Amendment 0002 for Solicitation W9124317R0001 - Repair Building 2945

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
Pre-Proposal_&_Site_Visit_Sign-in_Roster.pdf PDF
Amend_1_17R0001.pdf PDF
Pre-proposal_slides_05112017_17R0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NGCB 142102

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. This amendment answ ers all RFIs received to date. The time for the receipt for proposals has been extended to 3:00 p.m. (1500 hrs) CST. on 8 June 2017. Acknow ledgement in w riting of this amendment is mandatory. Receipt of a proposal w ithout this w ritten acknow ledgement may deem the proposal ineligible for evaluation for aw ard. The amendment consists of tw o attached documents that incorporated to the amendment: Amendment 0002.RFIs and 29450030.Attachment. Nothing follow s.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91243-17-R-0001

X 9B. DATED (SEE ITEM 11)

01-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jun-2017

CODE

USPFO FOR NEBRASKA

2433 NW 24TH ST

LINCOLN NE 68524

W91243 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91243-17-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

See attached documents Amendment 0002.RFIs and 29450030.Attachment.

Nothing Follows.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 08-Jun-2017 10:00 AM to 08-Jun-2017 03:00 PM.

(End of Summary of Changes)

Amendment 0002 6/6/2017

Solicitation W9124317R0001 – Renovation of Bldg 2945, Lincoln Air National Guard, Lincoln, NE

The Following Requests for Information have been received and are provided. This amendment will extend the time proposals are due to 3:00 p.m. CST on 8 June 2017. Acknowledgement of this amendment is mandatory and failure to acknowledge the amendment with the proposal submitted may be grounds for elimination from evaluation for award.

Requests For Information

Control #

Information Requested Response Given

29450001

Recommended adding FAR 52.208-9 Mandatory Sources because the door hardware is available from AbilityOne

KO has no authority to make the awarded contractor for the project "an agent of the Government" which is required per FAR Part 51 in order to allow a contractor to purchase from mandatory sources.

29450002

Unable to access FBO Documents Answered in Amendment 0001

29450003

Rqt for Prior approval for Air terminal units and other HVAC equipment

Johnson Controls Air Terminal Units (Air Terminal Units), LG (Ductless Split Systems) are approved to bid in my opinion with no concern.

I'm not familiar with the American Aldes Air-To-Air Energy Recovery Equipment or Sigma Cabinet Unit heaters but recommend approval All material approvals will be done after award of the contract per Spec section 012500 and 013300

29450004

Specification section 281300, page 21 item 2.9.E calls for Stripe Swipe Readers and 2.9.F calls for Touch-plate and Proximity Readers, which type of readers are required for the system?

The readers shall be touchplate and proximity readers

Control #

Information Requested Response Given

29450005

Specification section 281300, page 21 item

2.9 Card Readers, Credential Cards and

Keypads makes no mention of the type and or quantity of credentials to be provided with the system. What type of credential are to be provided and how many?

Proximity [Cards]: Use proximity detection without physical contact with the reader for proper operation; quantity = 1000

29450006

Homeland Security Presidential Directive 12 (HSPD-12) sets a clear goal to improve Physical Access Control System (PACS) through the use of government-wide standards. [FIPS 201] defines characteristics of the identity credential that can be interoperable government-wide. In the context of Federal PACS, the term interoperability means: 1) the ability of any PIV Card and any PACS to perform a FIPS 201-defined authentication mechanism relying only on mandatory PIV Card data objects, as requested by the PACS when the PIV Card is presented, and

2) where authorized, the same ability of any PIV-I card and PACS to perform a PIV-I card authentication mechanism relying only on mandatory PIV-I card data objects when the PIV-I card is presented. There is no mention of compliance with HSPD-12 or FIPS201 in the specification for the access control system, section 281300. Is the access control system required to be compliant with HSPD-12 and FIPS 201?

The system shall be HSPD-12 and FIPS 201 compliant.

29450007 Is the access control system a new standalone system or is to be an extension of an existing system?

This is a new system

29450008 Questions below a. through d. are about Drawing E7-02, detail 2, Battlestaff Timezone Clock Riser Diagram

N/A

29450009

a. What are the time zones for the 4 digital clocks shown?

Time zones to be verified by Government

29450010

b. Is the elapsed timer shown in the diagram and elapsed timer display or a control to start the elapsed timer function on one of the digital clocks shown?

Control to start; provide ET control for each clock

29450011

c. What starts the elapsed timer function?

Control to start; provide ET control for each clock

29450012

d. Can you provide a written description of how the battlestaff clock system and elapsed timer is supposed to function.

The basic operation of the system will be to set various time zones as wanted, (maximum of 4 at a time) with the ability to provide up or down elapsed time.

29450013

The specifications call for the new roof to be EPDM and colors are to be white and gray. There is not a gray EPDM. There is a roofing membrane (TPO) that is similar to the EPDM that does have both the white and gray color. Is it acceptalble for the roofing membrane to be TPO. Please clarify.

Change all EPDM color to White only. TPO is not an acceptable product on this project.

29450014 prior approval to bid Carrier HVAC Equipment

Air Cooled Chiller - 236423.21 - Daikin Applied, Trane, York are listed. Carrier is approved to bid if they meet the requirements of the plans and specifications.

Modular Air Handling Unit - 237313 - Daikin Applied, Tran, York are listed. Carrier is approved to bid if they meet the requirements of the plans and specifications.

Ductless Split Systems -Mechanical Equipment Schedule - Trane Basis of Design "or Equal" - Carrier is approved as equal to Trane.

Fancoil Units - Mechanical Equipment Schedule and

238239.13 - Carrier is listed as an approved manufacturer.

29450015

Panel – NC shown on drawing E4-02 is not shown on the electrical one-line on sheet E6-01. Please clarify what panel is feeding Panel – NC and what the feeder size is. See attached for Panel – NC shown on E4-01 for reference.

Panel NC shall be fed from PN-17; feeder size: 115-4.

29450016

Drawing E2-01 referenced notes 19 and 21 note fire alarm and mass notification by others. E0-01 general note I & J calls for removing the entire fire alarm system but keeping the system operational during construction. Drawing E3-01 Note 37 notes fire alarm and mass notification by others.

General System Note A on E3-01 only has us connecting 120 V to the panel. Please clarify how much of the fire alarm system should be included in our bid.

The building will no longer be occupied during construction therefore the existing system can be removed with the demolition process. The fire alarm and mass notification are included in the project scope and are defined in specification section 283133 and drawings F001, F002, F101 & F102.

29450017

Section 26 0517 Electrical Systems for Modular Partitions references 09 6917 Modular Access Flooring and 10 2217 Modular Partitions. There is no spec 10 2217 Modular Partitions and the access flooring is specified in 09 6900 Access Flooring. Is there a specification section missing and should this section point to 09 6900 instead?

Modular partitions have been removed from the project. The correct access flooring specification is 096900

29450018

Section 26 0517 notes several levels of conventional and modular construction, but it is not clear which one should be utilized for this project. Please clarify.

Spec Section 260517: Remove Paragraphs: 2.3.B;

2.4.B; 2.5.A; 2.6.A.

29450019 Light fixture Type A3 is not shown on E1- 03.

Change type A3 luminaire to type A1.

29450020

I noticed in the specs that, “all products shall be made in the USA and be compliant with the Buy America Act.” Due to the requirement I had to reach out to Square D, they informed me that they would need the exact section or USC or CFR that they would have to meet due to the requirements varying. In looking through the files on the drop box I did not come across a section like that, would you happen to have more documents for this project that does explain the requirements that I can have Square D review to verify if they meet them?

Review Provision 52.225-10 and FAR Clauses 52.225- 9 of the Solicitation.

29450021

Is the cost of commissioning being paid for by the government or by the contractor?

Commissioning agent is paid by the government.

Contractor should review spec section 019113 General Commissioning Requirements for contractor responsibilities and cooperation with the commissioning agent and their activities.

29450022

Several other large projects are bidding at the same time frame as this project and that is reducing interest from subcontractors. Would it be possible to extend the bid date?

the proposal due date will not be extended at this time.

29450023 Can the site superintendent act as the QA Manager & Safety Manager or does this require three separate people?

The Site Superintendent can act as the QA & Safety Manager.

29450024 Are the superintendent, QA Manager, and Safety manager required to be on-site full time?

The Site Superintendent is required to be on the jobsite anytime work is being completed on the job.

29450025

What date does the government plan on all building occupants and services being out of the building?

See Block 11 of the SF 1442 of the solicitation. No less than 30 days after Receipt of Notice To Proceed;

Prior to construction the government as indicated they will have vacated the building for use by the contractor

29450026

Is BIM coordination required? This is mentioned in section 01 3100 item 1.9 G 2 C 3.

No BIM coordination is not required. The items listed in spec section 013100 are for coordination purposes only if the contractor chooses at their option to use BIM.

29450027 Not used. Not used.

29450028 Color selection for CPT-3? CPT-3 is at the Access Flooring panels only. Color will be selected as stated in the Specifications to coordinate with CPT-1 field Carpet tiles.

29450029 will the ATS enclosures need to be NEMA 1 or NEMA 3R. Section 2.2 P under the transfer switches states Type 1 and Type 3R.

As indicated in the transfer spec section there are NEMA 1 and NEMA 3R transfer switches. Refer to the drawings, detail 1/E6-01: ATS-LS is NEMA 3R & ATS- EM is NEMA 1 as shown.

29450030

The material floor finish scheduled for Corridor 101 is LVT-1 and LVT-2. Floor finish plan A7-01 shows the layout of the LVT following the curve of the corridor. The LVT planks are 7” x 48” planks cannot be curved and must be installed in a straight pattern (one direction). Since the LVT cannot be installed in a curve pattern as shown, what direction should we install the planks in Corridor 101?

The intent with the LVT flooring at the curve is to install for the LVT in straight segments as it goes around the curve. This should only involve cutting the ends at an angle in the field tiles and trimming the sides at wall locations only. See attached sketch.

29450031

Projection Screens in Section 115213 2.1 B.

describes a screen that is different than the one identified in C. But I do not see a location for this screen on the plans.

That is correct there are two different projection screen as indicated in spec section 115213, paragraphs 2.1, B and C. The projection screens noted in paragraph 2.1.B are shown on Sheet A1-01 per Reference Plan Note #12. And the projection screen noted in paragraph 2.1.C is part of the bid Option No. 2 - Auditorium Finish Upgrade, where the existing surface mounted screen is to be removed and the new screen put back in its place - per Reference Plan Note #1 shown on Sheet A1-01, and Wall Section 3 on Sheet A4-02.

29450032 C indicates the screen in room 151 is option 2. What does Option 2 refer to?

See note above and Spec Section 012300, for Option No. 2 - Auditorium Finish Upgrades.

29450033

They call for a 144” by 144” screen ( square format ) which is not recommended as the format is no longer used by any projectors.

Without knowing the projector model we cannot give a recommendation on screen ratio or size.

Use the 144" x 144" projection screen specified, which will allow the government the same size screen they currently have and provide they the largest possible image size not matter what format projector is used.

29450034 Note E. Says the suspended screen is 69 x 110 with 16:10 aspect ratio. What room(s) is this screen located in?

For the location of the suspended screens see Sheet A1-01 per Reference Plan Note #12.

29450035

Page E3-01 Note 5 says AV Cabinet, AV equipment , cabling , speakers, etc and terminations by Government ( verify requirements with Governments vendor) while …. On E7-02 General Note B says to provide a complete system with all required hardware , cabling and accessories for a complete installation.

Note D says to install all rack mounted equipment in floor mounted rack at frame room which I assume is Note 29 on E3-01.

Clarifications sheet E3-01. Reference note 5: All audio (sound reinforcement, cabling, speakers, terminations, etc.) is by the government. All video (monitors, projectors, cabling; except HDMI shown;

terminations, etc.) is by the government. Reference note 29: the Crestron digital media switching system (complete with hardware, accessories, cabling and terminations) is by the GC. Also see detail 5/E7-02.

This includes any interface required with the government provided A/V equipment.

29450036

Based on the info given above from Page E# and E7, I would like clarified which AV system is the responsibility of the Government contractor and which is the responsibility of the GC contractor.

Clarifications sheet E3-01. Reference note 5: All audio (sound reinforcement, cabling, speakers, terminations, etc.) is by the government. All video (monitors, projectors, cabling; except HDMI shown;

terminations, etc.) is by the government. Reference note 29: the Crestron digital media switching system (complete with hardware, accessories, cabling and terminations) is by the GC. Also see detail 5/E7-02.

This includes any interface required with the government provided A/V equipment.

See 29450030.Attachment for corridor floor layout information applicable to this Amendment.

NOTHING FOLLOWS.