Attachment 4 - Pricing Schedule Revised.pdf
PDF 164 KB Posted
- Solicitation number
- W9123821B0011
About this file
This pricing schedule and solicitation call for bids for emergency levee repair work along the Yolo Bypass in California under Public Law 84-99. The solicitation is identified as number W9123821B0011 and is a 100% small business set aside with bids due by September 3, 2021. The pricing schedule provides unit pricing for various items including mobilization, SWPPP implementation, dewatering, excavation, fill, hydroseeding, and pipe installation. Optional items include gas pipe removal and additional dewatering capacities. The total estimated base price and additional options are requested. The work is to be performed at Site 0412-28 and the soliciting agency is the Department of the Army Corps of Engineers, Engineering District Sacramento.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule (Site 0412-28)
PL 84-99 Emergency Levee Repair Yolo County, California
BASE WORK
Estimated Unit of Unit Description Quantity Measure Price Total Price
Mobilization and Demobilization 1 JOB $ $
SWPPP Development and 1 JOB $ _______ $ ____________ Implementation
Canal Diversion 1 JOB $ _______ $ ____________
Groundwater Dewatering** 1 JOB $ _______ $ ____________ (Continuous - Up to 1,500 gpm)
Two (2) 48-in Corrugated Metal Pipes 1 JOB $ _______ $ ____________
Clearing, Grubbing, and Stripping* 1.5 AC $ _______ $ ____________
Excavate Stone Revetment 350 CY $ _______ $ ____________
Load and Haul Stone Revetment 350 CY $ _______ $ ____________
Excavation* 25,300 CY $ _______ $ ____________
Levee Fill – Levee* 18,100 CY $ _______ $ ____________
Random Fill – Canal Relocation* 7,900 CY $ _______ $ ____________
Top Soil* 4,100 SY $ _______ $ ____________
Hydro-Seeding* 4,100 SY $ _______ $ ____________
Aggregate Base – Levee Crown* 130 CY $ _______ $ ____________
Aggregate Base – Access Road* 130 CY $ _______ $ ____________
24-Inch Corrugated Metal Pipe 40 LF $ _______ $ ____________
TOTAL ESTIMATED BASE PRICE $ ____________
Remove 4-Inch Asphalt Coated Steel Natural Gas Pipe 1 JOB $ _______ $ ____________
Groundwater Dewatering 1 JOB $ _______ $ ____________ (Additional 500 gpm beyond the base amount)
Groundwater Dewatering 1 JOB $ _______ $ ____________ (Additional 500 gpm beyond the above option)
Groundwater Dewatering 1 JOB $ _______ $ ____________ (Additional 500 gpm beyond the above option)
Groundwater Dewatering 1 JOB $ _______ $ ____________ (Additional 500 gpm beyond the above option)
TOTAL OPTION WORK $ ____________
TOTAL BASE WORK + OPTION WORK $ ____________
NOTE: AC is acre, CY is cubic yard, EA is each, TN is ton, SY is square yard, and LF is linear foot.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.212-11 Variation in Estimated Quantity.
**Flow shall be continuous so that subsurface drawdown is continuous. Upper limit of dewatering is unknown, but must be continuous in order to maintain acceptable groundwater levels.
File details come from the government source that posted it. Updated .