Attachment 01 - Performance Work Statement_Amendment 0001.pdf

PDF 428 KB Posted

Attached to
USAG Ranges & Airfields Grounds Maintenance
Solicitation number
W91247-26-Q-A015
Issued by

About this file

This is a Performance Work Statement (PWS) for Range Control and Airfield Grounds Maintenance services at Fort Bragg, North Carolina, dated May 11, 2026.

The Contractor must provide comprehensive grounds maintenance services covering approximately 3,217 acres across five locations: Fort Bragg (2,014 acres), Simmons Army Airfield (170 acres runway environment plus additional outside areas), Camp Mackall Army Airfield (575 acres), and Pope Army Airfield (442 acres). Services include mowing, bush hogging, trimming, edging, policing, and general grounds maintenance. For range and training areas, grass height must not exceed six inches; for airfields, grass must be maintained between six and twelve inches to manage wildlife hazards. The Contractor must perform all work to meet Federal, State, and local laws and regulations, with a performance standard of 97-100% compliance depending on the specific task. The contract is Firm Fixed Price (FFP) with a base period of twelve months and four optional one-year periods. Normal operating hours are 6:00 a.m. to 4:30 p.m. EST, Monday through Friday, excluding Federal holidays, with flexible scheduling available upon coordination with the Contracting Officer's Representative. The Contractor must supply all personnel, equipment, tools, materials, and supervision, with specific requirements for a Project Manager, Quality Control Manager, and Key Personnel, all possessing relevant certifications including OSHA 40-Hour Hazardous Waste Operations, OSHA 30-Hour Construction Safety, and respiratory protection qualifications. Critical deliverables include security programs, anti-terrorism training certifications, iWATCH training completion, airfield driver's licenses, quality control plans, safety and spill plans, and monthly schedule reports, all with specified submission deadlines ranging from five to thirty days post-award. The Contractor is responsible for all property damage, hazardous spill cleanup costs, environmental compliance, and emergency medical treatment costs for employees, and must maintain 15-foot vegetation clearance around fire hydrants and ensure runway lighting visibility from aircraft.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Range Control & Airfield Grounds Maintenance.

Service Contract Branch

PERFORMANCE WORK STATEMENT

(PWS)

Fort Bragg, North Carolina.

11 May 2026 Version: A Revision 1.0

Table of Contents

Part 1: General Information

• 1.1. Description of Services/Introduction

• 1.2. Background

• 1.3. Objectives

• 1.4. Scope

• 1.5. Traffic Flow

• 1.6. Restoration of Real Property Damage

• 1.7. General Information

• 1.8. Period of Performance o 1.8.1. Place of Performance o 1.8.2. Recognized Holidays o 1.8.3. Hours of Operation o 1.8.4. Installation Closures o 1.8.5. Inclement Weather

• 1.9. Emergency Delays

• 1.10. Fraud, Waste, and Abuse

• 1.11. Type of Contract

• 1.12. Security o 1.12.1. Security Requirements o 1.12.2. Security Program o 1.12.3. Access and General Protection/Security Policy and Procedures o 1.12.4. Physical Security Plan

• 1.13. Security Training o 1.13.1. Training o 1.13.2. Anti-Terrorism (AT) Level I Training o 1.13.3. iWATCH Training o 1.13.5. Threat Awareness and Reporting Program Training o 1.13.6 Local Airfield and Driver License Training

• 1.14. Local Health Protection Conditions o 1.14.1. Key Control

• 1.15. General o 1.15.1. Personnel Certifications o 1.15.2. Access and General Protection/Security Policy and Procedures

• 1.16. Post Award Conference/Periodic Progress Meetings

• 1.17. Government Roles and Responsibilities o 1.17.1. Contracting Officer (KO) o 1.17.2. Contracting Officer’s Representative (COR/ACOR) o 1.17.3. COR/ACOR Authority o 1.17.4. COR or Designated Government Representative Functions

• 1.18. Specific Contractor Requirements, Roles, and Responsibilities o 1.18.1. U.S. Residency o 1.18.2. Contractor Hiring Restrictions o 1.18.3. Contractor Identification o 1.18.4. Standards of Conduct o 1.18.5. Contractor Key Personnel o 1.18.6. Project Manager (PM) o 1.18.7. Quality Control Manager/Inspector (QCM) o 1.18.8. Quality Control Program (QCP) o 1.18.9. Special Qualifications

• 1.19. Phase In /Phase Out Period

• 1.20. Emergency Services o 1.20.1. Emergency Medical Treatment o 1.20.2. Accident Reporting

• 1.21. Environment and OSHA

• 1.22. Safety o 1.22.1. Safety Plan o 1.22.2. Spill Plan o 1.22.3. Safety Data Sheets

• 1.23. Environmental Compliance

Part 2: Definitions & Acronyms

• 2.1. Definitions

• 2.2. Acronyms

Part 3: Government Furnished Property, Equipment, and Services

• 3.1. Equipment

• 3.2. Utilities

• 3.3. Materials

• 3.4. Property

• 3.5. Services

Part 4: Contractor Furnished Items and Services

• 4.1. General

• 4.2. Materials

• 4.3. Equipment

• 4.4. Unserviceable Contractor Equipment

Part 5: Common Level of Services

• 5.0. Specific Tasks for Airfield & Ranges Ground Maintenance

• 5.1. Grass Requirements

• 5.2. Grass Mowing

• 5.3. Damaged Grounds

• 5.4. Trimming

• 5.5. Priorities

• 5.6. Hours of Operation

• 5.7. Monthly Schedule Reports (MSR)

• 5.8. Traffic Flow Requirements

Part 6: Applicable Publications

Part 7: Attachment/Technical Exhibit Listing

Part 8: Performance Requirements Summary

• 8.1. Deliverables Schedule

Part 1

GENERAL INFORMATION

1.0. GENERAL:

This is a non-personal services contract for Range/Airfield Grass Cutting and Grounds Maintenance,

• The Government will not exercise any supervision or control over the contract service providers.

• The Contractor must perform to the standards specified in this Performance Work Statement (PWS).

• Contract service providers must be accountable solely to the Contractor who, in turn is responsible to the Government.

• The Contractor must furnish all necessary personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and any other non-personal services required to fulfill the obligations outlined in this PWS.

1.1. Description of Services/Introduction:

The Contractor must provide comprehensive management, supervision, personnel, labor, equipment, supplies, facilities, transportation, tools, materials, and other items and non-personal services necessary to perform all Range/Airfield Grass Cutting and Grounds Maintenance, as detailed and defined in this Performance Work Statement (PWS), Part 5 specific. activities to include, but not limited to mowing, bush hogging, policing, edging, trimming, and other general grounds maintenance of approximately 3,217 acres.

This must be done IAW all the terms, conditions, general and special provisions, specifications, attachments, and exhibits contained herein or incorporated by reference.

• The Contractor must ensure that all work meets or exceeds the specifications for the listed Common Levels of Service (CLS).

• The Contractor must perform to the standards in this contract.

1.2. Background:

The Directorate of Public Works (DPW) at Fort Bragg, North Carolina, oversees Range/Airfield Grass Cutting and Grounds Maintenance, across multiple locations. These include Fort Bragg, Pope Army Airfield (PAAF), Camp Mackall (MAAF), Simmons Army Airfield (SAAF), and Range Control. These sites span several counties in North Carolina: Cumberland, Hoke, Harnett, Moore, Richmond, and Scotland.

1.3. Objectives.

The Contractor must verify all work accomplished as fulfillment of this PWS meets all applicable Federal, State, and local laws, regulations, directives, and other requirements (LOR) (See Definitions & Acronyms, 2.2 Acronyms - Legal and Other Requirements) and Applicable Publications.

1.4. Scope:

The Contractor must perform Range/Airfield Grass Cutting and Grounds Maintenance, to the performance standards in this PWS, ensure the provision of management, equipment, and personnel for Range/Airfield Grass Cutting and Grounds Maintenance. As defined in this contract, and in accordance with all other terms, conditions and provisions contained herein.

1.5. Traffic Flow.

The Contractor must maintain the free flow of vehicle and pedestrian traffic while conducting grounds maintenance service tasks. Any street (or road) closures (less or more than 30 minutes) must be coordinated with the Contracting Officer Representative (COR) or Alternate Contracting Officer Representative (ACOR).

Any street (or road) closure exceeding 30 minutes, the Contractor must notify the Contracting Officer (KO), in writing, a minimum of fourteen (14) days in advance of any scheduled closure of streets. Emergency road closures must be coordinated with the Contracting Officer Representative (COR) or Alternate Contracting Officer Representative (ACOR) prior to conducting Grass, tree, trimming and cutting service tasks. (See Deliverables Schedule, paragraph 8.0, Deliverables A001).

1.6. Restoration of Real Property Damage.

The Contractor must be responsible for all damages to Government property occurring because of contractor employees’ work. The Contractor must notify the COR no later than 2 two hours of occurrence of any damages caused by the Contractor employee’s or equipment. The Contractor must make all necessary repairs, at no cost to the Government, and to the satisfaction of the Government. The Government may perform necessary repairs that are required because of Contractor damage. The Contractor must reimburse the Government for all costs the Government incurs due to the cost of repairing, cost of removal of damaged item or loss of assessed/appraised value due to Contractor caused damage to Government Property within thirty (30) calendar days of completion of repairs. (See Deliverables Schedule, paragraph 8.2, Deliverables A002).

1.7. General Information:

1.8. Period of Performance:

Base period of twelve (12) months with four (4) option years of twelve (12) months each.

1.8.1. Place of Performance:

The Contractor must perform work on Fort Bragg, Pope AAF, Camp Mackall AAF, Simmons AAF, Range Control, North Carolina. Authorized access is required to enter the government-owned property.

1.8.2. Recognized Holidays:

The Contractor must not be required to perform services on recognized federal holidays nor on days observed in lieu thereof. The recognized federal holidays include:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth

1.8.3. Hours of Operation:

The normal hours of operation are between the hours of 6:00 am – 4:30 pm EST, Monday through Friday, excluding Federal holidays or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. No overtime (OT) or compensatory time (CT) is authorized. Contractor personnel must not exceed a 40-hour work week; flexible work schedule may be considered, including for weekend work with coordination with the COR and Site Managers.

• The Contractor must coordinate with KO/COR to establish a schedule if services are required outside of normal hours of operation.

• The Contractor must maintain an adequate workforce to ensure the uninterrupted performance of all tasks defined within this PWS when installations are not closed for the aforement ioned reasons.

• The Contractor must work on the days the Government is scheduled to work.

• See Part 5 Common Levels of Service (CLS) 5.7. Operation hours of each Airfield and Range.

1.8.4. Installation Closures:

When an unforeseen installation closure occurs on a regularly scheduled day of work, (i.e., severe weather, training holiday, day of mourning, etc.).

• The Contractor must reschedule the work to be performed the following day, unless the following day falls on a weekend, or a recognized Federal holiday, or reschedule the work on any day that is mutually satisfactory.

1.8.5. Inclement Weather.

If the Contractor determines unsafe weather conditions for continued operations, then the Contractor must notify the KO/COR if inclement weather suspends operations within two (2) hours. The Contractor must resume operations with KO/COR approval.

1.9. Emergency Delays.

If the Contractor determines unsafe weather conditions or work environment is cause for an interruption of services, the Contractor must notify the KO or his/her designated representative COR/ACOR; two (2) hours prior to curtailing operations. The Contractor must obtain KO approval to resume operations.

• The Contractor must obtain KO approval to resume operations.

• The Contractor must coordinate with the DPW designated representative(s) in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations.

1.10. Fraud, Waste, and Abuse:

In accordance with AR 11-2, Internal Management Controls, the Contractor must be responsible for maintaining proper conduct and good discipline within Contractor-occupied work areas. Contractor personnel must be encouraged to be alert to and report to designated representatives suspected of fraud, waste, and abuse or other intentionally dishonest conduct observed during or in the performance of contract.

1.11. Type of Contract:

The Government will award a FIRM FIXED PRICE with a (FFP) type of contract.

1.12.1. Security Requirements.

Contractor personnel performing work under this contract must have and maintain a Homeland Security Installation Assess Control Badge at the time of the contract start date and for the life of the contract. The PM/APM and any individuals designated as key personnel must be able to understand, speak, read, and write the English language.

1.12.2. Security Program.

The Contractor’s Physical Security Plan, the Contractor’s Information Security Plan, the Contractor’s Information Systems and Plan, and National Industrial Security Program (NISP) must form the basis of the Contractor’s security program. The Contractor’s security program is required within 30 days after contract award and within five-working days of changes thereafter. Electronic copies must be provided to the KO/COR.

(See Deliverables Schedule, paragraph 8.2, Deliverables A003).

1.12.3. Access and General Protection/Security Policy and Procedures.

The Contractor and all associated subcontractors’ employees must provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost

Marshal Office, Director of Emergency Services or Security Office. The contractor workforce must comply with all personal identity verification requirements i.e., FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

• For contractors that do not require CAC but require access to a DoD facility or installation. Contractors and all associated sub-contractors employees must be screened using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Contractors or Contract Leads will coordinate with the COR to receive an entry badge (AIE). All issued badges will not exceed the issuance of three years or the length of the contract. Contractors requiring access to the installation will go to the visitor center to obtain a badge of access. Contractors will turn in the badge to the COR upon expiration of the contract or separation from the contract. Lost, damaged, or stolen badges will be reported immediately to the COR. IAW AR 190-51, at no point will a contractor use a retiree, or other DoD ID to access the installation unless it is a CAC ID, issued by the US Government and sponsored locally.

1.12.4. Physical Security Plan.

The Contractor’s security program must focus on physical security aspects related to contract performance. It should outline how the Contractor will prevent unauthorized access, vandalism, pilferage, larceny, sabotage, and arson targeting Contractor-controlled facilities and Government-Furnished Property (GFP). The physical security plan must be developed in alignment with the following regulations: ARs 190-11, 190-13, and 190-51;

Department of Defense (DOD) 4500.9-R; Department of Defense Instructions (DODI) 5100.76 and 5220.22;

as well as applicable Fort Bragg regulations or policies. The Contractor is required to develop and implement the physical security plan in accordance with AR 190-13.

1.13. Security Training.

In the event of a National Defense Emergency affecting Fort Bragg, North Carolina. The KO/COR will immediately notify the contract Program Manager. At that time, the contractor must take immediate steps to cease all activities on the installation(s) and will cause all personnel to leave the installation(s) property until notice is given by the installation and KO/COR that National Defense Emergency conditions are no longer in effect.

1.13.1. Training.

The Contractor must effectively educate its employees, through formal training, company policy, information directives and procedures, in an awareness of the legal provisions of FAR Subpart 4.19 and its underlying policy and principles, so that each employee will know and understand the provisions of that Subpart and the absolute necessity of safeguarding information from anyone other than the Contractor's employees who have a need to know, and the U.S. Government.

1.13.2. Anti-Terrorism (AT) Level I Training.

IAW Department of Defense Instruction (DoDI) 2000.16, Vol. 1 DoD Antiterrorism Standards and Army Regulation (AR) 525-13 Antiterrorism, all Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas must complete Antiterrorism (AT) Level I awareness training within 30 calendar days after contract start date. The Contractor must submit certificates of completion for each affected contract employee and subcontractor employee to the KO or COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis. AT Level I awareness training is available at the following site: http://jko.jten.mil (See Deliverables Schedule, paragraph 8.2, Deliverables A004).

a) If access to a computer is not available, the Government will provide AT Level I training to Contractor employees within 30 business days after the contract starts and maintain a copy of the attendance roster for one (1) year. Any Contractor hired after contract start will be required to receive AT Level I training within 30 calendar days either online or as provided by the Government.

b) The Contractor must present the training certificate to the (KO) or designated Government representative/COR within 30 calendar days (See Deliverables Schedule, paragraph 8.2, Deliverables A005).

1.13.3. iWATCH Training.

The Contractor must brief the local iWATCH program (training standards provided by the Installation Anti- Terrorism Officer (ATO)) to all its’ employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to Fort Bragg, North Carolina and at any pertinent locations in and around Camp MacKall, Simmons Army Airfield, Pope Army Airfield. The Contractor must complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government representative/COR via both electronic and paper copy within 30 calendar days of completion (See Deliverables Schedule, paragraph 8.2, Deliverables A006).

1.13.5. Counterintelligence Awareness and Reporting Program Training.

For all DA contractors. Training will be completed within 30 days of assignment or employment to an organization and will undergo live environment CIAR training will be completed annually IAW AR 381-12 Counterintelligence Awareness and Reporting Program. The Contractor must provide either certificates of completion or dates of attendance, the training is available at the following site: http://jko.jten.mil, for each affected contractor employee and subcontractor employee to the COR, or to the Contracting Officer if a COR is not assigned, with 15 calendar days after completion of training by all employees and subcontractor personnel (See Deliverables Schedule, paragraph 8.2, Deliverables A007).

1.13.6. Local Airfield/Flightline Driver License Training

a) The Contractor operators mowing/trimming within the confines of the airfield perimeter fence must complete an “Airfield Driver’s License” class. The Contractor must be responsible for tracking employees class completion date and must reapply for the license annually. It is recommended to renew it 30 days prior to license expiration date. If the employee fails to renew, they will be required to attend and complete the course prior to receiving the renewed license. The Pope Army Airfield (PAAF) class is for PAAF alone. Contact PAAF Base Operations to schedule the class. Simmons Army Airfield (SAAF) base operations provide airfield driver’s license training for both SAAF and Mackall Army Airfield (MAAF). MAAF airfield management personnel will give an orientation of the airfield upon arrival. In the event a contractor employee is found to be in violation of the Airfield operations standards after receiving the class/license. The individuals license will be suspended until retraining is complete. If the incident results in a Controlled Movement Area Violation (CMAV) the Contractor must be held responsible for paying the fine or fees. Listed below are the Location and Phone numbers for Airfield Management. The Contractor must be given the class by Airfield management s within five (5) days of post award start date. The Contractor must complete and pass this course/class to begin work on the Airfields. The Contractor must ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR/ACOR within twenty-four (24) hours prior to employees commencing performance. (See Deliverables Schedule, paragraph 8.1, Deliverables A021).

• PAAF Base Operations: Building 758, (910) 394-6510

• SAAF Base Operations: Building P-4541, (910) 396-7804

• MAAF Base Operations: Building T-2462, (910) 396-1794

1.14. Local Health Protection Conditions.

The Contractors will comply with all national and DoD policies regarding health protection issues including pandemic outbreaks. Local Health Protection Conditions (HPCON) change based on risk levels in the surrounding area Fort Bragg, North Carolina, and in cooperation with local, state, and national guidance. The Contractor must comply with installation and higher headquarters policies aimed at mitigating the spread of dangerous communicable diseases.

1.14.1. Key Control:

The Government will issue no keys, key cards nor combinations to the Contractor.

1.15. General:

1.15.1. The Contractor personnel performing work under this contract must possess and maintain current certifications as indicated in the Performance Work Statement (PWS) security requirements throughout the execution of this contract.

1.15.2. Access and General Protection/Security Policy and Procedures: All Contractor personnel performing work under this contract must comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative. Contractor personnel must provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor personnel must comply with all personal identity verification requirements as directed by DOD, HQDA, or local policies. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.

1.16. Post Award Conference/Periodic Progress Meetings:

The Contractor must attend the post award conference convened by the Contracting Activity or Contract Administration Office as agreed upon and stated in the contract award document and must be at no additional cost to the Government.

• When the KO/COR and DPW management meet with the Contractor to review the Contractor's performance, written minutes of meetings will be recorded by the Government and signed by the Requirements Authority (RA) and the KO.

• The written minutes will be distributed within five (5) business days after the meeting.

• If any party does not concur with any portion of the minutes, the non-concurrence must be provided in writing to the KO/COR within two (2) workdays following receipt of the minutes.

• Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.

1.17. Government Roles and Responsibilities:

1.17.1. Contracting Officer (KO):

The KO is the only person authorized to make any changes to the requirements listed on this PWS. This authority remains solely with the KO, regardless of any provisions stated elsewhere in this contract,

• If the Contractor makes any change under the direction of someone other than the KO, the change will be deemed unauthorized and will be made solely at the Contractor's risk and expense.

• All contract administration will be handled by the KO.

• Communications regarding contractual administrative matters should be directed to the KO.

• No changes or deviations from the terms and conditions will be effective without a written modification to the contract, executed by the KO.

• The KO will approve all deliverables and plans required in this PWS.

1.17.2. Contracting Officer’s Representative (COR/ACOR):

The KO will appoint a COR during the performance of this requirement.

• Additional Government personnel may be designated to assist in contract oversight IAW AR 70-13 Management and Oversight of Service Acquisitions.

• Other surveillance personnel may be designated as COR and must be trained and appointed IAW DoDI 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR) Certification.

• The COR will aid in identification and resolution of problems within ten (10) days of identification of problem conflicts in priority, subtask requirement definitions, and other operations type problems.

• The COR will perform IAW the responsibilities and duties identified in the appointment letter.

1.17.3. COR/ACOR Authority:

A letter of designation will be issued to the COR/ACOR by the KO.

• A copy of the letter will be sent to the Contractor.

• The letter of designation states the responsibilities and limitations of the COR, especially regarding changes in cost, price estimates, or changes in delivery dates.

• The COR is not authorized to change any of the terms and conditions regarding cost, quantity, or schedule of the resulting order.

1.17.4. COR or Designated Government Representative Functions:

The COR or designated Government representative must monitor all technical aspects of the contract and assist in contract administration.

• The COR or designated Government representative is authorized to perform the following functions:

o assure the Contractor performs the technical requirements of the contract.

o perform inspections necessary in connection with contract performance.

o maintain written and oral communications with the Contractor concerning technical aspects of the contract.

o issue written interpretations of technical requirements.

o monitor, document, and report Contractor's performance and notify both the KO and

Contractor of any deficiencies.

o coordinate availability of Government-Furnished Facilities and Incidental Property and provide direction or assistance for site entry requests of Contractor personnel.

1.18. Specific Contractor Requirements, Roles, and Responsibilities:

See below for Contractors Roles, and Requirements, Responsibilities.

1.18.1. U.S. Residency:

All CONUS Contractor employees must be legal U.S. residents.

• The Contractor must immediately remove any employee that is not a legal U.S. resident.

• The Contractor personnel must be able to communicate clearly in the English language.

1.18.2. Contractor Hiring Restrictions:

The Contractor must not hire or subcontract with off-duty or former Government employees whose employment would result in a conflict of interest as defined in DOD 5500.7-R Joint Ethics Regulation 30 August 1993, to include change dated 17 November 2011.

1.18.3. Contractor Identification.

The Contractor must ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, and/or uniform) from Government employees.

• The Contractor must ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.

• Contractor-owned/leased vehicles and trailers must be clearly identified.

1.18.4. Standards of Conduct:

Contractor personnel’s conduct must not reflect discredit upon the Government.

• The Contractor must ensure all personnel present a professional appearance while working on the Government installation.

• The Contractor’s employees must observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.

• The Contractor must ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner.

• The Contractor must remove, from the job site, any employee for reasons of misconduct or security.

• The Contractor must ensure employee conduct complies with 41 USC §423, Procurement Integrity.

• The Contractor must also ensure that no Contractor employees conduct political related activities or events on the installation.

• The removal of such a person must not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.

1.18.5. Contractor Key Personnel:

The contractor must provide a resume of key personnel, who will be designated in writing, to the KO within one week of the contract award (See Deliverables Schedule, paragraph 8.1, Deliverables A008).

• These key personnel must be available during normal duty hours.

• These individuals designated as key personnel must be able to understand, speak, read, and write the

English language.

• The Government considers the Project Manager and Quality Control Manager as Key Personnel.

1.18.6. Project Manager (PM):

The Contractor must provide a Project Manager (PM) who must be responsible for the performance of the work under this contract. The name of this person must be designated in writing to the KO. The PM must have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM must be available between the hours of 6:30 AM to 4:00 PM, EST (not to exceed 40 Hours per week) Monday through Friday, except federal holidays or when the Government facility is closed for administrative reasons.

PM must:

• Have Occupation Safety and Health Association, 40 Hour Hazardous Waste Operations and Emergency Response OSHA Standard CFR 1910.120.(e)(8) certificate of training.

• Be on a Medical Surveillance Program.

• Have OSHA 30 Hour Construction Safety and Health 29 CFR Part 1926 certificate of training.

• Be qualified to wear Respiratory Protection per 29 CFR 1910.134.

• Have a valid U.S. Driver’s License.

1.18.7. Quality Control Manager/Inspector (QCM):

The Contractor must designate a part time QCM on site during normal duty hours.

• As a minimum, the QCM must have at least two (2) years of documented relative experience and must be responsible for the overall management and implementation of the Contractor's Quality Control Plan

1.18.8. Quality Control Program (QCP):

Quality Control is the responsibility of the Contractor. This contract requires a primary (QC). The Contractor must provide a Quality Control Plan (QCP) within thirty (30) business days of contract start date. The Contractor must provide and maintain a (QCP) that is acceptable to the (KO). Changes to the Contractor’s QCP must be submitted to the KO for review and approval within five (5) business days prior to implementation. (See Deliverables Schedule, paragraph 8.1, Deliverables A009).

b) The Contractor must ensure all Contractor’s employees and associated subcontractors are certified or licensed in the specific areas required by the State of (NC).

c) The Contractor must ensure employees are certified or licensed in the appropriate Environmental Protection Agency (EPA) areas required.

d) The Contractor must ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR/ACOR within twenty-four (24) hours prior to employees commencing performance. (See Deliverables Schedule, paragraph 8.1, Deliverables A010).

1.18.9. Special Qualifications:

All contractor personnel must be able to operate standard equipment associated with ground grass cutting requirements such as agriculture tractors, mowing decks, weed eaters, various hand tools etc. The work leader is predominantly responsible for monitoring equipment, repairs/inspections and workflow but should also be capable of providing the necessary labor services required of this task order.

1.19. Phase Out Period:

The Contractor must conduct a seamless transition of services, the Contractor must execute the following phase-out procedures during the ten (10) business day transition period immediately preceding the contract's expiration(See Deliverables Schedule, paragraph 8.1, Deliverables A011).

• Successor Familiarization: The Contractor is required to permit the successor contractor and its designated employees to observe all ongoing operations under the contract. This is to ensure the incoming team can become familiar with the full scope of work and procedures.

• Cooperation and Non-Interference: The Contractor must fully cooperate with both the successor contractor and Government personnel. All phase-out activities must be conducted in a manner that does not interfere with the successor's ability to assume their duties or disrupt any future work.

• Maintain Service Levels: Throughout the phase-out period, the Contractor must provide sufficient experienced personnel to guarantee that all services are maintained at the required level of proficiency without degradation.

1.20. Emergency Services:

1.20.1. Emergency Medical Treatment:

The Contractor or their employees must immediately notify their supervisor of any incident requiring immediate emergency medical treatment.

a) The Government may provide 911 emergency support ambulance service and/or DoD medical facility, if available.

• If injuries are incurred while an employee is performing work under this contract, the Contractor must verbally notify the KO/COR immediately, but no later than (NLT) two (2) hours after an emergency medical event, followed by a documented summary of events (See Deliverables Schedule, paragraph 8.1, Deliverables A012).

• The Contractor must be responsible for reimbursement of any cost of provided emergency medical treatment services provided to Contractor personnel.

• Reimbursement must be paid to the U.S. Treasury.

1.20.2. Accident Reporting:

The Contractor must comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact.

• The Contractor must immediately provide a verbal report to the KO/COR, but NLT two (2) hours of each such occurrence followed by an email documenting each such occurrence (See Deliverables Schedule, paragraph 8.1, Deliverables A013).

• The Contractor must adhere to reporting of mishaps IAW AR 385-10, The Army Safety Program (Chapter 3 Accident Investigation and Reporting, Chapter 4 Contracting Safety) and DA Pam 385-40, Army Accident Investigations and Reporting.

1.21. Environment and OSHA:

IAW para. 1.4 Scope, any apparent conflict between compliance (with such local, State, and Federal environmental and occupational safety laws, rules, and regulations) and the requirements of the contract must be immediately brought to the attention of the KO and authorized representative(s) (i.e., Environmental Officer, Safety Officer, and COR) verbally.

• The Contractor must notify the KO and authorized representative(s) via email outlining the details for each said conflict such that a final resolution is derived (See Deliverables Schedule, paragraph 8.1, Deliverables A014).

• The Contractor must be liable for all fines, penalties, and costs that result from violations of, or failure to comply with para. 1.4 Scope.

• The Contractor must implement the following environmental objectives in accordance with FAR 23.4;

FAR 23.7; FAR 52.223-1 through 52.223-5; and based on EPA-issued guidance).

• Maximize the utilization of environmentally preferable products.

• Maximize the utilization of bio-based products. See USDA-designated items at http://www.biopreferred.gov or 7 CFR part 3201.

• Maximize the reutilization of nonhazardous and recovered materials.

• Eliminate or reduce the generation of hazardous waste and the need for special material processing

(including special handling, storage, treatment, and disposal).

1.22. Safety:

The Contractor must safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract.

• The Contractor must comply with AR 385-10, The Army Safety Program.

• All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the KO to halt all Contractor performance until such unsafe conditions are corrected.

• The Contractor must take due caution not to endanger personnel during performance of this contract.

• Upon discovery of a serious hazard such as, but not limited to, fire, or fuel spill, the Contractor must immediately notify the KO and designated authorized representatives verbally followed up with an email notification within three (3) business days (See Deliverables Schedule, paragraph 8.1, Deliverables A015).

The Contractor must exercise caution while operating equipment and performing services within all performance locations under this requirement. Certain locations may contain wetlands, uneven terrain, sinkholes, obstructions, active operational areas, low-flying aircraft operations, and protected or endangered species habitats. The Contractor is highly encouraged to familiarize personnel with the terrain and site conditions prior to and throughout performance. Known hazards identified by the Government may be marked, as applicable. The Contractor must immediately notify the COR and/or applicable Base Operations personnel upon identification of any additional hazards, unsafe conditions, or obstructions discovered during contract performance.

1.22.1. Safety Plan:

The Contractor must develop and implement a safety plan for its employees.

• The Contractor must submit the safety plan to the KO/COR for review and acceptance within 30 business days after contract award.

• Revisions must be submitted to the KO/COR five (5) business days prior to the effective date of change (See Deliverables Schedule, paragraph 8.1, Deliverables A016).

1.22.2. Spill Plan:

The Contractor must immediately clean up hydraulic oil spills and other liquids leaking from their vehicles, within (2) hours. Disposal of hazardous waste must be coordinated with the Environmental Division for manifest signature. Any spills of fuel, solvents, oxidizers, acids, or highly flammable material that enters a storm drain or waterway (including ditches) and any spillover (5) gallons at any location must be reported to the Fire Department immediately (911), (910) 907-4813 or (910) 309-9506. The Fire Department will notify DPW, who will determine whether it’s required to report the spill to NCDEQ.

a) The Contractor must immediately notify the KO/COR of all spills, but NLT within (2) hours of spillage. Additionally, the contractor is required to submit all paperwork showing compliance and disposing of the hazardous spillage. (See Deliverables Schedule, paragraph 8.1, Deliverables A017).

b) The Contractor is responsible for all costs associated with the clean-up of a hazardous spill.

• The Contractor must submit a Spill Plan to the KO/COR for approval within 30 calendar days of contract award (See Deliverables Schedule, paragraph 8.1, Deliverables A018).

• The Contractor must verbally notify the KO and COR, followed by written notification as required in the (Fort Bragg) Spill Plan, if the Contractor spills or releases any hazardous substances, (i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification.)

1.22.3. Safety Data Sheets:

For materials that have Safety Data Sheets (SDS) associated with them, the Contractor must submit the SDS to the KO/COR for approval five (5) business days after contract award (See Deliverables Schedule, paragraph 8.1, Deliverables A019).

• The Contractor must adhere to all applicable requirements of the Installation Hazardous Waste Management Plan.

• The Contractor must provide all materials, labor, training, transportation, and equipment for the handling and storage of hazardous materials or toxic materials.

1.23. Environmental Compliance.

The Contractor must implement the following environmental objectives in accordance with FAR 23.4; FAR 23.7; FAR 52.223-1 through 52.223-5; and based on EPA-issued guidance).

• Maximize the utilization of environmentally preferable products.

• Maximize the utilization of bio-based products. See USDA-designated items at http://www.biopreferred.gov or 7 CFR part 3201.

• Maximize the reutilization of nonhazardous and recovered materials.

• Eliminate or reduce the generation of hazardous waste and the need for special material processing

(including special handling, storage, treatment, and disposal).

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACT ADMINISTRATOR. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime.

2.1.3. CONTRACTING OFFICER. A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

The government is appointed by the contracting officer to administer the contract. Such an appointment must be in writing and must state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have the authority to change the terms and conditions of the contract.

2.1.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.6. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.7. GOVERNMENT-FURNISHED PROPERTY (GFP) OR GOVERNMENT PROPERTY

(GP). Property in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

2.1.8. KEY PERSONNEL. The follow personnel are considered key personnel by the Government: The Contractor must provide a contract manager who must be responsible for the performance of the work. The name of this person, and an alternate who must act for the contractor when the manager is absent, must be designated in writing to the contracting officer.

The contract manager, or alternate, must have full authority to act for the contractor on all contract matters relating to the daily operation of this contract. The contract manager or alternate must be available between 0630-1600, Monday through Friday, except Federal holidays or when the Government facility is closed for administrative reasons.

2.1.8.1 The Contractor must notify the Contracting Officer, in writing, if one or more of the key personnel, for any reason, becomes or is expected to become unavailable to provide services under this task order for a continuous period exceeding 30 workdays, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated.

Notification must be made with one business day of the contractor becoming aware of the change of a contractor employee identified as “key”. The notification must provide, at a minimum, the circumstances necessitating the change in key personnel, and the effective date of the change.

2.1.9. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.10. QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are acceptable in accordance with the established standards and requirements of this contract.

2.1.11. QUALITY ASSURANCE EVALUATOR. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

2.1.12. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.13. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of a product or service must meet contract requirements.

2.1.14. SUBCONTRACTOR. One that enters a contract with a prime contractor. The Government does not have a contract with the subcontractor.

2.1.15. WORKDAY.

2.1.16. Monday through Friday, except for Federal holidays unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CFR Code of Federal Regulations CMR Contract Manpower Reporting COR Contracting Officer Representative COTR Contracting Officer's Technical Representative DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense DPW Directorate of Public Works FAR Federal Acquisition Regulation GR Government Representative KO Contracting Officer MAAF Mackall Army Airfield MSR Monthly Status Report OCI Organizational Conflict of Interest OS-COR On Site – Contracting Officer’s Representative PAAF Pope Army Airfield POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAE Quality Assurance Evaluator QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SAAF Simmons Army Airfield TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT AND SERVICES.

3.0. GOVERNMENT FURNISHED PROPERTY, EQUIPMENT AND SERVICES.

3.1. Equipment.

The Government will provide radios as incidental property to the Contractor personnel performing mowing/trimming operations within the confines of the airfield fencing. These radios are checked out and returned daily from each of the airfield base operations facility. The Contractor will be held to all Federal Aviation Administration (FAA) communications guidance as given in the Airfield Driver’s License course. If the incident results in a FAA or CMAV violation, the Contractor must be held responsible for paying the fine or fees. The Contractor must be responsible for the care of equipment while the radio is in their possession during the duty day. In the event the Contractor employee loses, damages or destroys the radio, the Contractor must be liable for the loss, and a Statement of Charges will be issued to the Contractor for the repair or replacement of the assigned radio. In the event a radio is lost and cannot be found. The Contractor must report the loss of equipment immediately to Airfield Management, KO/COR. All operations will then be suspended due to sensitivity of communication and risk to operation security.

3.2. Utilities.

The Government will provide water, solid waste/recycling removal, sewer, electricity from existing outlets, and heating for facilities being serviced at no additional cost to the Contractor.

• The Contractor must make no changes to existing outlets. Contractor personnel must not utilize telephones located in buildings receiving service unless prior consent is obtained from the KO.

Contractors must follow Government policy related to electric vehicle recharging stations.

• The Contractor must instruct employees in utilities conservation practices.

• The Contractor must instruct employees in utilities conservation practices. The Contractor must be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount for the Contractor to perform the tasks outlined in this PWS

• If Government fuel tank is authorized for Contractor use, Government fuel tanks must first be drained of Government-owned fuel prior to contractor operations. The Contractor will be responsible for all costs associated with fueling, operating, and maintaining the designated fuel tanks utilized under this requirement. Final guidance and authorized fuel tank locations, if applicable, will be provided by post-award coordination.

3.3. Materials.

The Government will not provide any materials under this contract.

3.4. Property.

On-site storage or laydown areas, if authorized by the Government, will be identified after award. On-site storage at Fort Bragg locations remains tentative and has not been finalized. No on-site storage is authorized at range locations or Pope AAF under this requirement. On-site storage is authorized at Simmons AAF and Mackall AAF. Contractors are responsible for the storage, security, and safeguarding of all contractor-owned equipment, materials, and supplies at all locations. Locations may be subject to change due to changing mission requirements.

3.5. Services.

Police and fire protection will be provided by the Government while work is being conducted on Fort Bragg.

• Emergency medical services (see paragraph 1.20)

• Mowing or Snow removal of parking lot(s)

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4.0. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

4.1. General.

The Contractor must furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. Materials.

The Contractor must furnish all materials and supplies required to perform work under this contract except that which is furnished by the Government (see Part 3). The Contractor must provide all supplies, tools, and clothing (including personal protective clothing and equipment for Contractor employees when required by OSHA regulations, 29 CFR 1910, SUBPART I) required to meet the terms of the contract.

4.3.…