Attachment 1 Summary of Work.pdf
PDF 104 KB Posted
- Attached to
- Navy Ops Support Center Federal contract opportunity
- Solicitation number
- W9123820R0058
About this file
This solicitation is for a design-build contract to construct a Navy Operations Support Center. The scope of work includes designing and building a low-rise training facility with insulated concrete masonry unit exterior walls, steel framed roof structure, concrete spread footing foundations and slab on grade. The facility will provide spaces for administrative support, medical services, unit classrooms, offices and a drill hall. The contractor will perform all design, engineering, construction and related work.
The current Navy Operations Center in Salt Lake City is located off base and does not meet security or space requirements. The new training center will support 16 full time staff, 14 reserve units and a maximum weekend drill population of 352 reservists. The selected contractor must follow all security protocols to access the military base and complete anti-terrorism training within 30 days of award. The U.S. Army Corps of Engineers will oversee the contractor's performance and completion of work according to specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF1442 Phase 1 W9123820R00058 Amendment 0001.pdf | ||
| Form Past Performance Questionaire.pdf | ||
| Form Pre Award Survey.pdf | ||
| Form for Proposal Data Sheet.pdf | ||
| Form Offeror Project Experience.pdf | ||
| Attachment 2 P203 NOSC Concept Design Drawings (FINAL).pdf | ||
| Attachment 4 Wage Determination 01 01 2021.pdf | ||
| SF1442 Phase 1_W9123820R0058 NAVY OPS 13JAN2021.pdf | ||
| Attachment 3 Supplemental Contract Requirements.pdf | ||
| Attachment 5 Instructions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 19 Aug 2020
Summary of Work P203 Naval Operations Support Center
Hill AFB, UT
1. Scope of Work
The work for this project is to design and construct a low-rise training facility with insulated concrete masonry unit exterior walls, steel framed roof structure, concrete spread footing foundations and slab on grade. The facility includes spaces for administrative support, medical services, unit classrooms, offices and a drill hall. Design and construction shall include all civil, paving, architectural, geotechnical, structural, utilities, landscaping, security, mechanical, electrical, demolition, and communications work to support the necessary construction.
2. Description
2.1 The Contractor shall furnish and install all labor, materials, tools, equipment, and supervision necessary to provide a complete and usable project per the Specific Technical Engineering and Design Criteria, Functional Design Criteria Room by Room Requirements, including all attachments, Base Facility Design Standard, Architectural Compatibility Guide and requirements specified in the contract.
This project, the P203 Naval Operations Support center (NOSC), will allow the Navy Reserve to conduct operations on a military installation. The current Navy Operations Center at Salt Lake City is located at Fort Douglas within the University of Utah campus near downtown Salt Lake City. The reserve center does not meet ATFP requirements or the CNIC GSIP Navy Operational Support Center Addendum June 2011 recommendation that reserve centers be located within the fence line of an active military installation.
Adequate facilities are required to support the training, recruiting and administration of the Navy Reserve Unit. The training center at Salt Lake City serves 16 full time staff, 14 reserve units and a maximum weekend drill population of 352 reservists. The current facility is approximately 4,100 SF deficient in space and does not meet the drill population requirements. Built in 1976, the facility requires ongoing maintenance and repair and is inefficient to maintain.
This is a design-build contract therefore the Contractor is required to perform design work prior to construction. The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.
The Government’s conceptual facility and site design provided in the RFP documents illustrates intent and functional relationships and does not indicate all necessary construction requirements or components. The Specific Technical Engineering and Design Criteria and Functional Design Criteria Room by Room Requirements describes associated technical, performance and systems requirements.
The Contractor is responsible for the complete project design, shall retain all responsibilities, and be recognized as the Designer of Record.
Contractor shall perform work as stated in this Attachment 1 Summary of Work, Attachment 2 Supplemental Contract Requirements, Attachment 3 – Davis Bacon Wage Determination, Attachment 4 – P203 NOSC Concept Design, Unified Facility Guide Specifications; design documents; drawings, and all other documents contained in the contract. Contractor is highly encouraged to attend the pre-proposal site visit and field verify all dimensions and layouts. The project shall be designed within the criteria prescribed, as well as other codes and standards specified in the contract.
3. General Project Requirements:
Contractor shall follow all security requirements for base access. All Contractor and subcontractor personnel will need to obtain badges for all access on base from the security office.
Attachment 1 19 Aug 2020
AT Level I Training: All Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at http://jko.jten.mil/courses/atl1/launch.html The Contractor shall be responsible for the coordination of work performed by their employees and all subcontractors. The Contractor should inspect all work areas prior to submitting a proposal in accordance with FAR 52.236-3, Site Investigation and Conditions Affecting the Work. It shall be the Contractor’s responsibility to verify all current record drawings prior to the start of any and all design and /or construction work. The Contractor shall be responsible for the coordination and proper relationship of this work to the building premises and thoroughly familiarize themselves with all details of the work and working conditions, to verify all dimensions in the field, and advise the Administrative Contracting Officer (ACO) of any discrepancies before performing any work.
The Contractor is responsible for maintaining the site and all other Contractor controlled areas in such a manner as to minimize the risk of injury or accident to site personnel or others who may be in the area.
The Contractor is also responsible for furnishing an identification badge/card to each individual working on the site.
4. After Award Administrative Contracting Officer (ACO) and Post Award POC and Work Coordination:
An Administrative USACE point of contact, ACO, and Contracting Officer Representative will be responsible for verifying that the Contractors’ performance and completion of work is in accordance with applicable requirements.
http://jko.jten.mil/courses/atl1/launch.html
| Summary of Work |
| 2. Description |
| An Administrative USACE point of contact, ACO, and Contracting Officer Representative will be responsible for verifying that the Contractors’ performance and completion of work is in accordance with applicable requirements. |
File details come from the government source that posted it. Updated .