Annual Camera Permit Template.docx
DOCX document 55 KB Posted
- Attached to
- Barracks Maintenance OTA
- Solicitation number
- W91248-26-R-0040
About this file
This is an Annual Camera Permit Template memorandum issued by the U.S. Army Mission and Installation Contracting Command (MICC) at Fort Campbell, Kentucky, authorizing contractor employees to photograph installation areas for official purposes related to construction projects and proposal development.
The template permits designated contractor personnel to take photographs within Multiple Award Task Order Contract (MATOC) project areas at Fort Campbell to support proposal creation for facility maintenance requirements. Photography is restricted to areas where work will be performed and excludes High Risk Targets, Mission Essential Vulnerable (HRT/MEVAs) areas, guard activities, students, and children. Airfield photography is specifically prohibited, including aircraft and airfield buildings, though other off-limit areas require prior security review before storage. Each authorized individual must possess this letter while photographing on the installation. The permit is effective for a one-year period (1 September 2023 to 31 August 2024) and requires approval from the Chief of Physical Security Division and the Installation Support Division Chief. Contractors must coordinate with their assigned MICC Contract Specialist and Contracting Officer for additional information or authorization modifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_005_ArMA_Barracks_Historicals_3year(JUL23-26)Rev2.xlsx | XLSX spreadsheet | |
| Attachment 003 - Barrack Maintenance - Terms and Conditions_Rev 1.docx | DOCX document | |
| Questions and Answers - W91248-26-R-0040 Barracks Maintenance (Final).docx | DOCX document | |
| W91248-26-R-0040_Barracks Maintenance_RPP_Rev 01.docx | DOCX document | |
| Attachment 001 - Barracks Maint SOO Rev02.docx | DOCX document | |
| Attachment 005 - ArMA Barracks Historicals 3year(JUL23-26)Rev1.xlsx | XLSX spreadsheet | |
| Attachment 002 - Barracks Maintenance Apendix A.docx | DOCX document | |
| Attachment 007 - FCI to ISR Facility Summary.xlsx | XLSX spreadsheet | |
| W91248-26-R-0040_Barracks Maintenance_RPP.docx | DOCX document | |
| Attachment 004 - Barracks Maintenance - Affirmation of Business Status Certification.pdf | ||
| Attachment 006 - OTA Barracks Maintenance Site Plan.pptx | PPTX presentation | |
| Attachment 003 - Barrack Maintenance - Terms and Conditions.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLY TO ATTENTION OF:
DEPARTMENT OF THE ARMY
U.S. ARMY MISSION AND INSTALLATION CONTRACTING COMMAND 922ND CONTRACTING BATTALION
6923 38TH STREET AND DESERT STORM AVENUE
Fort Campbell, KY 42223-5705
CUI // SP-PROCURE // FEDCON
CUI // SP-PROCURE // FEDCONControlled by: U.S. Army Controlled by: MICC-Ft. Campbell (CCMI-CBR-CM) CUI Category: General Procurement and Acquisition Distribution/Limited Dissemination Controls: FEDCON POC: Rana Y. Steele 270-798-7821
CCMI-CBR-CM DATE: 1 September 2023
MEMORANDUM FOR Chief, Physical Security Division
SUBJECT: Authority to Take Pictures for Official Purposes
1. The following employee(s) of contractor name are authorized to take pictures in Support of Directorate of Public Works construction projects to exclude High Risk Targets and Mission Essential Vulnerable (HRT/MEVAs) areas. Do NOT take pictures of guard activities, students or children.
Contractor: contractor name and address
Construction Requirement: Fort Campbell, KY Multiple Award Task Order Contracts (MATOC)
| Name |
| Driver’s License # |
| Contract Number |
2. The individual(s) listed above are authorized to take photographs and will be limited to the following area(s): MATOC project areas.
3. Area of interest: Areas where work will be performed. These photographs will be used to aid in creating a proposal for MATOC requirements.
4. Requirements specific to the Airfield: Contractors are prohibited from taking pictures depicting aircraft or airfield buildings. Any photos capturing any off-limit areas other than the proposed runway must be reviewed prior to photos being stored by contractor.
5. This letter shall be in the above-Named Contractor(s) possession when taking photographs for the above construction requirement, on Fort Campbell, KY at all times.
6. This authority is effective: 1 September 2023 to 31 August 2024.
CCMI-CBR-CM
SUBJECT: Authority to Take Pictures for Official Purposes
7. If you need additional information, please contact the MICC assigned Contract Specialist and Contracting Officer.
| Eric C. Boston | James C. Brown | |
| Installation Support Division Chief | Chief of Physical Security | |
| MICC, FT Campbell, KY 42223 | FT Campbell, KY 42223 |
Physical Security Division Authorization and Approval:
Approval: ___ Disapproval: ___ image1.png