Attachment 4 - Pricing Schedule Revised.pdf

PDF 175 KB Posted

Attached to
Public Law (P. L. ) 84-99, Site 0412-28 Yolo Bypass Levee Repair
Solicitation number
W9123821B0011
Issued by

About this file

This pricing schedule provides estimated costs for emergency levee repair work for Public Law 84-99 Site 0412-28 in Yolo County, California. The schedule outlines base work including SWPPP development, canal diversion, dewatering up to 1,500 gallons per minute, installation of corrugated metal pipes, excavation and fill work, hydroseeding, and road and crown work. Unit pricing is provided for each line item with total estimated base pricing of [dollar amount]. Optional additional work includes removal of a natural gas pipe and increased dewatering capacities up to an unlimited upper limit. Total estimated pricing with optional work is also provided. Related solicitation W9123821B0011 from the Department of the Army Corps of Engineers Engineering District Sacramento seeks bids for this 100% small business set-aside PL 84-99 emergency levee repair project in Yolo County. Bids are due by September 3, 2021 at 10:00AM PST.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Schedule (Site 0412-28)

PL 84-99 Emergency Levee Repair Yolo County, California

BASE WORK

Estimated Unit of Unit Description Quantity Measure Price Total Price

Mobilization and Demobilization 1 JOB $ $

SWPPP Development and 1 JOB $ _______ $ ____________ Implementation

Canal Diversion 1 JOB $ _______ $ ____________

Groundwater Dewatering 1 JOB $ _______ $ ____________ (Continuous - Up to 1,500 gpm)

Two (2) 48-in Corrugated Metal Pipes 1 JOB $ _______ $ ____________

Clearing, Grubbing, and Stripping* 1.5 AC $ _______ $ ____________

Excavate Stone Revetment 350 CY $ _______ $ ____________

Load and Haul Stone Revetment 350 CY $ _______ $ ____________

Excavation* 25,300 CY $ _______ $ ____________

Levee Fill – Levee* 18,100 CY $ _______ $ ____________

Random Fill – Canal Relocation* 7,900 CY $ _______ $ ____________

Top Soil* 4,100 SY $ _______ $ ____________

Hydro-Seeding* 4,100 SY $ _______ $ ____________

Aggregate Base – Levee Crown* 130 CY $ _______ $ ____________

Aggregate Base – Access Road* 130 CY $ _______ $ ____________

24-Inch Corrugated Metal Pipe 40 LF $ _______ $ ____________

TOTAL ESTIMATED BASE PRICE $ ____________

Remove 4-Inch Asphalt Coated Steel Natural Gas Pipe 1 JOB $ _______ $ ____________

Groundwater Dewatering 1 JOB $ _______ $ ____________ (Additional 500 gpm beyond the base amount)

Groundwater Dewatering 1 JOB $ _______ $ ____________ (Additional 500 gpm beyond the above option)

Groundwater Dewatering 1 JOB $ _______ $ ____________ (Additional 500 gpm beyond the above option)

Groundwater Dewatering 1 JOB $ _______ $ ____________ (No upper limit on pumping**)

TOTAL OPTION WORK $ ____________

TOTAL BASE WORK + OPTION WORK $ ____________

NOTE: AC is acre, CY is cubic yard, EA is each, TN is ton, SY is square yard, and LF is linear foot.

*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.212-11 Variation in Estimated Quantity.

**Flow shall be continuous so that subsurface drawdown is continuous. Upper limit of dewatering is unknown, but must be continuous in order to maintain acceptable groundwater levels.