This document summarizes a federal solicitation for construction services. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Campbell, Kentucky is seeking bids for an indefinite delivery/indefinite quantity contract for installation-wide paving repair, replacement, and minor construction of roads, housing streets, parking lots, and airfield pavements. The estimated value is between $25-100 million over one base year and four option years. Bids are due on June 5, 2023, with an anticipated award date of July 27, 2023. This is a 100% small business set-aside for North American Industry Classification System code 237310. The incumbent contractor will provide supervision, personnel, equipment, materials and supplies to perform paving and construction services in accordance with all applicable rules at Fort Campbell locations across Tennessee and Kentucky.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011727848
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the Basic Bituminous Material Index to the most current information.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124823B0001
X 9B. DATED (SEE ITEM 11)
05-May-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-May-2023
CODE
MICC - FORT CAMPBELL
BLDG 6923 38TH AND DESERT STORM
FORT CAMPBELL KY 42223
W91248 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9124823B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
REQUIRED INSURANCE
In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.
Workmen’s Compensation As required by Federal and State laws Employer’s Liability Insurance $100,000 General Liability Insurance:
Bodily Injury Liability $500,000 per occurrence
Auto Liability Insurance $200,000 per person Bodily Injury $500,000 per occurrence Property Damage $20,000 per occurrence
ASBESTOS PROHIBITION
“Asbestos”, including chrysotile, ammosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos and any of these materials that have been chemically treated and/or altered is prohibited from incorporation into the work under this contract. This prohibition does not apply to nor prevent the removal and disposal of asbestos materials.
ALTERNATE DISPUTES RESOLUTION
In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable in accordance with the authority and requirements of the ADR Act.
FIRE PREVENTION
The Contractor shall comply with fire prevention practices as set forth by the National Fire Protection Association in the National Fire Code and other recognized fire prevention agencies and post regulations.
ECONOMIC PRICE ADJUSTMENT
Economic Price Adjustment applies to Bituminous Material only. The following Price List Item Numbers (and subsequent Option Price List Item Numbers) will be afforded a price adjustment redetermination:
0005AD
INSTALL BITUMINOUS CONCRETE SURFACE
COURSE (1" DEPTH)
0005AE
INSTALL BITUMINOUS CONCRETE SURFACE
COURSE (2” DEPTH)
0005AF
INSTALL BITUMINOUS CONCRETE SURFACE
COURSE (3” DEPTH)
0005AG
INSTALL BITUMINOUS CONCRETE SURFACE
COURSE (4” DEPTH)
0005AH
INSTALL BITUMINOUS CONCRETE SURFACE
COURSE FOR AIRFIELDS (1" DEPTH)
0005AI
INSTALL BITUMINOUS CONCRETE SURFACE
COURSE FOR AIRFIELDS (2” DEPTH)
0005AJ
INSTALL BITUMINOUS CONCRETE SURFACE
COURSE FOR AIRFILEDS (3” DEPTH)
0005AK
INSTALL BITUMINOUS CONCRETE SURFACE
COURSE FOR AIRFIELDS (4” DEPTH)
0005AL
INSTALL BITUMINOUS CONCRETE BASE
COURSE (1" DEPTH)
0005AM
INSTALL BITUMINOUS CONCRETE BASE
COURSE (2” DEPTH)
0005AN
INSTALL BITUMINOUS CONCRETE BASE
COURSE (3” DEPTH)
0005AO
INSTALL BITUMINOUS CONCRETE BASE
COURSE (4” DEPTH)
0005AP
INSTALL BITUMINOUS CONCRETE BASE
COURSE (5” DEPTH)
0005AQ
INSTALL BITUMINOUS CONCRETE BASE
COURSE (6” DEPTH)
0005AR
INSTALL BITUMINOUS CONCRETE BASE
COURSE (7” DEPTH)
0005AS
INSTALL BITUMINOUS CONCRETE BASE
COURSE (8” DEPTH)
0005AT
INSTALL BITUMINOUS CONCRETE BASE
COURSE (9” DEPTH)
0005AU
INSTALL BITUMINOUS CONCRETE BASE
COURSE (10” DEPTH)
0005AV
INSTALL BITUMINOUS CONCRETE BASE
COURSE (11” DEPTH)
0005AW
INSTALL BITUMINOUS CONCRETE BASE
COURSE (12” DEPTH)
0005AX
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFIELDS (1" DEPTH)
0005AY
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFIELDS (2” DEPTH)
0005AZ
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFIELDS (3” DEPTH)
0005BA
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFIELDS (4” DEPTH)
0005BB
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFIELDS (5” DEPTH)
0005BC
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFIELDS (6” DEPTH)
0005BD
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFIELDS (7” DEPTH)
0005BE
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFILEDS (8” DEPTH)
0005BF
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFIELDS (9” DEPTH)
0005BG
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFILEDS (10” DEPTH)
0005BH
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFILEDS (11” DEPTH)
0005BI
INSTALL BITUMINOUS CONCRETE BASE
COURSE FOR AIRFIELDS (12” DEPTH)
The Basic Bituminous Material Index will be the basis for the adjustment and is defined as an average of the current quotations on P.G. 64-22 from suppliers furnishing asphalt cement to contractors in the state of Tennessee. The quotations are the cost per ton f.o.b. supplier’s terminals.
The Basic Bituminous Material Index for the contract is $651.82 per ton and will be effective for one (1) year from the date of contract award.
Sixty (60) days prior to the exercise of an option for this contract award, the Government will utilize the website https://www.tn.gov/content/dam/tn/tdot/construction/Const-bituminousindex.pdf to obtain the current $ / ton price. At this time, if the current price differs from the “basic bituminous material index” price by greater than five percent, the government will adjust the below listed Price List item numbers by the following formula:
Revised Price = GUP – (GUP * t * ((BB-AB)/BB)) where;
GUP = Government Unit Price (ex. $3.01/SY) t = 0.8 (80% GUP is attributed to asphalt) BB = Basic Bituminous Material Index ($651.82 per ton) AB = Adjusted Bituminous Material Index (as obtained from TDOT link 60 days prior to exercise of an option) (End of Section)
(End of Summary of Changes)