/13/26 | 18 | Is plenum-rated wire acceptable? | The contractor shall provide cabling and materials suitable for the installation environment and compliant with applicable codes, manufacturer requirements, and the PWS. |
| 9/13/26 | 19 | Is after-hours access available to the contractor at no additional cost to the Government? | Yes, as long as it is pre-coordinated. |
| 9/13/26 | 20 | What is the height of exterior cameras, if any? | ~18ft |
| 9/13/26 | 21 | Will the Government post other questions and answers received? | The Government will post responses to timely questions that require clarification of the solicitation. Quoters are responsible for monitoring SAM.gov for amendments. |
| 9/13/26 | 22 | Please provide a list of equipment and part numbers to be installed. | See Attachment 1, Bill of Materials, included in the Performance Work Statement, for the Government-identified equipment, descriptions, and quantities. The Bill of Materials identifies major required components and is not intended to relieve the contractor of its responsibility to furnish all incidental materials, accessories, labor, equipment, and services necessary to complete the requirements of the PWS. |
| 9/13/26 | 23 | Are pipe chases available between floors? | Unsure |
| 9/13/26 | 24 | What is the budget range for this project, and has funding been appropriated? | The Government will not disclose the independent Government estimate, budget range, or funding details. Quoters shall submit their best pricing in accordance with the solicitation. |
| 9/13/26 | 25 | Because of the high cost of parts, may the contractor invoice when parts arrive on site, or are progress payments allowed? | No. This is a firm-fixed-price purchase order. Payment will be made in accordance with the contract payment terms and after submission of a proper invoice and Government acceptance of the applicable services or deliverables. Progress payments, advance payments, and payment solely upon delivery of parts are not authorized. |
| 9/13/26 | 26 | How many feet of new wire will need to be installed? | unsure |
| 9/13/26 | 27 | What type and quantity of cipher locks are required, such as X-10 locks? | By-Pass Key Systems at all locations |
| 9/13/26 | 28 | Please post the site-visit sign-in sheet and resulting questions and answers. | If a site visit is conducted, the Government will post any material clarification resulting from the site visit through a solicitation amendment. The Government will not post a site-visit attendance list. |
| 9/13/26 | 29 | Please post drawings and the drawing key. | The PWS, Attachment 1, and other posted solicitation attachments constitute the information available for quotation. Any additional information determined necessary for all quoters will be released by solicitation amendment. |
File details come from the government source that posted it. Updated .