Conformed Copy (Amendment) W9124723R0014 P00001.pdf

PDF 1 MB Posted

Attached to
Bay & Hangar Door Maint & Repair Services
Solicitation number
W9124723R0014
Issued by

About this file

This is a solicitation for bay and hangar door maintenance and repair services. The contractor will perform preventative maintenance, repairs, and replacements for bay and hangar doors at Fort Liberty and other Army facilities in North Carolina. Services include semi-annual preventative maintenance checks, responding to routine and emergency service calls, and providing replacement parts. The base period of performance is eight months with four 12-month option periods. Pricing is firm-fixed price. The set-aside is for small businesses. The soliciting agency is the Department of the Army Mission and Installation Contracting Command.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9124723R0014

SEE ADDENDUM

(No Collect Calls)

W9124723R0014 29-Sep-2023

b. TELEPHONE NUMBER

910-396-9728

8. OFFER DUE DATE/LOCAL TIME

09:00 AM 30 Oct 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912479. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

VANDETTA MCGOOGAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

MICC CENTER - FORT LIBERTY

MICC - FORT LIBERTY

2-1731 C STINER STREET

FORT LIBERTY NC 28310-5000

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W36B5K 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

DPW ATTN

DPW ATTN

2175 ROCK MERRITT AVENUE

FORT LIBERTY, NC 28310 NC 28310

TEL: FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

19,000,000.00

NAICS:

238990

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF73

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 8 Months Demand Maint Orders

FFP

Upon receipt of Demand Maintenance Orders (DMO), the Contractor shall acknowledge the service call in the response time specified and take all actions IAW the PWS, the DMO, and other contractual requirements PWS Section 5.3.

FOB: Destination

PSC CD: Z1JZ

NET AMT

0002 5,344 Job Preventative Maintenance

FFP

The Contractor shall perform continuance Preventive Maintenance (PM) twice a year on bay and hangar doors on the facilities listed in Technical Exhibit 5 PWS Sections 5.1. & 5.2.

0003 Job Other Direct Costs (ODC)

COST

*No Labor shall be billed on this CLIN* IAW Section 1.6.14 the purpose of this CLIN is to reimburse the Contractor for authorized Parts and Materials required during the performance of this requirement (i.e., bay and hangar doors replacement, grease, oil, and miscellaneous door parts) in order to satisfy the mission in accordance with procedures and exceptions detailed in the PWS. The ODC is NOT TO EXCEED $98,000.00 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

ESTIMATED COST

1001 12 Months OPTION Demand Maint Orders

FFP

Upon receipt of Demand Maintenance Orders (DMO), the Contractor shall acknowledge the service call in the response time specified and take all actions IAW the PWS, the DMO, and other contractual requirements PWS Section 5.3.

1002 8,018 Job OPTION Preventative Maintenance

FFP

The Contractor shall perform continuance Preventive Maintenance (PM) twice a year on bay and hangar doors on the facilities listed in Technical Exhibit 5 PWS Sections 5.1. & 5.2.

1003 Job OPTION Other Direct Costs (ODC)

COST

*No Labor shall be billed on this CLIN* IAW Section 1.6.14 the purpose of this CLIN is to reimburse the Contractor for authorized Parts and Materials required during the performance of this requirement (i.e., bay and hangar doors replacement, grease, oil, and miscellaneous door parts) in order to satisfy the mission in accordance with procedures and exceptions detailed in the PWS. The ODC is NOT TO EXCEED $146,000.00 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

2001 12 Months OPTION Demand Maint Orders

FFP

Upon receipt of Demand Maintenance Orders (DMO), the Contractor shall acknowledge the service call in the response time specified and take all actions IAW the PWS, the DMO, and other contractual requirements PWS Section 5.3.

2002 8,018 Job OPTION Preventative Maintenance

FFP

The Contractor shall perform continuance Preventive Maintenance (PM) twice a year on bay and hangar doors on the facilities listed in Technical Exhibit 5 PWS Sections 5.1. & 5.2.

2003 Job OPTION Other Direct Costs (ODC)

COST

*No Labor shall be billed on this CLIN* IAW Section 1.6.14 the purpose of this CLIN is to reimburse the Contractor for authorized Parts and Materials required during the performance of this requirement (i.e., bay and hangar doors replacement, grease, oil, and miscellaneous door parts) in order to satisfy the mission in accordance with procedures and exceptions detailed in the PWS. The ODC is NOT TO EXCEED $146,000.00 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

3001 12 Months OPTION Demand Maint Orders

FFP

Upon receipt of Demand Maintenance Orders (DMO), the Contractor shall acknowledge the service call in the response time specified and take all actions IAW the PWS, the DMO, and other contractual requirements PWS Section 5.3.

3002 8,018 Job OPTION Preventative Maintenance

FFP

The Contractor shall perform continuance Preventive Maintenance (PM) twice a year on bay and hangar doors on the facilities listed in Technical Exhibit 5 PWS Sections 5.1. & 5.2.

3003 Job OPTION Other Direct Costs (ODC)

COST

*No Labor shall be billed on this CLIN* IAW Section 1.6.14 the purpose of this CLIN is to reimburse the Contractor for authorized Parts and Materials required during the performance of this requirement (i.e., bay and hangar doors replacement, grease, oil, and miscellaneous door parts) in order to satisfy the mission in accordance with procedures and exceptions detailed in the PWS. The ODC is NOT TO EXCEED $146,000.00 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4001 12 Months OPTION Demand Maint Orders

FFP

Upon receipt of Demand Maintenance Orders (DMO), the Contractor shall acknowledge the service call in the response time specified and take all actions IAW the PWS, the DMO, and other contractual requirements PWS Section 5.3.

4002 8,018 Job OPTION Preventative Maintenance

FFP

The Contractor shall perform continuance Preventive Maintenance (PM) twice a year on bay and hangar doors on the facilities listed in Technical Exhibit 5 PWS Sections 5.1. & 5.2.

4003 Job OPTION Other Direct Costs (ODC)

COST

*No Labor shall be billed on this CLIN* IAW Section 1.6.14 the purpose of this CLIN is to reimburse the Contractor for authorized Parts and Materials required during the performance of this requirement (i.e., bay and hangar doors replacement, grease, oil, and miscellaneous door parts) in order to satisfy the mission in accordance with procedures and exceptions detailed in the PWS. The ODC is NOT TO EXCEED $146,000.00 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

MAINTENANCE AND REPAIR OF BAY DOORS AND

HANGAR DOORS

Part I General

Information

(f) GENERAL: This is a non-personal services contract to perform maintenance, repair, replacement (emergency, urgent, and routine), and services of bay doors and hangar doors at Fort Liberty and Army-maintained facilities at Pope Army Airfield, Camp Mackall, Simmons Army Airfield, the Airborne Special Operations Museum (ASOM), and Linden Oaks, North Carolina in support of the Directorate of Public Works. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

• Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance, repair and services of bay doors and hangar doors as defined in this Performance Work Statement (PWS).

• Background: The Directorate of Public Works (DPW), Fort Liberty, North Carolina has a requirement for maintenance, repair and replacement of bay and hangar doors at Fort Liberty Army-maintained facilities at Pope Army Airfield, Camp Mackall, Simmons Army Airfield, the Airborne Special Operations Museum (ASOM), and Linden Oaks. The requirement calls for a contractor to furnish labor, necessary equipment, and tools to ensure proper maintenance and repair of bay/hangar doors per the Performance Work Statement (PWS). Fort Liberty DPW oversees (660) buildings with approximately (3,768) bay and hangar doors requiring maintenance and repair service. Bay and hangar doors range in size and type of operation to include electric, chain hoist and manual systems. Preventative maintenance is required semi-annually to ensure equipment remains in operational order.

• Objectives: The basic service objective includes the following:

• Basic service objectives are to provide semi-annual preventive maintenance services and safety inspections of bay and hangar doors on Fort Liberty and surrounding areas.

• Repair services will be provided as required upon the receipt of a Demand Maintenance Order

(DMO).

• Scope: The list of buildings identified in Technical Exhibit (TE) # 5 is a current representation sample and is not inclusive. Buildings may be added to or deleted from TE # 5 throughout contract period. The contractor shall provide the work defined in Section 5 of this PWS. Bay doors that require maintenance for DPW range in sizes. The smallest size is 8' width X 10' height, and the largest size is 28' width x 16' height. There are numerous doors that fall between these sizes depending on the structure of the building.

• Place of Performance/Hours of Operation. The contractor shall perform work on Fort Liberty and Army- maintained facilities at Pope Army Airfield, Camp Mackall, Simmons Army Airfield, the Airborne Special Operations Museum (ASOM) and Linden Oaks. The Contractor shall maintain the following customer service hours: 7:30 am to 5:00 pm (EST), Monday through Friday. In addition, the contractor shall be available IAW 5.3.1, Priority 1, Emergency DMO.

1.5 Period of Performance: The period of performance shall be for an eight (8) month base and four (4), twelve (12) month option periods.

1.6 General Information

1.6.1. Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1 Contractor Inspection Requirements).

1.6.1.1. Quality Control Program: The Government is committed to a highly interactive relationship between quality control by the Contractor and quality assurance by the Government recipient of services. This relationship shall be achieved through an effective Prevention Based Quality Control Program dedicated to ensuring the best possible products and services to end users. The Contractor shall provide a written Quality Control Plan (QCP) within (10) days after contract award and within five (5) days of any proposed changes to the Contracting Officer (KO) and the Contracting Officer’s Representative (COR).

1.6.1.1.1. The Contractor’s quality program shall demonstrate its prevention-based outlook by meeting the objectives stated in the PWS throughout all areas of performance. The QCP shall be developed to specify the Contractor’s responsibility for management and quality control actions to meet the terms of the contract. The QCP at a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies;

procedures for trend analysis; and procedures for collecting and addressing customer feedback/complaints. At a minimum, the QCP shall also include the following:

1.6.1.1.2. A process for preventing, identifying, and resolving conflicts of interest and appearances of impropriety in the performance of this PWS, in accordance with organizational policies and/or standards. If the contractor does not have published standards of ethics or associated policies, the contractor shall use applicable areas as published in the Standards of Ethical Conduct (5 CFR Part 2635).

1.6.1.1.3. A description of the contractor’s Quality Control (QC) process. The description of this process shall cover all services and specify work to be inspected on a scheduled or unscheduled basis, position(s) and qualifications for personnel performing the QC inspections, and the extent of their authority. The inspection system shall have a method of identifying and correcting deficiencies in the services performed before the level of performance becomes unacceptable.

1.6.1.1.4. On-site records shall be maintained of all inspections conducted by the Contractor and the corrective action taken. Upon request, this documentation shall be made available to the Contracting Officer and/or the COR during the term of the contract.

1.6.1.1.5. Corrective Actions. If at any time it is determined by the Contracting Officer that the Contractor’s QCP is not providing results which conform to contract requirements, action shall be taken by the Contractor to correct the deficiency, i.e., replacement of personnel, additional quality control inspection. Provisions for recording the results of inspections and for recording corrective action taken.

1.6.1.1.6. Provisions to update and revise the QCP during the performance of the contract. The Contractor’s QCP shall be incorporated into and become part of this contract after the plan has been accepted by the KO.

Proposed changes made after KO acceptance shall be submitted in writing through the COR to the KO for review and acceptance prior to implementing any revision. The Contractor’s QCP shall be maintained throughout the life of the contract and shall include the Contractor’s procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract.

1.6.1.1.7. A file of all Preventive Maintenance/QC inspections both unscheduled and scheduled, inspection results, dates and details of corrective actions taken shall be maintained by the contractor. The contractor shall submit an electronic copy of the monthly Preventive Maintenance/QC inspections using the most current updated Microsoft Office (Excel spreadsheet), with the invoice for payment each month, along with a summary of defects observed and corrected. This electronic Excel file, using software approved by the COR shall become the property of the Government. The Contractor shall maintain both electronic and hard copies of all scheduled and unscheduled QC inspections. The complete QC file shall be organized by month and year and packaged in boxes for storage; the QC files shall be turned over to the COR within (30) days following completion of each service period and/or termination of this award.

1.6.1.2. Non-Conformance Report (NCR): When the Contractor's performance is unsatisfactory, an NCR will be issued. The Contractor shall reply in writing within five (5) workdays from the date of receipt of the NCR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.

1.6.1.3. Quality Assurance: The COR will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the COR must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). When an observation indicates defective performance, the COR will request the Contractor or a designated on-site representative to initial the observation to acknowledge the defective performance. The acknowledgement of the observation does not necessarily constitute Contractor concurrence with the observation, only that the Contractor has been made aware of the defective performance.

1.6.2. Recognized Federal Holidays: The Contractor is normally not required to perform services on recognized federal holidays; however, that requirement is subject to mission execution requirements. The recognized federal holidays include:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day Washington’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth

1.6.2.1. When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday. The contractor shall work on the days the Government is scheduled to work.

1.6.2.2. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor will have the following options:

1.6.2.2.1. Reschedule the work so it is performed the following day unless the following day falls on a weekend.

1.6.2.2.2. Reschedule the work on any day that is mutually satisfactory with the COR.

1.6.3. Hours of Operation: The Contractor shall be responsible for providing services, between the hours of 7:30 am to 5:00 pm (EST) Monday through Friday, except federal holidays or when the government facility is closed due to local or national emergencies, administrative closings or similar government directed facility closings. For other than firm fixed price contracts, the Contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential to successful performance under this contract. No overtime (OT) or compensatory time (CT) is authorized. Contractor personnel shall not exceed a (40) hour work week; a flexible work schedule may be considered.

1.6.4. Place of Performance: IAW PARC Policy Alert 14-33, Homeland Security Presidential Directive 12 (HSPD-12) issued 31 Dec 2013, the contractor shall perform work on Fort Liberty and Army-maintained facilities at Pope Army Airfield, Camp Mackall, Simmons Army Airfield, the Airborne Special Operations Museum (ASOM) and Linden Oaks. The Contractor shall maintain the following customer service hours: 7:30 am to 5:00 pm (EST), Monday through Friday. In addition, the contractor shall be available (24) hours a day

(7) days a week for emergencies.

1.6.5. Type of Contract: Firm-Fixed Price Contract

1.6.6. Security Requirements: Fort Liberty is a closed post with access restrictions. All vehicles and personnel are subject to search and seizure of contraband and/or unauthorized Government property.

Contractor vehicles (Contractor-owned and personal), Contractor personnel, and their personal property shall be subject to searches upon entering or leaving the Installation. The search and seizure provisions of AR 190-13, The Army Physical Security Program shall apply to Contractor personnel entering or leaving Fort Liberty or activities/installations in the Fort Liberty area of responsibility which require access by Contractor personnel in performance of this contract. The Contractor should be aware that force protection awareness requirements and installation closure exercises are increasing, and installation access is restrictive.

1.6.6.2. Physical Security: The contractor shall be responsible for safeguarding information of a confidential or sensitive nature. Failure to safeguard any privileged information which may involve the contractor or the contractor's personnel or to which they may have access may subject the contractor and/or the contractor's employees to criminal liability under Title 18, section 793 and 7908 of the United States Code. Provisions of the Privacy Act apply to all records and reports maintained by the contractor. All programs and materials developed at Government expense during this contract will be the property of the Government. Provisions of the Privacy Act shall apply to all records and reports maintained by the Contractor. All contractor personnel must meet the security requirements for access to Army Reserve buildings, units, networks, and databases.

1.6.6.3. Automated Installation Entry (AIE): Contractor personnel shall gain access to Fort Liberty through the Posts Automated Installation Entry (AIE) Badge system. To register and receive an AIE access control badge, the contractor must complete and submit the Directorate of Emergency Services (DES) Form 118 to the COR. Once submitted, the National Crime Information Center (NCIC) Level III background check will be completed on each employee requesting access. No employees with prior felonies or three misdemeanors, excluding routine traffic violations, within the past five years will be granted access to Fort Liberty. All contractor personnel shall be U.S. citizens and legal to work in the United States. Contractor personnel performing work under this contract shall be escorted by Government personnel at restricted areas. The Contractor shall provide at the Post Award Conference a list of all personnel requiring access to any facility or building. The list shall include the employee’s full name and social security number. The Contractor shall provide the COR with a list of Contractor personnel requiring entry into restricted areas no less than three (3) calendar days thereafter. It shall be the sole responsibility of the Contractor to update the list as changes occur, or as requested by the COR and to provide the updated list no later than (24) hours after the change is determined. The application form (DES Form 118) for access cases are located on the Fort Liberty Provost Marshal webpage http://www.bragg.army.mil/directorates/DEAIES/pmo/Pages/AIE.aspx under the Installation Access Control Tab. Sponsorship is required for all non-DOD affiliated persons. The COR will turn in DES Forms (DES Form 118) to the All-American Visitor Control Center (VCC) for processing and approval. When approved or cleared by the VCC, the COR will notify the Contractor. The Contactor will notify Contractor Personnel to pick up their badges from the VCC.

1.6.6.3.1. The Contractor shall immediately report any lost AIE or Government issued identification cards to the COR and Military and/or DoD police agencies. The Contractor shall immediately collect the AIE, and other Government issued forms of identification upon termination of the employee, notify the COR within

(1) hour, and turn over the AIE badge to the COR within (24) hours. At the end of the contract (or final Option Period) the Contractor will turn over all AIE badges to the COR. Final payment may be delayed if Contractor fails to comply with these requirements.

1.6.6.3.2. In the event a contractor employee separates without advance notice (either quits or is terminated), the Contractor shall immediately notify the COR who will ensure AIE permissions are revoked the same day.

In various instances a contractor employee may not be on task (working) due to furloughs, suspensions pending the outcome of an investigation, or the contract reaches the end of the period of performance (POP) and renewal is anticipated but not yet complete. During these occurrences, the Contractor will collect and return the AIE badges to the COR. AIE permissions will be revoked at the VCC. The Contractor shall include a monthly report listing contractor employees who departed or hired during the previous month.

1.6.6.3.3. Contractor Vehicles. The Contractor’s vehicles shall display the Contractor’s name/logo on both sides of the vehicle with a minimum 2” lettering so that it is clearly visible and readable to a distance of at least (50) ft. Contractor and sub-contractor vehicles shall fully comply with the vehicle registration requirements regarding Contractor-owned and Contractor employee privately owned vehicles (POVs) as set forth in Fort Liberty Regulation 190-5, Military Police Traffic Regulation having valid NC registration, license plates and inspection stickers. Any questions regarding the regulation can be directed to (910) 432- 8193. Contractor vehicles and Contractor employee POVs will be searched if the appropriate passes/decals are not displayed when entering Fort Liberty Access Control Points (ACPs). All vehicles, including those with passes/decals, are subject to random search at any time.

1.6.6.3.4. Health and Safety. The contractor shall report to the COR without delay, any accident involving work- related injury, illness, or disease, motor vehicle accidents or non-vehicle property damage accidents.

The contractor shall utilize forms to report accidents in accordance with Federal installation Safety, Incident Reporting System, and Investigation Procedure.

1.6.6.3.5. The Contractor’s personnel shall not drive privately owned vehicles to work site. The Contractor shall provide the COR access to all vehicles used in performance of this contract for vehicle compliance inspection, no later than (10) workdays upon contract start date, and as contract vehicles are replaced.

1.6.7. Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.

NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the KO and COR.

1.6.7.1. In the event keys other than master keys are lost or duplicated, the Contractor shall, upon direction of the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.2. The Contractor shall prohibit the use of Government issued keys by any persons other than Contractor’s personnel. The Contractor shall prohibit the opening of locked areas by Contractor personnel to permit entrance of persons other than Contractor personnel engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.

1.6.7.3. Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.6.8. General:

1.6.8.1. The Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current certifications as indicated in PWS [1.6.6.]; security requirements during the execution of this contract.

1.6.8.2. Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements. They shall have a command of both the written and spoken English language to properly clearly, and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.

1.6.8.2.1. The Contractor shall provide a workforce that is equipped to satisfactorily perform and complete all tasks associated with this PWS. The Contractor shall possess the requisite skills, knowledge, abilities, training, licensing, and certifications (in compliance with all federal, state, local laws and regulations, and industrial standards, etc.) needed to satisfactorily perform the services required by this PWS.

1.6.8.3. Contractor personnel performing work under this contract shall be U.S. citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non-U.S. citizen to perform the required support.

1.6.8.4. Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current Information Assurance Technician (IAT) Level I professional certification during the execution of this contract.

1.6.8.5. Access and General Protection/Security Policy and Procedures: All Contractor personnel performing work under this contract shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative. Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor personnel shall comply with all personal identity verification requirements as directed by Department of Defense (DoD), HQ Department of Army (DA) or local policies. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.

1.6.8.5.1. Anti-Terrorism (AT) Level I Training: Contractor personnel performing work under this contract that require access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within (30) calendar days after commencing performance under this contract. The Contractor shall submit employee certificates of completion within (30) calendar days after completion of the training. AT Level I awareness training is available at the following website:

https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf

1.6.8.5.2. iWATCH Training: The Contractor shall brief all personnel performing work under this contract on the local iWATCH program [training standards provided by the requiring activity Anti-Terrorism Office (ATO)]. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within (30) calendar days of contract award with the results reported to the COR NLT (45) calendar days after contract award. New employees shall complete the training within (10) calendar days of commencing performance of work under this contract.

https://www.lrn.usace.army.mil/portals/49/docs/security/iwatch_usace%20contractors%2024aug20.pdf https://www.army.mil/e2/c/downloads/287489.pdf

1.6.8.5.3. OPSEC Training: Per AR 530-1, Operations Security, the Contractor shall complete Level I OPSEC training within (30) calendar days of their reporting for duty and annually thereafter.

1.6.8.5.4. Information assurance (IA)/information technology (IT) training: The Contractor employees working in IA/IT functions shall comply with DoD and Army training requirements in DoD 8570.01, DoD 8570.01-M and AR 25-2 within six (6) months of employment.

1.6.8.5.5. Contractor personnel shall have a favorable National Agency Check (NAC) with inquiry in accordance with Security definition for personnel who occupy “ADP (Automated Data Processing) Sensitive” positions, as per AR 380-67, paragraph 3-67, “The Personnel Security Program” no later than (30) calendar days after contract award.

1.6.8.5.6. Contractor Employees Requiring Access to Government Information Systems: Contractor shall have access to Government-controlled information systems during performance of work under this contract.

All contractor employees and associated subcontractors who require access to a government information system shall be registered in the ATCTS (Army Training Certification Tracking System) at commencement of support services and must successfully complete the DoD Information Assurance Awareness prior to access to the information systems. Training shall be required annually after the initial training. Completion certificates shall be submitted to the COR within fifteen (15) calendar days from date of commencing performance under this contract.

1.6.9. Post Award Conference/ Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart

42.5. The KO and COR/ACOR will meet quarterly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Government and signed by all parties Contract Officer (KO) and Contract Officer Specialist (KS), Contract Officer Representative’s (COR), Alternative Contract Officer (ACOR) and the Contractor (KTR). The written minutes will be distributed within five (5) workdays after the meeting. If the Contractor does not concur with any portion of the minutes recorded by the Government, the non-concurrence shall be provided in writing to the COR/ACOR and KS/KO within two (2) calendar days following receipt of the minutes.

1.6.10. Contracting Officer Representative (COR): The COR will be identified by separate letter of appointment. The COR monitors all technical aspects of the contract and assists in contract administration.

The COR is authorized to perform the following functions: Assures that the Contractor performs the technical requirement of the contract; performs inspections necessary in connection with contract performance; maintains written and oral communications with the Contractor concerning technical aspects of the contract; issues written interpretations of technical requirements, including government drawings, designs, specifications; monitors Contractor's performance and notifies both the KO and Contractor of any deficiencies; and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

1.6.11. Key Personnel: Key personnel shall not be added to or removed from the contract without express acknowledgement of the COR. Any changes to the working status of these key personnel shall be transmitted (in writing) to the KO/COR within ten (10) workdays of the proposed change. If, for any reason, any of the key personnel becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding (30) workdays the contractor shall promptly replace personnel with personnel who possess qualifications equal to or better than that of the original employee. The Contractor shall ensure all key personnel terminated or released from employment under this contract are replaced within ten (10) workdays of the termination.

1.6.11.1. The follow is considered key personnel by the Government: The Contractor shall provide a Program Manager (PM) who shall be responsible for the performance of the work under this contract. The name of this person, and an Alternate PM (APM), who shall act for the Contractor when the PM is absent, shall be designated in writing to the KO at the post award conference. The PM or APM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM or APM shall be available between the hours of 7:30 AM to 5:00 PM (EST), Monday through Friday, except federal holidays or when the government facility is closed for administrative reasons.

1.6.11.2. Qualifications for all Key Personnel:

1.6.11.2.1. Program Manager (PM): The Program Manager shall be a fully qualified Bay door and hangar door maintenance mechanic with a minimum of (4) years’ experience. The Project Manager shall maintain control and surveillance over all contractor personnel who are performing bay door repairs/maintenance.monthly 1.6.11.2.2.

1.6.11.2.3. The Project Manager shall be available during normal duty hours within thirty minutes to meet with COR to discuss problem areas. After normal duty hours, the Project Manager shall be available within two (2) hours.

1.6.12. Contractor Personnel:

1.6.12.1. Identification of Contractor Personnel: All Contractor personnel attending meetings, answering government telephones, and working in other situations where their contractor status is not obvious to third parties, are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel shall wear distinctive clothing bearing the company’s name, and wear an identification badge displaying the company’s name, employee’s name, description, title, and a picture of the employee. It must be clearly displayed while working at Ft. Liberty. Contractor’s personnel shall be as neat and clean as practicable; shall conduct themselves in a proper, efficient manner, and shall cause the least possible annoyance and disturbance to the using service. The Contractor shall be responsible for the supervision and conduct of his employees. Contractor’s personnel shall be experienced, qualified and capable of performing maintenance and repairs as required by this contract.

1.6.12.1.1. All Contractor personnel performing work under this contract shall obtain a Department of Defense (DoD) Common Access Card (AIE). The AIE shall be always worn, when performing work under this contract, to include attending government meetings and conferences. Unless otherwise specified in the contract, Contractor personnel shall wear the indicate identification badges in a conspicuous place on the front of exterior clothing and above the waist, except when safety or health reasons prohibit such placement or when being used for computer access.

1.6.12.1.2. The Government issued credential is the property of the U.S. Government and shall not be retained by the cardholder upon expiration, replacement, or when the DoD affiliation of the employee has been terminated.

The contractor shall ensure that the Government issued credential is retrieved/returned to the issuing Trusted Agent. Unauthorized possession of an official credential, like an AIE, can be prosecuted criminally under section 701, title 18, United States Code. Within five calendar (5) days of contract award, the Contractor shall complete Contractor Verification System (CVS) applications for AIE for all personnel who will perform work under this SOW. Contractor personnel shall always carry their AIE while on Federal installations or while otherwise performing duties associated with this PWS.

1.6.12.1.3. The Contractor shall develop, maintain, and provide to the COR an updated roster which shall include names and positions of all Contractor personnel as well as indicating which employees were issued AIE or other forms of government identification cards. The Contractor shall submit initial roster to the COR within ten (10) calendar days after commencement of base period of performance.

1.6.12.1.4. The Contractor shall immediately report any lost AIE, or government issued identification cards to the COR and Military and/or DoD police agencies. The Contractor shall immediately collect the AIE, and other government issued forms of identification upon termination of employee, or at the end of the contract performance period. The AIE and other government issued forms of identification shall be returned to the COR within one (1) hour of employee termination, or at the end of contract performance period, whichever comes first. Final payment may be delayed if Contractor fails to comply with these requirements.

1.6.12.2. Contractor Personnel Appearance and Performance: It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal prescribed drugs, or any other incapacitating agents. Contractor personnel shall be neatly groomed and dressed in business casual attire to always present a professional appearance.

1.6.13. Warranties: The Contractor shall warrantee all parts and material associated with work the Contractor has performed or authorized to be performed for a period of a one year starting the day the work and materials are accepted by the COR.

1.6.13.1. Warranty Records: The Contractor shall develop and maintain records on all parts and equipment containing warranties that are purchased and utilized under this contract. Records shall identify the item, nature, and expiration date of the warranty, and the name and location of the firm to be contacted regarding warranty entitlements. The Contractor shall provide a copy of these warranties to the COR and records shall be made available to the COR upon request.

1.6.13.2. The Government reserves the right to provide Government-furnished equipment / materials (GFE / GFM) that are on-hand if it can be used by the Contractor to complete work. The Government will hand-receipt the GFE/GFM to the Contractor.

1.6.14. Other Direct Costs (ODCs): During the performance of this requirement, the contractor shall be required to provide materials (i.e., bay and hangar doors, grease, oil, and miscellaneous door parts) to satisfy the mission.

1.6.14.1. The Contractor shall submit monthly invoices for reimbursement citing the appropriate CLIN.

Copies of receipts shall be attached to the invoice to support charges. Original receipts shall be maintained by the Contractor and made available to Government auditors upon request.

1.6.14.2. The Government will reimburse the contractor for all authorized parts and materials used in the repair and maintenance of (bay and hangar doors) except for contractor tools. Contractor’s expenses as used herein are defined as the price paid to the supplier as evidenced by the supplier’s invoice. The Contractor shall acquire the parts and materials required for the performance of this contract at the lowest price obtainable, secure reasonable competition for such purchases when available and take all discounts and obtain all rebates possible.

These discounts and rebates shall be credited to the Government. The parts and materials shall be standard products of manufacturers regularly engaged in the production of such parts and materials. The Contractor shall maintain original supplier’s invoice, tickets, sales slip(s), warranties, or other documents identifying items purchased under this contract. All documents shall be available for the Contracting Officer’s review and audit.

1.6.15. Reserved

1.6.16. Organizational Conflict of Interest:

1.6.16.1. Purpose. To aid in ensuring that:

1.6.16.1.1. The Contractor does not obtain an unfair competitive advantage by establishing the ground rules for a future competition.

1.6.16.1.2. The Contractor's objectivity and judgment are not biased because of its present or future interests (financial, contractual, organizational, or otherwise) which relate to work performed under this contract; and

1.6.16.1.3. The Contractor does not obtain an unfair competitive advantage by virtue of its access to non-public or proprietary information belonging to others.

1.6.16.2. Organizational Conflicts of Interest Examples. The following examples illustrate situations in which organizational conflicts of interest may arise. These examples are not all inclusive.

1.6.16.2.1. Biased Ground Rules. This type of conflict may arise in situations where a company sets the ground rules for a future competition. For example, when a Contractor develops requirements then competes to provide products or services to satisfy those requirements, thus obtaining a competitive advantage.

1.6.16.2.2. Impaired Objectivity. This type of conflict may exist where a contractor’s obligations under a contract require objectivity, but another role of the Contractor casts doubt on its ability to be truly objective.

An example of this type of conflict is where a contractor’s work under one contract entails evaluating itself, its affiliates, or its competitors under a separate contract.

1.6.16.2.3. Unequal Access to Information. This type of conflict may arise when a Contractor has access to nonpublic or proprietary information as part of its performance under a contract that gives it an unfair advantage in a competition for a later contract.

1.6.16.3. General Constraints. The provisions of FAR Subpart 9.5, Organizational and Consultant Conflicts of Interest, concerning organizational conflicts of interest govern this contract. Potential conflicts may exist in accordance with FAR 9.505-1, Providing Systems Engineering and Technical Direction, through 9.505-4, Obtaining Access to Proprietary Information. In this regard, the Contractor is responsible for identifying any actual or potential organizational conflicts of interest to the KO that arise as the result of performance under this contract. To avoid or mitigate a potential conflict related to performance under this contract, the KO will impose appropriate constraints such as the constraints discussed below. Since it is impossible to foresee all the circumstances that might give rise to organizational conflicts of interest, the constraints discussed below are not all inclusive and the KO may impose constraints other than, or in addition to, the constraints listed below.

1.6.16.4.1. The Contractor agrees that if it provides, under a contract or task order or delivery order, systems engineering and technical guidance for systems and programs, but does not have overall contractual responsibility, it will not be allowed to be awarded a contract or task or delivery order to supply the system or any of its major components or be a subcontractor or consultant to a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .