Form Offeror Project Experience.pdf

PDF 115 KB Posted

Attached to
Navy Ops Support Center Federal contract opportunity
Solicitation number
W9123820R0058
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document contains a federal solicitation for design-build services to construct a Navy Operations Support Center. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Sacramento and bears number W9123820R0058. The contractor will be responsible for designing and building a low-rise training facility with insulated concrete masonry unit exterior walls, steel framed roof structure, concrete spread footing foundations and slab on grade. The facility is to include spaces for administrative support, medical services, unit classrooms, offices and a drill hall. The contractor must perform all necessary civil, architectural, structural, mechanical and electrical work to support construction according to the concept design drawings and supplemental contract requirements provided. The scope of work also involves any required demolition and communications infrastructure. The pre-proposal site visit is strongly encouraged so the contractor can verify all dimensions and layouts. The design must comply with the criteria and standards outlined in the solicitation documents.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #8 –OFFEROR’S PROJECT EXEPERIENCE

<<Picture>>

Contractor’s Name (Who performed the work?):

Project Name:

Project Location:

City, State

Project Owner: Point of contact information (owner name, POC name, address, and phone minimum) If Government Contract, additionally provide the contract number and contracting office)

Detailed Description: General scope and relevance. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal.

Detailed Explanation of Relevancy:

Success/Challenges with schedule management, quality management, subcontractor management and site safety:

BGSF: XXX,XXX DART Rate:

Schedule:

Start Date:

MM-DD-YYYY

Original Completion:

MM-DD-YYYY

Final Contract Completion:

MM-DD-YYYY

Beneficial Occupancy Date:

MM-DD-YYYY

Cost Original Project Cost:

Final Project Cost:

Cost Difference

% Subcontracted:

File details come from the government source that posted it. Updated .