W91247-27-Q-A003 - 0001 Released 20261118 (1).pdf
PDF 4 MB Posted
- Solicitation number
- W91247-27-Q-A003
About this file
This document is an Amendment (0001) to Solicitation W9124727QA003, issued by the U.S. Army at Fort Bragg, North Carolina on November 16, 2026. The amendment revises the Total Price Calculation requirement for a Request for Quotation (RFQ) for pumping and cleaning services, with CLINs to be priced highlighted in yellow under Factor 3: Price. All other terms and conditions remain unchanged. The solicitation uses a Lowest Priced Technically Acceptable (LPTA) evaluation methodology and will be awarded to a single, responsible Offeror without discussions, though the Government reserves the right to conduct clarifications if necessary.
The evaluation process employs a four-stage gate system: Stage 1 (Administrative Compliance), Stage 2 (Technical Capability), Stage 3 (Past Performance), and Stage 4 (Price). Offerors must submit four required volumes in searchable PDF format for narratives and MS Excel for pricing, along with a completed SF-1449 form. The contract requires HUBZone Small Business certification by the time of quote submission. Technical evaluation focuses on staffing adequacy, Service Contract Labor Standards alignment, key personnel qualifications (Project Manager and Quality Control Manager), and execution plans for pumping/cleaning services, maintenance, hazardous materials handling, and two-hour emergency response capability. The Total Evaluated Price calculation includes CLINs 0001-0005 (Base Year) with per-gallon pricing and CLIN 0006, plus equivalent CLINs for Option Years 1-4 (CLINs 1001-4006), with an additional FAR 52.217-8 Option Price calculated as one-half of Option Year 4 total price. Labor rates must comply with applicable Service Contract Labor Standards wage determinations, with quotes below minimums subject to rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - W9124727QA003 (Released) 20261103.pdf | ||
| W9124727QA003 - 0001 Conformed Copy (Released) 20261118 (1).pdf | ||
| PWS - Grease Traps and Septic Tanks - 2027 16NOV27.docx | DOCX document | |
| KW 500 As-Builts.pptx | PPTX presentation | |
| W91247-27-Q-A003 0001 Conformed Copy 20261117.pdf.pdf | ||
| QA - W91247-27-Q-A003 20261118 Clean copy.docx | DOCX document | |
| TE-1 as of 18NOV26.xlsx | XLSX spreadsheet | |
| W91247-27-Q-A003 0001 20261117.pdf.pdf | ||
| Solicitation - W9124727QA003.pdf | ||
| 15-4377 rv33 20262008.txt | TXT text file | |
| Solicitation - W9124727QA003.pdf | ||
| Performance Work Statement - Clean Copy 20261028.docx | DOCX document | |
| TE-1 update 20261102.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Evaluation Factors for Award
Miscellaneous text in this section has been modified from:
A. BASIS FOR AWARD
1. : The Government will award a single, Firm- Lowest Priced Technically Acceptable (LPTA) Fixed-Price contract resulting from this Request for Quotation (RFQ) to the responsible Offeror whose quote is technically acceptable, meets all administrative compliance requirements of the solicitation, and represents the lowest evaluated price.
2. : The Government intends to evaluate quotes and award a Award Without Discussions contract without conducting discussions with Offerors. Therefore, the Offeror's initial quotation must contain the best terms from both a technical and price standpoint. However, the Government reserves the right to conduct discussions or clarifications if the Contracting Officer determines them to be in the best interest of the Government.
3. : The Government will evaluate quotes using a staged process:Evaluation Process
(Complete and Accurate / Incomplete)Stage 1: Administrative Compliance Gate Check (Acceptable / Unacceptable)Stage 2: Factor 1 (Technical Capability) Evaluation
(Acceptable / Unacceptable or Neutral)Stage 3: Factor 2 (Past Performance) Evaluation (Lowest Evaluated Price)Stage 4: Factor 3 (Price) Evaluation
B. EVALUATION FACTORS
STAGE 1: ADMINISTRATIVE COMPLIANCE GATE CHECK (COMPLETE AND ACCURATE /
INCOMPLETE)
Prior to technical and financial evaluations, the Government will conduct an initial Compliance Gate check of all quotes received.
: The quote contains all four (4) required volumes, uses the correct Complete and Accurate formats (Searchable PDF for narratives; MS Excel for pricing), and includes a signed, dated, and fully completed SF-1449 with Blocks 17a, 19-24, 30a, 30b, and 30c completed without exceptions or pricing discrepancies. Additionally, the Offeror is actively certified by the SBA as a HUBZone Small Business concern at the time of quote submission.
W9124727QA0030001
The quote is missing required volumes, uses incorrect formats, contains Incomplete:
discrepancies between the Excel pricing and the SF-1449 pricing, is submitted in Microsoft Word, or the Offeror is not actively SBA-certified as a HUBZone concern.
Quotes receiving an "Incomplete" rating at this gate will immediately not be considered for award and will not proceed further in the evaluation process.
FACTOR 1: TECHNICAL CAPABILITY (ACCEPTABLE / UNACCEPTABLE)
Subfactor 1a: Staffing and Transition Plan
The Government will evaluate the Offeror's Staffing and Transition Plan based on the following:
: The narrative clearly demonstrates that the proposed staffing levels, on-Staffing Adequacy site personnel roles, and organizational structure are sufficient to execute pumping and cleaning services operations across all Fort Bragg installations.
: The unpriced staffing matrix clearly Service Contract Labor Standards (SCLS) Alignment depicts appropriate labor categories, Wage Determination Category Numbers, and productive hours.
: The resumes for the Project Manager (PM) and Quality Control Key Personnel Qualifications Manager (QCM) meet or exceed the mandatory qualifications:
: Project Manager (PM) The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM shall be available between the hours of 7:30 AM to 4:30 PM, EST
: Quality Control Manager (QCM) QCM shall have at least two (2) years of documented relative experience and shall be responsible for the overall management and implementation of the Contractor's Quality Control Plan
: Drivers Septic tank drivers and pumping employees shall have at least one (1) year of experience in the Grease Trap and Septic Tank and Lift Station servicing.
Limitations on Subcontracting: The staffing plan explicitly demonstrates compliance with FAR Clause 52.219-14, confirming that the prime SBA-certified HUBZone contractor (or similarly situated HUBZone entities) will perform at least 50% of the cost of contract performance for personnel
Subfactor 1b: Pumping and Cleaning Service Execution Plan
The evaluation will include an assessment of whether the Offeror's proposed execution plan incorporates all service areas and capability levels as identified Technical Exhibit #1 The evaluation will include an assessment of whether the Offeror's maintenance plan outlines procedures for routine and emergency maintenance, and the corrective actions that will be taken to ensure adequate equipment is readily available with minimal equipment downtime in accordance with PWS requirements The evaluation will include an assessment of whether the Offeror's proposed hazardous material plan includes a hazardous material list, storage plan, and handling procedures that comply with AR 200-1, Environmental Protection and Enhancement.
: DMO Responsiveness Strategy Priority 1 Emergency Pumping (Demand Maintenance Orders - DMO) The Contractor shall respond and commence contract work within two (2) hours after :
telephonic notification of a requirement for emergency services to the tank/facility location as informed by the COR, paragraph 5.3.9 PWS.
FACTOR 2: PAST PERFORMANCE
The Past Performance factor will be evaluated to assess the Offeror's probability of successful contract performance based on relevant history.
: The Government will evaluate the relevancy of the Offeror's Relevancy Assessment submitted contract references (maximum of 5) performed within the last three (3) years.
Relevancy is defined as work similar in nature, size, magnitude, complexity, and scope to this requirement.
Performance Rating:
: Based on the Offeror's performance record and independent federal Acceptable databases (e.g., CPARS/PPIRS), the Government has a reasonable expectation that the Offeror will successfully perform the required effort. The record must indicate no significant or unresolved negative past performance.
: In accordance with RFO 15.202(c), an Offeror without a record of relevant past Neutral performance, or for whom past performance information is not available, will not be evaluated favorably or unfavorably. Instead, the Offeror will receive a "Neutral" rating. A " " rating is deemed " for the purposes of this solicitation and will not Neutral Acceptable" negatively impact or disqualify the Offeror.
: Based on the Offeror's performance record, the Government does not Unacceptable have a reasonable expectation that the Offeror will successfully perform the required effort due to significant, unresolved negative past performance.
FACTOR 3: PRICE
Price will not be scored or adjectivally rated. Pricing will be evaluated for completeness, accuracy, and reasonableness.
: The Government will evaluate the completed CLIN schedule in Completeness & Accuracy the Offeror's Excel spreadsheet. The pricing must be mathematically accurate and must match the pricing entered on the signed SF-1449 form and its continuation sheets.
: The Government will evaluate price reasonableness using price analysis Reasonableness techniques in accordance with federal regulations. The existence of adequate price competition is expected to establish price reasonableness.
: The Government will evaluate the priced labor Labor Rate Realism ("Show Your Math") matrix to verify that all proposed hourly rates for non-exempt labor categories comply with the applicable SCA Wage Determination. Quotes proposing labor rates below SCLS minimums will be rejected.
The Government will calculate the Total Evaluated Price Total Evaluated Price Calculation:
by adding the proposed extended prices for:
CLIN 0001 | Base Year CLIN 1001 |Option Year 1 CLIN 2001 |Option Year 2 CLIN 3001 |Option Year 3 CLIN 4001 |Option Year 4 FAR 52.217-8 Option Price (Calculated as one-half of the Option Year 4 total price).
The evaluation of option years does not obligate the Government to exercise the options.
*** END OF NARRATIVE ***
To:
A. BASIS FOR AWARD
1. : The Government will award a single, Firm- Lowest Priced Technically Acceptable (LPTA) Fixed-Price contract resulting from this Request for Quotation (RFQ) to the responsible Offeror whose quote is technically acceptable, meets all administrative compliance requirements of the solicitation, and represents the lowest evaluated price.
2. : The Government intends to evaluate quotes and award a Award Without Discussions contract without conducting discussions with Offerors. Therefore, the Offeror's initial quotation must contain the best terms from both a technical and price standpoint. However, the Government reserves the right to conduct discussions or clarifications if the Contracting Officer determines them to be in the best interest of the Government.
3. : The Government will evaluate quotes using a staged process:Evaluation Process
(Complete and Accurate / Incomplete)Stage 1: Administrative Compliance Gate Check (Acceptable / Unacceptable)Stage 2: Factor 1 (Technical Capability) Evaluation
(Acceptable / Unacceptable or Neutral)Stage 3: Factor 2 (Past Performance) Evaluation
(Lowest Evaluated Price)Stage 4: Factor 3 (Price) Evaluation
B. EVALUATION FACTORS
STAGE 1: ADMINISTRATIVE COMPLIANCE GATE CHECK (COMPLETE AND ACCURATE /
INCOMPLETE)
Prior to technical and financial evaluations, the Government will conduct an initial Compliance Gate check of all quotes received.
: The quote contains all four (4) required volumes, uses the correct Complete and Accurate formats (Searchable PDF for narratives; MS Excel for pricing), and includes a signed, dated, and fully completed SF-1449 with Blocks 17a, 19-24, 30a, 30b, and 30c completed without exceptions or pricing discrepancies. Additionally, the Offeror is actively certified by the SBA as a HUBZone Small Business concern at the time of quote submission.
The quote is missing required volumes, uses incorrect formats, contains Incomplete:
discrepancies between the Excel pricing and the SF-1449 pricing, is submitted in Microsoft Word, or the Offeror is not actively SBA-certified as a HUBZone concern.
Quotes receiving an "Incomplete" rating at this gate will immediately not be considered for award and will not proceed further in the evaluation process.
FACTOR 1: TECHNICAL CAPABILITY (ACCEPTABLE / UNACCEPTABLE)
Subfactor 1a: Staffing and Transition Plan
The Government will evaluate the Offeror's Staffing and Transition Plan based on the following:
: The narrative clearly demonstrates that the proposed staffing levels, on-Staffing Adequacy site personnel roles, and organizational structure are sufficient to execute pumping and cleaning services operations across all Fort Bragg installations.
: The unpriced staffing matrix clearly Service Contract Labor Standards (SCLS) Alignment depicts appropriate labor categories, Wage Determination Category Numbers, and productive hours.
: The resumes for the Project Manager (PM) and Quality Control Key Personnel Qualifications Manager (QCM) meet or exceed the mandatory qualifications:
: Project Manager (PM) The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM shall be available between the hours of 7:30 AM to 4:30 PM, EST
: Quality Control Manager (QCM) QCM shall have at least two (2) years of documented relative experience and shall be responsible for the overall management and implementation of the Contractor's Quality Control Plan
: Drivers Septic tank drivers and pumping employees shall have at least one (1) year of experience in the Grease Trap and Septic Tank and Lift Station servicing.
Limitations on Subcontracting: The staffing plan explicitly demonstrates compliance with FAR Clause 52.219-14, confirming that the prime SBA-certified HUBZone contractor (or similarly situated HUBZone entities) will perform at least 50% of the cost of contract performance for personnel
Subfactor 1b: Pumping and Cleaning Service Execution Plan
The evaluation will include an assessment of whether the Offeror's proposed execution plan incorporates all service areas and capability levels as identified Technical Exhibit #1 The evaluation will include an assessment of whether the Offeror's maintenance plan outlines procedures for routine and emergency maintenance, and the corrective actions that will be taken to ensure adequate equipment is readily available with minimal equipment downtime in accordance with PWS requirements The evaluation will include an assessment of whether the Offeror's proposed hazardous material plan includes a hazardous material list, storage plan, and handling procedures that comply with AR 200-1, Environmental Protection and Enhancement.
: DMO Responsiveness Strategy Priority 1 Emergency Pumping (Demand Maintenance Orders - DMO) The Contractor shall respond and commence contract work within two (2) hours after :
telephonic notification of a requirement for emergency services to the tank/facility location as informed by the COR, paragraph 5.3.9 PWS.
FACTOR 2: PAST PERFORMANCE
The Past Performance factor will be evaluated to assess the Offeror's probability of successful contract performance based on relevant history.
: The Government will evaluate the relevancy of the Offeror's Relevancy Assessment submitted contract references (maximum of 5) performed within the last three (3) years.
Relevancy is defined as work similar in nature, size, magnitude, complexity, and scope to this requirement.
Performance Rating:
: Based on the Offeror's performance record and independent federal Acceptable databases (e.g., CPARS/PPIRS), the Government has a reasonable expectation that the Offeror will successfully perform the required effort. The record must indicate no significant or unresolved negative past performance.
: In accordance with RFO 15.202(c), an Offeror without a record of relevant past Neutral performance, or for whom past performance information is not available, will not be evaluated favorably or unfavorably. Instead, the Offeror will receive a "Neutral" rating. A " " rating is deemed " for the purposes of this solicitation and will not Neutral Acceptable" negatively impact or disqualify the Offeror.
: Based on the Offeror's performance record, the Government does not Unacceptable have a reasonable expectation that the Offeror will successfully perform the required effort due to significant, unresolved negative past performance.
FACTOR 3: PRICE
Price will not be scored or adjectivally rated. Pricing will be evaluated for completeness, accuracy, and reasonableness.
: The Government will evaluate the completed CLIN schedule in Completeness & Accuracy the Offeror's Excel spreadsheet. The pricing must be mathematically accurate and must match the pricing entered on the signed SF-1449 form and its continuation sheets.
: The Government will evaluate price reasonableness using price analysis Reasonableness techniques in accordance with federal regulations. The existence of adequate price competition is expected to establish price reasonableness.
: The Government will evaluate the priced labor Labor Rate Realism ("Show Your Math") matrix to verify that all proposed hourly rates for non-exempt labor categories comply with the applicable SCA Wage Determination. Quotes proposing labor rates below SCLS minimums will be rejected.
The Government will calculate the Total Evaluated Price Total Evaluated Price Calculation:
by adding the proposed extended prices for:
CLIN 0001, 0002, 0003, 0004, 0005 ($____per gallon) and 0006 | Base Year CLIN 1001, 1002, 1003, 1004, 1005 ($____per gallon) and 1006 |Option Year 1 CLIN 2001, 2002, 2003, 2004, 2005 ($____per gallon) and 2006 |Option Year 2 CLIN 3001, 3002, 3003, 3004, 3005 ($____per gallon) and 3006 |Option Year 3 CLIN 4001, 4002, 4003, 4004, 4005 ($____per gallon) and 4006 |Option Year 4 FAR 52.217-8 Option Price (Calculated as one-half of the Option Year 4 total price).
The evaluation of option years does not obligate the Government to exercise the options.
*** END OF NARRATIVE ***
| IDCode: J |
| Page: 1 |
| Pages: 8 |
| AmendNo: 0001 |
| EffDate: 16 NOV 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W91247 |
| AdmCode: |
| IssuedBy: W6QM MICC FDO FT BRAGG |
2175 ROCK MERRITT AVE, STOP A
FORT BRAGG, NC 28310-0000
UNITED STATES
LUIS SERRANO-TORRES, EMAIL: LUIS.SERRANO-TORRES.CIV@ARMY.MIL TELEPHONE: 910-643-4617 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W9124727QA003 |
| SolDate: 03 NOV 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: This amendment is to: |
1) Revise Total Price Calculation requirement. CLINs to be priced are highlighted in yellow (Factor 3: Price; Total Evaluated Price Calculation)
All other terms and conditions remain the same.
| ContNameTitle: |
| CoNameTitle: JOHN MACHINE |
| ContDate: |
| CODate: 24 NOV 2026 |
File details come from the government source that posted it. Updated .