Questions- Answers.pdf

PDF 151 KB Posted

Attached to
Replace Water Tank at Camp Oliver Federal contract opportunity
Solicitation number
W9124M20B0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command

About this file

This document contains questions and answers related to a solicitation for replacing water tanks at Camp Oliver. The solicitation seeks removal of existing potable water supply and replacement with a new hydro-pneumatic potable water tank, appurtenances, and piping. It also requires installation of a new emergency water source tank, appurtenances, and piping. One question confirms the thickness of an existing concrete slab is 4 inches according to record drawings from 1956. Another question regarding pressure relief valve PSI on an existing potable water tank directs the offeror to Drawing M-6. The document clarifies all materials must meet Buy American Act requirements and codes indicated in the drawings and specifications. It also provides the location of an emergency water source sign detail on Drawing C-2.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Water Tank at Camp Oliver, newest first.
File Type Posted
Copy of ABSTRACT - 20-B-0012-Replace Water Tanks at Camp Oliver. 3.pdf PDF
Amendment 3.pdf PDF
FS-26 Camp Oliver Drawings 1956.pdf PDF
Coronavirus disease 2019 (COVID-19) Factsheet.pdf PDF
ENCL 4 200405_DoD Guidance on the Use of Cloth Face Coverings.pdf PDF
Amendment 2.pdf PDF
Amendment 1.pdf PDF
Q5A-8-5J Env Asbestos Report.docx DOCX document
DRAWINGS 3777 Combined.pdf PDF
SOLICITATION.pdf PDF
Camp Oliver Tank Replacement Design Change 3 Dec 2019.pdf PDF
Webex Instructions.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9124M-20- B-0012- Replace Water Tanks at Camp Oliver

1. Question :

Is the Government supplying a metal container in which the concrete is to be placed as concrete structures are being demolished or after concrete structures have been demolished by the contractor?

DPW ANSWER:

FSGA/HAAF has a mandatory recycling program. Unless otherwise specified, the Government retains all salvage rights. Contractors shall recycle construction & demolition debris as required by the Installation's recycling clause, 52.000-4061:

RECYCLING, SALVAGE, AND DISPOSAL OF MATERIALS FORT STEWART AND

HUNTER ARMY AIRFIELD.

Source Reduction is required to reduce the initial input to the solid waste stream.

Ensure minimum packing and packaging materials are used for items shipped to the Installation. Also, all military construction, renovation and demolition projects shall include performance requirements for a 60% minimum diversion of C&D waste by weight. Contractor must provide all weight tickets to demonstrate meeting the performance standard. Specifications must include submission of a contractor’s C&D Waste Management Plan.

Concrete and asphalt material shall be hauled and disposed of off of government property. Recycle materials will be broken down when delivered to the Recycling Center (to include metal equipment). Scrap metal will be cut down to no larger than 4 square feet in size.

Please read environmental requirement located in Technical Provisions General (TPG) for disposal and recycle.

2. Question:

What is the thickness of the concrete slab under building 15003A? It is important to know this, in order to determine the cost of the demolition.

RECORD DRAWINGS INDICATE BUILDING 15003A IS A 4” CONCRETE SLAB.

SEE ATTACHED REFERENCE DRAWINGS FROM 1956. PROJECT NUMBER FS-

3. Question: What is the PSI for the Pressure Relief Value (PRV) on the potable water tank on

Site 1?

SEE DRAWING M-6.

4. Question: Do the pipe, fittings, and all other materials have to be manufactured in the USA?

ALL MATERIALS SHALL MEET “THE BUY AMERICAN ACT” AND REQUIRED

CODES AND STANDARDS INDICATED ON THE DRAWINGS AND

SPECIFICATIONS.

5. Question: On Drawing M-2, and EMERGENCY WATER SOURCE sign is called out with a reference to Drawing C-2 for details. There is no description or dimensions of such sign on Drawing C-2 or on any other Drawing so far as we can ascertain. Please provide that information in order to determine the cost of this signage.

EMERGENCY WATER SOURCE SIGN DETAIL IS LOCATED ON DRAWING C-2.

IT IS LOCATED ABOVE THE GATE POST SCHEDULE.