IB08_Amendment_W9124D25QA294-0001_Baltimore MEPS Awning.pdf
PDF 3 MB Posted
- Attached to
- Fixed Gable-style Awning System Federal contract opportunity
- Solicitation number
- W9124D25QA294
About this file
This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for a project to install a permanent, high-quality 18 x 32 x 40 gabled aluminum awning system with retractable slides at the Baltimore Military Entrance Processing Station (MEPS) facility. The amendment, issued by the U.S. Army Contracting Directorate, changes the response due date from 01 September 2025 to 08 September 2025 and updates the Salient Characteristics document. A clarifying Q&A section addresses a measurement discrepancy, confirming that the 32' measurement is from the edge of the awning east to west, with a 13' distance between the existing building arches.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IB08_Amendment_Attachment 1_Salient_Characteristics_Baltimore_MEPS_Awning_20250818.pdf | ||
| IB08_Solicitation RFQ - W9124D25QA294_Baltimore MEPS Awning.pdf | ||
| IB08_Attachment 1_Salient_Characteristics_Baltimore_MEPS_Awning_20250730.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form Continuation
The following changes have been made:
INFORMATION FROM TO
Response Due Date 01 Sep 2025 08 Sep 2025
Continuation of Description
The Requirements text has been modified to:
Install a permanent, high-quality 18 x 32 x 40 gabled aluminum awning system with retractable slides at the Baltimore MEPS facility in accordance with the Salient Characteristics attached.
List of Contract Documents, Exhibits, or Attachments
The attachments table has changed from:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
Salient Characteristics Baltimore MEPS Awning
Specification 31 Jul 2025 Attachment No
To:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
Salient Characteristi cs_Batlimore
MEPS
Awning_20250819
Specification 19 Aug 2025 Attachment No
The following contract documents were added:
Salient Characteristics_Batlimore MEPS Awning_20250819
The following contract documents were deleted:
Salient Characteristics Baltimore MEPS Awning
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
Salient Characteristics_Baltimore MEPS Awning_20250819 none
W9124D25QA2940001
Miscellaneous text in this section has been added to:
Question submitted 9/7/25
Your drawing indicates 35 feet between the doorway arches, but based on rough estimates with a typical 3-foot doorway, it appears to be closer to 13 feet. Could you confirm the 35-foot measurement?
Answer: The 32' is from the edge of the awning east to west. The distance in between the existing building arch is 13'.
W9124D25QA2940001
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 19 AUG 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W9124D |
| AdmCode: |
| IssuedBy: W6QM MICC-FT KNOX |
KO DIRECTORATE OF CONTRACTIN, BLDG 1109B RM 250
FORT KNOX, KY 40121-5000
UNITED STATES
AMY GAWARECKI, EMAIL: AMY.L.GAWARECKI.CIV@ARMY.MIL TELEPHONE: 520-945-8989
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W9124D25QA294 |
| SolDate: 31 JUL 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: HQ MEPCOM GABLED AWNING FOR BALTIMORE MEPS |
1. THIS MODIFICATION ANSWERS QUESTIONS SUBMITTED IN RESPONSE TO THE ORIGINAL SOLICITATION AND INCLUDES ADDITIONAL ILLUSTRATIONS TO CLARIFY.
2. THE SALIENT CHARACTERISTICS HAVE BEEN CHANGED TO ADD A REQUIREMENT FOR RETRACTABLE SLIDES. SEE ATTACHMENT 1 FOR ADDITIONAL DETAILS.
3. THE RESPONSE DUE DATE IS EXTENDED TO 10:00 AM EST, 8 SEPTEMBER 2025.
4. POINT OF CONTACT FOR THIS ACTION IS CONTRACT SPECIALIST, AMY GAWARECKI AMY.L.GAWARECKI.CIV@ARMY.MIL.