This is a Questions and Answers document clarifying Solicitation W91247-27-Q-A003 for pumping and cleaning services at U.S. Army Garrison installations. The solicitation seeks a contractor to provide comprehensive management and performance of grease trap, septic tank, lift station, and field latrine services across approximately 139 systems/facilities, including pumping, cleaning, grease removal, inspection, and disposal activities. The contract is a firm-fixed-price (FFP) arrangement with a base year (June 1 to December 1, 2026) valued at $512,000, plus four option years and a six-month extension. The incumbent contractor is The Plumbing Shop Inc. dba Quick Action Group under IGSA NC-R5-HVAC-090524.
Key clarifications addressed in the Q&A include: water supply will not be provided by the Government; contractors must submit pricing on a per-gallon basis for specified CLINs (0001–0006 for base year, with parallel CLINs for option years); SUTA certification requirements can be satisfied by a Letter of Good Standing or signed certification; evaluation pricing includes only base year and four option years, excluding the six-month extension; the controlling quotation deadline is November 30, 2026, at 11:00 a.m. Eastern, with performance commencing December 14, 2026; emergency services must be priced to include all mobilization, labor, disposal, and after-hours costs at a per-gallon rate; and the Project Manager must meet all qualifications prior to award. Historical workload data indicates emergency work orders ranged from five to six annually with 7,500 to 20,000 gallons pumped. One identified facility is BLDG# KW-500 on Mustin Street at Naval Air Station Key West, Florida, requiring normal base access through the Visitor Control Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - W9124727QA003 (Released) 20261103.pdf | ||
| W91247-27-Q-A003 - 0001 Released 20261118 (1).pdf | ||
| W9124727QA003 - 0001 Conformed Copy (Released) 20261118 (1).pdf | ||
| PWS - Grease Traps and Septic Tanks - 2027 16NOV27.docx | DOCX document | |
| KW 500 As-Builts.pptx | PPTX presentation | |
| W91247-27-Q-A003 0001 Conformed Copy 20261117.pdf.pdf | ||
| TE-1 as of 18NOV26.xlsx | XLSX spreadsheet | |
| W91247-27-Q-A003 0001 20261117.pdf.pdf | ||
| Solicitation - W9124727QA003.pdf | ||
| 15-4377 rv33 20262008.txt | TXT text file | |
| Solicitation - W9124727QA003.pdf | ||
| Performance Work Statement - Clean Copy 20261028.docx | DOCX document | |
| TE-1 update 20261102.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers (Q&A): The following questions and responses are provided for clarification of Solicitation W91247-27-Q-A003. Questions were accepted through 12 November 2026 at 10:00 AM EST. This Q&A does not modify the terms and conditions of the solicitation. Any changes to the solicitation will be issued by formal amendment via the Government Point of Entry (SAM.Gov).
| # |
| Questions |
| Answers |
| 1. |
| Water supply PWS Section 3.2 states that government water will be provided at no cost, while Section 5.1.1 requires the contractor to haul its own water. May contractors fill their trucks at designated installation water points? If so, please identify the locations and access restrictions. |
| I updated the PWS to correct the conflicting information. Section 3.2 now states that the Government will not provide any utilities in this contract. |
| 2. |
| We saw this solicitation posted and would like to bid on it, but we do not see a bid sheet included. |
Could we please get a bid sheet to submit?
For the bid schedule, refer to Solicitation W91247-27-Q-A003 (released).
| 3. |
| Regarding the requirement in Volume I, Section 4, for a State Unemployment Tax Act |
(SUTA) Certificate: Will an official Letter of Good Standing be issued by the North Carolina Division of Employment Security, confirming the offeror’s unemployment insurance tax account is current and in good standing, satisfy this requirement?
1. A current SUTA/state unemployment insurance account certificate, account notice, rate notice, or equivalent document issued by the applicable state unemployment-insurance authority; or
1. A signed certification by an officer or other individual authorized to bind the offeror stating:
1. the offeror does not currently maintain a state unemployment-insurance account;
1. the factual basis for that status;
1. the states in which the offeror proposes to employ personnel for contract performance, if awarded;
1. that the offeror will obtain any registration, account, coverage, or other authorization required by applicable Federal, state, or local law before employing personnel or commencing performance; and
1. that the offeror remains responsible for all applicable unemployment-tax obligations for itself and its subcontractors.
A signed certification under paragraph 2 is acceptable in lieu of a current SUTA certificate for purposes of quotation submission. It does not constitute a Government determination that the offeror is exempt from any state unemployment-tax requirement.
Insurance: The successful offeror shall, before commencing performance, provide the Contracting Officer written notice and evidence that it has obtained and will maintain the insurance required by the contract, consistent with FAR 52.228-5.
| 4. |
| Incumbent and historical pricing Please identify the current incumbent and contract number, including any bridge |
contracts or extensions following W91247-20-P-0032. Please provide the latest annual awarded amount and publicly releasable CLIN-level pricing, including emergency pumping rates.
-Incumbent name: The Plumbing Shop Inc. dba Quick Action Group (QAMG) -Contract Number: IGSA NC-R5-HVAC-090524 -Contract Type: FFP-Period of performance. 1 June 2026 to 1 December 2026.
-CLIN-Level Pricing including Emergency Rates: Total contract value: $512,000.00.
| 5. |
| Historical workload and scope changes |
Please provide actual annual gallons pumped and service-call counts for the most recent two years, broken out by grease traps, septic tanks, lift stations/field latrines, and emergency services, if available. What material scope changes distinguish between this requirement from the current contract?
The TE has been pretty much the same for the last 2 years and has not changed. For Emergency Work Orders in 2024 there were 5 total. 3 for Septic Tanks and 2 For Grease Traps. 6,500gals were pumped for Septic Tanks and 10,000 was pumped for Grease Traps. For 2025 there was a total of 6 Emergency Work Orders. 5 were for Septic Tanks and 1 was for Gease Traps. A total of 19,000gal was pumped for Septic Tanks and 1,000 was pumped for Grease Traps. There are NO field Latrines.
| 6. |
| Full pumping versus skimming |
PWS Sections 5.0–5.2.1 require complete emptying, while Technical Exhibit 1 includes skimming instructions. Which requirement should offerors use for pricing and performance? Where both skimming and periodic full pumping are listed, does the full pumping replace that period’s skimming service or occur in addition to it?
Go by the TE Instructions. The TE has been corrected to clarify when skim services versus full services are required.
| 7. |
| McRidge holding tanks and service frequencies Technical Exhibit 1 lists four identical weekly entries for the 5,000-gallon McRidge Landfill/Holding Tank at O-3454. Do these represent four separate tanks, multiple weekly services of one tank, or duplicate entries? Please also confirm that “bimonthly” means every two months and “biannually” means twice per year. |
| This is the same tank that is serviced once a week. |
Bimonthly – means twice a month Biannually – means twice a year
| 8. |
| Hydro-jetting and system inventory |
For quarterly grease-trap line hydro-jetting, please provide available line lengths, diameters, and access information, or a common estimating basis. Please identify any lift stations, field latrines, or other systems included in the scope but not separately identifiable in Technical Exhibit 1.
I cannot get this information at this time. There are no Field Latrines. This information is not available at this time. Please use the Key West Grease Trap as an example as one.
| 9. |
| Emergency service pricing and staffing |
Please confirm whether the emergency per-gallon rate must include all mobilization, labor, disposal, and after-hours costs, with no separate minimum call-out charge. How should offerors reconcile the 24/7, two-hour emergency response requirement with the prohibition on overtime and the 40-hour weekly limit? What authorization process applies if emergency demand exceeds the $15,000 annual CLIN ceiling?
Historically, there have been three weekend calls per year, with a maximum duration of two hours per call. Any overtime should be included in the price per gallon. The Contracting Officer’s Representative (COR) explained that personnel employed by previous contractors were not full-time employees. If demand exceeds the $15,000 ceiling, an unauthorized commitment may occur. Any unauthorized commitment would require ratification by an authorized Government official (Contracting Officer), provided the conditions in RFO 1.405 (c) are met.
| 10. |
| Total evaluated price Section L describes evaluation using the base year, all four option years, and the six-month extension amount. Section M’s detailed calculation lists only CLINs 0001, 1001, 2001, 3001, and 4001. Please confirm whether all CLINs are included in the evaluated total, including septic-tank, school, Womack, emergency, and reporting lines, and provide controlling calculation. |
| Total evaluation Price are all the CLINs in base years and four option years only. Added to Section M- Evaluation Factors for Award (highlighter in Yellow) |
Base Year CLINs 0001, 0002,0003, 0004, 0005($___per gallon) and 0006 Option year 1 CLINs, 1001, 1002, 1003, 1004, 1005 ($___ per gallon) and 1006 Option year 2 CLINs, 2001, 2002, 2003, 2004, 2005 ($___ per gallon) and 2006 Option year 3 CLINs, 3001, 3002, 3003, 3004, 3005 ($___ per gallon) and 3006 Option year 4 CLINs, 4001, 4002, 4003, 4003, 4005 ($___ per gallon and 3006
CLINS 0005, 1005, 2005, 3005, and 4005. The Contractor shall insert its proposed rate per gallon; however, this rate will not be used for evaluation purposes.
| 11. |
| Submission deadline and mobilization |
Please confirm the controlling quotation deadline: the SF-1449 cover shows November 6, 2026, at 11:00 a.m., while Sections A and L state November 30, 2026, at 10:00 a.m. Eastern. Is December 14, 2026, still the anticipated performance start date, and what mobilization period is expected between award and service commencement?
Quotation deadline is 30 November 2026 at 11:00 am.
Period of Performance starts 14 December 2026.
Mobilization period is starting date of 14 December 2026
| 12. |
| I have a question regarding the attached solicitation document. |
Do we need to quote the entire list, or only the highlighted yellow section?
See question 10. above
| 13. |
| I have one last question regarding the pricing structure. |
Do you require a separate price for each individual location, or may I provide a combined price for the grease traps and septic tanks based on the service frequency?
See Section M- Factor 3: Price for instructions for award.
| 14. |
| Key West facility (KW-500) |
Technical Exhibit #1 identifies a facility designated KW-500 in Key West, Florida. Please provide the facility’s physical address, installation or jurisdiction, access requirements, and confirm the precise pumping and cleaning services required at this location.
The BLDG# is KW-500 on Mustin St. The Installation is Naval Air Station in Key West. It’s normal access to the installation; it’s not a secure area where you need an escort or special requirements. There is only one grease trap that needs to be pumped on this installation.
Address is BLDG# KW-500 Mustin Street, Key West, FL 33040. Located on the Naval Air Station. Access to the Installation visit the Visitor Control Center at BLDG# A641 Saratoga Ave, Key West, FL 33040.
| 15. |
| Project Manager qualification compliance — PWS Section 1.18.6 |
PWS Section 1.18.6 establishes qualification requirements for the Project Manager, including medical surveillance and respiratory protection. Please clarify when the proposed Project Manager must demonstrate compliance with all qualifications specified in this section: at quotation submission, prior to award, or within 30 calendar days following award? Please confirm the applicable compliance deadline.
Prior to award
| 16. |
| Quotation receipt deadline the SF-1449 indicates November 30, 2026, at 11:00 a.m., whereas Section L specifies November 30, 2026, at 10:00 a.m. Eastern. Please confirm the controlling quotation receipt deadline and time zone. |
See question 11. above
| 17. |
| Regarding the requirement in Volume I, Section 4, for a State Unemployment Tax Act (SUTA) Certificate: |
Will an official Letter of Good Standing issued by the North Carolina Division of Employment Security, confirming the offeror’s unemployment insurance tax account is current and in good standing, satisfy this requirement?
See question 2. Above