Attachment4-UFCSection11.pdf
PDF 2 MB Posted
- Attached to
- 2015 IDIQ Paving
- Solicitation number
- W9124G-15-B-0001
About this file
UFC Section 11
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFC 3-260-01
17 NOVEMBER 2008
SECTION 11 TIEDOWNS, MOORING, AND GROUNDING POINTS
B11-1 TYPES OF EQUIPMENT
B11-1.1 Mooring and Grounding Point. A mooring and grounding point is a mooring casting with a grounding rod attached. Aircraft mooring and grounding points are used to secure parked aircraft and also serve as electrodes for grounding connectors for aircraft. Combined mooring and grounding points have previously been used by the Army but are not currently used as they do not meet mooring and grounding design loads required by TM 1-1500-250-23.
B11-1.2 Mooring Point. A mooring point is a mooring casting without a grounding rod attached, used to secure parked aircraft. Mooring points are used by the Army.
B11-1.3 Static Grounding Point. A static grounding point is a ground rod attached to a casting. The casting protects the ground rod but does not provide mooring capability.
Static grounding points are used by the Army in aprons and hangars.
B11-1.4 Static Grounding Tiedown. A static grounding tiedown is a 3-meter (10-foot) rod with a closed-eye bend. The static grounding tiedown is not intended to secure parked aircraft but may serve as an electrode connection for static grounding of aircraft.
Static grounding tiedowns are installed at many Air Force installations.
B11-1.5 Tiedown Mooring Eye. A tiedown mooring eye is a mooring casting with a grounding rod attached. They are similar to the mooring and grounding point discussed above. Tiedown mooring eyes are used by the Navy and Marine Corps.
B11-2 MOORING POINTS FOR ARMY FIXED- AND ROTARY-WING AIRCRAFT
B11-2.1 Type. A mooring point consists of a ductile iron casting, as shown in Figure B11-1. The mooring casting is an oval-shaped casting with a cross-rod to which mooring hooks are attached.
Figure B11-1. Army Mooring Point
152mm [6"]
51mm [2"] [3/8"]
51mm
[6.5"]
[3-1/2"] R
11mm [7/16"]
(2) 13mm [1/2"] DIA.
CORED HOLES
29mm
22mm [7/8"] DIA.
73mm [2-7/8"]
121mm [4-3/4"]
51mm [2"]
197mm [7-3/4"]
PLAN
SECTION
MOORING DEVICE TO BE CAST
IN DUCTILE IRON 80-55-06
OR EQUAL.
165mm
[1-1/8"]
89m m
9.5mm
[2"]
N.T.S.
B11-2.2 Design Load. Unless specifically waived in writing by the facility commander, all new construction of Army aircraft parking aprons will include aircraft mooring points designed for a 67,800-Newton (15,250-pound) load, as specified in TM 1- 1500-250-23 and applied at 19.15 degrees (19.15°) from the pavement surface, as illustrated in Figure B11-2.
Figure B11-2. Army Load Testing of Mooring Points
19.15°
[15,250 LB]
MOORING DEVICE
67,835 N
MOORING TESTS SHOULD BE ACCOMPLISHED USING A HYDRAULIC RAM OR
SIMILAR DEVICE AND AN APPROPRIATE REACTION (HEAVY VEHICLE, ETC.)
THAT IS CAPABLE OF APPLYING A TENSILE LOAD OF 71,172 N [16,000 LB]
THE LENGTH OF MOORING CHAIN AND CONNECTING SHACKLE SHOULD BE
SELECTED IN SUCH A WAY THAT AN ANGLE OF 19.15° FROM THE PAVEMENT
SURFACE (SEE ABOVE FIGURE) CAN BE MAINTAINED DURING LOAD TESTING.
APPROPRIATE SAFETY PRECAUTIONS SHOULD BE TAKEN AT ALL TIMES DURING
LOAD TESTING OPERATIONS.
TO PASS TEST REQUIREMENTS, MOORING POINTS SHALL NOT DEFORM
PERMANENTLY UNDER 71,172 N [16,000 LB] LOAD.
1.
2.
3.
4.
5.
NOTES
THE MOORING POINTS SHOULD BE LOADED IN 1,130 kg [2,500 LB]
INCREMENTS UP TO 44,482 N [10,000 LB] AND IN 4,448 N [1000 LB]
INCREMENTS UP TO 71,172 N [16,000 LB] WITH EACH LOAD INCREMENT
HELD FOR AT LEAST 60 SECONDS.
B11-2.3 Layout.
B11-2.3.1 Fixed-Wing Aprons. Mooring points should be located as recommended by the aircraft manufacturer or as required by the base.
B11-2.3.2 Rotary-Wing Aprons.
B11-2.3.2.1 Number of Moored Parking Spaces. Moored parking spaces will be provided for 100 percent of the authorized aircraft. The combined total of apron parking space and hangar parking space should provide sufficient parking for wind protection for all facilities’ authorized aircraft and typical transient aircraft. Additional parking spaces with mooring points may be added as necessary to ensure wind protection for all aircraft. The locations of these additional mooring points can be on pavements other than parking aprons. Prepared turf-surfaced areas are acceptable for rotary-wing aircraft mooring locations.
B11-2.3.2.2 Number of Mooring Points at Each Parking Space. Each rotary-wing aircraft parking space location will have six mooring points. Although some rotary-wing aircraft only require four mooring points, six will be installed to provide greater flexibility for the types of rotary-wing aircraft that can be moored at each parking space. The largest diameter rotor blade of the facilities’ assigned aircraft will be used for locating the mooring points within the parking space. The allowable spacing and layout of the six mooring points is illustrated in Figure B11-3. Parking space width and length dimensions are presented in Table 6-2 of Chapter 6.
Figure B11-3. Army Rotary-Wing Allowable Mooring Point Spacing
W
MOORING DEVICE (TYPICAL)
SEE FIGURE A12.1
1.
2.
3.
NOTES
LL
THE PREFERRED MOORING POINT SPACING FOR EACH AIRCRAFT PARKING
POSITION IS L =L = W = 6m [20.0']
IN NEW OR EXISTING RIGID PAVEMENT, THE MOORING POINTS WILL BE
AT LEAST 600mm [2'] AWAY FROM ANY PAVEMENT JOINT OR EDGE. TO MISS
THE PAVING JOINTS, THE SPACING OF THE MOORING POINTS MAY BE
VARIED AS FOLLOWS:
A. W, L AND L MAY VARY FROM 5 TO 6m [17 TO 20'].
B. W, L AND L NEED NOT BE EQUAL.
THE CONSTRUCTION TOLERANCE ON MOORING POINT LOCATION SHOULD
BE 50mm [±2"]
1 2
1 2
[2']STATIC GROUND
POINT
600mm
B11-2.3.2.3 Mooring Points on a Grid Pattern. A 6-meter by 6-meter [20-foot by 20-foot] mooring point grid pattern throughout the apron for mass aircraft parking aprons will not be authorized unless economically and operationally justified in writing by the installation commander. Figure B11-4 provides the recommended pavement joint and mooring point spacing should grid pattern mooring be utilized.
Figure B11-4. Army Rotary-Wing Mooring Points Layout
1.5m
1.
5m
6m [2
0'
6m [20'] TYPICAL
3m [10']
TYPICAL
3m [1
0'
T Y
P
IC
A L
TYPICAL MOORING
POINT
THIS IS THE RECOMMENDED JOINT SPACING FOR NEW CONCRETE PAVEMENT
WHERE MOORING DEVICES ARE JUSTIFIED AND AUTHORIZED THROUGHOUT
THE APRON. OTHER JOINT SPACINGS MAY BE USED AS LONG AS MOORING
DEVICES ARE SPACED AS SHOWN IN FIGURE B11-3.
NOTE
T Y
P
IC
A L
[5']
[5
B11-2.4 Installation
B11-2.4.1 Mooring Points for New Rigid Pavement Equal to or Greater Than 150 Millimeters (6 Inches) Thick. Mooring points for new rigid pavements will be provided by embedding the mooring devices in fresh Portland cement concrete (PCC).
The layout of points is shown in Figure B11-3 with mooring points at least 600 millimeters (2 feet) from the new pavement joints. This spacing will require close coordination between the parking plan and the jointing plan. Mooring points should be located a minimum of 600 millimeters (2 feet) from any pavement edge or joint and should provide proper cover for the reinforcing steel. Reinforcing bars should be placed around the mooring points as illustrated in Figure B11-5.
Figure B11-5. Slab Reinforcement for Army Mooring Point
1,000mm [3']
LONG. SEE NOTE.
MOORING DEVICE
(SEE FIGURE B11-1)
BARS
1,200mm [4'] LONG.
PLAN VIEW
THESE #6 REINFORCING BARS SHOULD BE PLACED 75mm [3"] FROM MOORING DEVICE AND 75mm [3"] BELOW PAVEMENT SURFACE.
THE ENDS OF REINFORCING BARS SHOULD BE PLACED 75mm [3"]
FROM PAVING JOINTS TO PROVIDE COVER.
1.
2.
NOTES
20mm [#6] BARS
20mm [#6]
B11-2.4.2 Mooring Points for Existing Rigid Pavement Equal to or Greater Than 150 Millimeters (6 Inches) Thick and in Uncracked Condition. The following method should be used to provide mooring points for existing rigid pavement in an uncracked condition. The pavement should have only a few slabs with random cracks and must not exhibit "D" cracking. Mooring points should be provided by core-drilling a 300-millimeter (12-inch) -diameter hole through the pavement and installing a mooring point as illustrated in Figure B11-6.
Figure B11-6. Mooring Point for Existing Rigid Pavement for Pavement Thickness Greater Than 150 Millimeters (6 Inches)
600mm [24"] MIN.
0m m [2
4" ] M
IN
[4
M
IN
MOORING DEVICE FOR
DETAILS SEE FIGURE B11-1
B B
300mm [12"] DIA. CORE HOLE
PLAN VIEW
EXISTING CONTRACTION
AND/OR CONSTRUCTION
JOINTS
SET TOP OF MOORING DEVICE
FLUSH WITH EXISTING PAVEMENT
SURFACE
CORE HOLE TO BE ROUGHENED
BY SAND BLASTING
50mm [2"] MIN.
[6"] OR
GREATER
CONCRETE WILL HAVE A MINIMUM
COMPRESSIVE STRENGTH 41.400 kPa [6000 psi], AND WILL BE PLACED IN AT LEAST 2
LIFTS. EACH LIFT WILL BE CONSOLIDATED
BY INTERNAL VIBRATION, ALLOW CONCRETE
SECTION B
EXISTING CONCRETE SHOULD HAVE
ONLY A FEW SLABS WITH CRACKS
IF THIS OPTION IS TO BE USED.
NOTE
TO "MUSHROOM" BELOW EXISTING SLAB.
m m
150 mm
[12"] DIA.
300 mm
B11-2.4.3 Mooring Points for Areas Not Covered Above. The following installation options should be used to provide mooring points for rotary-wing aircraft parked on the following pavements: existing rigid pavement less than 150 millimeters (6 inches) thick;
existing rigid pavement in a cracked or deteriorated condition; new or existing flexible pavement; turfed areas; and other areas where appropriate.
B11-2.4.3.1 Installation Option 1, Mooring Pad. This option is the preferred installation method and allows for placement of a new concrete pad with a minimum thickness of 200 millimeters (8 inches). The size of the pad should be a minimum of
7.3 meters (24 feet) wide by 13.4 meters (44 feet) long. The length and width may be increased to match the existing concrete joint pattern. The mooring pad, with six mooring points, is illustrated in Figure B11-7. The mooring devices should be installed as illustrated in Figure B11-1 and the concrete reinforced as illustrated in Figure B11-5.
Figure B11-7. Army Rotary-Wing Mooring Pad Detail
[2 0'
[2 4'
[2'] MIN.
6.1m [20'] 6.1m [20']
13.4m [44'] MIN.
0.6m
0.6m
MOORING POINT LOCATION (TYPICAL)
SEE FIGURE B11-1
PLAN VIEW
THIS MOORING PAD IS THE PREFERRED METHOD OF PROVIDING MOORING
POINTS IN GRASSED AREAS AND IN FLEXIBLE PAVEMENTS. FOR RIGID
PAVEMENT APPLICATIONS, THE SIZE OF THE PAD SHOULD BE INCREASED
TO MATCH THE EXISTING JOINT PATTERN.
THICKNESS OF THE PAD SHOULD BE DESIGNED TO CARRY THE EXPECTED
AIRCRAFT LOADS, BUT NOT LESS THAN 200mm [8"].
THE SLAB SHOULD BE DESIGNED AS A REINFORCED SLAB SO THAT
PAVEMENT JOINTING WILL NOT BE REQUIRED. IF JOINTED PAVEMENT IS
DESIRED, JOINT SPACING SHOULD BE ADJUSTED SO THAT MOORING
POINTS ARE A MINIMUM OF 0.6m [2'] FROM PAVEMENT JOINTS.
SEE FIGURE B11-6 FOR REINFORCING ADJACENT TO MOORING DEVICE.
TYPICAL PREFERRED SPACING BETWEEN MOORING DEVICES IS 6.1m [20']. SEE
FIGURE B11-3 FOR ALLOWABLE MOORING AND STATIC GROUND POINT SPACING.
1.
2.
3.
4.
5.
NOTES
PORTLAND CONCRETE PAD
M
IN
[2'] MIN.
[2'] MIN.
0.6m
6.
1m
7.
3m
N.T.S.
0.6m
[2'] MIN.
B11-2.4.3.2 Installation Option 2, Piers. This option allows the use of individual concrete piers for each mooring point, as shown in Figure B11-8. The diameter and length of the pier must be based on the strength of the soil, as presented in Table B11-1.
Figure B11-8. Army Mooring Point for Grassed Areas, Flexible Pavement, or Rigid Pavement - Thickness Less Than 150 millimeters (6 inches)
ASPHALT PAVEMENT, RIGID
PAVEMENT OR GRASSED
AREAS
MOORING DEVICE
(SEE FIGURE B11-1)
TIES
3 AT 150mm [6"]
TIES
3 AT 300mm [12"] m m m m [3
75mm [3"] CONCRETE
COVER (TYP.)
TIES AS
SHOWN
6-20mm [#6] BARS
VERTICAL
SEE NOTE 2
SECTION
A
CORE DRILL ASPHALT PAVEMENT. FOR PIER LENGTH
AND DIAMETER, SEE TABLE B11-1
SPIRAL REINFORCEMENT EQUIVALENT TO THE 13mm [#4]
TIES MAY BE USED.
SEE FIGURE B11-3 FOR ALLOWABLE MOORING AND STATIC
1.
2.
3.
NOTES
16mm [NO. 4] COPPER
CONDUCTOR
A A
[1
13mm [#4]
ELEVATION
N.T.S.
GROUND POINT SPACING
Table B11-1. Army Pier Length and Depths for Tiedowns
Cohesive Soils
Pier Diameter Pier Length
Unconfined Compressive Strength
(qu in kg/m2 [lb/ft2) m ft m ft qu < 5,000 kg/m2
(qu < 1,000 lb/ft2)
600 mm 2.0 ft 1,800 mm 6.0 ft
5,000< qu <19,500 kg/m2
(1,000< qu <4,000 lb/ft2)
500 mm 1.5 ft 1,800 mm 6.0 ft qu >18,500 kg/m2
(qu >4,000 lb/ft2)
500 mm 1.5 ft 1,200 mm 4.0 ft
Cohesionless Soils
Pier Diameter Pier Length
Friction Angle ∅ in Degrees m ft m ft
∅ < 20° 600 mm 2.0 ft 2,100 mm 7.0 ft
20° ≤ ∅ ≤ 30° 600 mm 2.0 ft 1,800 mm 6.0 ft
∅ > 30° 500 mm 1.5 ft 1,800 mm 6.0 ft
B11-3 EXISTING MOORING POINTS FOR ARMY. Existing mooring points will be tested for structural integrity and strength as detailed in Figure B11-2. If the existing mooring fails to meet the structural requirements listed herein, replacement of the mooring structure is required. If the existing mooring point has an attached ground rod, its electrical resistance value must be measured. If it fails to meet resistivity requirements, a new static ground rod is required.
B11-3.1 Evaluation of Existing Mooring Points for Structural Adequacy
B11-3.1.1 Adequate Mooring Points. Existing 19-millimeter (0.75-inch) -diameter bimetallic, copper-covered steel rods, 1,800 millimeters (6 feet) long are considered adequate for immediate aircraft protection, provided the following conditions are met:
The existing rods are installed in rigid pavement.
The existing rods do not show signs of deformation or corrosion.
The existing rods are inspected for deformation and corrosion at least once a year and after each storm event with winds greater than 90 kilometers per hour (50 knots).
B11-3.1.2 Inadequate Mooring Points. At Army facilities, any existing rods that exhibit deformation or corrosion will be considered inadequate and require replacement.
All existing 19-millimeter (0.75-inch) -diameter, 1,800-millimeter (6-foot) -long rods in flexible (asphalt) pavement, including those with a Portland cement concrete (PCC) block at the surface, require replacement.
B11-3.2 Evaluation of Existing Mooring Points for Resistance. The maximum resistance measured, in accordance with IEEE Standard 142, of existing grounding points, will not exceed 10,000 ohms under normally dry conditions. If this resistance cannot be obtained, an alternative grounding system will be designed.
B11-4 STATIC GROUNDING POINTS FOR ARMY FIXED- AND ROTARY-WING
FACILITIES
B11-4.1 Type. A static grounding point for Army facilities is a 3-meter (10-foot) rod with a closed eye (see Air Force Static Ground, Figure B11-12) except when installed in a hangar. Inside hangars, the static ground point consists of a copperweld rod attached to a bronze casting with a threaded connection, as shown in Figure B11-9.
Figure B11-9. Army Grounding Point Inside Aircraft Hangars
70mm [2-3/4"] DIA.
73mm [2-7/8"]
19mm [3/4"]
2,400mm [8']
FINISHED APRON
4mm [NO. 10] BRASS BALL CHAIN
19mm [3/4"] N.C. THREAD
19mm [3/4"] COPPER-WELD GROUND
ROD
CAST BRONZE COVER
FRICTION FIT
CAST BRONZE
HOUSING
BRASS PIN 2
B11-4.2 Layout
B11-4.2.1 Fixed-Wing Layout. Static grounding points for fixed-wing aircraft will be located on the parking apron as recommended by the aircraft manufacturer or as required by the facility. Typically, one static grounding point is provided for every two parking spaces, and is located between the parking spaces.
B11-4.2.2 Rotary-Wing Layout. One static grounding point will be provided at each rotary-wing aircraft parking space, as shown in Figure B11-10.
B11-4.3 Installation. Static grounding points can be installed in new concrete or asphalt. New grounding points placed in turf areas will be constructed in a 12,000-square-millimeter (18-square-inch) concrete pad flush with existing ground. Static grounding points for turf areas are shown in Figure B11-11.
B11-4.4 Grounding Requirements. In accordance with IEEE Standard 81, the maximum resistance measured of new grounding points will not exceed 10,000 ohms under normal dry conditions. If this resistance cannot be obtained, an alternative grounding system will be designed.
Figure B11-10. Mooring and Ground Point Layout for Rotary-Wing Parking Space
6m
6m [20'] 6m [20']
STATIC GROUNDING
POINT
MOORING POINT-SIX
LOCATIONS TYPICAL
0.6m [2']
TIEDOWN
CABLE
Figure B11-11. Army Grounding Point for Turf Areas
450mm [18"]
CONCRETE
PAD
ARMY STATIC
GROUNDING POINT
EXISTING
GROUND
PAD CONSTRUCTED FLUSH
WITH EXISTING GROUND
150mm [6"] CONCRETE MARKER PAD
OVER EXISTING SOIL
GROUND ROD WITH SCREW
3,000mm [10'] COPPER
TYPE BOTTOM ANCHOR
B11-5 AIR FORCE TIEDOWNS AND STATIC GROUNDS
B11-5.1 General. For the Air Force, tiedowns will be constructed in accordance with Figures B11-14 and B11-15 and may be used as a static ground provided they meet the requirements given in paragraph B11-5.4. For maximum flexibility, they may be installed in 4.6-meter (15-foot), 6.1-meter (20-foot), or 9.1-meter (30-foot) grids, or offset grids. At minimum, place tiedowns as indicated in aircraft Technical Orders or Facility Requirements Documents. Ideally, tiedowns will be centered in slabs, but, at minimum, shall not be located less than 914 millimeters (3 feet) from any joint.
B11-5.1.1 If tiedowns are intended to also be used as static grounds, soil conditions may require that a ground rod be installed. When a ground rod is included, bond it to the tiedown bar.
B11-5.1.2 Static grounding points will be installed using a minimum 3-meter (10-foot) rod with a closed eye. The 3-meter (10-foot) rod will have a diameter of not less than 19 millimeters (0.75 inch) and the top will be a closed forged eye or a shepherd's hook bend with clamped sleeve, having an inside diameter of not less than 40 millimeters (1.5 inches) (see Figure B11-12). The rod may be copper, copper-clad steel, galvanized steel, or copper-zinc-silicone alloy. The Air Force static ground is used only as a static ground, not an electrical ground, and is not designed to withstand the uplift forces imposed for mooring aircraft. On aprons, stencil the pavement near each static ground with the legend "Static Ground Only" in 102-millimeter (4- inch) block letters. Black lettering on a yellow background that extends a minimum of 51 mm (2 in) beyond the outermost edges of the letters is recommended.
B11-5.1.3 Inside hangars, Air Force activities may use the Army static ground fixture shown in Figure B11-9. All static ground fixtures inside hangars must be connected to the building ground and all grounds must be bonded.
B11-5.2 Layout. Static grounds and tiedowns will be configured and spaced in accordance with the requirements of the mission aircraft and will vary from aircraft to aircraft. An example of a multiple fixed-wing aircraft tiedown layout is shown in Figure B11-13.
Figure B11-12. Air Force Static Ground
19mm
19mm
5m m m m m m
[4
/2
A P
P R
O X
DETAIL OF EYE AND
SLEEVE ASSEMBLY 127mm [5"] DIA. MIN.
PAVEMENT
150mm [6"] MAX.
5m m
A A
B
B
APPROX. 80mm [3-1/4"] R.
ANCHOR
ANCHOR
EDGES ROUNDED
SECTION A
SECTION
B
DETAIL OF PAVEMENT RECESS
FOR CONCRETE
[3/4"] R
[3/4"] R
[1
[1
/2
[3
38 mm [1.5"]
THREADED OR
WELDED SCREW
ANCHOR FOR
FLEXIBLE PAVEMENT
SHEPHERDS HOOK
OR FORGED EYE
19mm [3/4"] MIN DIAMETER x 3,000mm [10'] COPPER, COPPER
CLAD STEEL, GALVANIZED
STEEL, OR
COPPER-ZINC-SILICONE ALLOY
COPPER COMPRESSION
SLEEVE FOR SHEPHERDS
HOOK STYLE ROD ENDS
NOTES
1. STATIC TIEDOWN GROUNDS ARE NOT INTENDED
AS AIRCRAFT TIEDOWNS OR THRUST ANCHORS.
2. THESE WILL BE USED AS EXTERIOR STATIC
GROUND POINTS FOR ARMY ROTARY WING
AIRCRAFT.
Figure B11-13. Example of Air Force Multiple Tiedown Layout for Fixed-Wing Aircraft
6m [20']
18m [60']
6m [20']
17m [56']
9m
3m [10']
B-1B BLAST DEFLECTOR
B-1B TIEDOWN
LOCATION
THIS IS AN EXAMPLE FOR ONE AIRCRAFT (B-1B).
FOR SPECIFIC AIRCRAFT DIMENSIONS REFERENCE
THE AIRCRAFT TECHNICAL ORDER (T.O.)
(AVAILABLE FROM MAINTENANCE ASSISTANCE
PROGRAM OFFICE).
[30']
C OF PARKING SPOTL C OF PARKING SPOTL
NOTE:
B11-5.3 Installation
B11-5.3.1 Static Grounds in Rigid Pavement. Where static grounds are to be installed in rigid pavement, the rods may be installed without bottom anchors. Static grounds should be offset a minimum of 600 millimeters (2 feet) from any pavement edge, joint, or tiedown point.
B11-5.3.2 Static Grounds in Flexible Pavements. Where flexible pavement is to be constructed, static grounding rods will be equipped with a screw-type bottom end having a wing diameter of not less than 127 millimeters (5 inches), as shown in Figure B11-12. The helical anchor may be welded to the rod or the rod may be threaded to permit attachment to the bottom anchor.
B11-5.3.3 Pavement Recess Design. The top of the static ground will be set at pavement grade or not more than 6 millimeters (0.25 inch) below grade. A smooth, rounded-edge recess 75 millimeters (3 inches) wide and not more than 150 millimeters (6 inches) long will be provided in the pavement around the eye for accessibility and attachment of grounding cables. This is shown in Figure B11-12.
Figure B11-14. Air Force Aircraft Tiedown, Profile
127mm [5"]
NOTES:
1. PLACE TIE DOWNS AS INDICATED IN AIRCRAFT TECHNICAL ORDER OR FACILITY REQUIREMENTS
DOCUMENT. IF THE TIEDOWN IS INTENDED TO ALSO BE USED AS A STATIC GROUND, SOIL
CONDITIONS MAY REQUIRE THAT A GROUND ROD BE INSTALLED. WHEN A GROUND ROD IS
INCLUDED, BOND IT TO THE TIEDOWN BAR.
2. MINIMUM DISTANCE FROM TIEDOWN CENTER POINT TO AN UNDOWELED JOINT IS 914 mm (3').
WHEN TIE DOWNS OCCUR 914mm [3 '] FROM A SINGLE JOINT, ORIENT BAR PARALLEL WITH THE JOINT. IF CENTER POINT OCCURS 914mm (3') FROM ADJACENT JOINTS, ORIENT BAR PARALLEL
WITH EITHER JOINT.
3. BAR WILL BE 32mm [1.25"] AISI 4130.
4. MINIMUM SLAB THICKNESS IS 254mm [10"].
5. PIER DIMENSIONS FOR ASPHALT PAVEMENTS MUST BE DESIGNED TO ACCOMMODATE
ANTICIPATED UPLIFT FORCES. FOR 17,100 kg (37,700 LBS) MINIMUM PIER DIMENSIONS ARE 1.83m x 1.83m x 2.13m (6' x 6' x 7').
6. FOR INSTALLATION IN PREEXISTING SLABS, INSTALL 1" Ø x 16" DOWEL RODS CENTERED AT HALF
SLAB DEPTH , ALL FOUR SIDES AS SHOWN IN THE PLAN VIEW. MINIMUM ANCHOR BLOCK
DIMENSIONS IN THIS CASE ARE 254mm [10"] x 1,067mm [42"] x 1,067mm [42"].
76mm [3"] R
146mm [5.75"]
914.4mm [36"]
254mm [10"] MINIMUM
92.25mm [3.75"]
178mm [7"] 127mm [5"] 152mm [6"]
#5 REBAR, FOUR
EACH WAY, TYP
114mm [4.5"]
DOWELS REQUIRED FOR
INSTALLATION IN PREEXISTING SLABS,
SEE NOTE 6
406mm [16"]
DOWEL
PRE-EXISTING
SLABS
Figure B11-15. Air Force Aircraft Tiedown, Plan
25mm [1"]
DOWELS
1,067mm [42"]
1,067mm [42"] 76mm [3"] MIN
305mm [12"] MIN
152mm 6"]
203 mm [8"]
203 mm [8"]
1m (3') MIN TO JOINT
1m (3') MIN TO JOINT
B11-5.4 Grounding Requirements. The maximum resistance of new static grounds, measured in accordance with IEEE Standard 81, should not exceed 10,000 ohms under normal dry conditions. If this resistance cannot be achieved, an alternative grounding system should be considered. Tiedowns that meet the above requirements may be used as static grounds.
B11-6 TIEDOWN MOORING EYES FOR NAVY AND MARINE CORPS.
Requirements, layout, and installation details for Navy and Marine Corps tiedown mooring eyes are found in Figure B11-16. Requirements, layout, and installation details for Navy and Marine Corps grounding arrangements are found in MIL-HDBK-274.
Figure B11-16. Navy and Marine Corps Mooring Eye/Tiedown Details
H/3
TIEDOWN/MOORING EYE-TYPE A
BAR Ø
NOT TO SCALE
DEPRESSION
HEMISPHERICAL
TROWELED
ADJUST TO SATISFY
DIMENSION "H"
CONTRACTOR TO
H
NOT TO SCALE
DEPRESSION
HEMISPHERICAL
TROWELED
LC
3" R
TIEDOWN/MOORING EYE (RETROFIT) DETAIL
610mm [2'-0"]
[5" TO 6"]
H
2. WHEN REBAR FOR EYE OCCURS WITHIN 304mm (1') OF JOINT,
1. PLACE MOORING EYES AS INDICATED ON PLANS.
ORIENT REBAR PARALLEL TO JOINT.
NOTES
BAR SIZES
127 to 152mm
25.4mm [1"] R
76.2mm [3"] R
25.4mm [1"] R
63.5mm +/- 6mm [2.5" +/- 1/4"]
H <254mm
[<10"] 254 TO 305mm
[10" TO 12"]
330 TO 406mm
[13" TO 16"]
BAR Ø
19mm [0.75"]
25.4mm [1"]
31.75 [1.25"]
25.4mm [1"] R
305mm [12"] CORE
[5" TO 6"]
127 to 152mm
63.5mm +/- 6mm [2.5" +/- 1/4"]
EXISTING
CONCRETE
102mm x 254mm x 19mm [4" x 10" x 3/4"]
PLATE (SNUG FIT WITH BAR)
PLAIN BAR ASTM A572 WITH HEAVY HEX NUTS
25mm [1"] DIA. BAR FOR PAVEMENTS < 254mm
[10"] THICK
32mm [1.25"] DIA. BAR FOR PAVEMENTS > 254mm
[10"] THICK
H
76mm[3"]
76mm [3"]
NOTES
1. PLACE MOORING EYES AS INDICATED ON PLANS.
2. DO NOT PLACE MOORING EYE WITHIN 1M [3'] OF ANY CRACK OR JOINT.
3. THEORETICAL ULTIMATE PULLOUT CAPACITY FOR 25mm [1"] BAR AND PAVEMENT < 254mm [10"] IS 111 ,205
NEWTONS [25,000 LBS].
4. THEORETICAL ULTIMATE PULLOUT CAPACITY FOR 32mm [1.25"] BAR AND PAVEMENT > 254mm [10"] IS 200,170
NEWTONS [45,000 LBS].
SEQUENCE:
1. CORE PAVEMENT.
2. EXTEND SHAFT TO A MINIMUM DEPTH AND 76mm [3"] MINIMUM UNDERCUT SHOWN.
3. MAINTAIN SHAFT TILL PCC PLACEMENT.
4. PLACE BAR ASSEMBLY AND NEW CONCRETE (4,000 PSI MIN).
3. BAR SHALL BE SMOOTH (PLAIN ASTM A615, GRADE60, HOT-DIPPED
GALVANIZED IN ACCORDANCE WITH ASTM A123) UNLESS
OTHERWISE NOTED.
472mm DIA. SHAFT
76mm [3"] MIN. AT PERIMETER
COAT WITH EPOXY, ASTM C-881, TYPE V,
GRADE AS APPROVED, PRIOR TO NEW
CONCRETE PLACEMENT
4. IF DEFORMED BAR IS TO BE USED, BARBEND R = 127 mm [5"].
| FOREWORD |
| REVISION SUMMARY SHEET |
| CONTENTS |
| CHAPTER 1 GENERAL REQUIREMENTS |
| 1-1 PURPOSE OF THIS MANUAL. |
| 1-2 SCOPE. |
| 1-2.1 Terminal Instrument Procedures (TERPS). |
| 1-2.2 Objects Affecting Navigable Airspace. |
| 1-2.3 Navigational Aids (NAVAIDS) and Lighting. |
| 1-2.4 Vertical/Short Takeoff and Landing (V/STOL) Aircraft (V-22). |
| 1-3 REFERENCES. |
| 1-4 APPLICATION OF CRITERIA |
| 1-4.1 Existing Facilities. |
| 1-4.2 Modification of Existing Facilities. |
| 1-4.3 New Construction. |
| 1-4.4 Metric Application. |
| 1-4.5 Military Activities on Civil Owned Airfields. |
| 1-4.6 USAFE Installations. |
| 1-5 SERVICE REQUIREMENTS. |
| 1-6 THEATER OF OPERATIONS. |
| 1-7 SECURITY CONSIDERATIONS FOR DESIGN. |
| 1-7.1 Integration of Security Measures. |
| 1-7.2 Security-Related Requirements. |
| 1-8 WAIVERS TO CRITERIA. |
| 1-9 USAF WORK ORDER COORDINATION AND AUTHORIZATION. |
| 1-10 NEW RUNWAYS, EXTENDING EXISTING RUNWAYS, AND NOTICE OF CONSTRUCTION. |
| 1-11 CONSTRUCTION PHASING PLAN. |
| 1-12 ZONING. |
| 1-13 ASSOCIATED DESIGN MANUALS. |
| Table 1-1. Associated Design Manuals |
| 1-14 USE OF TERMS. |
| CHAPTER 2 AVIATION FACILITIES PLANNING |
| 2-1 APPLICABILITY. |
| 2-1.1 Manual Usage. |
| 2-1.2 Terms. |
| 2-1.3 Planning Process. |
| 2-1.4 Planning Elements. |
| Figure 2-1. Aviation Facilities Planning Process |
| 2-1.5 Guidance. |
| 2-1.6 Additional Planning Factors. |
| 2-1.7 Space Allowances. |
| 2-2 JUSTIFICATION |
| 2-2.1 Aviation Facilities Planning. |
| 2-2.2 Number of Aircraft. |
| 2-2.3 Joint Use Facilities. |
| 2-3 GENERAL PLANNING CONSIDERATIONS |
| 2-3.1 Goals and Objectives. |
| 2-3.2 Functional Proponent. |
| 2-3.3 Requirements. |
| 2-3.4 Safety. |
| 2-3.5 Design Aircraft. |
| 2-3.6 Airspace and Land Area. |
| 2-4 PLANNING STUDIES |
| 2-4.1 Master Plan. |
| 2-4.2 Land Use Studies. |
| 2-4.3 Environmental Studies. |
| 2-4.4 Aircraft Noise Studies. |
| 2-4.5 Instrumented Runway Studies. |
| 2-5 SITING AVIATION FACILITIES |
| 2-5.1 Location. |
| 2-5.2 Site Selection |
| 2-5.3 Airspace Approval. |
| 2-5.4 Airfield Safety Clearances |
| 2-6 AIRSIDE AND LANDSIDE FACILITIES. |
| 2-7 LANDING AND TAKEOFF AREA |
| 2-7.1 Runways and Helipads. |
| 2-7.2 Number of Runways. |
| 2-7.3 Number of Helipads. |
| 2-7.4 Runway Location. |
| 2-7.5 Runway and Helipad Separation. |
| 2-7.6 Runway Instrumentation. |
| 2-8 AIRCRAFT GROUND MOVEMENT AND PARKING AREAS. |
| 2-8.1 Taxiways. |
| 2-8.2 Aircraft Parking Aprons. |
| 2-9 AIRCRAFT MAINTENANCE AREA (OTHER THAN PAVEMENTS). |
| 2-9.1 Aircraft Maintenance Facilities. |
| 2-9.2 Aviation Maintenance Buildings (Air Force and Navy). |
| 2-9.3 Aviation Maintenance Buildings (Army) |
| 2-9.4 Maintenance Aprons. |
| 2-9.5 Apron Lighting. |
| 2-9.6 Security. |
| 2-10 AVIATION OPERATIONS SUPPORT AREA |
| 2-10.1 Aviation Operations Support Facilities. |
| 2-10.2 Location. |
| 2-10.3 Orientation of Facilities. |
| 2-10.4 Multiple Supporting Facilities. |
| 2-10.5 Transient Facilities. |
| 2-10.6 Other Support Facilities. |
| 2-10.7 Aircraft Fuel Storage and Dispensing |
| 2-10.8 Roadways to Support Airfield Activities |
| 2-10.9 Navy/Marine Corps Exemptions from Waivers. |
| CHAPTER 3 RUNWAYS (FIXED-WING) AND IMAGINARY SURFACES |
| 3-1 CONTENTS. |
| 3-2 REQUIREMENTS. |
| 3-3 RUNWAY CLASSIFICATION. |
| 3-3.1 Class A Runways. |
| 3-3.2 Class B Runways. |
| 3-3.3 Rotary-Wing and V/STOL Aircraft. |
| Table 3-1. Runway Classification by Aircraft Type |
| 3-3.4 Landing Zones (formerly called Short Fields and Training Assault Landing Zones). |
| 3-4 RUNWAY SYSTEMS. |
| 3-4.1 Single Runway. |
| 3-4.2 Parallel Runways. |
| 3-4.3 Crosswind Runways. |
| Table 3-2. Runways |
| 3-5 RUNWAY ORIENTATION/WIND DATA. |
| 3-6 ADDITIONAL CONSIDERATIONS FOR RUNWAY ORIENTATION. |
| 3-6.1 Obstructions. |
| 3-6.2 Restricted Airspace. |
| 3-6.3 Built-Up Areas. |
| 3-6.4 Neighboring Airports. |
| 3-6.5 Topography. |
| 3-6.6 Soil Conditions. |
| 3-6.7 Noise Analysis. |
| 3-7 RUNWAY DESIGNATION. |
| 3-8 RUNWAY DIMENSIONS. |
| 3-8.1 Runway Dimension Criteria, Except Runway Length. |
| 3-8.2 Runway Length Criteria |
| 3-8.3 Layout. |
| Table 3-3. Army Class A Runway Lengths |
| Figure 3-1. Runway Transverse Sections and Primary Surface |
| Figure 3-2. Clear Zone Transverse Section Detail |
| Figure 3-3. Runway and Overrun Longitudinal Profile |
| Figure 3-4. Army Clear Zone and Accident Potential Zone Guidelines |
| Figure 3-5. Air Force Clear Zone and APZ Guidelines |
| Figure 3-6. Navy and Marine Corps Clear Zone and APZ Guidelines |
| Figure 3-7. Class A VFR Runway Primary Surface End Details |
| Figure 3-8. Class A VFR Runway Isometric Airspace Imaginary Surfaces |
| Figure 3-9. Class A VFR Runway Plan and Profile Airspace Imaginary Surfaces |
| Figure 3-10. Class A IFR Runway Primary Surface End Details |
| Figure 3-11. Class A IFR Runway Airspace Imaginary Surfaces |
| Figure 3-12. Class A IFR Runway Plan and Profile Airspace Imaginary Surfaces |
| Figure 3-13. Class B Army and Air Force Runway End and Clear Zone Details |
| Figure 3-14. Class B Army Runway Airspace Imaginary Surfaces |
| Figure 3-15. Class B Army and Air Force Runway Airspace Plan and Profile Runway Imaginary Surfaces |
| Figure 3-16. Class B Navy Runway Primary Surface End Details |
| Figure 3-17. Class B Air Force and Navy Runway Airspace Imaginary Surfaces |
| Figure 3-18. Class B Navy Runway Airspace Plan and Profile Runway Imaginary Surfaces |
| Figure 3-19. VFR and IFR Crosswind Runways Isometric Airspace Imaginary Surfaces |
| Figure 3-20. Plan, Single Runway, Navy Class A, and Basic Training Outlying Field |
| Figure 3-21. Plan, Single Runway, and Navy Class B |
| Figure 3-22. Typical Layout, Navy Dual Class B Runways |
| 3-9 SHOULDERS. |
| 3-9.1 Paved Shoulder Areas |
| 3-9.2 Unpaved Shoulder Areas |
| 3-10 RUNWAY OVERRUNS. |
| Table 3-4. Overruns |
| 3-10.1 The Paved Portion of the Overrun |
| 3-10.2 The Unpaved Portion of the Overrun |
| 3-11 RUNWAY CLEAR ZONES. |
| 3-11.1 Treatment of Clear Zones. |
| 3-11.2 Clear Zone Mandatory Frangibility Zone (MFZ). |
| Table 3-5. Clear Zones |
| 3-11.3 US Navy Clear Zones |
| 3-12 ACCIDENT POTENTIAL ZONES (APZ). |
| 3-13 AIRSPACE IMAGINARY SURFACES |
| 3-13.1 Types of Airspace Imaginary Surfaces. |
| 3-13.2 Imaginary Surfaces. |
| Table 3-6. Accident Potential Zones (APZs) |
| Table 3-7. Airspace Imaginary Surface |
| 3-14 AIRSPACE FOR AIRFIELDS WITH TWO OR MORE RUNWAYS. |
| 3-15 OBSTRUCTIONS TO AIR NAVIGATION. |
| 3-15.1 Aircraft Movement Area. |
| 3-15.2 Determining Obstructions. |
| 3-15.3 Trees. |
| Table 3-8. Imaginary Surfaces Minimum Clearances over Highway, Railroad, Waterway, and Trees |
| 3-16 AIRCRAFT ARRESTING SYSTEMS. |
| 3-16.1 Navy and Marine Corps Requirements. |
| 3-16.2 Installation Design and Repair Considerations. |
| 3-16.3 Joint-Use Airfields. |
| 3-16.4 Military Rights Agreements for Non-CONUS Locations. |
| CHAPTER 4 ROTARY-WING RUNWAYS, HELIPADS, LANDING LANES, AND HOVERPOINTS |
| 4-1 CONTENTS. |
| 4-2 LANDING AND TAKEOFF LAYOUT REQUIREMENTS. |
| 4-3 ROTARY-WING RUNWAY. |
| 4-3.1 Orientation and Designation. |
| 4-3.2 Dimensions. |
| 4-3.3 Layout. |
| Table 4-1. Rotary-Wing Runways |
| Figure 4-1. Helicopter VFR Runway |
| Figure 4-2. Helicopter IFR Runway |
| Figure 4-3. IFR Airspace Imaginary Surfaces: IFR Helicopter Runway and Helipad |
| 4-4 HELIPADS. |
| 4-4.1 Standard VFR Helipad. |
| 4-4.2 Limited Use Helipad. |
| 4-4.3 IFR Helipad. |
| 4-4.4 Helipad Location. |
| 4-4.5 Dimensional Criteria. |
| Table 4-2. Rotary-Wing Helipads and Hoverpoints |
| 4-4.6 Layout Criteria. |
| 4-5 SAME DIRECTION INGRESS/EGRESS. |
| 4-5.1 Dimensions Criteria. |
| 4-5.2 Layout Criteria. |
| 4-6 HOVERPOINTS |
| 4-6.1 General. |
| 4-6.2 Hoverpoint Location. |
| 4-6.3 Dimensions. |
| 4-6.4 Layout. |
| 4-7 ROTARY-WING LANDING LANES. |
| 4-7.1 Requirements for a Landing Lane. |
| 4-7.2 Landing Lane Location. |
| 4-7.3 Touchdown Points. |
| 4-7.4 Dimensions. |
| 4-7.5 Layout. |
| Figure 4-4. Standard VFR Helipad for Army and Air Force |
| Figure 4-5. Standard VFR Helipad for Navy and Marine Corps and Limited Use VFR Helipad for Army and Air Force |
| Figure 4-6. Standard IFR Helipad |
| Figure 4-7. Army, Air Force, Navy, and Marine Corps VFR Helipad with Same Direction Ingress/Egress |
| Figure 4-8. Army and Air Force VFR Limited Use Helipad with Same Direction Ingress/Egress |
| Figure 4-9. Army and Air Force IFR Helipad with Same Direction Ingress/Egress |
| Figure 4-10. Helicopter Hoverpoint |
| Table 4-3. Rotary-Wing Landing Lanes |
| Figure 4-11. Rotary-Wing Landing Lane |
| 4-8 AIR FORCE HELICOPTER SLIDE AREAS (OR “SKID PADS”). |
| 4-9 SHOULDERS FOR ROTARY-WING FACILITIES. |
| Table 4-4. Shoulders for Rotary-Wing Facilities |
| 4-10 OVERRUNS FOR ROTARY-WING RUNWAYS AND LANDING LANES. |
| Table 4-5. Overruns for Rotary-Wing Runways and Landing Lanes |
| 4-11 CLEAR ZONE AND ACCIDENT POTENTIAL ZONE (APZ). |
| 4-11.1 Clear Zone Land Use. |
| 4-11.2 Accident Potential Zone (APZ). |
| 4-11.3 Dimensions. |
| 4-12 IMAGINARY SURFACES FOR ROTARY-WING RUNWAYS, HELIPADS, LANDING LANES, AND HOVERPOINTS. |
| Table 4-6. Rotary-Wing Runway and Landing Lane Clear Zone and APZ |
| Table 4-7. Rotary-Wing Imaginary Surface for VFR Approaches |
| Table 4-8. Rotary-Wing Imaginary Surfaces for IFR Approaches |
4-13 OBSTRUCTIONS AND AIRFIELD AIRSPACE CRITERIA.
| CHAPTER 5 TAXIWAYS |
| 5-1 CONTENTS. |
| 5-2 TAXIWAY REQUIREMENTS. |
| 5-3 TAXIWAY SYSTEMS |
| 5-3.1 Basic. |
| 5-3.2 Parallel Taxiway. |
| 5-3.3 High-Speed Taxiway Turnoff. |
| 5-3.4 Additional Types of Taxiways. |
| 5-3.5 Taxilanes. |
| 5-3.6 USAF Taxitraks. |
| Figure 5-1. Common Taxiway Designations |
| 5-4 TAXIWAY LAYOUT. |
| 5-4.1 Efficiency. |
| 5-4.2 Direct Access. |
| 5-4.3 Simple Taxiing Routes. |
| 5-4.4 Delay Prevention. |
| 5-4.5 Runway Exit Criteria. |
| 5-4.6 Taxiway Designation. |
| 5-5 FIXED-WING TAXIWAY DIMENSIONS. |
| 5-5.1 Criteria. |
| 5-5.2 Transverse Cross-Section. |
| Figure 5-2. Spacing Requirements: Normal Taxiway Turnoffs |
| Table 5-1. Fixed-Wing Taxiways |
| Figure 5-3. Taxiway and Primary Surface Transverse Sections |
| 5-6 ROTARY-WING TAXIWAY DIMENSIONS. |
| Table 5-2. Rotary-Wing Taxiways |
| 5-7 TAXIWAYS AT DUAL USE (FIXED- AND ROTARY-WING) AIRFIELDS |
| 5-7.1 Criteria. |
| 5-7.2 Taxiway Shoulders. |
| Table 5-3. Rotary-Wing Taxiway Shoulders |
| 5-8 TAXIWAY INTERSECTION CRITERIA. |
| 5-8.1 Fillet-Only Dimensions. |
| 5-8.2 Fillet and Lead-in to Fillet Dimensions. |
| Table 5-4. Runway/Taxiway Intersection Fillet Radii |
| Table 5-5. Taxiway/Taxiway Intersection and Taxiway Turns Fillet Radii |
| Figure 5-4. Runway/Taxiway Intersection Fillets |
| Figure 5-5. Taxiway/Taxiway Intersection Fillets |
| Figure 5-6. Intersection Geometry for Navy and Marine Corps FacilitiesServing Aircraft with Wingspan Greater than 33.5 m (110 ft) |
| 5-9 HIGH-SPEED RUNWAY EXITS. |
| 5-10 APRON ACCESS TAXIWAYS. |
| 5-10.1 Parking Aprons. |
| 5-10.2 Fighter Aircraft Aprons. |
| 5-11 SHOULDERS. |
| 5-11.1 Fixed-Wing Taxiways. |
| 5-11.2 Rotary-Wing Taxiways. |
| 5-12 TOWWAYS. |
| 5-12.1 Dimensions. |
| 5-12.2 Layout. |
| 5-12.3 Existing Roadway. |
| 5-13 HANGAR ACCESS. |
| Table 5-6. Towways |
| Figure 5-7. Towway Criteria |
| CHAPTER 6 APRONS AND OTHER PAVEMENTS |
| 6-1 CONTENTS. |
| 6-2 APRON REQUIREMENTS. |
| 6-3 TYPES OF APRONS AND OTHER PAVEMENTS. |
| 6-4 AIRCRAFT CHARACTERISTICS. |
| 6-5 PARKING APRON FOR FIXED-WING AIRCRAFT. |
| 6-5.1 Location. |
| 6-5.2 Size. |
| 6-5.3 Army Parking Apron Layout |
| 6-5.4 Air Force Parking Apron Layout. |
| 6-5.5 Layout for Combined Army and Air Force Parking Aprons. |
| 6-5.6 Tactical/Fighter Parking Apron Layout. |
| Figure 6-1. Apron Nomenclature and Criteria |
| Figure 6-2. Army and Air Force Parking Plan |
| Figure 6-3. Apron with Diagonal Parking |
| 6-5.7 Refueling Considerations. |
| 6-5.8 Parking Dimensions. |
| Figure 6-4. Truck Refueling Safety Zone Example |
| Table 6-1. Fixed-Wing Aprons |
| 6-6 TAXIING CHARACTERISTICS ON APRONS FOR FIXED-WINGAIRCRAFT |
| 6-6.2 Turning Capabilities (Aircraft Turning and Maneuvering |
| 6-6.3 Departure Sequencing. |
| 6-6.4 Minimum Standoff Distances from Edge Pavements. |
| 6-7 PARKING APRON FOR ROTARY-WING AIRCRAFT. |
| 6-7.1 Location. |
| 6-7.2 Apron Size. |
| 6-7.3 Maneuverability. |
| 6-7.4 Army Parking Apron Layout. |
| 6-7.5 Air Force Parking Apron Layout. |
| 6-7.6 Refueling Considerations. |
| 6-7.7 Parking Dimensions. |
| Figure 6-5. Type 1 Parking for All Rotary-Wing Aircraft Except CH-47 |
| Figure 6-6. Type 1 Parking for CH-47 |
| Figure 6-7. Type 2 Parking for Skid Rotary-Wing Aircraft |
| Figure 6-8. Type 2 Parking for Wheeled Rotary-Wing Aircraft |
| Table 6-2. Rotary-Wing Aprons for Army Airfields |
| 6-8 WARM-UP PADS. |
| 6-8.1 Navy and Marine Corps. |
| 6-8.2 Location |
| 6-8.3 Siting Considerations |
| 6-8.4 Warm-Up Pad Size. |
| 6-8.5 Taxi-In/Taxi-Out Capabilities. |
| Figure 6-9. Warm-Up Pad at End of Parallel Taxiway |
| Figure 6-10. Warm-Up Pad Next to Parallel Taxiway |
| Figure 6-11. Warm-Up Pad Located in Clear Zone |
| Figure 6-12. Warm-Up Pad Located in Approach-Departure Clearance Surface |
| Figure 6-13. Warm-Up Pad/Localizer Critical Area |
| Figure 6-14. Air Force Warm-Up Pad/Glide Slope Critical Area |
| Figure 6-15. Warm-Up Pad/CAT II ILS Critical Area |
| Figure 6-16. Warm-Up Pad Taxiing and Wingtip Clearance Requirements |
| 6-8.6 Parking Angle. |
| 6-8.7 Turning Radius. |
| 6-8.8 Taxilanes on Warm-Up Pads. |
| 6-8.9 Tie-Downs and Grounding Points. |
| 6-9 POWER CHECK PAD. |
| 6-9.1 Location and Siting Considerations. |
| 6-9.2 Unsuppressed Power Check Pad Layout. |
| 6-9.3 Access Taxiway/Towway. |
| 6-9.4 Grading. |
| 6-9.5 Thrust Anchors/Mooring Points. |
| Figure 6-17. Geometry for Rectangular Power Check Pad |
| Figure 6-18. Geometry for Square Power Check Pad |
| Figure 6-19. Geometry for Circular Power Check Pad |
| 6-9.6 Anchor Blocks. |
| 6-9.7 Power Check Pad Facilities |
| 6-9.8 Noise Considerations. |
| 6-10 ARM/DISARM PADS. |
| 6-10.1 Navy and Marine Corps Requirements. |
| 6-10.2 Location. |
| 6-10.3 Siting Considerations |
| 6-10.4 Arm/Disarm Pad Size. |
| 6-10.5 Taxi-In/Taxi-Out Capabilities. |
| 6-10.6 Parking Angle. |
| 6-10.7 Turning Radius. |
| 6-10.8 Access Road. |
| 6-10.9 Tie-downs and Grounding Points. |
| 6-10.10 Ammunition and Explosives Safety Standards. |
| Figure 6-20. Arm-Disarm Pad for F-4 Fighter |
| Figure 6-21. Arm-Disarm Pad for F-15 Fighter |
| Figure 6-22. Arm-Disarm Pad for F-16 Fighter |
| Figure 6-23. Arm-Disarm Pad for F-22 Fighter |
| 6-11 COMPASS CALIBRATION PAD (CCP). |
| 6-11.1 Air Force. |
| 6-11.2 Navy and Marine Corps. |
| 6-11.3 Location. |
| 6-11.4 Siting Consideration |
| 6-11.5 Compass Calibration Pad (CCP) Size |
| Figure 6-24. Army and Air Force Compass Calibration Pad |
| 6-11.6 Access Taxiway/Towway. |
| 6-11.7 Grading. |
| 6-11.8 Tie-Down/Mooring Points. |
| 6-11.9 Embedded Material. |
| 6-11.10 Control Points. |
| 6-12 HAZARDOUS CARGO PADS. |
| 6-12.1 Navy and Marine Corps Requirements. |
| 6-12.2 Siting Criteria. |
| 6-12.3 Hazardous Cargo Pad Size |
| 6-12.4 Access Taxiway. |
| 6-12.5 Tie-Down and Grounding Points. |
| 6-12.6 Miscellaneous Considerations. |
| 6-13 ALERT PAD. |
| Figure 6-25. Hazardous Cargo Pad Other than APOE/Ds |
| Figure 6-26. Typical Hazardous Cargo Pad for APOE/Ds |
| Figure 6-27. Typical Alert Apron for Bombers and Tanker Aircraft |
| Figure 6-28. Typical Alert Pad for Fighter Aircraft |
| 6-13.1 Navy and Marine Corps Requirements. |
| 6-13.2 Location. |
| 6-13.3 Siting Criteria |
| 6-13.4 Alert Pad Size |
| Table 6-3. Minimum Separation Distance on Bomber Alert Aprons from theCenterline of a Through Taxilane to a Parked Aircraft |
| 6-13.5 Design Aircraft. |
| 6-13.6 Alert Aircraft Parking Arrangements |
| 6-13.7 Jet Blast Distance Requirements. |
| 6-13.8 Taxi-In/Taxi-Out Capabilities. |
| 6-13.9 Turning Radius. |
| Figure 6-29. Alert Apron Taxi-In/Taxi-Out Parking |
| Figure 6-30. Alert Apron Back-In Parking |
| 6-13.10 Dedicated Access Taxiway. |
| 6-13.11 Tie-Down and Grounding Points. |
| 6-14 AIRCRAFT WASH RACKS. |
| 6-14.1 Location. |
| 6-14.2 Wash Rack Size. |
| Table 6-4. Wash Rack Clearances From Aircraft to Curb |
| 6-14.3 Wash Rack Facilities. |
| 6-14.4 Wash Rack Grading. |
| 6-14.5 Tie-Down and Grounding Points. |
| 6-14.6 Concrete Curbs. |
| 6-14.7 Service Points |
| Figure 6-31. Wash Rack for Mixed Mission Facility |
| Figure 6-32. Heavy Bomber Wash Rack (B-52 or B-1) |
| Figure 6-33. Cargo Aircraft Wash Rack |
| Figure 6-34. Fighter Aircraft Wash Rack and Navy Type A Wash Rack |
| Figure 6-35. Navy Type B Wash Rack |
| Figure 6-36. Helicopter Wash Rack (Single Helicopter) |
| Figure 6-37. Utilities and In-Pavement Structures |
| 6-14.8 Wastewater Collection. |
| 6-14.9 Wastewater Treatment. |
| 6-14.10 Utilities Control Building. |
| 6-14.11 Utilities. |
| 6-15 HANGAR ACCESS APRONS. |
| 6-15.1 Dimensions. |
| 6-15.2 Grades for Aircraft Fueling Ramps. |
| 6-15.3 Grades for Aircraft Access into Hangars. |
| Table 6-5. Hangar Access Apron |
| 6-16 TAXIING CHARACTERISTICS ON APRONS FOR ROTARY-WINGAIRCRAFT. |
| 6-16.1 Hoverlane/Taxilane Width at Army Facilities. |
| 6-16.2 Hoverlane/Taxilane Width at Air Force Facilities. |
| 6-17 FIXED-WING AND ROTARY-WING GRADING STANDARDS |
| 6-17.1 Fixed-Wing Aircraft. |
| 6-17.2 Rotary-Wing Aircraft. |
| 6-17.3 Grades for Aircraft Fueling Ramps. |
| 6-18 SHOULDERS. |
| 6-18.1 Paved Shoulder Areas |
| 6-18.2 Unpaved Shoulder Areas |
| 6-19 MISCELLANEOUS APRON DESIGN CONSIDERATIONS. |
| 6-19.1 Jet Blast Deflectors. |
| 6-19.2 Line Vehicle Parking. |
| 6-19.3 Utilities. |
| 6-20 CV-22 APRON CLEARANCES. |
| 6-21 US NAVY AND MARINE CORPS AIRCRAFT BLOCK DIMENSIONS. |
| Figure 6-38. CV-22 Apron Clearance Requirements |
| Figure 6-39. Navy/Marine Corps, 45-Degree Aircraft Parking Configuration |
| Figure 6-40. Navy/Marine Corps, 90-Degree Aircraft Parking Configuration |
| Table 6-6. Navy/Marine Corps Aircraft Parking Spacing,Helicopter Aircraft, 90-Degree Parking |
| Table 6-7. Navy/Marine Corps Aircraft Parking Spacing,Propeller Aircraft, 90-Degree Parking |
| Table 6-8. Navy/Marine Corps Aircraft Parking Spacing,Jet Aircraft, 90-Degree Parking |
| Table 6-9. Navy/Marine Corps Aircraft Parking Spacing,Jet Aircraft, 45-Degree Parking |
| CHAPTER 7 LANDING ZONES FOR C-130 AND C-17 |
| 7-1 GENERAL INFORMATION. |
| 7-1.1 Differences in Service Criteria. |
| 7-1.2 Landing Zone Marking and Lighting Standards. |
| 7-2 DEFINITIONS. |
| 7-2.1 Accident Potential Zone–Landing Zone (APZ-LZ) |
| 7-2.2 Clear Zone-LZ |
| 7-2.3 Contingency Operations |
| 7-2.4 Exclusion Area |
| 7-2.5 Graded Area |
| 7-2.6 Imaginary Surfaces-LZ |
| 7-2.7 Infield Area |
| 7-2.8 Landing Zone (LZ) |
| 7-2.9 Maintained Area |
| 7-2.10 Parking Maximum on Ground (MOG) |
| 7-2.11 Paved Landing Zone (LZ) |
| 7-2.12 Primary Surface-LZ |
| 7-2.13 Runway End. |
| 7-2.14 Semi-Prepared Landing Zone (LZ). |
| 7-2.15 Turnaround (or Hammerhead) |
| 7-3 ACRONYMS. |
| 7-4 SITE PLANNING FOR LANDING ZONES (LZ). |
| 7-4.1 Future Development (Land or Aircraft Technology). |
| 7-4.2 Prohibited Land Uses. |
| 7-4.3 APZs not on DOD Property. |
| 7-5 SITING CONSIDERATIONS. |
| 7-5.1 Training Landing Zones (LZs). |
| 7.5.2 Siting Landing Zones (LZs). |
| 7-5.3 FAA Requirements. |
| 7-5.4 Siting LZs in Built-Up Areas. |
| 7-6 GEOMETRIC CRITERIA FOR RUNWAYS AND OVERRUNS. |
| 7-6.1 LZ Runway Lengths. |
| Table 7-1. C-17 LZ Runway Lengths |
| 7-6.2 LZ Runway Widths. |
| Table 7-2. Runways for LZs |
| 7-6.3 Operating Surface Gradient Allowances. |
| 7-6.4 LZ Shoulders. |
| Table 7-3. Taxiways for LZs |
| Table 7-4. Aprons for LZs |
| Table 7-5. Overruns for LZs |
| 7-6.5 Turnarounds. |
| 7-7 IMAGINARY SURFACES AND LAND USE CONTROL AREAS. |
| Table 7-6. Runway End Clear Zone for LZs |
| Table 7-7. Imaginary Surfaces for LZs |
| Table 7-8. APZs and Exclusion Areas for LZs |
| Figure 7-1. LZ Primary Surface End Details |
| Figure 7-2. LZ Details |
| Figure 7-3. LZ with Contiguous Aprons and Turnarounds |
| Figure 7-4. LZ Apron Layout Details |
| Figure 7-5. LZ Runway Imaginary Surfaces |
| Figure 7-6. LZ Runway, Taxiway, and Apron Sections |
| Figure 7-7. Navy and Marine Corps LZ Primary Surface End Details |
| Figure 7-8. Navy and Marine Corps LZ Details |
| Figure 7-9. Navy and Marine Corps LZ with Contiguous Aprons and Turnarounds |
| Figure 7-10. Navy and Marine Corps LZ Apron Layout Details |
| Figure 7-11. Navy and Marine Corps LZ Runway Imaginary Surfaces |
| Figure 7-12. Navy LZ Runway, Taxiway, and Apron Sections |
| 7-8 OPERATIONAL WAIVERS TO CRITERIA. |
| 7-9 SEPARATION DISTANCES BETWEEN PERMANENTRUNWAYS/HELIPADS AND LZ RUNWAYS |
| 7-9.1 Separation Distances between Permanent Runways/Helipads and LZRunways for Simultaneous Operations. |
| 7-9.2 Separation between Permanent Class A or Class B Runways and LZRunways for Non-Simultaneous Operations. |
| 7-10 SURFACE TYPES. |
| 7-11 MARKING AND LIGHTING. |
| Table 7-9. Runway Separation for Simultaneous Operations |
| CHAPTER 8 AIRCRAFT HANGAR PAVEMENTS |
| 8-1 GENERAL REQUIREMENTS. |
| 8-2 AIRCRAFT MODULES SPACE. |
| Table 8-1. Aircraft Space Modules for Army Aviation Facilities |
| 8-3 HANGAR AND SHELTER CLEARANCES. |
| 8-4 HANGAR FLOOR DESIGN. |
| Table 8-2. Aircraft Clearances inside Hangars |
| GLOSSARY |
| APPENDIX A REFERENCES |
| APPENDIX B BEST PRACTICES |
| SECTION 1 WAIVER PROCESSING PROCEDURES |
| B1-1 ARMY |
| B1-1.1 Waiver Procedures |
| B1-1.2 Contents of Waiver Requests. |
| B1-1.3 Additional Requirements |
| B1-2 AIR FORCE |
| B1-2.1 Waivers to Criteria and Standards |
| B1-2.2 Waiver Processing Procedures. |
| B1-2.3 Waiver Authority. |
| B1-2.4 Effective Length of Waiver. |
| B1-2.5 Responsibilities. |
| B1-3 NAVY AND MARINE CORPS |
| B1-3.1 Applicability |
| B1-3.2 Approval. |
| B1-3.3 Obtaining Waiver. |
| B1-3.4 Exemptions from Waiver. |
| SECTION 2 ARMY LAND USE AND FACILITY SPACE -- ALLOWANCES |
| B2-1 APPLICABILITY |
| B2-1.1 Air Force. |
| B2-1.2 Navy and Marine Corps. |
| Table B2-1. Facility Class 1: Operational and Training Facilities, Category Group11: Airfields Pavement, General |
| SECTION 3 DOD AIR INSTALLATIONS COMPATIBLE USE ZONESSUGGESTED LAND USE COMPATIBILITY IN ACCIDENT POTENTIAL ZONES |
| B3-1 LEGEND. |
| B3-2 NOTES. |
| B3-3 REFERENCES. |
| B3-3.1 DOD. |
| B3-3.2 Air Force. |
| B3-3.3 Navy and Marine Corps. |
| SECTION 4 WIND COVERAGE STUDIES |
| B4-1 APPLICABILITY |
| B4-1.1 Army. |
| B4-1.2 Air Force. |
| B4-1.3 Navy and Marine Corps. |
| B4-2 OBJECTIVE. |
| B4-3 GENERAL. |
| B4-3.1 Basic Conditions. |
| B4-3.2 Meteorological Conditions. |
| B4-4 WIND VELOCITY AND DIRECTION. |
| B4-4.1 Composite Windrose. |
| B4-4.2 Terrain. |
| B4-4.3 Additional Weather Data. |
| B4-4.4 Wind Distribution. |
| B4-5 USE OF WINDROSE DIAGRAMS. |
| B4-5.1 Drawing the Windrose. |
| B4-5.2 Special Conditions. |
| Figure B4-1. Windrose Blank Showing Direction and Divisions(16-Sector [22.5°] Windrose) |
| Figure B4-2. Windrose Blank Showing Direction and Divisions(36-Sector [10°] Windrose) |
| Figure B4-3. Completed Windrose and Wind Velocity Equivalents(16-Sector [22.5°] Windrose) |
| B4-5.3 Desired Runway Orientation. |
| Figure B4-4. Windrose Analysis |
| B4-6 WIND COVERAGE REQUIREMENTS FOR RUNWAYS. |
| B4-6.1 Primary Runways. |
| B4-6.2 Secondary Runways. |
| B4-6.3 Maximum Allowable Crosswind Components (Navy Only) . |
| B4-6.4 Allowable Variations of Wind Direction. |
| Figure B4-5. Allowable Wind Variation for 19 Kilometer-per-Hour (10.4 Knot) and28 Kilometer-per-Hour (15 Knot) Beam Wind Components |
| SECTION 5 EXTRACT OF FEDERAL AVIATION REGULATION PART 77,OBJECTS AFFECTING NAVIGABLE AIRSPACE |
| SECTION 6 AIRCRAFT CHARACTERISTICS FORAIRFIELD-HELIPORT DESIGN AND EVALUATION |
| B6-1 GENERAL. |
| SECTION 7 JET BLAST EFFECTS |
| B7-1 CONTENTS. |
| B7-2 CONSIDERATIONS. |
| B7-2.1 Blast Temperatures. |
| B7-2.2 Blast Velocities. |
| B7-2.3 Minimum Clearances. |
| B7-2.4 Engine Blast Relationship. |
| B7-3 PROTECTION FROM JET BLAST EFFECTS. |
| B7-3.1 Blast Deflectors. |
| B7-3.2 Unprotected Areas. |
| B7-4 NOISE CONSIDERATIONS. |
| B7-5 JET BLAST REQUIREMENTS. |
| B7-5.1 Parked Aircraft. |
| B7-5.2 Taxiing Aircraft. |
| SECTION 8 JET BLAST DEFLECTOR |
| B8-1 OVERVIEW. |
| B8-1.1 Location. |
| B8-1.2 Size and Configuration. |
| B8-1.3 Paved Shoulders. |
| SECTION 9 EXPLOSIVES ON OR NEAR AIRFIELDS |
| B9-1 CONTENTS. |
| B9-2 SEPARATION DISTANCE REQUIREMENTS. |
| B9-3 PROHIBITED ZONES. |
| B9-4 HAZARDS OF ELECTROMAGNETIC RADIATION TO EED. |
| B9-5 LIGHTNING PROTECTION. |
| B9-6 GROUNDING OF AIRCRAFT. |
| B9-7 HOT REFUELING. |
| SECTION 10 COMPASS CALIBRATION PAD MAGNETIC SURVEY |
| B10-1 CONTENTS. |
| B10-2 AIR FORCE, NAVY, AND MARINE CORPS REQUIREMENTS. |
| B10-3 ACCURACY REQUIREMENTS. |
| B10-4 PRELIMINARY SURVEY REQUIREMENTS. |
| B10-4.1 Proton Magnetometer Method. |
| B10-4.2 Distant Object Method. |
| B10-4.3 Reciprocal Observation Method. |
| B10-5 MAGNETIC SURVEY REQUIREMENTS. |
| B10-6 MAGNETIC SURVEY PROCEDURES. |
| B10-6.1 Magnetic Field Survey (Variation Check). |
| Figure B10-1. Magnetic Field Survey Sheet |
| B10-6.2 Magnetic Direction Survey. |
| Figure B10-2. Layout of Compass Rose |
| B10-7 SITING CONSIDERATIONS. |
| B10-7.1 Separation Distances. |
| B10-7.2 Checking Site. |
| SECTION 11 TIEDOWNS, MOORING, AND GROUNDING POINTS |
| B11-1 TYPES OF EQUIPMENT |
| B11-1.1 Mooring and Grounding Point. |
| B11-1.2 Mooring Point. |
| B11-1.3 Static Grounding Point. |
| B11-1.4 Static Grounding Tiedown. |
| B11-1.5 Tiedown Mooring Eye. |
| B11-2 MOORING POINTS FOR ARMY FIXED- AND ROTARY-WING AIRCRAFT |
| B11-2.1 Type. |
| Figure B11-1. Army Mooring Point |
| B11-2.2 Design Load. |
| Figure B11-2. Army Load Testing of Mooring Points |
| B11-2.3 Layout. |
| Figure B11-3. Army Rotary-Wing Allowable Mooring Point Spacing |
| Figure B11-4. Army Rotary-Wing Mooring Points Layout |
| B11-2.4 Installation |
| Figure B11-5. Slab Reinforcement for Army Mooring Point |
| Figure B11-6. Mooring Point for Existing Rigid Pavement for Pavement ThicknessGreater Than 150 Millimeters (6 Inches) |
| Figure B11-7. Army Rotary-Wing Mooring Pad Detail |
| Figure B11-8. Army Mooring Point for Grassed Areas, Flexible Pavement, or RigidPavement - Thickness Less Than 150 millimeters (6 inches) |
| Table B11-1. Army Pier Length and Depths for Tiedowns |
| B11-3 EXISTING MOORING POINTS FOR ARMY. |
| B11-3.1 Evaluation of Existing Mooring Points for Structural Adequacy |
| B11-3.2 Evaluation of Existing Mooring Points for Resistance. |
| B11-4 STATIC GROUNDING POINTS FOR ARMY FIXED- AND ROTARY-WING FACILITIES |
| B11-4.1 Type. |
| Figure B11-9. Army Grounding Point Inside Aircraft Hangars |
| B11-4.2 Layout |
| B11-4.3 Installation. |
| B11-4.4 Grounding Requirements. |
| Figure B11-10. Mooring and Ground Point Layout for Rotary-Wing Parking Spac |
| Figure B11-11. Army Grounding Point for Turf Areas |
| B11-5 AIR FORCE TIEDOWNS AND STATIC GROUNDS |
| B11-5.1 General. |
| B11-5.2 Layout. |
| Figure B11-12. Air Force Static Ground |
| Figure B11-13. Example of Air Force Multiple Tiedown Layoutfor Fixed-Wing Aircraft |
| B11-5.3 Installation |
| Figure B11-14. Air Force Aircraft Tiedown, Profile |
| Figure B11-15. Air Force Aircraft Tiedown, Plan |
| B11-5.4 Grounding Requirements. |
| B11-6 TIEDOWN MOORING EYES FOR NAVY AND MARINE CORPS. |
| Figure B11-16. Navy and Marine Corps Mooring Eye/Tiedown Details |
| SECTION 12 FLIGHTLINE VEHICLE PARKING - NAVY AND MARINE CORPS |
| B12-1 CONTENTS. |
| B12-2 ARMY AND AIR FORCE CRITERIA. |
| B12-3 LOCATION. |
| B12-3.1 Area Required. |
| B12-3.2 Station-Assigned Vehicles. |
| B12-3.3 Squadron-Assigned Vehicles. |
| B12-3.4 Refueling Vehicles. |
| B12-4 SURFACING. |
| B12-5 SHELTER. |
| B12-6 LIGHTING. |
| Table B12-1. Vehicle Parking Area Requirements |
| Figure B12-1. Typical Site Plan - Vehicle Parking |
| Figure B12-2. Typical Line Vehicle Shelters |
| SECTION 13 DEVIATIONS FROM CRITERIA FOR AIR FORCE AIRFIELD SUPPORT FACILITIES |
| B13-1 WAIVERABLE AIRFIELD SUPPORT FACILITIES |
| B13-1.1 Contents. |
| B13-1.2 Army, Navy, and Marine Corps Requirements. |
| B13-1.3 Fixed Base Airport Surveillance Radar (ASR) or Fixed Base DigitalAirport Surveillance Radar (DASR). |
| B13-1.4 Airport Rotating Beacon. |
| B13-1.5 Nondirectional Radio Beacon Facilities. |
| B13-1.6 Rotating Beam Ceilometers. |
| B13-1.7 Laser Beam Ceilometers. |
| B13-1.8 Air Traffic Control Tower (ATCT). |
| B13-2 PERMISSABLE DEVIATIONS FROM DESIGN CRITERIA |
| B13-2.1 Contents. |
| B13-2.2 Frangibility Requirements. |
| B13-2.3 Visual Air Navigational Facilities. |
| B13-2.5 Emergency Generators, Maintenance and Personnel Facilities(Non-Frangible). |
| B13-2.6 Remote Microwave Link (Non-Frangible). |
| B13-2.7 PAR Reflectors (Frangible and Non-Frangible). |
| B13-2.8 Airborne Radar Approach Reflectors (Non-Frangible). |
| B13-2.9 Instrument Landing System (ILS). |
| B13-2.10 Microwave Landing System (MLS) and Mobile Microwave LandingSystem (MMLS) (Non-Frangible). |
| B13-2.11 Mobile Navigational Aids and Communication Facilities(Non-Frangible). |
| B13-2.12 Mobile Air Traffic Control Towers (MATCT) (Non-Frangible). |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .