W9124M-19-R-PW91_Combined_Synopsis_Solicitation.pdf

PDF 5 MB Posted

Attached to
Packing and Crating Ft Stewart GA
Solicitation number
W9124M-19-R-PW91
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9124M-19-R-PW91 Request for Proposal (RFP).

2019-02 (5/6/2019).

488991set-aside for Small Business (Total)

27.5 Million (USD).

Services 01-Sep-19 31-Aug-24

W9124M-19-R-PW91

Services FOB DestinationGovernment

✔ ✔ ✔evaluation factors

Approximately equal to cost or price

20-Aug-19 05:00 pmMAJ Paul Wolfe 912-767-9033

Additional Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement(DFARS) Clauses incorporated into this acquisition, including those mandated by the Defense Transportation Regulation (DTR), are identified in and included as exhibits following this document.

This acquisition uses standardized contract formatting and language prescribed by the Defense Transportation Regulation pursuant to DFARS 247.271-3. As such: Chapter 404, DIRECT PROCUREMENT METHOD (DPM), of Part IV of the DTR; The Performance Work Statement (DTR Appendix G3); and subsequent Attachments (G1 through G7); are included as exhibits following this document.

MAJ Paul Wolfe 20-Aug-19 05:00 pmpaul.l.wolfe14.mil an overall period of performance

488991 V003 V - Transportation, Travel and Relocation

W9124M-19-R-PW91 20-Aug-19 05:00 pm

Fort Stewart and Hunter Army Airfield require packing and crating services for the movement of household goods. This requirement will be awarded under three schedules: Schedule I (Out-Bound); Schedule II (In-Bound);

and Schedule III (In-Town/Local Area). Each schedule will be awarded as a base year with four option years of performance. If applicable, multiple schedules that are awarded to the same successful offer will be issued on one contract.

**** Offerors shall use the CLIN schedule found in the Defense Transportation Regulation – Part IV, APPENDIX G, ATTACHMENT G3 (provided), pages IV-G3-5 through IV-G3-18, to submit the cost/pricing portion of their proposal. For the purposes of this solicitation, "Item" in the above referenced attachment is considered "CLIN";

therefore "Item 0001, AA" would be CLIN 0017AA, "Item 0001, AB" would be CLIN 0001AB, and so on. ****

Offers interested in competing for a limited number of schedules should so indicate, in order to prevent their proposal from being evaluated as incomplete and therefore unresponsive.

Services

CLIN OPT Item QTY U/I Delivery / PoP Location

15W9124M-19-R-PW91

52.203-3 Gratuities APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-12 Limitation On Payments To Influence Certain Federal Transactions OCT 2010 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUL 2013 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment AUG 2013 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-14 Limitations On Subcontracting NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-17 Nondisplacement of Qualified Workers MAY 2014 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-35 Equal Opportunity for Veterans SEP 2010 52.222-36 Affirmative Action For Workers With Disabilities OCT 2010 52.222-37 Employment Reports on Veterans SEP 2010 52.222-40 Notification of Employee Rights Under the National Labor Relations Act DEC 2010 52.222-41 Service Contract Act Of 1965 MAY 2014 52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor Standards - Price Adjustment (Multiple Year And Option Contracts) MAY 2014 52.222-50 Combating Trafficking in Persons FEB 2009 52.222-54 Employment Eligibility Verification AUG 2013 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving AUG 2011 52.225-1 Buy American Act--Supplies MAY 2014 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-18 Availability Of Funds APR 1984 [...] continued within Exhibit A.

paul.l.wolfe14.mil

MAJ Paul Wolfe

MAJ Paul Wolfe SFC Joshua Fejeran joshua.l.fejeran.mil

20-Aug-19 05:00 pm

15W9124M-19-R-PW91 5

15W9124M-19-R-PW91 6

Request for Proposal (RFP). W9124M-19-R-PW91

15W9124M-19-R-PW91 7

15W9124M-19-R-PW91 8

15W9124M-19-R-PW91 9

15W9124M-19-R-PW91 10

15W9124M-19-R-PW91 11

15W9124M-19-R-PW91 12

15W9124M-19-R-PW91 13

15W9124M-19-R-PW91 14

1998-0205 (Rev 27)

15W9124M-19-R-PW91 15

The ordering period for this contract is as follows:

01-Sep-2019 31-Aug-2020 1-Sep-2020 31-Aug-2021

01-Sep-2021 31-Aug-2022 01-Sep-2022 31-Aug-2023 01-Sep-2023 31-Aug-2024

52.232-33 Payment by Electronic Funds Transfer--System for Award Management JUL 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And Vegetation APR 1984 52.237-3 Continuity Of Services JAN 1991 52.242-13 Bankruptcy JUL 1995 52.246-4, Inspection of Services-Fixed-Price 52.246-14 Inspection of Transportation APR 1984 52.247-5 Familiarization With Conditions APR 1984 52.247-8 Estimated Weights or Quantities Not Guaranteed APR 1984 52.247-11 Net Weight - Household Goods or Office Furniture APR 1984 52.247-12 Supervision, Labor, or Materials APR 1984 52.247-13 Accessorial Services - Moving Contracts APR 1984 52.247-14 Contractor Responsibility for Receipt of Shipment APR 1984 52.247-15 Contractor Responsibility for Loading and Unloading APR 1984 52.247-16 Contractor Responsibility for Returning Undelivered Freight APR 1984 52.247-17 Charges APR 1984 52.247-21 Contractor Liability for Personal Injury and/or Property Damage APR 1984 52.247-23 Contractor Liability for Loss of and/or Damage to Household Goods JAN 1991 52.247-27 Contract Not Affected by Oral Agreement APR 1984 52.247-28 Contractor's Invoices APR 1984 52.247-68 Report of Shipment (REPSHIP) FEB 2006 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD Officials SEP 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7000 Disclosure Of Information AUG 2013 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7001 Disclosure of Ownership or Control by the Government of a Terrorist Country JAN 2009 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country

MAR 2014

252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage And Disposal Of Toxic And Hazardous Materials APR 2012 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports JUN 2012 252.232-7010 Levies on Contract Payments DEC 2006 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.247-7003 Pass-Through of Motor Carrier Fuel Surcharge Adjustment To The Cost Bearer JUN 2013 252.247-7010 Scope of Contract DEC 1991

W9124M-19-R-PW91 A 1 5

252.247-7012 Ordering Limitation DEC 1991 252.247-7014 Demurrage DEC 1991 252.247-7016 Contractor Liability for Loss or Damage DEC 1991 252.247-7017 Erroneous Shipments DEC 1991 252.247-7018 Subcontracting DEC 1991 252.247-7019 Drayage DEC 1991 252.247-7020 Additional Services AUG 2000 252.247-7023 Transportation of Supplies by Sea APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.216-18 – Ordering (Oct 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 01 September 2019 through 31 August 2024. Ordering Officers will be designated upon contract award.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail.

Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

(End of Clause)

52.216-19 -- Order Limitations. (Oct 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than one (1) pound, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor --

(1) Any order for a single item in excess of the contractor's guaranteed capability;

(2) Any order for a combination of items in excess of the contractor's guaranteed capability; or

(3) A series of orders from the same ordering office within one (1) day that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within one

(1) day after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of Clause)

W9124M-19-R-PW91 A 2 5

52.217-8 -- Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor at any time before the contract expiration date. This option will be evaluated at the time of award.

(End of Clause)

52.217-9 -- Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 15 days prior to contract expiration; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 66 months.

(End of Clause)

52.223-11 -- Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016)

(a) Definitions. As used in this clause-- “Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon Dioxide’s global warming potential is defined as 1.0.

“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables of alternatives available at (http://www.epa.gov/snap/ ).

“Hydrofluorocarbons” means compounds that only contain hydrogen, fluorine, and carbon.

“Ozone-depleting substance” means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as--

(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or

(2) Class II , including, but not limited to hydrochlorofluorocarbons.

(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), (d), and (e) and 40 CFR Part 82, Subpart E, as follows:

"WARNING: Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere."

* The Contractor shall insert the name of the substance(s).

(c) Reporting. For equipment and appliances that normally each contain 50 or more pounds of hydrofluorocarbons or [...] cont.

W9124M-19-R-PW91 A 3 5

[...] refrigerant blends containing hydrofluorocarbons, the Contractor shall—

(1) Track on an annual basis, between October 1 and September 30, the amount in pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons contained in the equipment and appliances delivered to the Government under this contract by—

(i) Type of hydrofluorocarbon (e.g., HFC-134a, HFC-125, R-410A, R-404A, etc.);

(ii) Contract number; and

(iii) Equipment/appliance;

(2) Report that information to the Contracting Officer for FY16 and to www.sam.gov, for FY17 and after00

(i) Annually by November 30 of each year during contract performance; and

(ii) At the end of contract performance.

(d) The Contractor shall refer to EPA’s SNAP program (available at http://www.epa.gov/snap ) to identify alternatives.

The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at http://www.epa.gov/snap .

(End of Clause)

52.228-9 -- Cargo Insurance (May 1999)

(a) The Contractor, at the Contractor’s expense, shall provide and maintain, during the continuance of this contract, cargo insurance of $150,000.00 per vehicle to cover the value of property on each vehicle and of $150,000.00 to cover the total value of the property in the shipment.

(b) All insurance shall be written on companies acceptable to Mission Installation Contracting Command Fort Stewart (MICC-FS), and policies shall include such terms and conditions as required by MICC-FS. The Contractor shall provide evidence of acceptable cargo insurance to MICC-FS before commencing operations under this contract.

(c) Each cargo insurance policy shall include the following statement: “It is a condition of this policy that the Company shall furnish --

(1) Written notice to Mission Installation Contracting Command Fort Stewart, 976 William H. Wilson Ave., Ste. 100, Fort Stewart, GA 31314, 30 days in advance of the effective date of any reduction in, or cancellation of, this policy; and

(2) Evidence of any renewal policy to the address specified in paragraph (1) of this statement, not less than 15 days prior to the expiration of any current policy on file with Mission Installation Contracting Command Fort Stewart, 976 William H. Wilson Ave., Ste. 100, Fort Stewart, GA 31314.

(End of Clause)

52.247-2 -- Permits, Authorities, or Franchises (Jan 1997)

(a) The offeror does ( ), does not ( ), hold authorization from the Federal Highway Administration (FHWA) or other cognizant regulatory body. If authorization is held, it is as follows:

(Name of regulatory body) (Authorization No.)

[...]cont.

W9124M-19-R-PW91 A 4 5

[...] (b) The offeror shall furnish to the Government, if requested, copies of the authorization before moving the material under any contract awarded. In addition, the offeror shall, at the offeror’s expense, obtain and maintain any permits, franchises, licenses, and other authorities issued by State and local governments.

(End of Clause)

52.247-24 -- Advance Notification by the Government (Apr 1984)

The Government will notify the Contractor 24 hours in advance of the number of pieces and weight of all normal shipments and the time the shipment will be available for pickup. On other-than-normal shipments, the Government will furnish additional information; e.g., dimension of oversized pieces, as necessary to determine the amount of equipment and/or manpower needed to perform the required services.

(End of Clause)

252.216-7006 Ordering (MAY 2011)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from 01 September 2019 through 31 August 2024.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c)(1) If issued electronically, the order is considered “issued” when a copy has been posted to the Electronic Document Access system, and notice has been sent to the Contractor.

(c)(2) If mailed or transmitted by facsimile, a delivery order or task order is considered “issued” when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.

(3) Orders may be issued orally only if authorized in the schedule.

(End of Clause)

W9124M-19-R-PW91 A 5 5

Defense Transportation Regulation – Part IV 15 January 2019 Personal Property

IV-404-1

CHAPTER 404

DIRECT PROCUREMENT METHOD (DPM)

A. PURPOSE AND SCOPE

This chapter provides guidance for the preparation and shipment by the DPM method, and provides instructions for the preparation and marking of DPM shipments and procurement of DPM services.

This chapter applies to all DPM household goods and unaccompanied baggage (UB) shipments when transportation services are acquired on the bill of lading (BL) or other shipping document.

B. DPM SERVICES

When the DPM is used, generally the line-haul transportation service is provided by common TSPs of freight. Required materials (including containers) and services for the preparation, storage, and movement of DPM shipments are acquired by the contract. See Paragraph G for contracting procedures.

C. ROUTING BY THE PERSONAL PROPERTY SHIPPING OFFICE (PPSO)

The PPSO determines the mode of transportation and the origin freight Transportation Service Provider (TSP) for the movement of DPM shipments.

D. USE OF DPM AIR MODE FOR INTERNATIONAL HOUSEHOLD GOODS

Prior to moving DPM shipments overseas, a Transportation Officer (TO) must have Service approval in accordance with (IAW) Department of Defense (DoD) component publications.

E. VALUATION OF SHIPMENTS

Generally, the maximum released valuation applicable to the lowest rate or rating published by freight TSPs is used for DPM shipments. Consideration must be given to use another code/mode of service when a customer requests a valuation higher than that offered by the freight TSP.

F. CONTAINERS

Authorized containers, including overflow and oversize containers, must be constructed as specified in the technical provisions of the Performance Work Statement for Packing, Containerization, and Local Drayage of Direct Procurement Method Personal Property Shipments (Appendix G). The policy on the use of overflow and oversize containers is also set forth in this regulation.

IV-404-2

G. PROCEDURES

1. DPM Contracts. Packing and containerization services must be acquired by contract. The contracting format in Appendix G is mandatory. The Performance Work Statement (PWS) or the technical provisions for Packing, Containerization, and Local Drayage of DPM Personal Property Shipments (Appendix G) and the Bid Schedules or items to be ordered must be used for developing requirements in acquiring packing and containerization services. The contractual clauses used in the solicitation, award, and administration of the contract are contained in the Federal Acquisition Regulation (FAR) and the Defense Federal Acquisition Regulation Supplement (DFARS). Annual estimates need to be annotated on the Bid Schedules and a copy of Appendix G provided to the contracting office for their coordination and preparation of the solicitation package.

a. Inspection of shipments must be performed by using DD Form 2773, Report of Contractor Services, Figure 404-1. Unsatisfactory services must be indicated by citing specific paragraph or areas in the PWS and annotating this on DD Form 2772, Contract Discrepancy Report (CDR), Figure 404-2. When completed, the Contract Discrepancy Report must be forwarded to the contracting office for action. The Contracting Officer (CO) or Contracting Officer’s Representative (COR) must take action (set-off deduction, cure letter), against the contractor IAW FAR Clause 52.246-4, Inspection of Services-Fixed-Price.

b. Problems encountered in executing the PWS contract must be resolved by the COR, with the assistance of the CO.

c. The PPSO will base contractual requirements on past experience and estimated future needs.

The PPSO must establish areas of performance for contracting purposes. Both population density and traffic volume must be considered in the establishment of areas of performance.

2. PWS Contract Administration. The TO is responsible for the routing and release of shipments and for arranging delivery to the line-haul TSP. Delivery to the line-haul TSP can be by common TSP pickup at the contractor’s facility or by local drayage by the contractor to the TSP’s terminal.

The TO must ensure the contractor meets all requirements of the PWS, and is also responsible for maintaining accurate DPM contract data in the Transportation Operational Personal Property Standard System (TOPS). If the contractor fails to comply with the terms of the PWS, the PPSO must document deficiencies and follow procedures outlined in Paragraph G.1.a., above.

3. Weight Data for DPM UB Shipments. The TO/PPSO must receive the actual pieces, weight, and cube prior to printing the BL. The contractor must provide the required information to the TO/PPSO within three working days after pickup.

4. Consignment.

a. DPM shipments must be consigned IAW the Personal Property Consignment Instruction Guide (PPCIG).

b. When the Continental United States (CONUS) destination is not known for a shipment from overseas, the shipment must be consigned to the designated storage facilities as contained in the PPCIG in the CONUS. The statement “Hold for Storage in Transit” or “Hold for Non- Temporary Storage” must be stenciled on each container after the consignment data. In such cases, the customer at the time application for shipment is made must provide the origin PPSO with a leave or contact address in the space provided on the DD Form 1299, Application for Shipment and/or Storage of Personal Property, Figure 404-3. The origin PPSO must forward this information to the responsible storage facility identified at designated ports. The origin PPSO must instruct the customer to furnish disposition

IV-404-3

instructions to the designated storage facilities, either directly or through the most convenient PPSO, upon determination of the final destination.

c. Shipments moving by military or commercial air must not be consigned for placement in a “hold” status, except when Air Mobility Command Transportation Priority 4 (TP-4) tariff rates apply or when air is the only available shipping method between the origin overseas area and the CONUS. In those cases, the DPM must be used to make delivery to the nearest designated storage facilities. For shipments arriving at East/West Coast ports, refer to the CONUS PPCIG for the responsible facility.

5. Documentation for DPM Shipments Entering the Defense Transportation System (DTS).

a. If documentation for DPM shipments is unavailable through the DTS, the PPSO must assign a Transportation Control Number (TCN) to each DPM personal property shipment entering the DTS. The TCN must be developed IAW this regulation, Part II, Cargo Movement, and annotated on the BL, freight warrant, or other transportation acquisition document. When a shipment requires more than one transportation acquisition document, the same TCN must be annotated on each document. The PPSO must use the date of pickup from the customer as the Julian date in the construction of the TCN.

b. The BL for UB shipments must be prepared after the TO/PPSO has received and input the actual weight and cube from the contractor into DTS. The TO/PPSO then provides the BL to the contractor to give to the TSP upon pickup of the shipment from the contractor facility or provides the BL directly to the TSP picking up the shipment.

c. The Transportation Control and Movement Document (TCMD) must be prepared for all DPM personal property shipments entering the DTS.

d. After the TCMD is assembled, the shipper must offer the shipment for clearance before making the shipment. A clearance is required for all DPM personal property shipments entering the DTS. The shipper clears a DPM shipment by sending Advance Transportation Control and Movement Document (ATCMD) data to the clearance authority.

e. DPM personal property shipments are considered cleared if the clearance authority has not challenged it by the hours/day entered in the ATCMD shipped field.

f. One copy of the BL or other transportation acquisition document, annotated with the TCN, and a properly completed manual TCMD, together with other required documents, must be placed in a waterproof pouch on the number one container of the shipment. One copy of the inventory and one copy of the packing list must be placed in an envelope inside the number one container, in an easily accessible position. For shipments released from non-temporary storage, the exception sheet must also be included. Specific detail on the preparation and usage of TCMDs, TCNs, data elements, prime documents, and trailer cards are contained in this regulation, Part II, Cargo Movement.

g. For those shipments entering the DTS at DoD-controlled aerial and water ports, a two-dimensional and linear bar-coded Military Shipping Label, prepared IAW Appendix G, Paragraph A.7.f.(5) must be prepared and affixed to each shipment piece.

h. The origin PPSO must mail one copy each of the DD Form 1299, customer’s orders, transportation document, and BL to the destination PPSO, who has final delivery responsibility.

IV-404-4

Figure 404-1. DD Form 2773, Report of Contractor Services

IV-404-5

Figure 404-2. DD Form 2772, Contract Discrepancy Report

IV-404-6

Figure 404-3. DD Form 1299, Application for Shipment and/or Storage of Personal Property

IV-G-1

APPENDIX G

PERFORMANCE WORK STATEMENT FOR PACKING, CONTAINERIZATION AND

LOCAL DRAYAGE OF DIRECT PROCUREMENT METHOD (DPM) PERSONAL

PROPERTY SHIPMENTS

PART I – DESCRIPTION OF SERVICES

A. SCOPE OF WORK

The contractor will furnish all personnel, equipment, facilities, supplies, services, and materials, except as specified herein as government-furnished, for the preparation of the personal property

(including servicing of appliances) of Department of Defense (DoD) personnel for shipment, drayage and/or storage and related services through the DPM. Work to be performed will be those services in the Schedules awarded to the contractor as outlined in individual Contract Line Item Number (CLIN) items (see Attachment G3). Table G-1, Task/Type of Move Matrix, shows which tasks normally apply to each type of move. The contractor shall furnish all materials except Government-owned containers (Federal Specification PPP-B-580), all equipment, plant and labor; and perform all work in accomplishing containerization of personal property for overseas or domestic movement or storage, including stenciling, cooperage, drayage of personal property in connection with other services, decontainerization of inbound shipments of personal property; and the handling of shipments into and out of the Contractor's facility. Specific requirements for each task are described below. If specific instructions or requirements are not provided, commercial standards of services and best business practices are acceptable. Excluded from the scope of this contract is the furnishing of like services or materials which are provided incident to complete movement of personal property when purchased by the Through Government Bill of Lading or other method/mode of shipment or property to be moved under the Do-It-Yourself moving program or otherwise moved by the owner. The contractor shall perform services within the following defined areas of performance, which include terminals identified in the Schedule and/or individual CLIN items. The Government will consider all areas of performance described in the Schedule and/or individual items as including the contractor's facility, regardless of geographical location.

1. Premove Survey. The contractor will determine the nature of personal property offered for shipment either by physical inspection or telephone survey with the customer. The survey will be conducted at a time and date mutually agreed upon between the contractor and the customer.

Any pack/pickup date changes will be coordinated with the ordering officer.

2. Weighing.

a. The gross, tare, and net weight of all shipments will be determined through the use of scales properly certified by a state inspector of weights and measures in accordance with (IAW) the regulations of the state or district having legal jurisdiction over the scales. Personnel designated to operate the scales will be licensed or otherwise qualified as weigh masters if required by the state, commonwealth, or district. When a metric scale is utilized, the contractor will use 1 kilogram per 2.2 pounds for conversion.

b. The contractor will submit weight tickets, reflecting gross, tare, and net weight, in duplicate, properly certified IAW federal, state, and commonwealth or district regulations to the ordering officer with documentation (Contract Data Requirements List [CDRL] 0002).

c. When scales are not available or their use is not practical, the application of a constructive weight of 7 pounds per cubic foot will be used provided prior written approval is obtained from the ordering officer. (See Paragraph A.2.d for constructive weight of professional books, papers, and equipment [PBP&E], also known as PRO or PRO-Gear).

IV-G-2

d. When PBP&E are included as part of the shipment, the weight of each item individually described on the inventory will be entered on the same line of the inventory next to the description. The total weight of such articles will be annotated separately on the inventory and packing list. The PBP&E weight may be obtained using bathroom or platform type scales. If it is not possible or practical for the contractor to weigh the items at the time of packing and pickup, and there is no cube indicated on the inventory, a constructive weight of

7 pounds per cubic foot will be used for PBP&E.

e. The weight tickets will contain the name and address of the weighing station, date, name of contractor, van or trailer number, name of customer, call number assigned by the ordering officer, and signature of the weigh master.

f. For inbound personal property, the contractor will bill on the origin net weights obtained from the Personal Property Government Bill of Lading/Bill of Lading (PPGBL/BL) or other movement document and need not submit a weight certificate, unless a reweigh is ordered.

When a reweigh is ordered, the contractor will bill on the reweigh weight.

g. If the PPGBL/BL, movement document, or container does not reflect the net weight for inbound shipments or if the PPGBL/BL is unavailable at the destination, the contractor will bill on the origin gross weights obtained from the PPGBL/BL, or other available sources, such as containers or supporting documentation. The contractor is required to use all means available (containers, supporting documentation) to obtain a net weight prior to submitting the bill. If the bill is submitted on the origin gross weight, the contractor is paid for the gross weight based on the net weight bid price.

h. The contractor will perform reweigh services when ordered. The reweigh will normally be requested at the time the delivery order is placed and will be performed IAW instructions set forth in Paragraph A.2.a. When so advised by the ordering officer, a designated representative of the ordering officer or the customer will be permitted to accompany, in a separate conveyance, the contractor to witness the reweigh. This would be at no extra charge and the contractor would not provide the separate conveyance.

i. When a reweigh is ordered, the contractor will furnish the ordering officer weight tickets in duplicate within 7 workdays of completion of the service.

j. When the weighing of a shipment at origin is witnessed by the Personal Property Shipping

Office (PPSO), the back of all copies of the weight ticket will be annotated with the statement

“weight observed” and verified by the signature of the PPSO. The number 7 copy of the

PPGBL/BL (property received copy) will be similarly annotated prior to mailing to the destination PPSO. When computer-generated PPGBL/BLs are used, the copy going to the destination PPSO will be annotated.

k. Billing Procedures. For Continental United States (CONUS) activities, to include Hawaii and

Alaska, shipments are payable on the basis of 100-pound minimum weight for unaccompanied baggage (UB) and a 500-pound minimum weight for household goods

(HHG), net or gross weight, as indicated in the bid item. For overseas activities, excluding

Hawaii and Alaska, shipments are payable on the actual net weight shipped.

l. Actual pieces, weight, and cube of UB shipments will be provided to the Transportation

Office (TO)/PPSO prior to the issuance of the PPGBL/BL.

3. Time Requirements.

a. This contract begins January 1, ____, and ends December 31, ____, both dates inclusive.

Any work ordered before, and not completed by the expiration date shall be governed by the terms of this contract. The Government will not place new orders under this contract that

IV-G-3

require that performance commence more than 15 days after the expiration date. The

Government may place orders required for the completion of services (for shipments in the contractor's possession) for 180 days past the expiration date. The ordering officer will normally give the contractor notice to commence services ordered herein at least 1 full workday prior to the date specified. Oral orders will be confirmed in writing within 2 workdays following order acceptance by the contractor. The contractor will be available to receive orders between the hours 0800 and 1700. Upon request, the contractor will provide information as to whether the service will be performed between the hours of 0800 to 1200 hours or between the hours of 1200 to 1700 hours, based upon the best information available.

b. The contractor will not begin pickup or delivery services at a customer’s residence before

0800 hours or after 1700 hours without prior approval of the ordering officer and the customer. The contractor will not begin any service that will not allow completion by 2100 hours without approval by the ordering officer and the customer by 1630 hours of the scheduled date. When services cannot be completed on the scheduled date, the contractor will notify the ordering officer and the customer. In case of an approved suspension of operations, the contractor will assure his/her return the next workday at 0800 hours to complete the services.

c. If containerization is ordered at the contractor’s facility, the HHG or UB will be picked up on the date and within the hours specified. Unless a longer period is authorized by the ordering office, the maximum containerization time allowed at the contractor’s facility will be 3 workdays following the specified pickup date for HHG and 2 workdays following the specified pickup date for UB.

d. The contractor will accept from commercial carriers and pickup from commercial, air, water, and military terminals inbound shipments of HHG or UB. The contractor will notify the ordering officer upon arrival of a shipment but not later than 1200 hours of the next workday.

Delivery will be affected within 3 workdays following the date of the contractor’s arrival notification unless otherwise specified. For shipments in storage, the contractor will affect delivery to the residence within 3 workdays following notification for delivery by the ordering officer (e.g., if the ordering officer calls on Monday, the personal property will be delivered on or before Thursday). The contractor will not deviate from the specified delivery date unless approved by the ordering officer.

4. Preparation, Packing, Loading, and Containerization.

a. Personal property will be prepared, packed, loaded, and containerized for all types of shipments destined for the CONUS or Outside CONUS (OCONUS). It is the contractor’s responsibility to coordinate with the ordering officer container size and configuration for each mode of shipment prior to packing containers.

b. The contractor will perform all preparation and packing in a manner requiring the least cubic measurement, producing packages that withstand normal movement without damage to the container or contents and at a minimum of weight. All shipments will be protected from the elements (rain, snow, or sun) and theft at all times.

(1) Items of unusual nature may require disassembly service by a third party. The contractor will not arrange for third-party servicing without the authorization of the ordering officer. The charges for third-party service will be billed by the contractor as a separate charge on the invoice and supported with two copies of the third-party company’s invoice. Examples of such items are shranks, wall units, grandfather clocks, and grand pianos.

IV-G-4

(2) The contractor will not be required to disassemble swing sets, outdoor recreation equipment, television and radio antennas, and similar articles. The customer will disassemble these items. Items disassembled by the customer will be shown in the remarks section of the inventory as Disassembled by the Owner (DBO).

(3) Customer-Packed Items. The contractor will inspect and repack items already packed by the customer, with the exception of Attachment G3, Schedule I, Item 0006, Outbound

Service-Unaccompanied Baggage Packed by Customer, and Item 0007, Outbound

Service-Unaccompanied Baggage Packed By Customer-Consolidated

Shipments/Government Facility. The carrier assumes liability for whatever they pack.

The carrier has the right to inspect all items and will use the appropriate carton(s) to pack all items (e.g., clothes in wardrobe boxes), thereby affording items the proper protection. PPSOs will ensure items are shipped in sealed cartons for stacking in trucks/crates and to avoid pilferage. Therefore, one of two things must occur:

(a) The carrier packs all the contents in cartons and then stacks empty plastic totes or tubs separately for onward movement, or

(b) The customer provides an already-packed tote/tub and the carrier then inspects it and decides to do one of the following:

1 Empty the tote/tub and place its contents in a carton, or

2 Ship the tote/tub as is with contents (it will be the carrier’s responsibility to place the tote/tub in a proper carton or container for safe movement; tape may not be placed directly on the tote/tub).

The above decision is at the carrier’s discretion. Members/employees cannot insist that the contents must remain in the tote/tub, since the carrier assumes liability for the tote/tub and the contents.

(4) Trunks and Footlockers. Trunks and footlockers may contain a properly packed quantity of HHG that is reasonable for the construction and condition of the container.

c. When the ordering officer authorizes tailgating, the load will not extend beyond the surface of the tailgate or beyond the surface of the vehicle. The tailgated items will be protected from inclement weather by a suitable covering.

d. Containerization. Containerization of outbound HHG and UB will be done at the member’s/employee’s residence, unless otherwise authorized by the ordering officer. The contractor will perform all exterior containerization services as prescribed in Paragraph A.7 for the type of articles, destination, and method of shipment designated by the ordering officer.

(1) Firearms. When firearms are included in containerized shipments, they will be placed in the number one container in such a manner to permit easy withdrawal for inspection.

Make, model, caliber or gauge, and serial number of the firearm will be listed on the inventory form (see Paragraph A.5.c).

(2) Boats. Boats may include, but are not limited to, the following: canoes, skiffs, light rowboats, kayaks, and sailboats. The contractor will be required to accept a boat and/or boat trailer less than 14 feet in length or over 14 feet in length (member only) but less than 500 pounds in weight from a customer. Employees are limited to domestic shipment of boats and their associated trailer that can be transported in a moving van

(e.g., canoe, kayak, rowboat, or outboard/inboard motorboat [14 feet or less]).

Components and boat accessories that will not fit into an American Society for Testing and Materials (ASTM) D4169-14, Standard Practice for Performance Testing of

IV-G-5

Shipping Containers and Systems or Military Surface Deployment and Distribution

Command (SDDC) Pamphlet 55-12, Transportation and Travel Commercial Containers for Department of Defense Household Goods Shipments, container will be containerized

IAW ASTM D6251/D6251M-011, Standard Specification for Wood-Cleated Panelboard

Shipping Boxes. The customer will be responsible for any special crating or materials needed to move the boat by DPM.

e. Security Seals. All exterior HHG/UB containers and boxes, including overflow and oversize boxes and rug tubes/cartons, will be sealed with accountable seals at the member’s/employee’s residence, unless otherwise authorized by the ordering officer. Sealing will be completed prior to any movement and the seal (control) numbers entered on the inventory, cross-referencing the container number. Two seals, as a minimum, for UB, will be used per box and seals will secure the access overlap top and ends. If only two seals out of a set of four are used, the seals not used will be destroyed at the time of sealing or given to the customer. Four seals, as a minimum, on HHG, will be used per box and seals will secure the access overlap door and side panels.

f. Removal of Debris. Packing and loading at the origin will include, as a minimum, removing from the member’s/employee’s residence all empty contractor-provided containers, packing materials, and other debris accumulated incident to packing and loading unless specifically waived by the customer in writing.

5. Tagging, Inventorying, and Packing List. The contractor, in coordination with the customer, will prepare an accurate, legible, HHG/UB descriptive inventory similar to Figure G1-1, Household

Goods Descriptive Inventory. The contractor will count and examine all goods tendered for shipments, receipt for them, and make written exception for any goods not in apparent good order. All tagging will be accomplished prior to the removal of goods from the residence.

a. Inventory Identification. Each carton will be marked to indicate the general contents and member’s/employee’s last name. Each carton will be tagged and inventoried as a separate inventory line item. Identify the cartons by type and cube with an indication of general contents, such as, linens, pots and pans, mirror carton, 3.5 cubic feet.

b. Inventory Symbols. The “Exception Symbols” and “Location Symbols,” as shown in Figure

G1-1, will be used to describe locations and exceptions. Locations and exceptions will be true and accurate. The omission of exception symbols will indicate good condition except for normal wear. Describe in as much detail as possible items of furniture; for example, television sets will be identified as being either “color” (C) or “black and white” (B&W) and console or portable. The contractor will annotate on the inventory item(s), such as TVs, stereo components, computer hardware, VCRs, and video cameras, by make, model, and serial number when these are visible on the outside of the item.

c. Each privately owned firearm will be annotated on the inventory by make, model, caliber or gauge, and serial number.

d. For PBP&E, ensure the term “PRO-GEAR (PRO)” is used to identify such articles on the inventory, together with the cube and weight of the individual carton; a line entry item for each container, such as, carton PRO 3 cubic ft., 53 lbs. These items identified by the customer will be separated from other items of the shipment, weighed separately, and placed in separate boxes or cartons to provide safe transportation. The symbol PRO will be used.

The total weight of the packed professional items will be recorded on the last page of the inventory and on the packing list for outbound HHG and UB shipments.

e. Items disassembled by the contractor will be shown in the remarks section of the inventory as

Contractor Disassembled (CD). Items disassembled by the customer will be shown in the

IV-G-6

remarks section of the inventory as DBO. When an article is packed in an original container furnished by the customer, the inventory will indicate the type of article and will be shown as

Contractor Packed (CP).

f. Motorcycles, mopeds, and motor scooters will be inventoried as one line item, listing their serial number, make, year, model, and odometer reading. For international shipments, ensure one copy of the title and/or registration is attached to all copies of the

PPGBL/BL/Commercial Bill of Lading/Transportation Control and Movement Document

(TCMD).

NOTE: Motorcycles and mopeds that do not conform to vehicle emissions standards and motor vehicle safety standards of the destination country cannot be shipped as part of a HHG shipment.

g. When the ordering officer permits the contractor to partially containerize a shipment at the warehouse, each item removed from the residence will be annotated on the inventory as

Containerized Warehouse (CW).

h. Inventory Form. The inventory form will bear the signature of the customer, and date signed, together with the signature of the contractor’s representative and date signed certifying to its accuracy and completeness.

i. The contractor will prepare the inventory in five copies for outbound HHG and UB shipments and in three copies for local drayage moves. The original and all copies will be legible and will bear the name and complete mailing address of the contractor. The original inventory will be furnished to the ordering officer, the contractor will retain one copy, and one copy will be given to the customer (CDRL 0003, Household Goods Descriptive Inventory). For

HHG and UB, the contractor will place in a waterproof envelope secured to the No. 1 container: one copy of the inventory; one copy of the DD Form 1299, Application for the

Shipment and/or Storage of Personal Property, Figure G-2, and if an overseas shipment, one copy of the member’s/employee’s orders and custom’s document. Additionally, for HHG, the contractor will place an envelope containing the following documents in an easily accessible location inside the No. 1 container: one copy of the packing list and Exception

Sheet for shipments released from non-temporary storage (NTS). For UB shipments, the contractor will place one copy of the member’s/employee’s orders inside the carton prior to sealing. The customer will be required to furnish all the necessary copies of his or her orders.

j. Annotate the receiving document or inventory to show any overage, shortage, and damage found, including visible damage to external shipping containers and condition of security seals each time custody of the property changes from a storage contractor (warehouseman) to the contractor or from one contractor or carrier to another. When available, use the same inventory prepared at origin to verify delivery and condition of the articles at destination.

k. Packing Lists. The packing list identified in Figure G1-2, Packing List of Household Goods, or a similar format, will be used. The contracting officer will advise the contractor as to the required packing list prior to the start date of the contract. The contractor will prepare a packing list at the time the goods are packed, noting the number of each piece, the weight, and the cubic measurement.

l. Removal from NTS. When the personal property is to be removed from NTS, the contractor will obtain from the storage contractor two legible copies of the NTS inventory and in conjunction with the storage contractor, check each item of the storage lot IAW such inventory. If at the time each item is checked there is a difference in condition of the item from that listed on the NTS inventory, the contractor will prepare an Exception Sheet and such differing conditions will be noted thereon. When the contractor elects to make a new

IV-G-7

inventory, differences as to condition of individual items, as compared with the NTS inventory, will be shown on an Exception Sheet as described above. In the event the opinions of the contractor’s representative and storage contractor’s representative differ as to shortages and overages or condition of an item(s), both opinions will be listed on the Exception Sheet and separately identified as to the source. Both parties will sign and date the Exception

Sheet, each retaining a legible copy for their respective files (CDRL 0004, Exception Sheet).

Such an Exception Sheet will remain an internal industry document. In the event a claim is filed, the contractor will provide legible copies of the Exception Sheet to the claims officer.

(1) Preparation of Inventories. Inventories prepared on shipments released from NTS will indicate the same article identification and item number as on the NTS inventory or a cross-reference will be made…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.