W9124M-19-R-PW91U0002_Combined_Synopsis_Solicitation_Amendment_2.pdf
PDF 3 MB Posted
- Attached to
- Packing and Crating Ft Stewart GA
- Solicitation number
- W9124M-19-R-PW91
About this file
Combined Synopsis Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Offer_Pricing_Sheet.xlsx | XLSX spreadsheet | |
| DPM_Questions_and_Answers_Final.pdf | ||
| W9124M-19-R-PW91U0001_Combined_Synopsis_Solicitation_Amendment_1.pdf | ||
| W9124M-19-R-PW91_Combined_Synopsis_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124M-19-R-PW91 Request for Proposal (RFP).
2019-02 (5/6/2019).
488991set-aside for Small Business (Total)
27.5 Million (USD).
Services 01-Dec-19 30-Nov-24
W9124M-19-R-PW91
Services FOB DestinationGovernment
✔ ✔ ✔evaluation factors
Approximately equal to cost or price
07-Nov-19 12:00 pmMAJ Paul Wolfe 912-767-9033
Additional Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement(DFARS) Clauses incorporated into this acquisition, including those mandated by the Defense Transportation Regulation (DTR), are identified in and included as exhibits following this document.
This acquisition uses standardized contract formatting and language prescribed by the Defense Transportation Regulation pursuant to DFARS 247.271-3. As such: Chapter 404, DIRECT PROCUREMENT METHOD (DPM), of Part IV of the DTR; The Performance Work Statement (DTR Appendix G3); and subsequent Attachments (G1 through G7); are included as exhibits following this document.
MAJ Paul Wolfe 07-Nov-19 12:00 pmpaul.l.wolfe14.mil an overall period of performance
488991 V003 V - Transportation, Travel and Relocation
W9124M-19-R-PW91 07-Nov-19 12:00 pm
Fort Stewart and Hunter Army Airfield require packing and crating services for the movement of household goods. This requirement will be awarded under three schedules: Schedule I (Out-Bound); Schedule II (In-Bound);
and Schedule III (In-Town/Local Area). Each schedule will be awarded as a base year with four option years of performance. If applicable, multiple schedules that are awarded to the same successful offer will be issued on one contract.
Offers interested in competing for a limited number of schedules should so indicate, in order to prevent their proposal from being evaluated as incomplete and therefore unresponsive.
**** Offerors shall use the CLIN schedule to be provided in Attachment 2 (Pricing Schedule) to Amendment 2 to submit the cost/pricing portion of their proposal. ****
Services
CLIN OPT Item QTY U/I Delivery / PoP Location
15W9124M-19-R-PW91
52.203-3 Gratuities APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-12 Limitation On Payments To Influence Certain Federal Transactions OCT 2010 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUL 2013 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment AUG 2013 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-14 Limitations On Subcontracting NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-17 Nondisplacement of Qualified Workers MAY 2014 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-35 Equal Opportunity for Veterans SEP 2010 52.222-36 Affirmative Action For Workers With Disabilities OCT 2010 52.222-37 Employment Reports on Veterans SEP 2010 52.222-40 Notification of Employee Rights Under the National Labor Relations Act DEC 2010 52.222-41 Service Contract Act Of 1965 MAY 2014 52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor Standards - Price Adjustment (Multiple Year And Option Contracts) MAY 2014 52.222-50 Combating Trafficking in Persons FEB 2009 52.222-54 Employment Eligibility Verification AUG 2013 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving AUG 2011 52.225-1 Buy American Act--Supplies MAY 2014 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-18 Availability Of Funds APR 1984 [...] continued within Exhibit A.
paul.l.wolfe14.mil
MAJ Paul Wolfe
MAJ Paul Wolfe SFC Joshua Fejeran joshua.l.fejeran.mil
30-Oct-19 03:30 pm
15W9124M-19-R-PW91 5
15W9124M-19-R-PW91 6
Request for Proposal (RFP). W9124M-19-R-PW91
15W9124M-19-R-PW91 7
15W9124M-19-R-PW91 8
15W9124M-19-R-PW91 9
15W9124M-19-R-PW91 10
15W9124M-19-R-PW91 11
15W9124M-19-R-PW91 12
15W9124M-19-R-PW91 13
15W9124M-19-R-PW91 14
1998-0205 (Rev 27)
15W9124M-19-R-PW91 15
The ordering period for this contract is as follows:
01-Dec-2019 30-Nov-2020 1-Dec-2020 30-Nov-2021
01-Dec-2021 30-Nov-2022 01-Dec-2022 30-Nov-2023 01-Dec-2023 30-Nov-2024
52.232-33 Payment by Electronic Funds Transfer--System for Award Management JUL 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And Vegetation APR 1984 52.237-3 Continuity Of Services JAN 1991 52.242-13 Bankruptcy JUL 1995 52.246-4, Inspection of Services-Fixed-Price 52.246-14 Inspection of Transportation APR 1984 52.247-5 Familiarization With Conditions APR 1984 52.247-8 Estimated Weights or Quantities Not Guaranteed APR 1984 52.247-11 Net Weight - Household Goods or Office Furniture APR 1984 52.247-12 Supervision, Labor, or Materials APR 1984 52.247-13 Accessorial Services - Moving Contracts APR 1984 52.247-14 Contractor Responsibility for Receipt of Shipment APR 1984 52.247-15 Contractor Responsibility for Loading and Unloading APR 1984 52.247-16 Contractor Responsibility for Returning Undelivered Freight APR 1984 52.247-17 Charges APR 1984 52.247-21 Contractor Liability for Personal Injury and/or Property Damage APR 1984 52.247-23 Contractor Liability for Loss of and/or Damage to Household Goods JAN 1991 52.247-27 Contract Not Affected by Oral Agreement APR 1984 52.247-28 Contractor's Invoices APR 1984 52.247-68 Report of Shipment (REPSHIP) FEB 2006 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD Officials SEP 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7000 Disclosure Of Information AUG 2013 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7001 Disclosure of Ownership or Control by the Government of a Terrorist Country JAN 2009 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country
MAR 2014
252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage And Disposal Of Toxic And Hazardous Materials APR 2012 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports JUN 2012 252.232-7010 Levies on Contract Payments DEC 2006 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.247-7003 Pass-Through of Motor Carrier Fuel Surcharge Adjustment To The Cost Bearer JUN 2013 252.247-7010 Scope of Contract DEC 1991
W9124M-19-R-PW91 A 1 5
252.247-7012 Ordering Limitation DEC 1991 252.247-7014 Demurrage DEC 1991 252.247-7016 Contractor Liability for Loss or Damage DEC 1991 252.247-7017 Erroneous Shipments DEC 1991 252.247-7018 Subcontracting DEC 1991 252.247-7019 Drayage DEC 1991 252.247-7020 Additional Services AUG 2000 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.216-18 – Ordering (Oct 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 01 September 2019 through 31 August 2024. Ordering Officers will be designated upon contract award.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail.
Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
(End of Clause)
52.216-19 -- Order Limitations. (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than one (1) pound, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor --
(1) Any order for a single item in excess of the contractor's guaranteed capability;
(2) Any order for a combination of items in excess of the contractor's guaranteed capability; or
(3) A series of orders from the same ordering office within one (1) day that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within one
(1) day after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of Clause)
W9124M-19-R-PW91 A 2 5
52.217-8 -- Option to Extend Services (Nov 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor at any time before the contract expiration date. This option will be evaluated at the time of award.
(End of Clause)
52.217-9 -- Option to Extend the Term of the Contract (Mar 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 15 days prior to contract expiration; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 66 months.
(End of Clause)
52.223-11 -- Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016)
(a) Definitions. As used in this clause-- “Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon Dioxide’s global warming potential is defined as 1.0.
“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables of alternatives available at (http://www.epa.gov/snap/ ).
“Hydrofluorocarbons” means compounds that only contain hydrogen, fluorine, and carbon.
“Ozone-depleting substance” means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as--
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or
(2) Class II , including, but not limited to hydrochlorofluorocarbons.
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), (d), and (e) and 40 CFR Part 82, Subpart E, as follows:
"WARNING: Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere."
* The Contractor shall insert the name of the substance(s).
(c) Reporting. For equipment and appliances that normally each contain 50 or more pounds of hydrofluorocarbons or [...] cont.
W9124M-19-R-PW91 A 3 5
[...] refrigerant blends containing hydrofluorocarbons, the Contractor shall—
(1) Track on an annual basis, between October 1 and September 30, the amount in pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons contained in the equipment and appliances delivered to the Government under this contract by—
(i) Type of hydrofluorocarbon (e.g., HFC-134a, HFC-125, R-410A, R-404A, etc.);
(ii) Contract number; and
(iii) Equipment/appliance;
(2) Report that information to the Contracting Officer for FY16 and to www.sam.gov, for FY17 and after00
(i) Annually by November 30 of each year during contract performance; and
(ii) At the end of contract performance.
(d) The Contractor shall refer to EPA’s SNAP program (available at http://www.epa.gov/snap ) to identify alternatives.
The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at http://www.epa.gov/snap .
(End of Clause)
52.228-9 -- Cargo Insurance (May 1999)
(a) The Contractor, at the Contractor’s expense, shall provide and maintain, during the continuance of this contract, cargo insurance of $150,000.00 per vehicle to cover the value of property on each vehicle and of $150,000.00 to cover the total value of the property in the shipment.
(b) All insurance shall be written on companies acceptable to Mission Installation Contracting Command Fort Stewart (MICC-FS), and policies shall include such terms and conditions as required by MICC-FS. The Contractor shall provide evidence of acceptable cargo insurance to MICC-FS before commencing operations under this contract.
(c) Each cargo insurance policy shall include the following statement: “It is a condition of this policy that the Company shall furnish --
(1) Written notice to Mission Installation Contracting Command Fort Stewart, 976 William H. Wilson Ave., Ste. 100, Fort Stewart, GA 31314, 30 days in advance of the effective date of any reduction in, or cancellation of, this policy; and
(2) Evidence of any renewal policy to the address specified in paragraph (1) of this statement, not less than 15 days prior to the expiration of any current policy on file with Mission Installation Contracting Command Fort Stewart, 976 William H. Wilson Ave., Ste. 100, Fort Stewart, GA 31314.
(End of Clause)
52.247-2 -- Permits, Authorities, or Franchises (Jan 1997)
(a) The offeror does ( ), does not ( ), hold authorization from the Federal Highway Administration (FHWA) or other cognizant regulatory body. If authorization is held, it is as follows:
(Name of regulatory body) (Authorization No.)
[...]cont.
W9124M-19-R-PW91 A 4 5
[...] (b) The offeror shall furnish to the Government, if requested, copies of the authorization before moving the material under any contract awarded. In addition, the offeror shall, at the offeror’s expense, obtain and maintain any permits, franchises, licenses, and other authorities issued by State and local governments.
(End of Clause)
52.247-24 -- Advance Notification by the Government (Apr 1984)
The Government will notify the Contractor 24 hours in advance of the number of pieces and weight of all normal shipments and the time the shipment will be available for pickup. On other-than-normal shipments, the Government will furnish additional information; e.g., dimension of oversized pieces, as necessary to determine the amount of equipment and/or manpower needed to perform the required services.
(End of Clause)
252.216-7006 Ordering (MAY 2011)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from 01 September 2019 through 31 August 2024.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c)(1) If issued electronically, the order is considered “issued” when a copy has been posted to the Electronic Document Access system, and notice has been sent to the Contractor.
(c)(2) If mailed or transmitted by facsimile, a delivery order or task order is considered “issued” when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.
(3) Orders may be issued orally only if authorized in the schedule.
(End of Clause)
W9124M-19-R-PW91 A 5 5
CHAPTER 404
DIRECT PROCUREMENT METHOD (DPM)
A. PURPOSE AND SCOPE
B. DPM SERVICES
C. ROUTING BY THE PERSONAL PROPERTY SHIPPING OFFICE (PPSO)
D. USE OF DPM AIR MODE FOR INTERNATIONAL HOUSEHOLD GOODS
E. VALUATION OF SHIPMENTS
F. CONTAINERS
G. PROCEDURES
pickup at the contractor’s facility or by local drayage by the contractor to the ’s terminal.
the PPCIG in the CONUS. The statement “Hold for Storage in Transit” or “Hold for Non emporary Storage”
“hold” status, except when customer’s
Figure 404-1. DD Form 2773, Report of Contractor Services
Figure 404-2. DD Form 2772, Contract Discrepancy Report
Figure 404-3. DD Form 1299, Application for Shipment and/or Storage of Personal Property
Defense Transportation Regulation – Part IV 15 January 2019 Personal Property
IV-G-1
APPENDIX G
PERFORMANCE WORK STATEMENT FOR PACKING, CONTAINERIZATION AND
LOCAL DRAYAGE OF DIRECT PROCUREMENT METHOD (DPM) PERSONAL
PROPERTY SHIPMENTS
PART I – DESCRIPTION OF SERVICES
A. SCOPE OF WORK
The contractor will furnish all personnel, equipment, facilities, supplies, services, and materials, except as specified herein as government-furnished, for the preparation of the personal property (including servicing of appliances) of Department of Defense (DoD) personnel for shipment, drayage and/or storage and related services through the DPM. Work to be performed will be those services in the Schedules awarded to the contractor as outlined in individual Contract Line Item Number (CLIN) items (see Attachment G3). Table G-1, Task/Type of Move Matrix, shows which tasks normally apply to each type of move. The contractor shall furnish all materials except Government-owned containers (Federal Specification PPP-B-580), all equipment, plant and labor; and perform all work in accomplishing containerization of personal property for overseas or domestic movement or storage, including stenciling, cooperage, drayage of personal property in connection with other services, decontainerization of inbound shipments of personal property; and the handling of shipments into and out of the Contractor's facility. Specific requirements for each task are described below. If specific instructions or requirements are not provided, commercial standards of services and best business practices are acceptable. Excluded from the scope of this contract is the furnishing of like services or materials which are provided incident to complete movement of personal property when purchased by the Through Government Bill of Lading or other method/mode of shipment or property to be moved under the Do-It-Yourself moving program or otherwise moved by the owner. The contractor shall perform services within the following defined areas of performance, which include terminals identified in the Schedule and/or individual CLIN items. The Government will consider all areas of performance described in the Schedule and/or individual items as including the contractor's facility, regardless of geographical location.
1. Premove Survey. The contractor will determine the nature of personal property offered for shipment either by physical inspection or telephone survey with the customer. The survey will be conducted at a time and date mutually agreed upon between the contractor and the customer.
Any pack/pickup date changes will be coordinated with the ordering officer.
2. Weighing.
a. The gross, tare, and net weight of all shipments will be determined through the use of scales properly certified by a state inspector of weights and measures in accordance with (IAW) the regulations of the state or district having legal jurisdiction over the scales. Personnel designated to operate the scales will be licensed or otherwise qualified as weigh masters if required by the state, commonwealth, or district. When a metric scale is utilized, the contractor will use 1 kilogram per 2.2 pounds for conversion.
b. The contractor will submit weight tickets, reflecting gross, tare, and net weight, in duplicate, properly certified IAW federal, state, and commonwealth or district regulations to the ordering officer with documentation (Contract Data Requirements List [CDRL] 0002).
c. When scales are not available or their use is not practical, the application of a constructive weight of 7 pounds per cubic foot will be used provided prior written approval is obtained from the ordering officer. (See Paragraph A.2.d for constructive weight of professional books, papers, and equipment [PBP&E], also known as PRO or PRO-Gear).
IV-G-2
d. When PBP&E are included as part of the shipment, the weight of each item individually described on the inventory will be entered on the same line of the inventory next to the description. The total weight of such articles will be annotated separately on the inventory and packing list. The PBP&E weight may be obtained using bathroom or platform type scales. If it is not possible or practical for the contractor to weigh the items at the time of packing and pickup, and there is no cube indicated on the inventory, a constructive weight of 7 pounds per cubic foot will be used for PBP&E.
e. The weight tickets will contain the name and address of the weighing station, date, name of contractor, van or trailer number, name of customer, call number assigned by the ordering officer, and signature of the weigh master.
f. For inbound personal property, the contractor will bill on the origin net weights obtained from the Personal Property Government Bill of Lading/Bill of Lading (PPGBL/BL) or other movement document and need not submit a weight certificate, unless a reweigh is ordered.
When a reweigh is ordered, the contractor will bill on the reweigh weight.
g. If the PPGBL/BL, movement document, or container does not reflect the net weight for inbound shipments or if the PPGBL/BL is unavailable at the destination, the contractor will bill on the origin gross weights obtained from the PPGBL/BL, or other available sources, such as containers or supporting documentation. The contractor is required to use all means available (containers, supporting documentation) to obtain a net weight prior to submitting the bill. If the bill is submitted on the origin gross weight, the contractor is paid for the gross weight based on the net weight bid price.
h. The contractor will perform reweigh services when ordered. The reweigh will normally be requested at the time the delivery order is placed and will be performed IAW instructions set forth in Paragraph A.2.a. When so advised by the ordering officer, a designated representative of the ordering officer or the customer will be permitted to accompany, in a separate conveyance, the contractor to witness the reweigh. This would be at no extra charge and the contractor would not provide the separate conveyance.
i. When a reweigh is ordered, the contractor will furnish the ordering officer weight tickets in duplicate within 7 workdays of completion of the service.
j. When the weighing of a shipment at origin is witnessed by the Personal Property Shipping Office (PPSO), the back of all copies of the weight ticket will be annotated with the statement “weight observed” and verified by the signature of the PPSO. The number 7 copy of the PPGBL/BL (property received copy) will be similarly annotated prior to mailing to the destination PPSO. When computer-generated PPGBL/BLs are used, the copy going to the destination PPSO will be annotated.
k. Billing Procedures. For Continental United States (CONUS) activities, to include Hawaii and Alaska, shipments are payable on the basis of 100-pound minimum weight for unaccompanied baggage (UB) and a 500-pound minimum weight for household goods (HHG), net or gross weight, as indicated in the bid item. For overseas activities, excluding Hawaii and Alaska, shipments are payable on the actual net weight shipped.
l. Actual pieces, weight, and cube of UB shipments will be provided to the Transportation Office (TO)/PPSO prior to the issuance of the PPGBL/BL.
3. Time Requirements.
a. This contract begins January 1, ____, and ends December 31, ____, both dates inclusive.
Any work ordered before, and not completed by the expiration date shall be governed by the terms of this contract. The Government will not place new orders under this contract that
IV-G-3
require that performance commence more than 15 days after the expiration date. The Government may place orders required for the completion of services (for shipments in the contractor's possession) for 180 days past the expiration date. The ordering officer will normally give the contractor notice to commence services ordered herein at least 1 full workday prior to the date specified. Oral orders will be confirmed in writing within 2 workdays following order acceptance by the contractor. The contractor will be available to receive orders between the hours 0800 and 1700. Upon request, the contractor will provide information as to whether the service will be performed between the hours of 0800 to 1200 hours or between the hours of 1200 to 1700 hours, based upon the best information available.
b. The contractor will not begin pickup or delivery services at a customer’s residence before 0800 hours or after 1700 hours without prior approval of the ordering officer and the customer. The contractor will not begin any service that will not allow completion by 2100 hours without approval by the ordering officer and the customer by 1630 hours of the scheduled date. When services cannot be completed on the scheduled date, the contractor will notify the ordering officer and the customer. In case of an approved suspension of operations, the contractor will assure his/her return the next workday at 0800 hours to complete the services.
c. If containerization is ordered at the contractor’s facility, the HHG or UB will be picked up on the date and within the hours specified. Unless a longer period is authorized by the ordering office, the maximum containerization time allowed at the contractor’s facility will be 3 workdays following the specified pickup date for HHG and 2 workdays following the specified pickup date for UB.
d. The contractor will accept from commercial carriers and pickup from commercial, air, water, and military terminals inbound shipments of HHG or UB. The contractor will notify the ordering officer upon arrival of a shipment but not later than 1200 hours of the next workday.
Delivery will be affected within 3 workdays following the date of the contractor’s arrival notification unless otherwise specified. For shipments in storage, the contractor will affect delivery to the residence within 3 workdays following notification for delivery by the ordering officer (e.g., if the ordering officer calls on Monday, the personal property will be delivered on or before Thursday). The contractor will not deviate from the specified delivery date unless approved by the ordering officer.
4. Preparation, Packing, Loading, and Containerization.
a. Personal property will be prepared, packed, loaded, and containerized for all types of shipments destined for the CONUS or Outside CONUS (OCONUS). It is the contractor’s responsibility to coordinate with the ordering officer container size and configuration for each mode of shipment prior to packing containers.
b. The contractor will perform all preparation and packing in a manner requiring the least cubic measurement, producing packages that withstand normal movement without damage to the container or contents and at a minimum of weight. All shipments will be protected from the elements (rain, snow, or sun) and theft at all times.
(1) Items of unusual nature may require disassembly service by a third party. The contractor will not arrange for third-party servicing without the authorization of the ordering officer. The charges for third-party service will be billed by the contractor as a separate charge on the invoice and supported with two copies of the third-party company’s invoice. Examples of such items are shranks, wall units, grandfather clocks, and grand pianos.
IV-G-4
(2) The contractor will not be required to disassemble swing sets, outdoor recreation equipment, television and radio antennas, and similar articles. The customer will disassemble these items. Items disassembled by the customer will be shown in the remarks section of the inventory as Disassembled by the Owner (DBO).
(3) Customer-Packed Items. The contractor will inspect and repack items already packed by the customer, with the exception of Attachment G3, Schedule I, Item 0006, Outbound Service-Unaccompanied Baggage Packed by Customer, and Item 0007, Outbound Service-Unaccompanied Baggage Packed By Customer-Consolidated Shipments/Government Facility. The carrier assumes liability for whatever they pack.
The carrier has the right to inspect all items and will use the appropriate carton(s) to pack all items (e.g., clothes in wardrobe boxes), thereby affording items the proper protection. PPSOs will ensure items are shipped in sealed cartons for stacking in trucks/crates and to avoid pilferage. Therefore, one of two things must occur:
(a) The carrier packs all the contents in cartons and then stacks empty plastic totes or tubs separately for onward movement, or
(b) The customer provides an already-packed tote/tub and the carrier then inspects it and decides to do one of the following:
1 Empty the tote/tub and place its contents in a carton, or
2 Ship the tote/tub as is with contents (it will be the carrier’s responsibility to place the tote/tub in a proper carton or container for safe movement; tape may not be placed directly on the tote/tub).
The above decision is at the carrier’s discretion. Members/employees cannot insist that the contents must remain in the tote/tub, since the carrier assumes liability for the tote/tub and the contents.
(4) Trunks and Footlockers. Trunks and footlockers may contain a properly packed quantity of HHG that is reasonable for the construction and condition of the container.
c. When the ordering officer authorizes tailgating, the load will not extend beyond the surface of the tailgate or beyond the surface of the vehicle. The tailgated items will be protected from inclement weather by a suitable covering.
d. Containerization. Containerization of outbound HHG and UB will be done at the member’s/employee’s residence, unless otherwise authorized by the ordering officer. The contractor will perform all exterior containerization services as prescribed in Paragraph A.7 for the type of articles, destination, and method of shipment designated by the ordering officer.
(1) Firearms. When firearms are included in containerized shipments, they will be placed in the number one container in such a manner to permit easy withdrawal for inspection.
Make, model, caliber or gauge, and serial number of the firearm will be listed on the inventory form (see Paragraph A.5.c).
(2) Boats. Boats may include, but are not limited to, the following: canoes, skiffs, light rowboats, kayaks, and sailboats. The contractor will be required to accept a boat and/or boat trailer less than 14 feet in length or over 14 feet in length (member only) but less than 500 pounds in weight from a customer. Employees are limited to domestic shipment of boats and their associated trailer that can be transported in a moving van (e.g., canoe, kayak, rowboat, or outboard/inboard motorboat [14 feet or less]).
Components and boat accessories that will not fit into an American Society for Testing and Materials (ASTM) D4169-14, Standard Practice for Performance Testing of
IV-G-5
Shipping Containers and Systems or Military Surface Deployment and Distribution Command (SDDC) Pamphlet 55-12, Transportation and Travel Commercial Containers for Department of Defense Household Goods Shipments, container will be containerized IAW ASTM D6251/D6251M-011, Standard Specification for Wood-Cleated Panelboard Shipping Boxes. The customer will be responsible for any special crating or materials needed to move the boat by DPM.
e. Security Seals. All exterior HHG/UB containers and boxes, including overflow and oversize boxes and rug tubes/cartons, will be sealed with accountable seals at the member’s/employee’s residence, unless otherwise authorized by the ordering officer. Sealing will be completed prior to any movement and the seal (control) numbers entered on the inventory, cross-referencing the container number. Two seals, as a minimum, for UB, will be used per box and seals will secure the access overlap top and ends. If only two seals out of a set of four are used, the seals not used will be destroyed at the time of sealing or given to the customer. Four seals, as a minimum, on HHG, will be used per box and seals will secure the access overlap door and side panels.
f. Removal of Debris. Packing and loading at the origin will include, as a minimum, removing from the member’s/employee’s residence all empty contractor-provided containers, packing materials, and other debris accumulated incident to packing and loading unless specifically waived by the customer in writing.
5. Tagging, Inventorying, and Packing List. The contractor, in coordination with the customer, will prepare an accurate, legible, HHG/UB descriptive inventory similar to Figure G1-1, Household Goods Descriptive Inventory. The contractor will count and examine all goods tendered for shipments, receipt for them, and make written exception for any goods not in apparent good order. All tagging will be accomplished prior to the removal of goods from the residence.
a. Inventory Identification. Each carton will be marked to indicate the general contents and member’s/employee’s last name. Each carton will be tagged and inventoried as a separate inventory line item. Identify the cartons by type and cube with an indication of general contents, such as, linens, pots and pans, mirror carton, 3.5 cubic feet.
b. Inventory Symbols. The “Exception Symbols” and “Location Symbols,” as shown in Figure G1-1, will be used to describe locations and exceptions. Locations and exceptions will be true and accurate. The omission of exception symbols will indicate good condition except for normal wear. Describe in as much detail as possible items of furniture; for example, television sets will be identified as being either “color” (C) or “black and white” (B&W) and console or portable. The contractor will annotate on the inventory item(s), such as TVs, stereo components, computer hardware, VCRs, and video cameras, by make, model, and serial number when these are visible on the outside of the item.
c. Each privately owned firearm will be annotated on the inventory by make, model, caliber or gauge, and serial number.
d. For PBP&E, ensure the term “PRO-GEAR (PRO)” is used to identify such articles on the inventory, together with the cube and weight of the individual carton; a line entry item for each container, such as, carton PRO 3 cubic ft., 53 lbs. These items identified by the customer will be separated from other items of the shipment, weighed separately, and placed in separate boxes or cartons to provide safe transportation. The symbol PRO will be used.
The total weight of the packed professional items will be recorded on the last page of the inventory and on the packing list for outbound HHG and UB shipments.
e. Items disassembled by the contractor will be shown in the remarks section of the inventory as Contractor Disassembled (CD). Items disassembled by the customer will be shown in the
IV-G-6
remarks section of the inventory as DBO. When an article is packed in an original container furnished by the customer, the inventory will indicate the type of article and will be shown as Contractor Packed (CP).
f. Motorcycles, mopeds, and motor scooters will be inventoried as one line item, listing their serial number, make, year, model, and odometer reading. For international shipments, ensure one copy of the title and/or registration is attached to all copies of the PPGBL/BL/Commercial Bill of Lading/Transportation Control and Movement Document
(TCMD).
NOTE: Motorcycles and mopeds that do not conform to vehicle emissions standards and motor vehicle safety standards of the destination country cannot be shipped as part of a HHG shipment.
g. When the ordering officer permits the contractor to partially containerize a shipment at the warehouse, each item removed from the residence will be annotated on the inventory as Containerized Warehouse (CW).
h. Inventory Form. The inventory form will bear the signature of the customer, and date signed, together with the signature of the contractor’s representative and date signed certifying to its accuracy and completeness.
i. The contractor will prepare the inventory in five copies for outbound HHG and UB shipments and in three copies for local drayage moves. The original and all copies will be legible and will bear the name and complete mailing address of the contractor. The original inventory will be furnished to the ordering officer, the contractor will retain one copy, and one copy will be given to the customer (CDRL 0003, Household Goods Descriptive Inventory). For HHG and UB, the contractor will place in a waterproof envelope secured to the No. 1 container: one copy of the inventory; one copy of the DD Form 1299, Application for the Shipment and/or Storage of Personal Property, Figure G-2, and if an overseas shipment, one copy of the member’s/employee’s orders and custom’s document. Additionally, for HHG, the contractor will place an envelope containing the following documents in an easily accessible location inside the No. 1 container: one copy of the packing list and Exception Sheet for shipments released from non-temporary storage (NTS). For UB shipments, the contractor will place one copy of the member’s/employee’s orders inside the carton prior to sealing. The customer will be required to furnish all the necessary copies of his or her orders.
j. Annotate the receiving document or inventory to show any overage, shortage, and damage found, including visible damage to external shipping containers and condition of security seals each time custody of the property changes from a storage contractor (warehouseman) to the contractor or from one contractor or carrier to another. When available, use the same inventory prepared at origin to verify delivery and condition of the articles at destination.
k. Packing Lists. The packing list identified in Figure G1-2, Packing List of Household Goods, or a similar format, will be used. The contracting officer will advise the contractor as to the required packing list prior to the start date of the contract. The contractor will prepare a packing list at the time the goods are packed, noting the number of each piece, the weight, and the cubic measurement.
l. Removal from NTS. When the personal property is to be removed from NTS, the contractor will obtain from the storage contractor two legible copies of the NTS inventory and in conjunction with the storage contractor, check each item of the storage lot IAW such inventory. If at the time each item is checked there is a difference in condition of the item from that listed on the NTS inventory, the contractor will prepare an Exception Sheet and such differing conditions will be noted thereon. When the contractor elects to make a new
IV-G-7
inventory, differences as to condition of individual items, as compared with the NTS inventory, will be shown on an Exception Sheet as described above. In the event the opinions of the contractor’s representative and storage contractor’s representative differ as to shortages and overages or condition of an item(s), both opinions will be listed on the Exception Sheet and separately identified as to the source. Both parties will sign and date the Exception Sheet, each retaining a legible copy for their respective files (CDRL 0004, Exception Sheet).
Such an Exception Sheet will remain an internal industry document. In the event a claim is filed, the contractor will provide legible copies of the Exception Sheet to the claims officer.
(1) Preparation of Inventories. Inventories prepared on shipments released from NTS will indicate the same article identification and item number as on the NTS inventory or a cross-reference will be made on the new inventory indicating the item number and identification from the NTS inventory. The use of legible photo reproductions of the storage contractor’s inventory in lieu of preparing a new inventory is permissible.
(2) Identify personal property by affixing a tag or tape to each article (not applicable to individual items in packing containers). Each shipment will be separately identified by lot number. Each article will be assigned a number that will correspond with the item number shown on the inventory form. The type of identification used and the method of affixing it to the article will be such as not to damage any article so identified.
(3) Identify items disassembled or serviced by the contractor or by a third party at origin and record such items in the remarks section of the inventory.
6. Appliance Servicing and Unservicing. The contractor will service and unservice appliances IAW manufacturer’s specifications. If third-party servicing or unservicing is required and approved by the ordering officer, the contractor will bill the services as prescribed in Paragraph A.4.b.(1).
7. Containers and Vehicles
a. Government-owned containers (GOCs). GOCs are containers constructed IAW Commercial Standard ASTM-D4169-14. GOCs also include those containers listed in SDDC Pamphlet 55-12, those meeting ASTM-D6251, and wooden overflow and oversize containers purchased by the government or received by the contractor awarded the Schedule II, Inbound Services contract. GOCs will be used to the extent as they are available for Schedule I, Items 0001 through 0005, before using contractor-furnished containers.
(1) All GOCs and contractor-furnished containers will be free of defects (holes, loose or broken framing, missing skids, caulking repairs, or separated plywood). Unacceptable containers are those that have been extended to accommodate oversize or overflow items, any panel bowed or bulging beyond their normal conformity, those with deteriorated plywood (either rotted or delaminated), those caulked on outside seams or joints, and those patched without the use of caulking compound. Patches on the outside surfaces are not acceptable because they increase the overall dimension and are subject to being scraped off during handling. The floor will be solid and all skids installed and in sound condition.
(2) All GOCs and contractor-furnished containers must conform to United States (U.S.)
Department of Agriculture requirements for Wood Packaging Materials (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM must be constructed from Heat Treated (HT) lumber (HT to 56 degrees centigrade for 30 minutes) and certified by an accredited agency recognized by the American Lumber
IV-G-8
Standards Committee (ALSC), Incorporated, or an equivalent organization recognized by the host nation’s government for WPM procured outside the United States IAW WPM policy and WPM enforcement regulations (http://www.alsc.org). Wood fumigated with methyl bromide is not authorized for use in the shipment of HHGs as damage may occur to the HHGs. All materials must include certification markings IAW ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings will be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load will also comply with International Standards for Phytosanitary Measures Publication No. 15, International Standards for Phytosanitary Measures (ISPM): Guidelines for Regulating Wood Packaging Material (WPM) in International Trade and be marked with an ALSC approved dunnage stamp.
Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. Additional information on WPM requirements can be found at http://www.aphis.usda.gov.
b. Containers for articles such as large pieces of marble or glass table tops that require more protection than the standard packing techniques will be constructed IAW ASTM D6039/D6039M-11, Standard Specification for Crates, Wood, Open and Covered. These containers will be used for interior packing purposes.
c. Skids. Any container that will be handled with a forklift will be constructed with two or more skids. All wooden containers entering the Defense Transportation System (DTS) with a gross weight of 100 pounds or more or with length and width dimensions of 48 inches by 24 inches or more will be equipped with two skids of not less than a minimum of 3 inches high and 3-1/2 inches wide. Skid sizes will be IAW ASTM-D6251.
d. Banding. Containers of plywood construction will be banded IAW Commercial Standard ASTM D3953-13, Standard Specification for Strapping, Flat Steel and Seals, or of equal quality with nonmetal banding.
e. Coopering of GOCs will be performed when authorized by the ordering officer. Patches will not increase the overall container dimensions. All repairs will be done prior to delivery to residence.
f. Vehicles. The contractor will ensure that all vehicles used in the movement of personal property will be of a safe and sound condition so as not to permit damage to personal property.
8. Marking Exterior Shipping Containers. The contractor will mark all GOCs by stenciling with letters at least 1 inch high. Freehand marking will not be used. Felt-tip markers will not be used.
All old shipment markings will be obliterated prior to delivery to residence. Each container will be stenciled with all required elements prior to departure from the warehouse.
a. Permanent markings on containers will be legible and conform to Commercial Standard ASTM-D4169-14 and SDDC Pamphlet 55-12. The following permanent markings will be stenciled in black letters 1-1/2 inches high, Figures G1-3, Location of Permanent Markings on ASTM-D4169-14 Wood HHG Box, and G1-4, Location of Permanent Markings on MIL- STD-1489 HHG Box:
IV-G-9
On one side and one end:
USE NO HOOKS
STORE UNDER COVER
US PROPERTY
SDDC APPROVED
In the appropriate places:
CENTER OF BALANCE
LIFT HERE
FORKLIFT HERE
b. On Commercial Standard ASTM-D4169-14 and SDDC Pamphlet 55-12 containers, the following additional permanent markings will be stenciled on one side and one end toward the top of the container in black letters 2 inches high. The contractor will stencil the word “UP” with an arrow pointing to the top of the container. Then under “UP” on an orange background not to exceed 8 x 10 inches in black letters approximately 2 inches high, the contractor will stencil “DPM.” The word “EXPEDITE” will be symmetrically spaced below in 1-1/2-inch high black letters. (See Figures G1-3 and G1-4.)
c. Shipments identified as “BLUEBARK” will be stenciled in 1-inch letters with the code word BLUEBARK above the PPGBL/BL number.
d. As a minimum, the property member’s/employee’s last name will be legibly hand written or stenciled on all containers for identification purposes prior to departure from the origin residence or other pickup point.
e. Permanent markings on DPM HHG, Figure G1-5, Container Marking for Household Goods, and UB, Figure G1-7, Markings of Unaccompanied Baggage containers will be legible and conform to Commercial Standard ASTM-D4169-14 and SDDC Pamphlet 55-12. DPM HHG and UB containers will have a completed Military Shipping Label (MSL) affixed on one side and one end panel for all shipments entering the DTS, except for passenger bags and similar packages, which will have an MSL affixed to one surface. The MSL, Figure G1-6, Military Shipping Label for Personal Property, requires human-readable information as well as linear and two-dimensional bar codes. The human-readable and linear bar-coded portions of the MSL are prepared as described below and the two-dimensional bar code is prepared IAW Appendix R. If the shipping container does not lend itself to the application of the label, or if the label would cover or interfere with other required markings, the label will be attached to a general purpose tag or a placard. The general purpose tag or placard will be tied, wired, or otherwise fastened to the shipment unit or movement conveyance.
f. The following listed human readable data and Code 39 linear bar codes will be placed on each MSL. Some entries are keyed to numbered blocks on the MSL, and some are in addition to that form’s…