Text version

DPW Fort Rucker, AL J-i July 2017 Cantonment

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J: LIST OF ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT

NUMBER TITLE

J-1 Department of Labor Wage Determination J-C1 Performance Requirements Summary (PRS) Table J-C2 Government-Furnished Facilities, Equipment and Supplies J-C3 Grounds Maintenance Inventory and Estimated Grounds Maintenance

Services J-C4 Historical Temperature and Rainfall Data J-C5 Submittals J-C6 Approved Herbicides J-E1 Statistically Extrapolated Surveillance Techniques

ATTACHMENT J-1

DPW Fort Rucker, AL J-1-1 July 2017

DEPARTMENT OF LABOR WAGE DETERMINATION

Attached is Service Contract Act Wage Determination. This determination specifies the minimum wages and fringe benefits to be paid under this contract.

ATTACHMENT J-C1

PERFORMANCE REQUIREMENTS SUMMARY (PRS) TABLE

DPW Fort Rucker, AL J-C1-1 July 2017

The purpose of this attachment is to:

a. List the contract requirements and work requirements considered most critical to satisfactory contract performance (See PRS Column 2).

b. Summarize the standards of performance in the specification for each specified work requirement (See PRS Column 3).

c. Provide Acceptable Quality Level (AQL): Acceptable Quality Level (AQL) for each work requirement (See PRS Column 4). The AQL is the defect rate in a population of services which, when exceeded, indicates the Contractor's quality control is not effective. The AQL does not represent a threshold for payment deductions. Deductions are taken for all defects (with appropriate credit for rework) regardless of whether the AQL was exceeded.

d. Identify primary surveillance method (See PRS column 5)

d. Specify the percentage (weight) of contract requirement attributable to each listed work requirement (See PRS Column 6).

DPW Fort Rucker, AL J-C1-2 July 2017

REQUIRED

SERVICE

STANDARDS AQL METHOD OF

SURVEILLANCE

TASK

VALUE

PERCENT

A. Timely Completion

Work completed per Contractor's approved schedule and Attachment J-C3 (Paragraph C.1.20.3, C.5.2.1, 5.2.2, C.5.2.3 AND C.5.2.4)

6.5 15% CLIN

B. Debris

Removal Debris collected prior to cutting and clippings/trimmings removed from paved areas, disposed same day as collected (Paragraph C.5.2.4)

6.5 5% CLIN

C. Mowing (1) Cut to uniform height between TWO TO THREE INCHES, clippings BAGGED where identified (Paragraph C.5.2.1)

6.5 60% CLIN

D Edging The Contractor shall edge all sidewalks, driveways, street edges, curbs, and other concrete (except against asphalt edges) located in the improved areas to present a neat appearance. (Paragraph C.5.2.2)

6.5 15% CLIN

E Trimming Area trimmed matches height and appearance of surrounding mowed area (Paragraph C.5.2.3)

6.5 5% CLIN

1. CONTRACT REQUIREMENT: IMPROVED GROUNDS “A”, “B” and "C"

RANDOM SAMPLE

WITH

EXTRAPOLATED

DEDUCTIONS (LOT =

THE NUMBER OF

PARCELS CUT PER

MONTH)

DPW Fort Rucker, AL J-C1-3 July 2017

STANDARDS AQL METHOD OF

SURVEILLANCE

TASK

VALUE

PERCENT

A. Timely Completion

Work completed per Contractor's approved schedule and Attachment J-C3 (Paragraph C.1.20.3, C.5.3.1, C.5.3.2 , C.5.3.3 and C.5.3.4)

6.5 15% CLIN

B. Debris Removal

Debris collected prior to cutting and clippings/trimmings removed from paved areas, disposed same day as collected (Paragraph C.5.3.3)

6.5 5% CLIN

C. Mowing (1) Cut to uniform height between FIVE TO SIX INCHES, clippings distributed uniformly (Paragraph C.5.3.1)

6.5 60% CLIN

D Trimming Area trimmed matches height and appearance of surrounding mowed area (Paragraph C.5.3.2)

6.5 5% CLIN

E Herbicide Application to Rail Road

Herbicide applications of a glyphosate product to track ballast. (Paragraph C.5.3.4)

6.5 15% CLIN

RANDOM SAMPLE

WITH

EXTRAPOLATED

DEDUCTIONS (LOT =

THE NUMBER OF

PARCELS CUT PER

2. CONTRACT REQUIREMENT: SEMI-IMPROVED GROUNDS

DPW Fort Rucker, AL J-C1-4 July 2017

STANDARDS AQL METHOD OF

SURVEILLANCE

TASK

VALUE

PERCENT

A. Timely Completion

Work completed per Contractor's approved schedule and Attachment J-C3 (Paragraph C.1.20.3, C.5.4.1 to C.5.4.5)

6.5 15% CLIN

B. Debris Removal

Debris collected prior to cutting and clippings/trimmings removed from paved areas, disposed same day as collected (Paragraph C.5.4.5)

6.5 5% CLIN

C. Mowing (1) Cut to uniform height between THREE TO FOUR INCHES, clippings distrubuted uniformly (Paragraph C.5.4.1)

6.5 80% CLIN

3. CONTRACT REQUIREMENT: UNIMPROVED GROUNDS

RANDOM SAMPLE

WITH

EXTRAPOLATED

DEDUCTIONS (LOT =

THE NUMBER OF

PARCELS CUT PER

DPW Fort Rucker, AL J-C1-5 July 2017

(1) - Unsatisfactory performance of this work requirement will result in an unsatisfactory rating for the entire delivery order.

STANDARDS AQL METHOD OF

SURVEILLANCE

TASK

VALUE

PERCENT

A. Timely Completion

Work completed per Contractor's approved schedule and Attachment J-C3 (Paragraph C.1.20.3, C.5.2.5)

6.5 15% CLIN

B. Proper Pruning (1)

Shrubs and other plants to maintain their natural growth characteristics to enhance the beauty and health of the plant.

(Paragraph C.5.2.5 )

6.5 85% CLIN

4. CONTRACT REQUIREMENT: PRINNING SHRUBS IN IMPROVED GROUNDS "A" AND "B"

RANDOM SAMPLE

WITH

EXTRAPOLATED

DEDUCTIONS (LOT =

THE NUMBER OF

PARCELS)

REQUIRED

SERVICE

STANDARDS AQL METHOD OF

SURVEILLANCE

TASK

VALUE

PERCENT

A. Timely Completion

Work completed per Contractor's approved schedule and Attachment J-C3 (Paragraph C.1.20.3, C.5.2.5)

6.5 15% CLIN

B. Proper Pruning (1)

Shrubs and other plants to maintain their natural growth characteristics to enhance the beauty and health of the plant.

(Paragraph C.5.2.5 )

6.5 85% CLIN

5. CONTRACT REQUIREMENT: PRUINNING CREPE MYRTLES IN IMPROVED GROUNDS "A"

AND "B"

RANDOM SAMPLE

WITH

EXTRAPOLATED

DEDUCTIONS (LOT =

THE NUMBER OF

PARCELS)

ATTACHMENT J-C2

GOVERNMENT FURNISHED FACILITIES, EQUIPMENT AND SUPPLIES

DPW Fort Rucker, AL J-C2-1 July 2017

GOVERNMENT-FURNISHED FACILITIES

There are no Government-furnished facilities provided under this contract.

GOVERNMENT-FURNISHED EQUIPMENT

There is no Government-furnished equipment provided under this contract.

GOVERNMENT-FURNISHED MATERIAL

There are no Government-furnished materials provided under this contract.

ATTACHMENT J-C3

ESTIMATED GROUNDS MAINTENANCE SERVICES

DPW Fort Rucker, AL J-C3-1 July 2017

The following data and the attached drawings provide information on the location and geographic boundaries of the land areas (parcels) to be maintained under the contract, and a summary of the types and quantities of vegetation that they contain.

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC TOTAL

GRASSED AREAS 1 2 4 4 4 4 4 2 1 26

EDGING 1 2 4 4 4 4 4 2 1 26

PLANTS / SHRUBS 1 1 2

TRIMMING 1 2 4 4 4 4 4 2 1 26

CREPE MYRTLE 1 1

IMPROVED GROUNDS "A" - FREQUENCIES

PRINCIPLE USE GRASSED

AREAS ACRES

(1)

EDGING (LF)

(1)

Cantonment / Improved Grounds "A" 226.2 128,000

IMPROVED GROUNDS "A" - QUANTITIES

1 - ESTIMATED QUANTITIES MAY VARY BY +/- 10% OVER THE LIFE OF THE CONTRACT.

DPW Fort Rucker, AL J-C3-2 July 2017

Acres 22.0

7.3 21.3

0.3 1.0 0.3 4.4 6.7

32.6 9.2

22.6 24.3

4.3 5.1

11.4 10.6 10.1

5.0 5.3 4.3 6.9

4.7

3.4 3.1

226.2

IMPROVED GROUNDS "A"

HQ Parking and Other Areas

Museum, Veterans Park and Surrounding Areas Daleville Gate and Surrounding Area

Parade Field Officer's Club

PX and Surrounding Areas Burger King

Safety Center

Enterprise Gate to Dustoff ST.

Ozark gate to Avenger ST.

DOD School

New Chapel Area Soldier-On Field

Library and Surrounding Area

New Commissary on Division RD.

Farrel RD. from DoD Elementary School to USAARL and Blue Max ST.

Artillery RD. from North Side Of DoD Primary School to 650 FT. South of URELL ST. and from

South Side of DoD Primary School to the intersection of Farell RD.

Hatch RD. to Combat RD.

BLDG 750 and Surrounding Area

Faulkner Gate Newton Gate

Old Par-3 Golf Course

Total Acres

CDC and Chapel Complex and Surrounding Area

Chapel of the Wings

DPW Fort Rucker, AL J-C3-3 July 2017

IMPROVED AREA “A”

DPW Fort Rucker, AL J-C3-4 July 2017

CDC and Chapel Complex Bagging Requirement

14 Acres

DPW Fort Rucker, AL J-C3-5 July 2017

Parade Field

20.3 Acres

DPW Fort Rucker, AL J-C3-6 July 2017

Soldier-On Field and New Chapel

13.8 Acres

DPW Fort Rucker, AL J-C3-7 July 2017

Veteran’s Park and Museum

17.3 Acres

DPW Fort Rucker, AL J-C3-8 July 2017

Parade Field 22 Acres

DPW Fort Rucker, AL J-C3-9 July 2017

Officer’s Club

7.3 Acres

DPW Fort Rucker, AL J-C3-10 July 2017

PX and Surrounding Area

21.3 Acres

DPW Fort Rucker, AL J-C3-11 July 2017

Burger King

0.3 Acres

DPW Fort Rucker, AL J-C3-12 July 2017

Library and Surrounding Area

1.0 Acres

DPW Fort Rucker, AL J-C3-13 July 2017

REVISED Safety Center

0.3 Acres

(Area in black not in contract)

DPW Fort Rucker, AL J-C3-14 July 2017

HQ Parking and Other Areas

4.4 Acres

DPW Fort Rucker, AL J-C3-15 July 2017

Building 750 and Surrounding Areas

6.7 Acres

DPW Fort Rucker, AL J-C3-16 July 2017

Museum, Veterans Park and Surrounding Areas

32.6 Acres

DPW Fort Rucker, AL J-C3-17 July 2017

Daleville Gate and Surrounding areas

9.2 Acres

DPW Fort Rucker, AL J-C3-18 July 2017

Blue Max and Farrel RD.

7 Acres

DPW Fort Rucker, AL J-C3-19 July 2017

Enterprise Gate

6.5 Acres

DPW Fort Rucker, AL J-C3-20 July 2017

Enterprise Gate to Dustoff ST.

16.1 Acres

DPW Fort Rucker, AL J-C3-21 July 2017

Ozark Gate

4.6 Acres

DPW Fort Rucker, AL J-C3-22 July 2017

Ozark Gate to Main Post

19.7 Acres

DPW Fort Rucker, AL J-C3-23 July 2017

Faulkner Gate

4.3 Acres

DPW Fort Rucker, AL J-C3-24 July 2017

Newton Gate

5.1 Acres

DPW Fort Rucker, AL J-C3-25 July 2017

DOD School – Artillery Road

11.4 Acres

DPW Fort Rucker, AL J-C3-26 July 2017

DOD School – Red Cloud Avenue – NOT IN CONTRACT.

DPW Fort Rucker, AL J-C3-27 July 2017

Old Par 3 Golf Course

10.6 Acres

DPW Fort Rucker, AL J-C3-28 July 2017

CDC and Chapel Complex and Surrounding Area

10.1 Acres

DPW Fort Rucker, AL J-C3-29 July 2017

Soldier-On Field 5 Acres

DPW Fort Rucker, AL J-C3-30 July 2017

Artillery RD. from North Side of DOD Primary School to 650 FT. South of URELL ST., South side as identified.

4.7 Acre

DPW Fort Rucker, AL J-C3-31 July 2017

Hatch RD. – From Andrews Ave. to Combat RD.

3.4 Acres

South side of road to be cut to the paved jogging trail.

North side swath to be cut 15 FT wide from edge of pavement.

DPW Fort Rucker, AL J-C3-32 July 2017

New Chapel Area

5.3 Acres

DPW Fort Rucker, AL J-C3-33 July 2017

New Commissary

4.3 Acres

DPW Fort Rucker, AL J-C3-34 July 2017

Chapel of the Wings

3.1 Acres

DPW Fort Rucker, AL J-C3-35 July 2017

GRASSED AREAS 1 2 2 2 2 2 2 1 14

EDGING 1 2 2 2 2 2 2 1 14

PLANTS / SHRUBS 1 1 2

CREPE MYRTLE 1 1

TRIMMING 1 2 2 2 2 2 2 1 14

IMPROVED GROUNDS "B" - FREQUENCIES

PRINCIPLE USE GRASSED

AREAS ACRES

(1)

EDGING (LF)

(1)

Cantonment / Improved Grounds "B" 645.3 291,400

1 - ESTIMATED QUANTITIES MAY VARY BY +/- 10% OVER THE LIFE OF THE CONTRACT.

IMPROVED GROUNDS "B" - QUANTITIES

DPW Fort Rucker, AL J-C3-36 July 2017

Acres 37.5 41.8 11.8

8.6 41.0

8.1 11.9

115.0 7.1

38.8 85.3 37.6 11.6

7.7 5.8 3.5

34.7 22.8 22.6

1.9 30.0 20.2

7.6 13.3 12.2

1.0 0.5

639.9 Water Well Road

Total Acres

5102 Class Room and Surrounding Area Triangle Shoppett and Surrounding Area

MWR and Wildlife Office and Surrounding Area West Beach Recreation Area

Cemeteries (Byrd, Averett, & Clay Hill)

Fuel Point and Surrounding Area

North Side Baseball Field 46 Motor Pool, Barracks and Surrounding Area

NEW ASP

Buckhorn Lake

Beaver Lake And Jogging Trial Ech Lake

Helicopter crash site

K-9 Training Area and Surrounding Area Area Surrounding Night Hawk Street

DPW Storage Areas and Surrounding Area East Beach Recreaton Area and Access Road

MWR Youth Center

Tank Hill Road and Surrounding Area Hoist Tower and Training Site USAARL and Surrounding Area AIT Barracks and Hospital Area

BOQ, Laundry and Mother Rucker's Recycle Center and Surrounding Area Freedom Fest Area and Package Store

IMPROVED GROUNDS "B"

Guthrie Field

DPW Fort Rucker, AL J-C3-37 July 2017

IMPROVED AREA “B”

DPW Fort Rucker, AL J-C3-38 July 2017

Guthrie Field

37.5 Acres

DPW Fort Rucker, AL J-C3-39 July 2017

Tank Hill Road and Surrounding Area

41.8 Acres

DPW Fort Rucker, AL J-C3-40 July 2017

Hoist Tower and Training Site

11.8 Acres

DPW Fort Rucker, AL J-C3-41 July 2017

USAARL and Surrounding Area

8.6 Acres

DPW Fort Rucker, AL J-C3-42 July 2017

AIT Barracks and Hospital Area 41 Acres

DPW Fort Rucker, AL J-C3-43 July 2017

BOQ, Laundry, and Mother Rucker’s

8.1 Acres

(BOQ BLDG 313, 1.3 Acres, in yellow)

DPW Fort Rucker, AL J-C3-44 July 2017

Recycle Center and Surrounding Area

11.9 Acres

DPW Fort Rucker, AL J-C3-45 July 2017

Freedom Fest Area and Package Store 115 Acres

DPW Fort Rucker, AL J-C3-46 July 2017

MWR Youth Center

7.1 Acres

DPW Fort Rucker, AL J-C3-47 July 2017

North Side Baseball Field

18.8 Acres

DPW Fort Rucker, AL J-C3-48 July 2017

46 TH Motor Pool, Barracks and Surrounding Area

85.3 Acres

DPW Fort Rucker, AL J-C3-49 July 2017

New ASP

37.6 Acres

DPW Fort Rucker, AL J-C3-50 July 2017

Buckhorn

11.6 Acres Lake

DPW Fort Rucker, AL J-C3-51 July 2017

Beaver Lake and Jogging Trail

7.7 Acres

DPW Fort Rucker, AL J-C3-52 July 2017

Ech Lake

5.8 Acres

DPW Fort Rucker, AL J-C3-53 July 2017

Helicopter Crash Site

3.9 Acres

YELLOW NOT IN CONTRACT

DPW Fort Rucker, AL J-C3-54 July 2017

DPW Storage Areas and Surrounding Areas

34.7 Acres

(2.1 Acres in yellow in DPW yard)

DPW Fort Rucker, AL J-C3-55 July 2017

East Beach Recreation Area and Access Road

22.8 Acres

DPW Fort Rucker, AL J-C3-56 July 2017

K-9 Training Area and Surrounding Area

22.6 Acres

DPW Fort Rucker, AL J-C3-57 July 2017

Area Surrounding Night Hawk Street

1.9 Acres

DPW Fort Rucker, AL J-C3-58 July 2017

Fuel Point and Surrounding Area 30 Acres

DPW Fort Rucker, AL J-C3-59 July 2017

5102 Class Room and Surrounding Area

20.2 Acres

DPW Fort Rucker, AL J-C3-60 July 2017

Triangle Shoppett and Surrounding Area

7.6 Acres

DPW Fort Rucker, AL J-C3-61 July 2017

MWR and Wildlife Office and Surrounding Area

6.8 Acres

DPW Fort Rucker, AL J-C3-62 July 2017

West Beach Recreation Area

12.2 Acres

DPW Fort Rucker, AL J-C3-63 July 2017

Cemeteries (Averett, Beulah, Byrd & Clay Hill 1 Acre

DPW Fort Rucker, AL J-C3-64 July 2017

Water Well Road (In yellow)

0.5 Acres

DPW Fort Rucker, AL J-C3-65 July 2017

GRASSED AREAS 1 2 2 2 2 2 2 1 14

EDGING 1 2 2 2 2 2 2 1 14

TRIMMING 1 2 2 2 2 2 2 1 14

IMPROVED GROUNDS "C" - FREQUENCIES

Acres Skeet Range 13.0

Horse Stables 14.8 Singing Pines Cabins 7.9

RV Park 15.0 East Beach Cabins 7.4

Total Acres 58.1

IMPROVED GROUNDS "C" - QUANTITIES

DPW Fort Rucker, AL J-C3-66 July 2017

IMPROVED AREA “C”

DPW Fort Rucker, AL J-C3-67 July 2017

Skeet Range 13 Acres

DPW Fort Rucker, AL J-C3-68 July 2017

Horse Stables

14.8 Acres

DPW Fort Rucker, AL J-C3-69 July 2017

Singing Pines Cabins

7.9 Acres

DPW Fort Rucker, AL J-C3-70 July 2017

RV Park 15 Acres

DPW Fort Rucker, AL J-C3-71 July 2017

East Beach Cabins

7.4 Acres

DPW Fort Rucker, AL J-C3-72 July 2017

ROAD SHOULDERS 1 1 1 1 4

TRIMMING 1 1 1 1 4

RAIL ROAD RIGHTS-OF-WAY 1 1 1 1 4

SEMI-IMPROVED GROUNDS - FREQUENCIES

PRINCIPLE USE GRASSED

AREAS ACRES

(1)

RAIL ROAD

RIGHTS-OF-

WAY

(AC)(2)(3)

Road Sides and Out Laying Areas from the Main Cantonment Area, Rail Road Rights-Of-Way

227 4.5

1 - ESTIMATED QUANTITIES MAY VARY BY +/- 10% OVER THE LIFE OF THE CONTRACT.

2 - 2.3 MILES OF TRACK BY 16FT. WIDE AREA

SEMI-IMPROVED GROUNDS - QUANTITIES

Acres 4.0

14.2 27.0 13.4 15.7 13.8

4.9 27.0

7.6 7.2

15.5 18.8 57.8

226.9

SEMI-IMPROVED GROUNDS

Back Road to Hatch Ravenell Road and Johnson Road

Farrel Road

Red Cloud Road

Total Acres

Traffic Minder Road Christian Road Combat Road Airport Road

Engineer Road Dilly Branch Road

Hatch Road

Lowe Field Road Whittaker Road

DPW Fort Rucker, AL J-C3-73 July 2017

SEMI-IMPROVED AREA

DPW Fort Rucker, AL J-C3-74 July 2017

SEMI-IMPROVED GROUNDS - RAIL ROAD RIGHTS-OF-WAY

DPW Fort Rucker, AL J-C3-75 July 2017

PERIMETER FENCE LINE 1 1 2

LAKE THOLLOCO DAM 1 1 2

OLD LANDFILL 1 1 2

UNIMPROVED GROUNDS - FREQUENCIES

PRINCIPLE USE GRASSED

AREAS ACRES

(1) (2)

PERIMETER FENCE LINE 78.7

LAKE THOLLOCO DAM 18.0

OLD LANDFILL 23.3

OLD LAND FILL OFF OF DUSTOFF STREET 5.5

TOTAL= 125.5

1 - ESTIMATED QUANTITIES MAY VARY BY +/- 10% OVER THE LIFE OF THE

CONTRACT.

2 - CUT ONCE IN JUNE AND ONCE IN SEPTEMBER.

UNIMPROVED GROUNDS - QUANTITIES

DPW Fort Rucker, AL J-C3-76 July 2017

UNIMPROVED GROUNDS - PERIMETER FENCE / CABLE BARRIER LINE

DPW Fort Rucker, AL J-C3-77 July 2017

INSIDE OUTSIDE WIDTH LENGTH ACRES

A-A 50 20 70 1338 2.2 B-B 0 20 20 2939 1.3 C-C 0 20 20 1116 0.5 D-D 50 20 70 798 1.3 E-E 0 20 20 1473 0.7 F-F 0 20 20 2507 1.2 G-G 50 20 70 1372 2.2 H-H 0 20 20 1519 0.7 I-I 0 20 20 3803 1.7 J-J 50 20 70 50 0.1 K-K 0 20 20 3185 1.5 L-L 0 20 20 3257 1.5

M-M 0 20 20 1560 0.7 N-N 0 20 20 1867 0.9 O-O 0 20 20 1933 0.9 P-P 0 20 20 918 0.4 Q-Q 0 20 20 278 0.1 R-R 0 20 20 2567 1.2 S-S 0 20 20 1862 0.9 V-V 0 20 20 4922 2.3

W-W 0 20 20 7035 3.2 X-X 50 20 70 5303 8.5 Y-Y 50 20 70 11470 18.4 Z-Z 50 20 70 4843 7.8

AA-AA 50 20 70 4439 7.1

BB-BB 50 20 70 7165 11.5

78.7

PERIMETER FENCE LINE ACERAGE - GROSS ACRES

Gross acerage calculations based on maximum limits as identified in the PWS. Net acerage is less as there are areas where tree lines, roadways or other obstructions reduce the width of cut as noted in the PWS

DPW Fort Rucker, AL J-C3-78 July 2017

DPW Fort Rucker, AL J-C3-79 July 2017

DPW Fort Rucker, AL J-C3-80 July 2017

DPW Fort Rucker, AL J-C3-81 July 2017

DPW Fort Rucker, AL J-C3-82 July 2017

DPW Fort Rucker, AL J-C3-83 July 2017

DPW Fort Rucker, AL J-C3-84 July 2017

DPW Fort Rucker, AL J-C3-85 July 2017

DPW Fort Rucker, AL J-C3-86 July 2017

UNIMPROVED GROUNDS - LAKE THOLOCCO GROUNDS MAINTENANCE AREA

DPW Fort Rucker, AL J-C3-87 July 2017

OLD LANDFILL

DPW Fort Rucker, AL J-C3-88 July 2017

Old Land Fill Off Of Dustoff Street – 5.5 Ac.

DPW Fort Rucker, AL J-C3-89 July 2017

BUSHES 1' TO 3' 1 1 2

BUSHES 3' TO 6' 1 1 2

BUSHES OVER 6' 1 1 2

CREPE MYRTLES 1 1

PRUNING - IMPROVED GROUNDS "A" and "B" - FREQUENCIES

IMPROVED GROUNDS "A" and "B" - QUANTITIES

AREA BUSHES 1'

TO 3' (1) (3)

BUSHES 3'

TO 6' (1)

(3)

BUSHES

OVER 6'

(1) (3)

CREPE

MYRTLES

(1) (2)

1 0 2 6 6 2 62 15 6 124 3 224 57 13 118 4 798 145 12 48 5 74 30 9 6 6 1158 525 96 98 7 523 161 65 85 8 308 63 79 85 9 780 113 105 40 10 510 336 139 88 11 614 113 26 137 12 206 123 45 43 13 357 58 27 40 14 110 57 15 59

15 NA NA NA NA

16 475 175 2 17

TOTAL= 6199 1973 645 994

1 -

ESTIMATED

2 - CREPE

TRIMMED

DPW Fort Rucker, AL J-C3-90 July 2017

Onetime Special Clearing Of Significant Vegetation From Selected Interior Fence Locations

Primary School

LOCATION LENGTH (ft)

Primary School 1,626 Auto Craft Center 250

DRMO 1,126

Engine Test Facility 513 USAARL Test Tower 1,035

TOTAL LENGTH= 4,550

DPW Fort Rucker, AL J-C3-91 July 2017

Auto Craft Shop

DRMO

DPW Fort Rucker, AL J-C3-92 July 2017

Engine Test Facility

USAARL Test Tower

ATTACHMENT J-C4

HISTORICAL TEMPERATURE AND RAINFALL DATA

Cairns AAF

DPW Fort Rucker, AL J-C4-1 July 2017

NOTE: Alabama is subject to hurricanes

Year Month

Mean Monthly Precip

Mean Monthly

Max Temp ( F )

Mean Monthly

Min Temp ( F )

Total Monthly

PCPN

Monthly Max

Temp ( F )

Monthly Min

Temp ( F ) 2006 1 0.15 67 44 4.66 79 27 2006 2 0.16 61 39 4.31 75 25 2006 3 0.03 73 47 1.01 84 32 2006 4 0.08 83 58 2.13 91 45 2006 5 0.11 85 62 3.44 95 50 2006 6 0.09 93 68 2.49 100 57 2006 7 0.10 94 72 3.14 99 66 2006 8 0.16 93 73 5.07 97 70 2006 9 0.05 86 66 1.46 93 48 2006 10 0.07 77 54 2.07 90 37 2006 11 0.17 69 45 4.72 79 34 2006 12 0.22 67 48 3.05 77 32 2007 1 0.14 61 42 4.31 77 23 2007 2 0.15 63 38 4.25 79 21 2007 3 0.04 75 49 1.2 88 34 2007 4 0.19 75 51 5.59 86 37 2007 5 0.00 87 61 0.06 91 48 2007 6 0.09 92 69 2.79 97 61 2007 7 0.11 90 72 3.54 95 68 2007 8 0.14 96 74 4.22 104 72 2007 9 0.12 88 68 3.51 93 57 2007 10 0.13 80 59 4.17 90 41 2007 11 0.14 70 44 4.21 79 30 2007 12 0.22 66 44 6.85 81 28 2008 1 0.19 58 38 5.84 77 21 2008 2 0.18 66 40 5.1 81 27 2008 3 0.10 71 45 3.04 82 28 2008 4 0.09 77 54 2.57 86 37 2008 5 0.04 86 63 1.31 91 48 2008 6 0.21 92 70 6.2 99 63 2008 7 0.09 92 72 2.64 97 64 2008 8 0.26 88 71 8.18 99 63 2008 9 0.08 87 67 2.25 93 52 2008 10 0.11 76 54 3.49 88 32 2008 11 0.14 68 42 4.05 82 25 2008 12 0.23 66 45 7 79 27 2009 1 0.11 62 40 3.38 77 21 2009 2 0.10 64 38 2.79 75 21 2009 3 0.50 71 49 15.49 82 28

Cairns AAF

DPW Fort Rucker, AL J-C4-2 July 2017 Cantonment

2009 4 0.12 77 52 3.66 90 34 2009 5 0.29 83 66 8.91 90 50 2009 6 0.08 93 71 2.47 99 63 2009 7 0.24 90 70 7.31 99 61 2009 8 0.19 88 70 5.9 93 61 2009 9 0.09 87 69 2.65 93 52 2009 10 0.28 77 59 8.59 91 37 2009 11 0.12 68 45 3.71 77 32 2009 12 0.42 58 40 13 77 28 2010 1 0.30 55 33 9.42 75 16 2010 2 0.15 54 34 4.06 70 25 2010 3 0.08 66 42 2.5 79 28 2010 4 0.11 80 53 3.16 88 45 2010 5 0.14 88 66 4.27 95 52 2010 6 0.15 93 72 4.62 100 66 2010 7 0.11 95 74 3.42 102 66 2010 8 0.13 92 75 4.11 99 70 2010 9 0.05 94 67 1.47 99 55 2010 10 0.05 82 54 1.52 90 43 2010 11 0.15 72 43 4.55 81 30 2010 12 0.03 55 31 0.98 75 19 2011 1 0.15 56 33 4.52 73 19 2011 2 0.14 66 41 3.85 81 27 2011 3 0.15 74 49 4.8 86 32 2011 4 0.13 83 56 3.98 90 37 2011 5 0.03 88 60 0.78 97 43 2011 6 0.07 97 71 2.06 102 66 2011 7 0.25 92 73 7.62 99 70 2011 8 0.06 96 72 1.77 102 66 2011 9 0.18 86 65 5.36 97 55 2011 10 0.01 77 54 0.22 88 34 2011 11 0.05 71 47 1.4 84 30 2011 12 0.10 66 44 2.98 79 27 2012 1 0.17 67 42 5.18 79 19 2012 2 0.13 65 47 3.7 81 23 2012 3 0.16 79 56 5.08 86 37 2012 4 0.09 79 55 2.65 93 41 2012 5 0.07 88 64 2.15 97 54 2012 6 0.20 89 68 6.1 97 59 2012 7 0.15 91 73 4.61 99 68 2012 8 0.17 87 71 5.37 97 64 2012 9 0.17 86 66 5.16 91 50 2012 10 0.05 78 55 1.55 86 36 2012 11 0.04 68 43 1.3 84 28 2012 12 0.15 65 44 4.62 79 25 2013 1 0.11 67 47 3.35 81 32 2013 2 0.59 64 43 16.54 73 27

Cairns AAF

DPW Fort Rucker, AL J-C4-3 July 2017 Cantonment

2013 3 0.07 66 41 2.07 81 28 2013 4 0.13 77 54 3.8 88 37 2013 5 0.04 83 60 1.36 93 43 2013 6 0.18 89 70 5.53 95 64 2013 7 0.65 87 71 20.27 91 68 2013 8 0.35 89 71 10.91 95 64 2013 9 0.11 88 68 3.41 93 57 2013 10 0.05 79 57 1.41 90 37 2013 11 0.09 68 45 2.56 81 27 2013 12 2014 1 0.07 54 31 2.29 72 14 2014 2 0.17 65 43 4.8 79 27 2014 3 0.20 68 44 6.24 79 32 2014 4 0.48 76 55 14.48 88 43 2014 5 0.08 84 61 2.47 95 46 2014 6 0.14 90 70 4.21 95 66 2014 7 0.16 90 70 4.9 95 61 2014 8 0.10 93 71 3.09 99 64 2014 9 0.12 88 69 3.6 97 61 2014 10 0.14 81 55 4.37 91 43 2014 11 0.10 65 39 2.85 81 21 2014 12 0.17 65 44 5.24 79 32 2015 1 0.11 60 37 3.42 75 16 2015 2 0.14 58 36 3.93 77 21 2015 3 0.05 74 52 1.5 84 28 2015 4 0.25 80 61 7.49 90 45 2015 5 0.17 86 63 5.17 93 46 2015 6 0.08 92 70 2.47 99 66 2015 7 0.18 94 73 5.55 99 66 2015 8 0.08 93 72 2.58 99 64 2015 9 0.32 86 67 9.68 95 52 2015 10 0.07 79 58 2.07 90 43 2015 11 0.31 73 53 9.33 84 32 2015 12 0.31 71 50 9.51 82 28 2016 1 0.16 58 37 4.87 70 23 2016 2 0.19 66 41 5.56 79 25 2016 3 0.24 74 52 7.53 84 32 2016 4 0.20 78 56 5.85 90 43 2016 5 0.06 86 62 1.95 95 48 2016 6 0.13 91 70 4.04 99 63 2016 7 0.26 93 72 8.16 97 70 2016 8 0.22 92 73 6.97 95 70 2016 9 0.14 90 70 4.17 95 54 2016 10 0.00 86 58 0 91 39 2016 11 0.04 75 48 1.1 88 30 2016 12 0.32 66 46 9.91 81 28

ATTACHMENT J-C5

SUBMITTALS

DPW Fort Rucker, AL J-C5-1 July 2017

1.11 Draft copy of the Contractor's QCP shall be provided to the KO not later than the post award meeting. A final copy shall be provided to the KO and COR on the contract start date and no later than ten (10) workdays as changes occur.

1.11.2 Daily Quality Control documentation shall be submitted to the KO/COR at 0730 hours the following workday in the form of a status report.

1.11.4 The Contractor shall provide the KO and COR a local telephone number at which the Quality Control Manager, or his representative, may be contacted during normal working hours.

1.17.2 The Contractor shall provide proof of such experience to the KO no later than 10 normal working days prior to contract start date.

1.17.4 The Contractor shall provide, in writing, to the KO no later than 10 normal working days prior to contract start date, a location (address) and a local or toll-free telephone number at which the Project Manager or acting Project Manager may be reached.

1.19.2 The Contractor shall provide the KO a list of all employees who will perform work under this contract one week prior to commencing any work under this contract.

1.19.3 The Contractor’s Project Manager shall notify the KO in writing of any addition, deletion or change in work assignment, within one workday of such changes to the roster.

1.20.3 Proposed work schedules shall be submitted to the KO and COR monthly at least five working days prior to the start of the schedule month, and shall indicate the proposed date of accomplishment of all required services by location. The KO and COR shall be notified at least two working days in advance of any changes to the scheduled date of any work requirements.

1.20.4 The Contractor shall prepare and provide, on a daily basis, status reports for all mowing services required by the contract.

1.24.1 The Contractor shall, in turn, notify the KO or COR within 30 minutes of the incident.

C.5.3.4.2 Proof of current certification shall be submitted to the KO and COR for approval prior to the onset of any herbicide applications.

C.5.3.4.5

The Contractor shall maintain daily records of all herbicide applications including weather data and observations. The Contractor shall be responsible for reporting herbicide applications, surveillance inspections and accidental spill or discharge events as required by Fort Rucker’s NPDES permit.

C.5.3.4.5 Completed forms shall be provided to the COR within 7 working days of completion of any applications.

ATTACHMENT J-C6

APPROVED HERBICIDES

DPW Fort Rucker, AL J-C6-1 July 2017

Full Pesticide Trade Name from Label EPA Registration No. Active Ingredients Accord Concentrate Herbicide 62719-324 Glyphosate (CAS No. 38641-94-0)

Accord XRT Herbicide 62719-517 Glyphosate (CAS No. 38641-94-0) Accord XRT II Hebicidei 62719-556 Glyphosate (CAS No. 38641-94-0)

Alligare Glyphosate 4 Plus 81927-9 Glyphosate (CAS No. 38641-94-0) Aqua Neat Aquatic Herbicide 228-365 Glyphosate (CAS No. 38641-94-0)

Glyphosate 4 Plus 81927-9 Glyphosate (CAS No. 38641-94-0) Glyphosate Pro 4 Herbicide 72112-4 Glyphosate (CAS No. 38641-94-0)

Gly Star Pro 42750-61 Glyphosate (CAS No. 38641-94-0) QuikPro 524-535 Glyphosate (CAS No. 38641-94-0)

Ranger Pro Herbicide 524-517 Glyphosate (CAS No. 38641-94-0) Riverdale Razor Pro Herbicide 228-366 Glyphosate (CAS No. 38641-94-0)

Rodeo Herbicide 62719-324 Glyphosate (CAS No. 38641-94-0) Roundup Pro Herbicide 524-475 Glyphosate (CAS No. 38641-94-0)

Roundup ProMax Herbicide 524-579 Glyphosate (CAS No. 38641-94-0)

ATTACHMENT J-E1

EXAMPLE PAYMENT CALCULATIONS WHEN RESD IS USED

DPW Fort Rucker, AL J-E1-1 July 2017

1. The Government reserves the right to start surveillance using Random Sampling with Extrapolated Deductions (RSED) at any time during the contract, to discontinue the use of RSED, and to resume the use of RSED without notice to the Contractor. The Government will use the attached tables entitled Table of Sample Sizes for Normal Sampling Levels and Table of Sample Sizes for Reduced Sampling Levels to determine sample sizes for RSED. The Table of Sample Sizes for Reduced Sampling Levels represents the minimum sample sizes the Government will use for extrapolation.

2. The Acceptable Quality Level (AQL) is defined as the defect rate above which the Contractor's quality control is not effective. The AQL does not represent a threshold above which payment deductions are taken.

Deductions are taken for all defects (with credit for rework to the extent appropriate) irrespective of whether the AQL was exceeded or not. When a defect rate exceeds the AQL, the Contractor will be notified and appropriate administrative actions will be taken in addition to the payment deductions discussed above. The AQL for each work requirement is shown in the Performance Requirements Summary (PRS) table in Attachment J-C1.

3. The following example illustrates the process that will be used to calculate the Contractor's payment deduction when RSED is used for surveillance.

DPW Fort Rucker, AL J-E1-2 July 2017

GRASS CUTTING, HIGH

VISIBILITY AREA

TI

M

EL

Y

C

O M

PL

ET

IO

N

D

EB

R

IS

R

EM

O

V A

L

G R

A

SS

C

U

TT

IN

G

TR

IM

M

IN

G

A. Task value percent 15% 5% 60% 20%

B. Maximum payment for acceptable work - Unit cost from bid schedule times the quantity of work ordered that month times the task value %.

(EXAMPLE: 100 Acres times $50.00 per acre Times the Task Value %))

750 250 3000 1000

C. Cost Per Unit - (CLIN cost times Task

Value %)

7.5 2.5 30 10

D. AQL = 6.5

E. Accept / Reject = 2/3 2/3 2/3 2/3

F. Lot Size = Number of parcels cut. 105 105 105 105

G. Total Number of Acres in the Lot = 100 100 100 100

H. Sample Size (Normal) = Number of parcels 20 20 20 20

I. Total Number of Acres in The Sample

18 18 18 18

J. Number Of Observed Defects In

Sample 6 5 7 4

K. Percentage Of samples Found

Unacceptable - Observed Defect Rate (ODR) ((Defects Divided by Sample Size) x 100) (J/K)*100

30% 25% 35% 20%

DPW Fort Rucker, AL J-E1-3 July 2017 Cantonment

L. Uninspected Parcels - (105-20, or Lot Size-Sample Size) (F-H)

85 85 85 85

M. Uninspected Acres Total Acres Minus

Inspected Acres. (100 minus 18) (G-I) 82 82 82 82

N. Defects Corrected = 2 3 1 0

O. Revised Defect Rate for Corrected

Defects. ((Observed Defects minus corrected Defects) divided by 20) (J- N)/H

20% 10% 30% 20%

P. Service Value Lost For Inspected Lot.

Acres in Sample x Unit Cost x Revised ODR (RODR) (18 x $7.50 x RODR) I*C*P

$ 27.00 $ 4.50 $ 162.00 $ 36.00

Q. Extrapolated Deduction for uninspected Lots - ODR x Uninspected Acreas x Unit Cost. M*K*B

$ 184.50 $ 51.25 $ 861.00 $164.00

R. Administrative Cost = Flat Rate $50.00

S. Total Deductions = P (ALL) + Q

(ALL) + R

$ 1,540.25

END OF SECTION J

TABLE OF CONTENTS
GOVERNMENT-FURNISHED FACILITIES
There are no Government-furnished facilities provided under this contract.
GOVERNMENT-FURNISHED EQUIPMENT
There is no Government-furnished equipment provided under this contract.
GOVERNMENT-FURNISHED MATERIAL
There are no Government-furnished materials provided under this contract.
UNIMPROVED GROUNDS - PERIMETER FENCE / CABLE BARRIER LINE
UNIMPROVED GROUNDS - LAKE THOLOCCO GROUNDS MAINTENANCE AREA
END OF SECTION J