This attachment to a federal solicitation provides the bid schedule for the Natomas Reach B I-5 Window project. The bid schedule includes 38 line items with estimated quantities and units of measure for various construction and roadwork tasks. Key requirements include general excavation, soil removal by type, installation of reinforced concrete pipes, storm drains, manholes, sidewalks, asphalt, aggregate base, curbs, fencing, signs, and erosion control seeding. Bids are due by April 13, 2021 for the 100% small business set-aside contract to be awarded by the Department of the Army Corps of Engineers Sacramento District. The purpose of the project is to conduct levee improvements along the I-5 corridor in the Natomas area.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
American River Common Features (ARCF) Natomas Basin - Reach B, I-5 WINDOW W9123821B0006 Attachment 3 - Bid Schedule
ITEM
NO.
Description Estimated
Quantity
Unit of
Measure
Unit
Price
Total
Price
001.1 Mobilization and Demobilization 1 JOB
001.2 Traffic Control 1 JOB
001.3 Storm Water Pollution Control 1 JOB
001.4 Demolition 1 JOB
001.5 Clearing and Grubbing 29.6 AC
001.6 Stump and Root Ball Removal 24 EA
001.7 Topsoil Stripping 23,860 CY
001.8 Ground Vibration Monitoring 1 JOB
001.9 General Excavation 22,500 CY
001.10 Soil Type 1 18,800 CY
001.11 Soil Type 2 10,400 CY
001.12 Soil Type 3 52,900 CY
001.13 Storm Drain Inlet 1 EA
001.14 12-Inch Reinforced Concrete Pipe Culvert
60 LF
001.15 18-Inch Reinforced Concrete Pipe
70 LF
001.16 Storm Drain Manhole 1 EA
001.17 Piezometer 3 EA
001.18 Concrete Sidewalk 2,616 SF
001.19 Hot-Mix Asphalt(HMA) 4,002 TON
001.20 Cold Plane Asphalt 2,236 SF
001.21 Construct Temporary Detour
Roads
1 JOB
001.22 Demolish Temporary Detour Road
(north detour)
1 JOB
001.23 Demolish Temporary Detour Road
(south detour)
1 JOB
001.24 Class 2 Aggregate Base 867 TON
001.25 Cross Gutter 104 LF
001.26 Concrete Curb 527 LF
001.27 Pipe Gate (Type 1) 4 EA
001.28 Pipe Gate (Type 2) 2 EA
American River Common Features (ARCF) Natomas Basin - Reach B, I-5 WINDOW W9123821B0006 Attachment 3 - Bid Schedule
ITEM
NO.
Description Estimated
Quantity
Unit of
Measure
Unit
Price
Total
Price
001.29 Pipe Gate (Double Leaf) 1 EA
001.30 Slurry Seal 49,610 SF
001.31 Pavement Markings 2,722 SF
001.32 Thermoplastic Traffic Stripe 14,402 LF
001.33 Furnish and Install Roadside
Sign
1 EA
001.34 Remove and Replace Roadside
Sign
31 EA
001.35 Furnish and Install Street
Light
1 EA
001.36 Post and Cable Fencing 442 LF
001.37 Access Control Barrier 406 LF
001.38 Erosion Control Seeding 29.6 AC
Total Bid Price