W9123822B0004 Amendment 0002.pdf

PDF 192 KB Posted

Attached to
Sacramento River Erosion Contract 1 Federal contract opportunity
Solicitation number
W9123822B0004
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document is an amendment to a solicitation for erosion control services along the Sacramento River. The U.S. Army Corps of Engineers is seeking bids for earthwork, biotechnical, and barge work near Sacramento, California. The solicitation is set aside for small businesses. The amendment extends the bid due date from January 25 to February 1, 2022 at 10:00 AM PST and provides supplemental instructions. Only contractors listed on the August 2021 prequalified sources list for American River erosion contracts will be considered. The amendment provides contact information for questions and instructions for submitting bids electronically through the DOD SAFE system. The award will be made to the responsive, responsible bidder submitting the lowest total price.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose for this amendment is to:

1. Remove incorrect pre-aw ard survey language.

2. Add documents for informational purposes only.

3. Extend proposal due date.

Please note, 3 additional inquiries have been submitted and the respective responses are currently being addressed. These responses w ill be uploaded in the f inal amendment early next w eek.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123822B0004

X 9B. DATED (SEE ITEM 11)

17-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jan-2022

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123822B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 25-Jan-2022 10:00 AM to 01-Feb-2022 10:00 AM.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

IFB INSTRUCTION TO BIDDERS

SUBMITTAL INFORMATION FOR BIDDERS:

The following documents must be returned with your quote, bid, or offer.

--The completed Standard Form 1442 with continuation pages, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s CAGE Code is entered in the block with its name and address.

-- List of Pre-qualified contractors that make up your team to complete this project, and their commitment letters.

--Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.

Note: If the SF 1442 and/or the pricing schedule was changed by amendment, be sure to use the amended pages when submitting your quote, bid, or offer.

--The completed Pricing Schedule with your proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all contract line items and priced sub-line items. Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.

--Your completed Representations, Certifications, and Other Statements of Bidders/Offerors (Section 00 45 00).

--Your Bid Guarantee (e.g., Standard Form 24, “Bid Bond”)

--Completed Pre-Award Survey

INQUIRIES:

Prospective bidders should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for bid opening, please check https://sam.gov/

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the QUICK ADD link. Select https://sam.gov/ agency as USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click continue. Fill in all required information and click Add User.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

4. The Solicitation Number is: W9123822B0004 The Bidder Inquiry Key is: 7QMHYQ-DY2YKY 3G2AKB-TMTUYW

c. The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to the bid opening date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

f. The point of contact for this solicitation is:

Contract Specialist: Luke Salazar Telephone: (916) 557-6959

E-MAIL: Luke.J.Salazar@usace.army.mil

This will be a virtual Invitation for Bid (IFB), physical bids will not be accepted.

All bids must be submitted electronically.

Video Information:

https://usace1.webex.com/meet/melissa.a.denigris

Please copy/paste this link into your browser, and have the meeting call you for audio.

DIRECTIONS FOR SUBMITTING BIDS

Bids MUST BE submitted electronically using the DOD Secure Access File Exchange (SAFE): https://safe.apps.mil/

Proposals/Bids submitted through SAFE require an Offeror-unique link sent by the Contract Specialist to the Contractors point of contact and associated e-mail address. Registration with DoD SAFE is not required to upload files. Submissions are limited to 8 GB. Failure to properly submit a bid by the time due will render it late, and late bids will not be accepted regardless of technical difficulties.

Please request a link from the Luke Salazar by e-mail to Luke.J.Salazar@usace.army.mil

To ensure accurate receipt and prompt processing, Offerors are encouraged to request a DOD SAFE invitation link from the Contract Specialist no later than 24 hours prior to proposals/bid due date.

Links must be requested from the Contract Specialist at least 2 hours prior to the proposal/bid opening due date and time.

Submission shall be in Adobe PDF format.

mailto:Luke.J.Salazar@usace.army.mil https://usace1.webex.com/meet/melissa.a.denigris https://safe.apps.mil/ mailto:Luke.J.Salazar@usace.army.mil

Only one (1) SAFE submission is allowed per Offeror.

Once sent by the Contract Specialist, a SAFE invitation link is only active ONCE (i.e., multiple sessions or versions are not allowed - if the link is clicked, it will not be active later for changes to be made). The

Contract Specialist can verify bid submission receipt upon request; e-mail requests for confirmation are preferred.

SAFE links are valid for 14 days after being issued.

Late proposals/bids will NOT be accepted for any reason

Bid Due Date and Time: January 25, 2022, @ 10am February 01, 2022, @ 10am Bid Opening Date and Time: January 25, 2022 @ 11am February 01, 2022, @ 11am

CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY:

In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Attachments, Preaward Survey).

In order to be determined to be responsible a prospective contractor must:

a. Have adequate financial resources to perform the contract or the ability to obtain them.

b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.

c. Have a satisfactory performance record. In making the determination of responsibility, the Government Contracting Officer shall consider relevant past performance information. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history except when there are special standards set forth in the solicitation which applies to all bidders that must be met in order to receive the award. These special standards may be necessary when unusual expertise or specialized facilities are necessary in the performance of the contract; therefore, in order to be determined to be responsible for that particular contract, the offeror must be able to meet those special standards. A prospective contractor that is or recently has been seriously deficient in contract performance shall be presumed to be non-responsible unless the Contracting Officer determines that the circumstances were beyond the contractor's control or that the contractor has taken appropriate corrective action. Other responsibility considerations by the Contracting Officer will include past efforts by the contractor to apply sufficient tenacity and perseverance to perform acceptably, to meet quality requirements of contracts, and the contractor's past compliance with subcontracting plans (if required) under recent contracts.

d. Have a satisfactory record of integrity and business ethics.

e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).

f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.

g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations. If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed Preaward Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in subparagraphs a, e, and f above) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.

AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS DESCRIPTIONS:

a. The internet URL for Corps of Engineers publications is:

http://140.194.76.129/publications/

b. Construction Criteria Base (CCB). The Construction Criteria Base (CCB) system available through the National Institute of Building Sciences includes copies of Corps of Engineers methods and specifications. Information about the CCB can be obtained from:

http://www.wbdg.org/ccb/ccb.php

EVALUATION FOR AWARD:

The Government contemplates award of one contract to the responsive, responsible bidder who submits the low bid for the total of the following items in Pricing Schedule:

ACCEPTANCE OF OFFERS:

A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

SUPPLEMENTARY INSTRUCTIONS

This Invitation for Bid (IFB) requires pre-qualification through W9123821S0006, Prequalification of Sources List for American River Erosion Construction Contracts, USACE Sacramento

Only bids received from contractors presently named on the Pre-qualified Sources List (PSL) for American River Common Features (ARCF) 2016 Sacramento River and American River Erosion Construction Contracts, dated August 27, 2021, shall be considered for contract award.

Contractors have been pre-approved by feature of work. See latest notice W9123821S0006 available on www.sam.gov.

The following features of work apply to this project: Earthwork, Biotechnical and Barge Work.

If a bidder is not currently listed on the PSL, the bidder shall submit the required perqualification data to be considered for contract award. If the low price, the bidder’s submission will be reviewed one time to determine if they meet the qualifications as stated in W9123821S0006. Please see the latest notice W9123821S0006 available on SAM.gov for submission requirements. https://sam.gov/opp/996a0b2465494317b3b06883bc887af2/view

(End of Summary of Changes) http://140.194.76.129/publications/ http://www.wbdg.org/ccb/ccb.php http://www.sam.gov/ https://sam.gov/opp/996a0b2465494317b3b06883bc887af2/view

File details come from the government source that posted it. Updated .