About this file

This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines reporting requirements for Specialized Technology Integration Reports to support experimentation at the Cyber Battle Lab, Cyber Capabilities Development Integration Directorate, and Future Concepts Center of the United States Army Futures Command located at Fort Gordon, Georgia. Deliverables include situation awareness/assessment reports, network diagrams, equipment configurations, activity logs, bandwidth usage reports, satellite carrier reports, technology transfer reports, and agreements. The contractor must provide draft reports for a 30-day government review period before final delivery and acceptance. Distribution of the reports is restricted to the Department of Defense and contractors. The related federal contract opportunity is a draft pre-solicitation for Cyber Battle Lab experimentation support services at Fort Gordon. Interested parties are invited to submit questions by August 12, 2021. The solicitation will be issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.

View the file

Other files

File Type Posted
CBL CDRL B001 v2.pdf PDF
CBL Solicitation Amendment U0002 (9-2-21).pdf PDF
CBL Solicitation Amendment CONFORMED U0002 (9-2-21).pdf PDF
Attachment 6 - Past Performance Cover Letter and Questionnaire.pdf PDF
CBL CDRL A012 (002) v2.pdf PDF
CBL Solicitation Amendment U0001 FINAL (8-27-21).pdf PDF
CBL CDRL A006 v2.pdf PDF
CBL - Industry Questions and Government Responses (8-27-21).pdf PDF
Attachment 1. CBL Pricing Workbook Rev. 1.xlsx XLSX spreadsheet
CBL CDRL A011.pdf PDF
Attachment 1. CBL Pricing Workbook (8-12-21).xlsx XLSX spreadsheet
CBL CDRL B004.pdf PDF
CBL CDRL A003.pdf PDF
CBL CDRL B003.pdf PDF
Attachment 3 - DD 254_W9124921R0015 signed.pdf PDF
CBL CDRL A004.pdf PDF
CBL CDRL A012.pdf PDF
CBL CDRL A010.pdf PDF
CBL CDRL A008.pdf PDF
CBL CDRL A002.pdf PDF
CBL CDRL B001.pdf PDF
CBL CDRL A009.pdf PDF
Attachment 2 -Fort Gordon GA Wage Determination.pdf PDF
W9124921R0015 - Final Solicitation.pdf PDF
CBL CDRL A007.pdf PDF
CBL CDRL A001.pdf PDF
CBL CDRL B002.pdf PDF
CBL CDRL A006.pdf PDF
W9124921R0015 Cyber Battle Lab DRAFT Solicitation Rev.1.docx DOCX document
W9124921R0015 Cyber Battle Lab DRAFT Solicitation (8-6-21).pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

MISC

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Specialized Technology Integration Reports

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

PWS Para. 5.5 CBL, CCDID, FCC

DD

A D

As Required SEE BLK 16

SEE BLK 16

COR 0 1

0 2 0

The contractor shall provide written detailed Specialized Technology Integration Reports to the Government as required. These reports shall relate to any areas as described in the PWS. Specialized Reports shall include SAR/ASR, Special Network Requests, Event Cutsheets, Network Diagrams, Equipment Configuration Diagrams, Master Station Logs, Frequency Master Plans, Activity Logs, Bandwidth Usage and Network Traffic Reports, Satellite Carrier Reports, Event Change Notifications, Technology Transfer Lab Report, Cooperative Research Development Agreements, Education Partnership Agreements, Bailment Agreements, Commercial Testing Agreements, Broad Agency Announcements, etc. The Government requires a maximum of 30 days to review deliverables. The contractor shall structure work so that each deliverable has at least one (1) immediate review, by the designated Government official before final delivery and acceptance.

BLOCK 9: Distribution Statement D – Distribution authorized to the Department of Defense and DoD contractors only. Reason: To protect technical/operational data or information.

Adobe Professional 8.0

COR XX April 2021 Deputy Director

Contracting Officer 1

16. REMARKS

hector.cruz Cross-Out

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

MISC

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

File details come from the government source that posted it. Updated .