Attachment 6 - Bldg 1776 Loading Dock Cardboard Bailer area.pdf

PDF 842 KB Posted

Attached to
Industrial Cardboard Balers – Procurement, Installation, and Trade-In
Solicitation number
W9124C26QA030
Issued by

About this file

This document is an architectural floor plan for a reception complex facility. The plan depicts Part B of a multi-part building layout, drawn to a scale of 3/32"=1'-0", and is marked as "Issue for Construction."

The facility design includes multiple functional areas: a warehouse section with vertical carousel storage systems, charging stations, and material handling equipment; a mezzanine storage area with retaining walls and counter-type storage units; office spaces; and a break room. The layout shows separate work stations with racking systems for flow, sorting bins, inspection areas, and pants cutters. Two entry locations are clearly marked with red arrows on the plan. The document includes general notes referencing enlarged plans for additional information, specifications regarding finish floor and finish grades, mechanical systems placement, and fire extinguisher requirements. Plan notes address exterior stair slopes, interior floor drainage, and counter type details. A key plan in the lower right identifies the location of Part B within the overall facility context, with Parts A, C, D, and E shown as adjacent sections. The document is prepared by the US Army Corps of Engineers and includes standard architectural symbols, dimensions, and cross-reference notations for coordination with other construction documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .