Technical_Exhibit_6_(20_Oct).xls
XLS spreadsheet 107 KB Posted
- Attached to
- High Voltage Preventive Maintenance and Emergency Repairs Federal contract opportunity
- Solicitation number
- W9124C-15-R-0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9124C-15-R-0009-0003_High_Voltage_(Conformed)_25_Nov_15.doc | DOC document | |
| W9124C-15-R-0009-0003_High_Voltage_(Amendment_3)_25_Nov_15.doc | DOC document | |
| Sign_in_Sheet.pdf | ||
| Ft_Jackson_HV_Pre-Solicitation_Conference_24_Nov_15_(2).ppt | PPT presentation | |
| W9124C-15-R-0009-0002_High_Voltage_(Conformed)_16_Nov_15.pdf | ||
| W9124C-15-R-0009-0002_High_Voltage_(Amendment_2)_16_Nov_15.pdf | ||
| W9124C-15-R-0009_High_Voltage_Fort_Jackson_(4NOV15).pdf | ||
| W9124C-15-R-0009-0001_High_Voltage_Fort_Jackson_(4NOV15).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KTR3
| High Voltage Electrical Systems | ||||||
| Preventive Maintenance and Emergency Repairs Contract | ||||||
| Fort Jackson, South Carolina | ||||||
| CONTRACTOR'S COST PROPOSAL | ||||||
| General Instructions to Preparers: | ||||||
| 1 | On this worksheet, and all other accompaning worksheets, fill out all spaces in blank. Cells with a background color | |||||
| contain formulas, values or other information entered by the Government and those are forbidden of been change by | ||||||
| offerors. Any space left in blank by the offeror will be interpret by Government as a zero value ("0"). | ||||||
| 2 | Any offeror changing any cell with a background color on this or other worksheets shall be disqualified. Formulas and | |||||
| values entered by Government are for the purpose of giving the same base information to ALL offerors. | ||||||
| 3 | Most of the information in Worksheets #1 and #2 will populate automatically from information given by Preparer on | |||||
| this Worksheet #3, no changes necessary to those. It is offeror responsibility to look for spaces in blank in all | ||||||
| Worksheets and fill them out. | ||||||
| 4 | Estimated quantities supplied by Government are the best estimate at time of the announcement. They have been | |||||
| provided for bidding and proposal evaluation purposes ONLY. Actual quantities may vary during execution, but total | ||||||
| costs must not exceed totals for Contract Line Items (CLINs). | ||||||
| 5 | All the information entered by Preparer on these Worksheets will be used for Proposal Evaluation and compare | |||||
| against Independent Government Estimate (IGE) and other offerors proposals. | ||||||
| 6 | Information gathered using these Worksheets will be used as basis for future Contract Modifications. | |||||
| 7 | As soon as you fill out all spaces in blank in all Worksheets, print them, sign and compile in the regular ascending | |||||
| numerical order (1, 2, 3). Then, attach to the rest of your proposal documents. | ||||||
| WORKSHEET #3: Contract Hourly and Percent Rates | ||||||
| Table 3.1: Individual Hourly Rates ($) for Each Ordering Period | ||||||
| LABOR | HOURLY RATES FOR EACH ORDERING PERIOD (OP) | |||||
| OCCUPATION | Base | OPT 1 | OPT 2 | OP4 | OP5 | |
| Electrical Engineer | ||||||
| Land Surveyor | ||||||
| Manager | ||||||
| General Supervisor | ||||||
| Electrician | ||||||
| Lineman | ||||||
| Assistant Electrician | ||||||
| Assistant Lineman | ||||||
| CAD Technician/Draftsman | ||||||
| Crew Leader | ||||||
| Crew Member | ||||||
| Laborer | ||||||
| Phone Operator | ||||||
| Office Personnel (per person) | ||||||
| VEHICLES, EQUIPMENT, TOOLS AND SERVICES | ||||||
| ITEM DESCRIPTION | ||||||
| Lift Truck | ||||||
| Heavy Duty Equipment | ||||||
| Pickup Truck | ||||||
| Basic Logger Power Tools | ||||||
| Portable Pump | ||||||
| Personal Protection Equipment (PPE) | ||||||
| Basic Tool Kit per Truck | ||||||
| VEHICLES, EQUIPMENT, TOOLS & SERVICES | HOURLY RATES FOR EACH ORDERING PERIOD (OP) | |||||
| ITEM DESCRIPTION | Base | OPT 1 | OPT 2 | OP4 | OP5 | |
| Remove Debris From Area | ||||||
| Disposal Flat Rate | ||||||
| Note: Vehicle and Equipment rates include mobilization, demobilization, fuel, insurances and other related costs. Also include driver/operator hourly charge. | ||||||
| Table 3.2: Contract Percent Rates (%) for Each Ordering Period | ||||||
| ITEM DESCRIPTION | OP1 | OP2 | OP3 | OP4 | OP5 | |
| Other Work-related Costs (Permits, Fees, Etc.) | ||||||
| Overhead | ||||||
| Profit | ||||||
| Material Procurement and Handling | ||||||
| After Normal Business Hours Premium Rate |
&ROfferor's Worksheet Number 3, Page 3-&P &D
KTR2
| High Voltage Electrical Systems | |||||||
| Preventive Maintenance and Emergency Repairs Contract | |||||||
| Fort Jackson, South Carolina | |||||||
| CONTRACTOR'S COST PROPOSAL | |||||||
| WORKSHEET #2: Contract Line Items (CLIN) Unit Price Calculations | |||||||
| CLIN 0001 [UOM: EACH] - Emergency Electrical Repair Call: Contractor shall operate an Emergency Electrical Repairs Hotline [EERH] 24/7 including holidays. Shall show to the suspect point of failure within 2 hours of notification and conduct troubleshooting. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Electrical Engineer or Supervisor | HOUR | $0.00 | $0.00 | $0.00 | |||
| Electrician | HOUR | $0.00 | $0.00 | $0.00 | |||
| Assistant Electrician | HOUR | $0.00 | $0.00 | $0.00 | |||
| Phone Operator | HOUR | $0.00 | $0.00 | $0.00 | |||
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (Engineer or Supervisor) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (Crew) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | ||||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | ||||
| Overhead: | $0.00 | $0.00 | $0.00 | ||||
| Profit: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0002 [UOM: EACH] - Critical Electrical Repair Call: Contractor shall show to the suspect point of failure within 24 hours of notification and conduct troubleshooting. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Electrician | HOUR | $0.00 | $0.00 | $0.00 | |||
| Assistant Electrician | HOUR | $0.00 | $0.00 | $0.00 | |||
| Phone Operator | HOUR | $0.00 | $0.00 | $0.00 | |||
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | ||||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | ||||
| Overhead: | $0.00 | $0.00 | $0.00 | ||||
| Profit: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0003 [UOM: HOUR] - Overhead Troubleshooting & Repair Crew, Normal Business Hours (NBH): Include labor, equipment, and tools. Exclude Repair Parts/Material included in CLIN 0009. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Lineman | HOUR | $0.00 | $0.00 | $0.00 | |||
| Assistant Lineman | HOUR | $0.00 | $0.00 | $0.00 | |||
| Lift Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | ||||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | ||||
| Overhead: | $0.00 | $0.00 | $0.00 | ||||
| Profit: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0004 [UOM: HOUR] - Overhead Troubleshooting & Repair Crew, Outside Normal Business Hours (ONBH): Include labor, equipment, and tools. Exclude Repair Parts/Material included in CLIN 0009. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Cost NBH | HOUR | $0.00 | $0.00 | $0.00 | |||
| Premium Rate | % | 0.00% | 0.00% | 0.00% | |||
| Additional Cost ONBH | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0005 [UOM: HOUR] - Underground Troubleshooting & Repair Crew, NBH: Include labor, equipment, and tools. Exclude Repair Parts/Material included in CLIN 0009. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Electrician | HOUR | $0.00 | $0.00 | $0.00 | |||
| Assistant Electrician | HOUR | $0.00 | $0.00 | $0.00 | |||
| Laborer | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| Portable Pump | HOUR | $0.00 | $0.00 | $0.00 | |||
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | ||||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | ||||
| Overhead: | $0.00 | $0.00 | $0.00 | ||||
| Profit: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0006 [UOM: HOUR] - Underground Troubleshooting & Repair Crew, ONBH: Include labor, equipment, and tools. Exclude Repair Parts/Material included in CLIN 0009. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Cost NBH | HOUR | $0.00 | $0.00 | $0.00 | |||
| Premium Rate | % | 0.00% | 0.00% | 0.00% | |||
| Additional Cost ONBH | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0007 [UOM: HOUR] - Substation Troubleshooting & Repair Crew, NBH: Include labor, equipment, and tools. Exclude Repair Parts/Material included in CLIN 0009. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Electrical Engineer | HOUR | $0.00 | $0.00 | $0.00 | |||
| Electrician | HOUR | $0.00 | $0.00 | $0.00 | |||
| Assistant Electrician | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (Engineer) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (Crew) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | ||||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | ||||
| Overhead: | $0.00 | $0.00 | $0.00 | ||||
| Profit: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0008 [UOM: HOUR] - Substation Troubleshooting & Repair Crew, ONBH: Include labor, equipment, and tools. Exclude Repair Parts/Material included in CLIN 0009. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Cost NBH | HOUR | $0.00 | $0.00 | $0.00 | |||
| Premium Rate | % | 0.00% | 0.00% | 0.00% | |||
| Additional Cost ONBH | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0009 [UOM: JOB] - Repair Parts/Materials: Exclude all labor, equipment, and tools included in CLINs 0003 to 0008 above. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Government Estimated Parts/Materials Cost | 1 | JOB | $500,000.00 | $500,000.00 | $500,000.00 | ||
| Material Procurement and Handling Fees: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $500,000.00 | $500,000.00 | $500,000.00 | ||||
| CLIN 0010 [UOM: ACRE] - Land Surveys for IEPG Mapping: Contractor shall conduct land surveys for IEPG mapping as requested or authorized by KO IAW SOW. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Land Surveyor | HOUR | $0.00 | $0.00 | $0.00 | |||
| Crew: 2 Members | HOUR | $0.00 | $0.00 | $0.00 | |||
| CAD Technician/Draftman | HOUR | $0.00 | $0.00 | $0.00 | |||
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | ||||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | ||||
| Overhead: | $0.00 | $0.00 | $0.00 | ||||
| Profit: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0011 [UOM: MILE] - Vegetation Cutting/Trimming: Contractor shall cut/trim vegetation along electrical power lines Right-of-Ways as requested or authorized by KO IAW SOW. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| General Supervisor | HOUR | $0.00 | $0.00 | $0.00 | |||
| Crew Leader | HOUR | $0.00 | $0.00 | $0.00 | |||
| Crew: 2 Members | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Logger Power Tools | HOUR | $0.00 | $0.00 | $0.00 | |||
| Heavy Duty Equipment | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (General Supervisor) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (Crew Leader) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (Crew) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | ||||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | ||||
| Overhead: | $0.00 | $0.00 | $0.00 | ||||
| Profit: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0012 [UOM: EACH] - Tag or Label Poles and Facilities: Contractor shall tag or label poles and electrical facilities requested or authorized by KO IAW SOW. Tags and labels shall be GPS-located in the Installation GIS maps for future reference. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Land Surveyor | HOUR | $0.00 | $0.00 | $0.00 | |||
| Crew: 2 Members | HOUR | $0.00 | $0.00 | $0.00 | |||
| CAD Technician/Draftman | HOUR | $0.00 | $0.00 | $0.00 | |||
| Metallic Tags or Labels | EACH | ||||||
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | ||||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | ||||
| Overhead: | $0.00 | $0.00 | $0.00 | ||||
| Profit: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0013 [UOM: HOUR] - Remove and Disposed of Abandoned-In-Site/Decommissioned Equipment: Contractor shall remove and properly remove of abandoned-in-site and/or decommissioned equipment per KO request IAW SOW. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| General Supervisor | HOUR | $0.00 | $0.00 | $0.00 | |||
| Crew Leader | HOUR | $0.00 | $0.00 | $0.00 | |||
| Crew: 2 Members | HOUR | $0.00 | $0.00 | $0.00 | |||
| Heavy Duty Equipment | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (General Supervisor) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (Crew Leader) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Pickup Truck (Crew) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | |||
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | |||
| Disposal Flat Rate | HOUR | $0.00 | $0.00 | $0.00 | |||
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | ||||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | ||||
| Overhead: | $0.00 | $0.00 | $0.00 | ||||
| Profit: | $0.00 | $0.00 | $0.00 | ||||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | ||||
| CLIN 0014 [UOM: JOB] - Special Project to Replace Substation Batteries: Contractor shall remove, dispose and replace with new 1 weatherproof grounded cabinet with 2 compartments (one for the batteries and one for the charger and controls); remove, dispose and replace with new the existing 20 batteries; and remove, dispose and replace with new 1 battery charger and necessary meters and controls at the substation. This must be a one-time project. | |||||||
| DESCRIPTION | QUANTITY | UOM | Base | OPT 1 | OPT 2 | ||
| Electrical Engineer | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Electrician | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Assistant Electrician | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Crew: 2 Members | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| New Cabinet, Installed Over Concrete Pad | JOB | $0.00 | $0.00 | $0.00 | $0.00 | ||
| New Battery Charger, Installed | JOB | $0.00 | $0.00 | $0.00 | $0.00 | ||
| New Batteries, Installed | JOB | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Removal and Disposal of Old Equipment | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Pickup Truck (Engineer) | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Pickup Truck (Crew) | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Personal Protection Equipment (PPE) | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Basic Tool Kit per Truck | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Overhead: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Profit: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| CLIN 0015 [UOM: EACH] - Contractor Manpower Reporting: Contractor shall manpower reports IAW SOW. | |||||||
| DESCRIPTION | QUANTITY | UOM | OP1 | OP2 | OP3 | OP4 | OP5 |
| Manager | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| General Supervisor | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Office Personnel | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| CLIN Unit Work Subtotal: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Other Work-related Costs (Permits, Fees, Insurances Etc.): | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Overhead: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Profit: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| CLIN UNIT COST FOR EACH ORDERING PERIOD: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
&ROfferor's Worksheet Number 2, Page 2-&P &D
KTR1
| High Voltage Electrical Systems | |||||||||
| Preventive Maintenance and Emergency Repairs Contract | |||||||||
| Fort Jackson, South Carolina | |||||||||
| Technical Exhibit 6 - Contractor Proposal Calculation Template | |||||||||
| CONTRACTOR'S COST PROPOSAL | |||||||||
| WORKSHEET #1: COVER PAGE - Costs Totals | |||||||||
| CLIN No. | DESCRIPTION | AVERAGE QUANTITY PER YEAR | UOM | Base | Option 1 | Option 2 | CLIN TOTALS | ||
| 0001 | Emergency Electrical Repair Calls | 10 | EACH | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0002 | Critical Electrical Repair Calls | 40 | EACH | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0003 | Overhead Troubleshooting & Repair Crew, Normal Business Hours (NBH) | 1,800 | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0004 | Overhead Troubleshooting & Repair Crew, Outside Normal Business Hours (ONBH) | 160 | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0005 | Underground Troubleshooting & Repair Crew, NBH | 400 | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0006 | Underground Troubleshooting & Repair Crew, ONBH | 80 | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0007 | Substation Troubleshooting & Repair Crew, NBH | 40 | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0008 | Substation Troubleshooting & Repair Crew, ONBH | 40 | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0009 | Repair Parts/Materials | 1 | JOB | $500,000.00 | $500,000.00 | $500,000.00 | $1,500,000.00 | ||
| 0010 | Land Surveys for IEPG Mapping | 40 | ACRE | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0011 | Vegetation Cutting and Trimming | 10 | MILE | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0012 | Tag or Label Poles and Facilities | 6,000 | EACH | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0013 | Remove and Dispose of Abandoned-In-Site/Decommisioned Electrical Equipment | 40 | HOUR | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0014 | Special Project to Replace Substation Batteries | 1 | JOB | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0015 | Contractor Manpower Reporting | EACH | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 0015 | Performance and Payment Bonds | 1 | JOB | $0.00 | |||||
| TOTALS FOR EACH ORDERING PERIOD: | $500,000.00 | $500,000.00 | $500,000.00 | $0.00 | $0.00 | $1,500,000.00 | |||
| 3-YEAR CONTRACT TOTAL | |||||||||
| PROPOSAL PREPARER SIGNATURE: | |||||||||
| NAME: | Date Signed | ||||||||
| POSITION: | EMAIL ADDRESS: | ||||||||
| MAILING | |||||||||
| ADDRESS: | CONTACT PHONE: | ||||||||
| PROPOSAL APPROVING REVIEWER SIGNATURE: | |||||||||
| NAME: | Date Signed | ||||||||
| POSITION: | EMAIL ADDRESS: | ||||||||
| MAILING | |||||||||
| ADDRESS: | CONTACT PHONE: |
&ROfferor's Worksheet Number 1, Proposal Totals, Page1-&P &D
File details come from the government source that posted it. Updated .