B08 IFB Atch 3 - Bid Schedule.revised.pdf

PDF 168 KB Posted

Attached to
Natomas Reach B I-5 Window Federal contract opportunity
Solicitation number
W9123821B0006
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This bid schedule is for the Natomas Reach B I-5 Window project solicitation number W9123821B0006 issued by the Department of the Army Corps of Engineers Engineering District Sacramento. The solicitation is a 100% small business set aside for construction work including clearing, excavation, drainage, roadwork and erosion control totaling over $5 million. Bids are due by April 13, 2021 at 10:00 AM PST and will be evaluated for award. Work involves demolishing and rebuilding temporary detour roads, installing over 131 linear feet of reinforced concrete pipe, 4,200 tons of hot mix asphalt, 2,880 square feet of concrete sidewalk, and 17.6 acres of erosion control seeding.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

American River Common Features (ARCF) Natomas Basin - Reach B, I-5 WINDOW W9123821B0006 Attachment 3 - Bid Schedule – Revised Amendment 0001

ITEM

NO.

Description Estimated Quantity

Unit of Measure

Unit Price

Total Price

001.1 Mobilization and

Demobilization

1 JOB

001.2 Traffic Control 1 JOB

001.3 Storm Water Pollution

Control

1 JOB

001.4 Demolition 1 JOB

001.5 Clearing and Grubbing 29.6

14.5

AC

001.6 Stump and Root Ball

Removal

24 EA

001.7 Topsoil Stripping 23,860

11,600

CY

001.8 Ground Vibration

Monitoring

1 JOB

001.9 General Excavation 22,500 CY

001.10 Soil Type 1 18,800 CY

001.11 Soil Type 2 10,400

26,400

CY

001.12 Soil Type 3 52,900

59,900

CY

001.13 Storm Drain Inlet 1 EA

001.14 12-Inch Reinforced Concrete Pipe Culvert

LF

001.15 18-Inch Reinforced Concrete Pipe

LF

001.16 Storm Drain Manhole 1 EA

001.16 24-Inch Reinforced Concrete Pipe

69 LF

001.17 Piezometer 3 EA

001.18 Concrete Sidewalk 2,616

2,880

SF

001.19 Hot-Mix Asphalt(HMA) 4,002

4,200

TON

001.20 Cold Plane Asphalt 2,236 SF

001.21 Construct Temporary

Detour Roads

1 JOB

001.22 Demolish Temporary

Detour Road (north detour)

1 JOB

American River Common Features (ARCF) Natomas Basin - Reach B, I-5 WINDOW W9123821B0006 Attachment 3 - Bid Schedule – Revised Amendment 0001

001.23 Demolish Temporary

Detour Road (south detour)

1 JOB

001.24 Class 2 Aggregate

Base

867 TON

001.25 Cross Gutter 104 LF

001.26 Concrete Curb 527 LF

001.27 Pipe Gate (Type 1) 4 EA

001.28 Pipe Gate (Type 2) 2 EA

001.29 Pipe Gate (Double

Leaf)

1 EA

001.30 Slurry Seal 49,610 SF

001.31 Pavement Markings 2,722

2,902

SF

001.32 Thermoplastic Traffic

Stripe

14,402 LF

001.33 Furnish and Install

Roadside Sign

1 EA

001.34 Remove and Replace

Roadside Sign

31 EA

001.35 Furnish and Install

Street Light

1 EA

001.36 Post and Cable

Fencing

442 LF

001.37 Access Control

Barrier

406 LF

001.38 Erosion Control

Seeding

29.6

17.6

AC

001.39 Truncated Domes 9 EA

001.40 Sidewalk Barricade 50 LF

001.41 HMA Dike 243 LF

Total Bid Price