Attachment_3_Pricing_Generator.pdf
PDF 91 KB Posted
- Attached to
- MACH Generator Sevices Federal contract opportunity
- Solicitation number
- W9124C-16-T-2019
About this file
Schedule B/ Pricing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_MACH_Generator_Services_PWS.pdf | ||
| Attachment_4_Wage_Determination_Generator_Services.pdf | ||
| Attachment_2_Clauses_Generator.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3 Generator Repair Services
Section B Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months $________ $________
SCHEDULED SERVICES FOR EPSS
FFP
SCHEDULED SERVICES FOR EPSS EMERGENCY POWER SUPPLY SYSTEM (EPSS). TO PROVIDE
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS. ALL SCHEDULED AND PREVENTATIVE MAINTENANCES
REQUIRED BY THE ORIGINAL EQUIPMENT MANUFACTURERS AND APPLICABLE CODES ARE
ADDRESSED IN THE CHECKLISTS. THE CONTRACTOR SHALL COMPLETE SERVICES AS
SCHEDULED AND IN STRICT ACCORDANCE WITH THE PWS. FOB: DESTINATION
0002 ________ JOB $________ $________
REPAIR PARTS & NON-SCHEDULED SVC CALLS
REPAIR PARTS & NON-SCHEDULED SVC CALLS TO PROVIDE MATERIALS/PARTS AND REPAIR
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM, WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS ONLY IN RESPONSE TO AUTHORIZED REPRESENTATIVE
REQUEST (CALLED SERVICE CALL) FOR ROUTINE NON-SCHEDULED SERVICES. THE
CONTRACTOR SHALL COMPLETE REPAIR SERVICE AND MEET RESPONSE TIME IN STRICT
ACCORDANCE WITH THE PWS. FOB: DESTINATION
The total yearly estimated hours for non-scheduled service calls is 50 hours. Per paragraph 5.6 of the performance work statement, the Contractor is responsible for responding to all facility calls for non-scheduled service. Non-scheduled service shall be broken into the categories of routine, urgent and emergency. Routine service calls shall require an on-site response within 5 business days of receiving the trouble call (excluding all federal holidays). The on-site response time for urgent repairs shall be within 4 hours of receiving the trouble call. The on-site response time for emergency calls (total equipment failure) shall be within 1 hour of receiving the trouble call.
The Contractor shall quote an hourly rate for each of the three types of non-routine calls.
Routine Non-Scheduled Service Calls:
Estimated Hours: ____37 hours___
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Routine Non-scheduled service calls.
Urgent Non-Scheduled Service Calls:
Estimated Hours: ___10 hours___
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Urgent Nonscheduled service calls.
Emergency Non-Scheduled Service Calls:
Estimated Hours: ___3 hours____
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Emergency Non-scheduled service calls.
The Government will evaluate an overall total for CLIN 0002 by adding the total prices calculated for Routine, Urgent and Emergency Non-Scheduled Service Calls.
0003 1 Each $________ $________
CONTRACTOR'S MANPOWER REPORT (CMR)
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “No Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
1001 12 Months $________ $________
SCHEDULED SERVICES FOR EPSS EMERGENCY POWER SUPPLY SYSTEM (EPSS). TO PROVIDE
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS. ALL SCHEDULED AND PREVENTATIVE M
AINTENANCES REQUIRED BY THE ORIGINAL EQUIPMENT MANUFACTURERS AND APPLICABLE
CODES ARE ADDRESSED IN THE CHECKLISTS. THE CONTRACTOR SHALL COMPLETE SERVICES AS
SCHEDULED AND IN STRICT ACCORDANCE WITH THE PWS. FOB: DESTINATION
1002 ________ JOB $________ $________
REPAIR PARTS & NON-SCHEDULED SVC CALLS TO PROVIDE MATERIALS/PARTS AND REPAIR
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM, WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS ONLY IN RESPONSE TO AUTHORIZED REPRESENTATIVE
REQUEST (CALLED SERVICE CALL) FOR ROUTINE NON-SCHEDULED SERVICES. THE
CONTRACTOR SHALL COMPLETE REPAIR SERVICE AND MEET RESPONSE TIME IN STRICT
ACCORDANCE WITH THE PWS. FOB: DESTINATION
The total yearly estimated hours for non-scheduled service calls is 50 hours. Per paragraph 5.6 of the performance work statement, the Contractor is responsible for responding to all facility calls for non-scheduled service. Non-scheduled service shall be broken into the categories of routine, urgent and emergency. Routine service calls shall require an on-site response within 5 business days of receiving the trouble call (excluding all federal holidays). The on-site response time for urgent repairs shall be within 4 hours of receiving the trouble call. The on-site response time for emergency calls (total equipment failure) shall be within 1 hour of receiving the trouble call.
The Contractor shall quote an hourly rate for each of the three types of non-routine calls.
Routine Non-Scheduled Service Calls:
Estimated Hours: ____37 hours___
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Routine Non-scheduled service calls.
Urgent Non-Scheduled Service Calls:
Estimated Hours: ___10 hours___
Normal Business Hours Hourly Rate: $ _____________ After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Urgent Nonscheduled service calls.
Emergency Non-Scheduled Service Calls:
Estimated Hours: ___3 hours____
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Emergency Non-scheduled service calls.
The Government will evaluate an overall total for CLIN 1002 by adding the total prices calculated for Routine, 1003 1 Each $________ $________
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “No Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
2001 12 Months $________ $________
SCHEDULED SERVICES FOR EPSS EMERGENCY POWER SUPPLY SYSTEM (EPSS). TO PROVIDE
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS. ALL SCHEDULED AND PREVENTATIVE M
AINTENANCES REQUIRED BY THE ORIGINAL EQUIPMENT MANUFACTURERS AND APPLICABLE
CODES ARE ADDRESSED IN THE CHECKLISTS. THE CONTRACTOR SHALL COMPLETE SERVICES AS
SCHEDULED AND IN STRICT ACCORDANCE WITH THE PWS. FOB: DESTINATION
2002 ________ JOB $________ $________
REPAIR PARTS & NON-SCHEDULED SVC CALLS TO PROVIDE MATERIALS/PARTS AND REPAIR
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM, WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS ONLY IN RESPONSE TO AUTHORIZED REPRESENTATIVE
REQUEST (CALLED SERVICE CALL) FOR ROUTINE NON-SCHEDULED SERVICES. THE
CONTRACTOR SHALL COMPLETE REPAIR SERVICE AND MEET RESPONSE TIME IN STRICT
ACCORDANCE WITH THE PWS. FOB: DESTINATION
The total yearly estimated hours for non-scheduled service calls is 50 hours. Per paragraph 5.6 of the performance work statement, the Contractor is responsible for responding to all facility calls for non-scheduled service. Non-scheduled service shall be broken into the categories of routine, urgent and emergency. Routine service calls shall require an on-site response within 5 business days of receiving the trouble call (excluding all federal holidays). The on-site response time for urgent repairs shall be within 4 hours of receiving the trouble call. The on-site response time for emergency calls (total equipment failure) shall be within 1 hour of receiving the trouble call.
The Contractor shall quote an hourly rate for each of the three types of non-routine calls.
Routine Non-Scheduled Service Calls:
Estimated Hours: ____37 hours___
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Routine Non-scheduled service calls.
Urgent Non-Scheduled Service Calls:
Estimated Hours: ___10 hours___
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Urgent Nonscheduled service calls.
Emergency Non-Scheduled Service Calls:
Estimated Hours: ___3 hours____
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Emergency Non-scheduled service calls.
The Government will evaluate an overall total for CLIN 2002 by adding the total prices calculated for Routine, 2003 1 Each $________ $________
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “No Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
3001 12 Months $________ $________
SCHEDULED SERVICES FOR EPSS EMERGENCY POWER SUPPLY SYSTEM (EPSS). TO PROVIDE
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS. ALL SCHEDULED AND PREVENTATIVE M
AINTENANCES REQUIRED BY THE ORIGINAL EQUIPMENT MANUFACTURERS AND APPLICABLE
CODES ARE ADDRESSED IN THE CHECKLISTS. THE CONTRACTOR SHALL COMPLETE SERVICES AS
SCHEDULED AND IN STRICT ACCORDANCE WITH THE PWS. FOB: DESTINATION
3002 ________ JOB $________ $________
REPAIR PARTS & NON-SCHEDULED SVC CALLS TO PROVIDE MATERIALS/PARTS AND REPAIR
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM, WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS ONLY IN RESPONSE TO AUTHORIZED REPRESENTATIVE
REQUEST (CALLED SERVICE CALL) FOR ROUTINE NON-SCHEDULED SERVICES. THE
CONTRACTOR SHALL COMPLETE REPAIR SERVICE AND MEET RESPONSE TIME IN STRICT
ACCORDANCE WITH THE PWS. FOB: DESTINATION
The total yearly estimated hours for non-scheduled service calls is 50 hours. Per paragraph 5.6 of the performance work statement, the Contractor is responsible for responding to all facility calls for non-scheduled service. Non-scheduled service shall be broken into the categories of routine, urgent and emergency. Routine service calls shall require an on-site response within 5 business days of receiving the trouble call (excluding all federal holidays). The on-site response time for urgent repairs shall be within 4 hours of receiving the trouble call. The on-site response time for emergency calls (total equipment failure) shall be within 1 hour of receiving the trouble call.
The Contractor shall quote an hourly rate for each of the three types of non-routine calls.
Routine Non-Scheduled Service Calls:
Estimated Hours: ____37 hours___
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Routine Non-scheduled service calls.
Urgent Non-Scheduled Service Calls:
Estimated Hours: ___10 hours___
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Urgent Nonscheduled service calls.
Emergency Non-Scheduled Service Calls:
Estimated Hours: ___3 hours____
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Emergency Non-scheduled service calls.
The Government will evaluate an overall total for CLIN 2002 by adding the total prices calculated for Routine, 3003 1 Each $________ $________
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “No Cost”. Instructions, 4001 12 Months $________ $________
SCHEDULED SERVICES FOR EPSS EMERGENCY POWER SUPPLY SYSTEM (EPSS). TO PROVIDE
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS. ALL SCHEDULED AND PREVENTATIVE M
AINTENANCES REQUIRED BY THE ORIGINAL EQUIPMENT MANUFACTURERS AND APPLICABLE
CODES ARE ADDRESSED IN THE CHECKLISTS. THE CONTRACTOR SHALL COMPLETE SERVICES AS
SCHEDULED AND IN STRICT ACCORDANCE WITH THE PWS. FOB: DESTINATION
4002 ________ JOB $________ $________
REPAIR PARTS & NON-SCHEDULED SVC CALLS TO PROVIDE MATERIALS/PARTS AND REPAIR
SERVICES TO THE GENERATOR SETS, AUTOMATIC TRANSFER SWITCHES, ASSOCIATED
EQUIPMENT, AND EMERGENCY POWER SYSTEM, WHICH MEETS OR EXCEEDS ALL REGULATORY
AND MANUFACTURER'S REQUIREMENTS ONLY IN RESPONSE TO AUTHORIZED REPRESENTATIVE
REQUEST (CALLED SERVICE CALL) FOR ROUTINE NON-SCHEDULED SERVICES. THE
CONTRACTOR SHALL COMPLETE REPAIR SERVICE AND MEET RESPONSE TIME IN STRICT
ACCORDANCE WITH THE PWS. FOB: DESTINATION
The total yearly estimated hours for non-scheduled service calls is 50 hours. Per paragraph 5.6 of the performance work statement, the Contractor is responsible for responding to all facility calls for non-scheduled service. Non-scheduled service shall be broken into the categories of routine, urgent and emergency. Routine service calls shall require an on-site response within 5 business days of receiving the trouble call (excluding all federal holidays). The on-site response time for urgent repairs shall be within 4 hours of receiving the trouble call. The on-site response time for emergency calls (total equipment failure) shall be within 1 hour of receiving the trouble call.
The Contractor shall quote an hourly rate for each of the three types of non-routine calls.
Routine Non-Scheduled Service Calls:
Estimated Hours: ____37 hours___
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Routine Non-scheduled service calls.
Urgent Non-Scheduled Service Calls:
Estimated Hours: ___10 hours___
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Urgent Nonscheduled service calls.
Emergency Non-Scheduled Service Calls:
Estimated Hours: ___3 hours____
Normal Business Hours Hourly Rate: $ _____________
After Hours Hourly Rate: $ _____________
The Government will evaluate offers for award purposes by multiplying the estimated number of hours by the normal business hours price. The Government will also multiply the estimated hours by the after hour’s hourly rate.
These two figures will be added together to determine the estimated costs for Emergency Non-scheduled service calls.
The Government will evaluate an overall total for CLIN 2002 by adding the total prices calculated for Routine, 4003 1 Each $________ $________
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “No Cost”. Instructions,
File details come from the government source that posted it. Updated .