This document contains questions and answers related to a solicitation for a post-wide boiler inspection and labeling service contract at Fort Campbell, KY/TN. The key details are:
The contract will be for annual internal boiler inspections with safety checks, annual external inspections with safety checks, and annual calibrations. The contractor will provide a boiler inspection form for government approval and use the approved form for submittals. The government will supply any necessary gaskets and tubing. The contractor must adhere to an approved inspection schedule, which can be adjusted with government approval. This is a new requirement for Fort Campbell, and there is currently no incumbent contractor. A site visit will not be scheduled prior to award, but contractors are encouraged to obtain guest passes to visit the facilities as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Service Contract Act Wage Determination.pdf | ||
| Attachment 2 - Example Boiler Inspection Form.docx | DOCX document | |
| Attachment 3 - Boiler Inspection form - NB-6.pdf | ||
| Attachment 4 - Boiler Inspection form - NB-7.pdf | ||
| W9124825Q2000.pdf | ||
| Attachment 5 - Master Boiler List.xlsx | XLSX spreadsheet | |
| W9124825Q2000 P0001.pdf | ||
| Attachment 6 - Pricing Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Campbell, KY/TN W9124825Q2000 Questions for Boiler Inspections, Post-Wide
Question 1: There's a document, "Attachment 2 Example Boiler Inspection Form" that includes safety and performance tests, open/close of boilers, cleaning of certain components and replacing tubes and gaskets. Seeing how some of the items the items listed in the "Example Inspection form" are different from the PWS we're looking for a little clarification.
Answer 1: The contractor will provide the government a Boiler inspection form, once approved by the Government, the contractor will use the approved Boiler inspection form for submittals. This service contract will only be for Boiler inspection and not for repair. If a repair is needed on a Boiler, the contractor will annotate deficiencies on the inspection form and a government Boiler technician will conduct the repair. Once the repair is complete, the contractor will schedule the boiler’s reinspection date with the COR.
Reinspection of boilers that fail certification will take precedence over subsequent boilers on the initial inspection schedule. This is to limit any downtime that may occur and to expedite the boiler’s return to service.
Question 2: Will we be required to Open/Close and Clean all the boilers as in the Example document?
Answer 2: No. A coordination / inspection schedule will be established with the Government to predicate which boilers will be inspected throughout the POP. The Government will ensure a DPW Boiler Technician is on site and accompany the contractor to open each inspected boiler.
Question 3: Will Fort Campbell provide the replacement gaskets and tubing?
Answer 3: Yes, the Government will supply the gaskets and tubing needed to place the boiler back into service, post inspection.
Question 4: Is there a proposed schedule that we need to adhere to? Can we perform the inspections any time of year?
Answer 4: The contractor will create and submit an inspection schedule from the attached Boiler list to the Government. Once approved, the contractor shall adhere to the schedule. If the contractor requests to adjust the frequency of inspections, they must submit a request in writing to the Government. This request must be approved by the Government prior to any adjustments taking effect.
Question 5: Can we perform the inspections in quick succession, or will they need to be spaced apart?
Answer 5: Yes, but the contractor needs to ensure this is captured in the approved inspection schedule.
Question 6: In the excel boiler list, there are annual and semiannual visits listed. Does that apply to this contract at all, or are we only responsible for annual internal inspections with safety checks, annual external inspections with safety checks, and annual calibrations?
Fort Campbell, KY/TN W9124825Q2000 Questions for Boiler Inspections, Post-Wide
Answer 6: The first inspection will be a running (in operation) inspection (preferably in the Winter months, as many facilities on Ft. Campbell run on a two-pipe system and are turned off in the cooling months), the next inspection will be an internal (out of operation) inspection (preferably in the cooling season). All Boilers within TN must have the first (“in operation” and “out of operation”) inspection conducted by a certified TN boiler inspector to comply with State regulations.
The Contractor will be responsible for annual internal inspections with safety checks, annual external inspections with safety checks, and annual calibrations.
Question 7: Boiler Labeling Specifications: Are there specific standards or templates for the boiler labels, and who approves these before use?
Answer 7:
Question 8: Phase-In/Phase-Out Provisions: How much overlap will there be with an outgoing or incoming contractor, and what are the expectations for the handover of responsibilities or ongoing projects?
Answer 8: There is currently no incumbent Contractor. This is a new requirement for Fort Campbell, KY/TN.
Question 9: Incumbent Contractor: Is there an incumbent contractor currently performing these services? If so, what is the contract number and dollar value.
Answer 9: There is currently no incumbent Contractor. This is a new requirement for Fort Campbell, KY/TN.
Question 10: “FAR Clause 52.237-1 (Site Visit, APR 1984) is referenced in the solicitation. Under the Federal Regulations, it is recommended or required to provide a site visit to allow contractors to assess the work site and conditions. Will a site visit be scheduled for this opportunity, and if so, could you provide details regarding the date, time, and location?”
Answer 10: There will not be a scheduled site visit prior to the award of this Firm-Fixed- Price Indefinite Delivery Indefinite Quantity requirement, but Contractors are encouraged to obtain Guest Passes as needed to visit the extremities of the sites. Time permitting, scheduled site visits outside of inspections may be possible following the issuance of the first Task Order.