W9124J-25-Q-A011 Q and A.pdf

PDF 29 KB Posted

Attached to
Boom Lifts
Solicitation number
W9124J25QA011
Issued by

About this file

This document is a Questions and Answers (Q&A) file for a federal contract opportunity involving boom lifts. The document provides details about equipment usage and performance periods for three Contract Line Items (CLINs): 16 units of 80' boom lifts (CLIN 0001), 2 units of 120' boom lifts (CLIN 0002), and 32 safety harnesses (CLIN 0003). The boom lifts are expected to be used approximately 12 hours per day across two 6-hour shifts, with an anticipated 3-4 equipment moves during the performance period. The Period of Performance is 92 days per piece of equipment, with the reference document encouraging multiple quotes for staggered delivery. The solicitation is set aside 100% for small businesses and will be submitted electronically via the PIEE Solicitation Module, managed by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Sam Houston.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9124J-25-Q-A011 Q&A

Q1. Do you expect to use the boom lifts for more than 8hrs a day? If so, provide an estimated daily usage rate by boom type (80' and 120')

A1. Booms are being used around 12 hours/day for both 80' and 120' lifts. This is broken up across 2x 6-hour shifts with occasional breaks

Q2. How often do you expect boom lifts to be moved between jobsites?

A2. Anticipate around 3-4 potential moves during the period of performance. Project area has hills that we don't expect to safely drive a lift across, we're needing to transport the lifts around hills to continue work. No major movements anticipated but the short-distance moves would require vendor support.

Q3. Is the Period of Performance 8/4/25 to 11/4/25 for all equipment? Or is it:

CLIN 0001: 1,472 Days

CLIN 0002: 184 Days

CLIN 0003: 2,944 Days

A3. The Period of Performance is 92 days per piece of equipment

CLIN 0001: 1,472 Days = 16 (80’ Boom Lifts)

CLIN 0002: 184 Days = 2 (120’ Boom Lifts)

CLIN 0003: 2,944 Days = 32 (32 Safety Harness)

Reference “Instruction to O erors, 52.212-1 Addendum” document provides flexibility and encourages multiple quotes for staggered delivery and periods of performance.