Pre-proposal_slides_05112017_17R0001.pdf

PDF 202 KB Posted

Attached to
Repair Building 2945 NGCB 142102
Solicitation number
W9124317R0001
Issued by

About this file

Pre-Proposal Slides dated 11 May 2017

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
Amendment.0002.with.attachments.pdf PDF
Pre-Proposal_&_Site_Visit_Sign-in_Roster.pdf PDF
Amend_1_17R0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91243‐17‐R‐0001 Repair Building 2945, Squadron

Operations

PRE‐PROPOSAL CONFERENCE

DATE: 11 May 2017

Location of Project:

Lincoln Air National Guard Base, Lincoln, NE, Lancaster County

INTRODUCTION

• Contracting Officer (KO):

• Carrie Hancock

• Contracting Specialist:

• Dani Nuss

• Contracting Officer Representative

(COR):

• Barry Veen/Ryan Watson

• Designer of Record:

• The Schemmer Associates

• Terry Wood

INTRODUCTION of ATTENDEES

• Your Name

• Company

• Your Position in Company

• Are you a Prime or a Subcontractor

SYNOPSIS

• Magnitude‐$5,000,000 TO $10,000,000

• Statutory Cost Limitation on CLIN 0003

• A Firm‐fixed Price Contract To Be Awarded

• 100% Competitive 8(a) Set‐aside for Region

VII

• Nebraska, Iowa, Missouri and Kansas

• The Solicitation Will Be Evaluated Using Source Selection process

• Lowest Priced, Technically Acceptable Procedures

• Evaluation Factors –Technical & Past Performance & Price

• must be determined to be acceptable

SOLICITATION REVIEW

•On The Web ‐ https://www.fbo.gov •Solicitation

•Exhibits A, B & C •Attachments 1 ‐ 5 •Questions & Answers Document – pg 11 of 66 •Amendments

•Check Regularly & Refresh Web Page •Plans & Specifications‐ interested parties must be registered and have MPIN/password on FBO – Export controlled

•Bid Bonds are required: 20% of proposal or $3,000,000 which ever is less

•The project is NOT TAX EXEMPT

SOLICITATION, PLANS & SPECIFICATIONS

•Search for Solicitation No. W91243‐17‐R‐0001 •Export Controlled ‐MPIN

•Company must be certified (via an approved DD Form 2345 by the Joint Certification Program (JCP) administered by the Defense Logistics Information Service (DLIS)

•Questions about this program or DDForm 2345 should be addressed to:

U.S./Canada Joint Certification Office DLA Logistics Information Services Federal Center, 74 Washington Ave., North Battle Creek, MI USA 49037‐3084

Phone: (800) 352‐3572 Email: jcp‐admin@dla.mil

Federal Business Opportunities https://www.fbo.gov

Period of Performance

• 365 Calendar days from Notice to Proceed are allowed for this contract performance period

• Payment & Performance Bonds are due 10 calendar days after Contract Award

• All work will begin within 30 calendar days of Notice To Proceed

• Liquidated Damages are included in this project, Contract Clause 52.211‐10

DISCLAIMER

The following is a brief overview of the proposal requirements

Offerors Are Strongly Cautioned To Carefully Read The Requirements Of

The Solicitation And Comply Accordingly and Completely.

Important Reminder

•The Government Intends To Make Award Without Discussions

•There May Not Be A Chance For Discussions, Corrections, Or Revised Proposals

•Submit your best proposal

WHAT YOU MUST SUBMIT

•Section 00110 Of The RFP Details The Required Information And Format For The Proposal

•2 Volumes Are Required •VOL 1 – Price/Cost

•Pro forma documents •Attachment #5 – Proposal Price Breakdown •Submit Original and (3) hard copies

•VOL 2 – Technical and Past Performance •Exhibits A, B and C •original, (3) hard copies and one CD/DVD

Volume 1‐ Price/Cost

•Offeror portion of SF1442 •Section 00010 – Pricing Info:

•CLINs and Attachment #5

• Proposal Price Breakout

•Section 00600 – Representations and Certifications (R&C) •Complete R&C in SAM on the web @ https://www.sam.gov

•Complete and Return DoD R&Cs in Section

•Joint Venture Requirements •Section 00110, paragraph 2.5.1.7

Volume 2 Technical Capability – Part 1

NO PRICES/COST IN THIS VOLUME

•Technical Capability – Part 1 •Comprised of four (4) subfactors:

•1. Experience & Capability •2. Construction Schedule & Commissioning •3. Quality Control

•4. LEED

Volume 2 Past Performance – Part 2

NO PRICES/COST IN THIS VOLUME

•Past Performance – Part 2

• Comprised of five (5) subfactors

•Exhibit A‐ Part 1‐ Performance Relevancy Questionnaires – Use Exhibit Format!

• Complete not more than 5 forms for Relevant Contracts Completed Or Substantially Completed (70%) In The Last Five Years from the date of the solicitation

•Exhibit A‐Part 2 – Complete One (1) for each project

•Send Questionnaires For The Exhibit A Projects to your references they submit to KO directly

• Do This Early – Must Be to KO NLT Closing Date & Time

Exhibits •Exhibit A = Relevancy Questionnaire

• PART 1 (Not To Exceed 5) •PART 2 (submit separately – overall)

•Compliance with with applicable federal regulations

•Exhibit B = Subcontractor Consent Form‐ when applicable

•Exhibit C = Past Performance Letter and Questionnaire (you send out to References of Exhibit A projects)

Relevant Past Performance

•If You Do Not Have Relevant Past Performance And Are Using Experience Of Key Personnel, Predecessor Companies Or Subcontractors To Obtain This

• Ensure You Clearly State This In The Proposal

•To Be Considered The Subcontractor Must Complete A Consent Form ‐ Exhibit B

Past Performance References ‐Exhibit C

•Reference Questionnaires Are Due No Later Than the Closing Date and Time that the Proposal is Due •Send Reference Questionnaires Out As Soon As Possible to your Exhibit A project POCs

•Return to KO via E‐mail

Proposal Due Dates •Proposal Due: 31 MAY 2017 @ 1000 LOCAL TIME •Proposal Must Be Signed By Officer Of Your Company •No Facsimile Or Electronic Offers •Send or deliver to: (follow instructions in Section 00100 for base access)

USPFO for Nebraska ATTN: Contracting – W9124317R0001

JFHQ, ROOM 2200

2433 NW 24th St.

Lincoln, NE 68524

•Make sure you allow time for base and building access •Prior notification to contracting office for deliveries

Proposal Evaluation

•Process Is Detailed In RFP Section 00120 •Carefully Review Section 00120 When Preparing Proposal

•Comply With Section 00100 And 00110 Requirements

•Failure To Furnish A Complete Proposal May Result In Elimination From Consideration

Proposal Evaluation continued

• Technical & Past Performance requirements ‐ Section 00120 Technical Subfactors:

• Subfactor 1 – Experience and Capability

• Subfactor 2 – Construction Schedule

• Gantt Chart – complete progress schedule using NTP of 1 Oct

• Subfactor 3 – Quality Control

• Subfactor 4 – Experience with building to USGBC LEED® standards Past Performance Subfactors:

• Quality Control

• Timely Performance

• Management Effectiveness

• Compliance with Safety Standards

• Compliance with Federal laws and regulations

• In order to be considered awardable, there must be an

"acceptable" rating in every non‐price factor/subfactor.

Award The Contractor Whose Proposal Provides:

• the lowest price, technically acceptable (LPTA) per the source selection process.

• Best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price

• three (3) evaluation factors: Technical and Past Performance and Price.

• Proposals are evaluated for acceptability, but not ranked using the non‐price factors/subfactors.

• In order to be considered awardable, there must be an "acceptable" rating in every non‐price factor/subfactor.

Important Reminders

•Submit a Complete Proposal In Accordance With Instructions – Use Formats Provided

•The Government intends to evaluate proposals and award without discussions

•FAR Clause 52.219‐14 Limitations on Subcontracting does Apply

• General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.

•Provide Subcontractor Consent Form, Exhibit B, When Using A Subcontractor To Obtain/Enhance Relevancy Or The Information Will Not Be Considered

How Questions Will Be Handled •Questions Must Be Submitted in the format shown in Section 00100, page 11 of 66

• Via Email To: usaf.ne.155‐arw.mbx.uspfo‐contracting@mail.mil

•Submit Questions NLT COB 23 May 2017 •Questions Received After 23 May 2017 May Be Held And Addressed After RFP Closing With Those Offerors Determined To Be In The Competitive Range If Discussions Are Deemed Necessary •DO NOT Call Technical Personnel Or A&E‐ This Will Delay Getting An Answer

•Questions answered in writing from the KO/posted

FBO

Answers To Questions

•All Questions, On A Non‐Attribution Basis, And The Answers Will Be Posted To The Web Site https://www.fbo.gov/

•If Necessary Addendums, Issued By An Amendment, Will Also Be Posted

•Check Web Site Regularly And Don’t Forget To Refresh Web Page

Websites

•https://www.fbo.gov •(to download RFP, Plans and Specs;

Amendments & Question/Answers)

•https://www.sam.gov •(be sure you are registered and active)

Questions

Thank you for your attendance today and your interest in our project.

File details come from the government source that posted it. Updated .