Attachment 2 - SR C1 Sheet C-301-Amendment 003 (24-JAN-22).pdf

PDF 298 KB Posted

Attached to
Sacramento River Erosion Contract 1 Federal contract opportunity
Solicitation number
W9123822B0004
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document package includes engineering drawings and specifications for the Sacramento River Erosion Contract 1 project. The solicitation seeks bids for riverbank erosion protection including installation of soil-filled quarry stone and quarry stone above and below the average water surface elevation of 7.0 feet NAVD-88 in accordance with the drawings and specifications. Bids are due by January 25, 2022 at 10:00AM PST and will be evaluated for award under a 100% small business set-aside. The work is to be performed for the U.S. Army Corps of Engineers, Engineering District Sacramento.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

20:1

ALIGNMENT A

(LEVEE CREST)

RIVER BED

MINIMUM 5 FEET

QUARRY STONE

TYPE C

PLANTING

BENCH

1.5:1 SLOPE

EL. 7.0 FT. SEE NOTE 4.

OFFSETS

(SEE TABLE BELOW)

MINIMUM 2.5 FEET

SOIL FILLED QUARRY

STONE TYPE C

B C D E

1%

F

BEAVER FENCING. SEE NOTE 2

ON SHEET C-101 TO C-102 AND

DETAIL 4 ON SHEET C-502

6 INCHES

TOP SOIL LAYER

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C T

N

O

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S P

E

D E

S I G

N

F

I L

C-301

T Y

P I C

R O

S

C

T I O

N

S

K

H A

N

E

I T

S

K

H A

N

E

I T

B

H

A I N

E S

P

E

M

B

O E

D T

K E

R

P

E

FINAL DESIGN

S A

C R

A M

E N

U

N T

Y

C

A L I F

O R

N I A

A M

E R

I C

I V

M

M O

N

F

E A

T U

R E

S

W

R D

A

S A

C R

A M

E N

V

O

S I O

N

P

R O

T E

C T

I O

N

C O

N T

R A

R

I V

M

L

I N

H

O U

D

S

I G

N

J

S

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

O

C T

W X

X X

X

X X

X

W X

X X

X

X X

X

A N

S I

D

6-04-2294C-301.dwg

ELEVATIONS SHOWN ABOVE ARE FOR RELATIVE REFERENCE ONLY - SEE TABLE BELOW FOR ACTUAL ELEVATIONS

GENERAL NOTES

1. ALL CROSS SECTION OFFSETS ARE MEASURED PERPENDICULAR TO THE

CONSTRUCTION REFERENCE LINE UNLESS OTHERWISE NOTED.

2. ELEVATIONS GIVEN ARE FOR FINISHED SOIL FILLED QUARRY STONE AND QUARRY

STONE SURFACES.

3. BLANK ENTRY INDICATES THAT THE SPECIFIED "BREAKLINE" FEATURE IS NON-EXISTENT

AT THE GIVEN REFERENCE LINE STATIONING.

4. ELEVATION 7.0 FEET NAVD-88 IS THE AVERAGE WATER ELEVATION OF AUGUST ,

SEPTEMBER, AND OCTOBER OF THE GAGE RECORDS POST CONSTRUCTION OF OROVILLE

DAM.

5. SOIL FILLED QUARRY STONE AND QUARRY STONE TO BE PLACED ABOVE EXISTING

GRADE.

6. ALL ROCK ABOVE ELEVATION 7.0 FEET NAVD-88 IS TO BE SOIL FILLED QUARRY STONE

TYPE C WITH A MINIMUM THICKNESS OF 2.5 FEET NORMAL TO THE EXISTING CONDITIONS.

REFER TO SPECIFICATIONS 35 42 38 STONE PROTECTION.

7. ALL ROCK BELOW ELEVATION 7.0 FEET NAVD-88 IS TO BE QUARRY STONE TYPE C WITH

A MINIMUM THICKNESS OF 5 FEET NORMAL TO EXISTING CONDITIONS. REFER TO

SPECIFICATIONS 35 42 38 STONE PROTECTION.

8. CROSS SECTION PROVIDED IS GENERAL CROSS SECTION. REFER TO DETAIL 2 ON

SHEET C-501 FOR IWM PLACEMENT BELOW AVERAGE WATER SURFACE ELEVATION OF

7.0 FEET NAVD-88.

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P

F

E

N G

I N

E E

R S

A

C-301

TYPICAL CROSS SECTIONS FOR OFFSET/ELEVATION DATA

C-101

J A

N

I N

C L

U D

C H

Y

T

S O

L

L E

D

Q

U A

R R

Y

S

T O

B O

V

W

Sheets and Views
6-04-2294C-301-C-301

File details come from the government source that posted it. Updated .