Amendment 5 SF 30

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment issued to provide the revised PWS, revise section L and M revise Wage determination, and update section J. The date and time for receipt of proposal remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124G-18-R-0002

X 9B. DATED (SEE ITEM 11)

13-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Feb-2018

CODE

MICC - FORT BENNING

6650 MELOY DRIVE

BLDG 6, SUITE 250

FORT BENNING GA 31905-1300

W911SF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124G-18-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

a. Paragraph 1.8 Scope in Performance Work Statement is changed

FROM:

1.8 Scope: The Contractor shall maintain Improved, Semi-Improved Grounds and Unimproved Grounds as identified in this PWS.

TO:

1.8 Scope: The Contractor shall maintain Improved, Semi-Improved Grounds and Unimproved Grounds as identified in this PWS.

Current on-the-ground conditions may not always represent the expected outcome as identified in the PWS, and there may be some additional level of effort needed at some locations to normalize existing conditions on the first cutting.

Some shrubs have not been pruned in over a years' time. The PWS shrub height represents "Expected pruned and trimmed height" and some additional level of effort may be required on the first pruning to meet that standard.

b. Paragraph 1.9 Period of Performance of the Performance Work Statement is changed

FROM:

1.9 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12 month option years. The Period of Performance reads as follows:

Base Year 24 JAN 2018 to 23 JAN 2019 Option Year I 24 JAN 2019 to 23 JAN 2020 Option Year II 24 JAN 2020 to 23 JAN 2021 Option Year III 24 JAN 2021 to 23 JAN 2022

Option Year IV 24 JAN 2022 to 23 JAN 2023

TO:

1.9 Period of Performance: The period of performance shall be for a nine (9) month Base Year and four (1) one year option period. The Period of Performance reads as follows:

Base Year 1 Apr 2018 to 31 Dec 2018 Option Year I 1 Jan 2019 to 31 Dec 2019 Option Year II 1 Jan 2020 to 31 Dec 2020 Option Year III 1 Jan 2021 to 31 Dec 2021 Option Year IV 1 Jan 2022 to 31 Dec 2022

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Section J is updated to revise the Performance Work Statement and to add new wage determinations.

c. Attachment 6: Revised Performance Work Statement dated 22 February 2018 31 Pages is added to the solicitation.

d. Attachment 7: Wage Determination No.: 2015-4631 Revision No,: 6, Date of Revision 1/10/2018 11 pages is added to the solicitation.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

e. Section L: The page limit for Volume I Technical on paragraph L.3.2.2. Is changed from 25 to 60.

f. Section L: Paragraph 2 Preparation of Volume II- Past Performance subparagraph 3 is changed to add:

. Sections 2 and 3 can be merged together when submitting past performance.

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

SECTION M

g. Section M: A. Basis of Award is changed

FROM:

1. This is a best value source selection conducted in accordance with the Federal Acquisition Regulation (FAR) 15.101-1. A single award will be made to the responsible offeror submitting the proposal that is determined to offer the best value to the Government (i.e., which provides the greatest overall benefit to the Government in response to the requirement, price and non-price evaluation factors considered). As such, the Government may award to other than the lowest priced or technically outstanding proposal.

TO:

1.This is a best value source selection conducted in accordance with the Federal Acquisition Regulation (FAR) 15.101-2. A single award will be made to the responsible offeror submitting the proposal that is determined to offer the best value to the Government (i.e., which provides the greatest overall benefit to the Government in response to the requirement, price and non-price evaluation factors considered). As such, the Government may award to other than the lowest priced or technically outstanding proposal.

h. THE DATE AND TIME FOR RECEIPT OF PROPOSAL'S REMAIN UNCHANGED.

(End of Summary of Changes)