Amendment 6 - Revised Specs Section 01 57 19.pdf

PDF 729 KB Posted

Attached to
Hill Air Force Base West & Transient Apron Paving Federal contract opportunity
Solicitation number
W91238-20-R-0055
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document provides specifications for a construction project at Hill Air Force Base in Utah. The project scope includes demolishing existing concrete pavement, constructing new concrete pavement with a drainage layer and asphalt shoulders, protecting utilities, and installing new airfield striping, mooring points, and grounding systems. The specifications outline environmental protection requirements and best practices for waste management, stormwater controls, protecting natural and cultural resources, controlling dust and air emissions, handling hazardous materials, and responding to spills. The contractor must develop plans for traffic control, erosion and sediment control, waste management and disposal, air pollution prevention, and protecting historical and biological resources, and submit them to the contracting officer for approval.

View the file

Other files for this federal contract opportunity

Other files attached to Hill Air Force Base West & Transient Apron Paving, newest first.
File Type Posted
Amendment 7 - 01 57 19.pdf PDF
W9123820R0055 - Amendment 7.pdf PDF
Amendment 6 - Final QnAs.pdf PDF
W9123820R0055 - Solicitation Amendment 6.pdf PDF
Amendment 5 - Transient Sheets - Remove Hazard Material Testing.pdf PDF
Amendment 5 - Spec 01 11 00 - Phasing Addition edit.pdf PDF
Amendment 5 - West Sheets C-140 - Fire Riser Change.pdf PDF
Amendment 5 - Transient Sheets - Remove Crack Repairs.pdf PDF
Amendment 5 - Spec 31 00 00 - Spoils edits and Boring Logs.pdf PDF
Amendment 5 - West Sheets C-150s - Gradient Change.pdf PDF
Amendment 5 - West Sheets C-400s - Gradient Change.pdf PDF
W9123820R0055 - Solicitation Amendment 5.pdf PDF
W9123820R0055 - Solicitation Amendment 4.pdf PDF
W9123820R0055 - Solicitation Amendment 3.pdf PDF
HAFB West_Transient Apron Repair Site Walk 7-21-20 (002).pdf PDF
W9123820R0055 - Solicitation Amendment 2.pdf PDF
W9123820R0055 - Solicitation Amendment 1.pdf PDF
W9123820R0055 - Solicitation.pdf PDF
Attachment 6 - Past Performance Questionnaire.pdf PDF
Attachment 5 - DB Wage Determination.pdf PDF
Attachment 7 - Pre-Award Survey.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 8 - Hill AFB Site Visit Visitor Authorization List.pdf PDF
Attachment 2 - Drawings West Apron.pdf PDF
Attachment 3 - Drawings Transient Apron.pdf PDF
Attachment 4 - Pricing Schedule.pdf PDF
Attachment 9 - Utah Resident Office Map.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

West Apron Repair Project, Hill AFB 2324

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

08/16

PART 1 GENERAL

1.1 PAYMENT

1.2 REFERENCES

1.3 DEFINITIONS

1.3.1 Active Nest

1.3.2 Class I and II Ozone Depleting Substance (ODS)

1.3.3 Contractor Generated Hazardous Waste

1.3.4 Electronics Waste

1.3.5 Environmental Pollution and Damage

1.3.6 Environmental Protection

1.3.7 Hazardous Debris

1.3.8 Hazardous Materials

1.3.9 Hazardous Waste

1.3.10 Installation Pest Management Coordinator

1.3.11 Inactive Nest

1.3.12 Land Application for Discharge Water

1.3.13 Listed Bird Species

1.3.14 Non-Nesting Season

1.3.15 Municipal Separate Storm Sewer System (MS4) Permit

1.3.16 National Pollutant Discharge Elimination System (NPDES)

1.3.17 Oily Waste

1.3.18 Pests

1.3.19 Regulated Waste

1.3.20 Sediment

1.3.21 Solid Waste

1.3.21.1 Debris

1.3.21.2 Green Waste

1.3.21.3 Material not regulated as solid waste

1.3.21.4 Non-Hazardous Waste

1.3.21.5 Recyclables

1.3.21.6 Surplus Soil

1.3.21.7 Scrap Metal

1.3.21.8 Wood

1.3.22 Surface Discharge

1.3.23 Trees

1.3.24 Wastewater

1.3.24.1 Storm Water

1.3.25 Waters of the United States

1.3.26 Wetlands

1.3.27 Universal Waste

1.4 GENERAL REQUIREMENTS

1.4.1 Subcontractors

1.5 SUBMITTALS

1.6 ENVIRONMENTAL PROTECTION REQUIREMENTS

1.6.1 Conformance with the Environmental Management System

SECTION 01 57 19 Page 1 Amendment 0006

1.6.2 Protection Features

1.7 SPECIAL ENVIRONMENTAL REQUIREMENTS

1.8 QUALITY CONTROL

1.8.1 Preconstruction Survey And Protection Of Features

1.8.2 Regulatory Notifications

1.8.3 Environmental Brief

1.8.4 Environmental Manager

1.8.5 Employee Training Records

1.8.6 Non-Compliance Notifications

1.9 ENVIRONMENTAL PROTECTION PLAN

1.9.1 General Overview and Purpose

1.9.1.1 Descriptions

1.9.1.2 Duties

1.9.1.3 Procedures

1.9.1.4 Communications

1.9.1.5 Contact Information

1.9.2 General Site Information

1.9.2.1 Drawings

1.9.2.2 Work Area

1.9.2.3 Traffic Control Plan

1.9.2.4 Documentation

1.9.3 Management of Natural Resources

1.9.4 Protection of Historical and Archaeological Resources

1.9.5 Storm Water Management and Control

1.9.6 Protection of the Environment from Waste Derived from

Contractor Operations

1.9.7 Non-Hazardous Solid Waste Disposal Plan

1.9.8 Spill Control Plan

1.9.9 Prevention of Releases to the Environment

1.9.10 Regulatory Notification and Permits

1.9.11 Clean Air Act Compliance

1.9.11.1 Air Pollution Control Plan

1.9.11.2 Contaminant Prevention Plan

1.9.11.3 Haul Route

1.9.11.4 Pollution Generating Equipment

1.9.11.5 Stationary Internal Combustion Engines

1.9.11.6 Refrigerants

1.9.11.7 Air Pollution-Engineering Processes

1.9.11.8 Compliant Materials

1.9.12 Historical, Archaeological, Cultural Resources, and

Biological Resources and Wetlands Protection Plans

1.9.13 Compliance

1.9.14 Appendix

1.10 LICENSES AND PERMITS

1.10.1 Construction General Permit (UPDES Permit)

1.10.2 Solid Waste Management Permit

1.10.2.1 Solid Waste Management Report

1.11 ENVIRONMENTAL RECORDS BINDER

1.12 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS

1.13 NOTIFICATION

1.14 FACILITY HAZARDOUS WASTE GENERATOR STATUS

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 PROTECTION OF NATURAL RESOURCES

3.1.1 Flow Ways

SECTION 01 57 19 Page 2 Amendment 0006

3.1.2 Vegetation

3.1.3 Streams

3.2 STORMWATER

3.2.1 Construction General Permit

3.2.1.1 Stormwater Pollution Prevention Plan

3.2.1.2 Stormwater Notice of Intent for Construction Activities

3.2.1.3 Inspection Reports

3.2.1.4 Stormwater Pollution Prevention Plan Compliance Notebook

3.2.1.5 Stormwater Notice of Termination for Construction

Activities

3.2.2 Erosion and Sediment Control Measures

3.2.3 Work Area Limits

3.2.4 Contractor Facilities and Work Areas

3.2.5 Municipal Separate Storm Sewer System (MS4) Management

3.3 SURFACE AND GROUNDWATER

3.3.1 Waters of the United States

3.4 Protection of Cultural Resources

3.4.1 Historical, Archaeological, and Cultural Resources

3.5 AIR RESOURCES

3.5.1 Dust Control

3.5.1.1 Particulates

3.5.2 Odors

3.6 WASTE MINIMIZATION

3.6.1 Salvage, Reuse and Recycle

3.6.2 Non-Hazardous Solid Waste Diversion Report

3.7 WASTE MANAGEMENT AND DISPOSAL

3.7.1 Waste Determination Documentation

3.7.2 Solid Waste Management

3.7.2.1 Solid Waste Management Report

3.7.2.2 Control and Management of Solid Wastes

3.7.3 Control and Management of Hazardous Waste

3.7.3.1 Hazardous Waste/Debris Management

3.7.3.2 Contractor Generated Hazardous Wastes/Excess Hazardous

Material

3.7.3.3 Hazardous Waste Disposal

3.7.3.3.1 Responsibilities for Contractor's Disposal

3.7.3.3.1.1 Services

3.7.3.3.1.2 Samples

3.7.3.3.1.3 Analysis

3.7.3.3.1.4 Labeling

3.7.3.3.2 Contractor Disposal Turn-In Requirements

3.7.3.4 Universal Waste Management

3.7.3.5 Electronics End-of-Life Management

3.7.3.6 Disposal Documentation for Hazardous and Regulated Waste

3.7.4 Releases/Spills of Oil and Hazardous Substances

3.7.4.1 Response and Notifications

3.7.4.2 Clean Up

3.7.5 Mercury Materials

3.7.6 Wastewater

3.7.6.1 Treatment

3.8 HAZARDOUS MATERIAL MANAGEMENT

3.9 PREVIOUSLY USED EQUIPMENT

3.10 CONTROL AND MANAGEMENT OF ASBESTOS-CONTAINING MATERIAL (ACM)

3.11 CONTROL AND MANAGEMENT OF LEAD-BASED PAINT (LBP)

3.12 CONTROL AND MANAGEMENT OF POLYCHLORINATED BIPHENYLS (PCBS)

3.13 CONTROL AND MANAGEMENT OF LIGHTING BALLAST AND LAMPS CONTAINING

PCBS

3.14 MILITARY MUNITIONS

3.15 PETROLEUM, OIL, LUBRICANT (POL) STORAGE AND FUELING

SECTION 01 57 19 Page 3 Amendment 0006

3.15.1 Used Oil Management

3.15.2 Oil Storage Including Fuel Tanks

3.16 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED SOIL OR HAZARDOUS

WASTES

3.17 CHLORDANE

3.18 SOUND INTRUSION

3.19 POST CONSTRUCTION CLEANUP

3.20 BIOLOGICAL RESOURCES

-- End of Section Table of Contents --

SECTION 01 57 19 Page 4 Amendment 0006

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

08/16

PART 1 GENERAL

1.1 PAYMENT

No separate payment will be made for Work covered under this Section.

Payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor, and payment of all fines/fees for violation or non-compliance with Federal, State, regional and local laws and regulations are the Contractor's responsibility. Include all costs associated with this Section in the Contract Price.

1.2 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2015) Manual on Uniform Traffic Control Devices

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

ERDC/EL TR-08-28 (2008) Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Arid West Region (Version 2.0)

TR Y-87-1 (1987) Corps of Engineers Wetlands Delineation Manual

U.S. AIR FORCE (USAF)

AFI 32-1053 (2014) Integrated Pest Management Program

U.S. Code (USC)

16 USC 1531-1544 Endangered Species Act

16 USC 470 National Historic Preservation Act of 1966, as amended 89-665 Stat.915

16 USC 703-712 Migratory Bird Treaty Act

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

25 CFR 61 Preparation of rolls of Indians

29 CFR 1910 Occupational Safety and Health Standards

SECTION 01 57 19 Page 5 Amendment 0006

33 CFR 328 Definition of Waters of the United States

36 CFR 61 Procedures for State, Tribal, and Local Government Historic Preservation Programs

29 CFR 1910.120 Hazardous Waste Operations and Emergency Response

40 CFR 112 Oil Pollution Prevention

40 CFR 122.26 Storm Water Discharges (Applicable to State NPDES Programs, see section 123.25)

40 CFR 241 Guidelines for Disposal of Solid Waste

40 CFR 243 Guidelines for the Storage and Collection of Residential, Commercial, and Institutional Solid Waste

40 CFR 258 Subtitle D Landfill Requirements

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 261.7 Residues of Hazardous Waste in Empty Containers

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 262.31 Standards Applicable to Generators of Hazardous Waste-Labeling

40 CFR 262.34 Standards Applicable to Generators of Hazardous Waste-Accumulation Time

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities

40 CFR 268 Land Disposal Restrictions

40 CFR 273 Standards for Universal Waste Management

40 CFR 273.2 Standards for Universal Waste Management -

SECTION 01 57 19 Page 6 Amendment 0006

Batteries

40 CFR 273.3 Standards for Universal Waste Management - Pesticides

40 CFR 273.4 Standards for Universal Waste Management - Mercury Containing Equipment

40 CFR 273.5 Standards for Universal Waste Management - Lamps

40 CFR 279 Standards for the Management of Used Oil

40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan

40 CFR 300.125 National Oil and Hazardous Substances Pollution Contingency Plan - Notification and Communications

40 CFR 302 Designation, Reportable Quantities, and Notification

40 CFR 355 Emergency Planning and Notification

40 CFR 372-SUBPART D Specific Toxic Chemical Listings

40 CFR 403 General Pretreatment Regulations for Existing and New Sources of Pollution

40 CFR 50 National Primary and Secondary Ambient Air Quality Standards

40 CFR 60 Standards of Performance for New Stationary Sources

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

40 CFR 64 Compliance Assurance Monitoring

40 CFR 68 Chemical Accident Prevention Provisions

40 CFR 63 National Emission Standards for Hazardous Air Pollutants for Source Categories

40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential Structures

40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions

40 CFR 82 Protection of Stratospheric Ozone

49 CFR 171 - 178 Hazardous Materials Regulations

49 CFR 171 General Information, Regulations, and Definitions

SECTION 01 57 19 Page 7 Amendment 0006

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 172.101 Hazardous Material Regulation-Purpose and Use of Hazardous Material Table

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

49 CFR 178 Specifications for Packagings

UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY (UDEQ)

UCGP UTRC00000 (2014) Utah Pollutant Discharge Elimination System (UPDES) General Permit for Discharges from Construction Activities UPDES Permit No. UTRC00000

1.3 DEFINITIONS

1.3.1 Active Nest

Active nest refers to any bird nest with eggs or chicks present.

1.3.2 Class I and II Ozone Depleting Substance (ODS)

Class I ODS is defined in Section 602(a) of The Clean Air Act. A list of Class I ODS can be found on the EPA website at the following weblink.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances .

Class II ODS is defined in Section 602(s) of The Clean Air Act. A list of Class II ODS can be found on the EPA website at the following weblink.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances .

1.3.3 Contractor Generated Hazardous Waste

Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on-site by the Contractor to execute Work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e., methyl ethyl ketone, toluene, etc.), waste thinners, excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.

1.3.4 Electronics Waste

Electronics waste is discarded electronic devices intended for salvage, recycling, or disposal.

1.3.5 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the

SECTION 01 57 19 Page 8 Amendment 0006 environment aesthetically, culturally and/or historically.

1.3.6 Environmental Protection

Environmental protection is the prevention/control of pollution and habitat disruption or loss of habitat that may occur during construction.

The control of environmental pollution, disruption or loss of habitat, and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise;

solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.3.7 Hazardous Debris

As defined in Paragraph "Solid Waste", debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) in accordance with 40 CFR 261 . Hazardous debris also includes debris that exhibits a characteristic of hazardous waste in accordance with 40 CFR 261 .

1.3.8 Hazardous Materials

Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172 .

Hazardous material is any material that: Is regulated as a hazardous material in accordance with 49 CFR 173 ; or requires a Safety Data Sheet (SDS) in accordance with 29 CFR 1910.120 ; or during end use, treatment, handling, packaging, storage, transportation, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D.

Designation of a material by this definition, when separately regulated or controlled by other sections or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this Section for "control" purposes. Such material includes ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs).

1.3.9 Hazardous Waste

Hazardous Waste is any material that meets the definition of a solid waste and exhibit a hazardous characteristic (ignitability, corrosivity, reactivity, or toxicity) as specified in 40 CFR 261 , Subpart C, or contains a listed hazardous waste as identified in 40 CFR 261 , Subpart D.

1.3.10 Installation Pest Management Coordinator

Installation Pest Management Coordinator (IPMC) is the individual officially designated by the Installation Commander to oversee the Installation Pest Management Program and the Installation Pest Management Plan.

1.3.11 Inactive Nest

Inactive nest refers to any bird nest without eggs or chicks present.

SECTION 01 57 19 Page 9 Amendment 0006

1.3.12 Land Application for Discharge Water

Land Application means spreading or spraying discharge water at a rate that allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" is allowed.

Comply with Federal, State, and local laws and regulations.

1.3.13 Listed Bird Species

Listed bird species or "listed species" refers to any species of bird classified as threatened or endangered by the Federal Government or by the State of Utah . It also refers to any species of bird classified as a Species of Special Concern by the State of Utah .

1.3.14 Non-Nesting Season

Non-nesting season refers to the period beginning on July 1st and continuing through February 28th.

1.3.15 Municipal Separate Storm Sewer System (MS4) Permit

MS4 permits are those held by installations to obtain NPDES permit coverage for their storm water discharges.

1.3.16 National Pollutant Discharge Elimination System (NPDES)

The NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States. Note:

the U.S. EPA delegates NPDES permitting authority to the State of Utah under the Utah Pollutant Discharge Elimination System (UPDES) Program.

1.3.17 Oily Waste

Oily waste are those materials that are, or were, mixed with Petroleum, Oils, and Lubricants (POLs) and have become separated from that POLs.

Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, POLs and may be appropriately tested and discarded in a manner which is in compliance with other State and local requirements.

This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: It is not prohibited in other State regulations or local ordinances; the amount generated is "de minimus" (a small amount);

it is the result of minor leaks or spills resulting from normal process operations; and free-flowing oil has been removed to the practicable extent possible. Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, perform a hazardous waste determination prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.

1.3.18 Pests

Pests are arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except

SECTION 01 57 19 Page 10 Amendment 0006 for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.

1.3.19 Regulated Waste

Regulated waste are solid wastes that have specific additional Federal, State, or local controls for handling, storage, or disposal.

1.3.20 Sediment

Sediment is soil and other debris that have eroded and have been transported by runoff water or wind.

1.3.21 Solid Waste

Solid waste is a solid, liquid, semi-solid or contained gaseous waste. A solid waste can be a hazardous waste, non-hazardous waste, or non-Resource Conservation and Recovery Act (RCRA) regulated waste. Types of solid waste typically generated at construction sites may include:

1.3.21.1 Debris

Debris is non-hazardous solid material generated during the construction, demolition, or renovation of a structure that exceeds 2.5-inch particle size that is: A manufactured object; plant or animal matter; or natural geologic material (for example, cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics; roofing paper and shingles. Inert materials may be reinforced with or contain ferrous wire, rods, accessories and weldments. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.

1.3.21.2 Green Waste

Green waste is the vegetative matter from landscaping, land clearing and grubbing, including, but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to remain, be re-located, or be re-used are not included.

1.3.21.3 Material not regulated as solid waste

Material not regulated as solid waste is nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended; suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges;

regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.

1.3.21.4 Non-Hazardous Waste

Non-hazardous waste is waste that is excluded from, or does not meet, hazardous waste criteria in accordance with 40 CFR 263 .

SECTION 01 57 19 Page 11 Amendment 0006

1.3.21.5 Recyclables

Recyclables are materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable, wiring, insulated/non-insulated copper wire cable, wire rope, and structural components. It also includes commercial-grade refrigeration equipment with Freon removed, household appliances where the basic material content is metal, clean polyethylene terephthalate bottles, cooking oil, used fuel oil, textiles, high-grade paper products and corrugated cardboard, stackable pallets in good condition, clean crating material, and clean rubber/vehicle tires. Metal meeting the definition of lead contaminated or lead based paint contaminated may not be included as recyclable if sold to a scrap metal company. Paint cans that meet the definition of empty containers in accordance with 40 CFR 261.7 may be included as recyclable if sold to a scrap metal company.

1.3.21.6 Surplus Soil

Surplus soil is existing soil that is in excess of what is required for this Work, including aggregates intended, but not used, for on-site mixing of concrete, mortars, and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is not included and must be managed in accordance with Paragraph "Hazardous Material Management".

1.3.21.7 Scrap Metal

This includes scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe, and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included.

1.3.21.8 Wood

Wood is dimension and non-dimension lumber, plywood, chipboard, hardboard. Treated or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included. Treated wood includes, but is not limited to, lumber, utility poles, crossties, and other wood products with chemical treatment.

1.3.22 Surface Discharge

Surface discharge means discharge of water into drainage ditches, storm sewers, creeks or "waters of the United States." Surface discharges are discrete, identifiable sources and require a permit from the governing agency. Comply with Federal, State, and local laws and regulations.

1.3.23 Trees

Unless otherwise indicated, the terms "tree" or "trees" refers to any native woody plant species having a diameter at breast height (DBH) equal to or greater than 2 inches.

1.3.24 Wastewater

Wastewater is the used water and solids from a community that flow to a treatment plant.

SECTION 01 57 19 Page 12 Amendment 0006

1.3.24.1 Storm Water

Storm Water is any precipitation in an urban or suburban area that does not evaporate or soak into the ground, but instead collects and flows into storm drains, rivers, and streams. See Utah Department of Environmental Quality standards at https://deq.utah.gov for construction storm water management requirements.

1.3.25 Waters of the United States

Waters of the United States means Federally jurisdictional waters, including wetlands, that are subject to regulation under Section 404 of the Clean Water Act or navigable waters, as defined under the Rivers and Harbors Act and 33 CFR 328 .

1.3.26 Wetlands

Wetlands are those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, seasonal, semi-permanent, and permanent marshes, and bogs, and thereby, are considered as waters of the United States.

Official determination of whether or not an area is classified as a wetland must be done in accordance with TR Y-87-1 and the ERDC/EL TR-08-28 .

Use these documents to determine the limits or boundaries of jurisdictional Waters of the United States (which include wetlands).

1.3.27 Universal Waste

The universal waste regulations streamline collection requirements for certain hazardous wastes in the following categories: Batteries, pesticides, mercury-containing equipment (for example, thermostats), and lamps (for example, fluorescent bulbs). The rule is designed to reduce hazardous waste in the municipal solid waste (MSW) stream by making it easier for universal waste handlers to collect these items and send them for recycling or proper disposal. These regulations can be found at

40 CFR 273 .

1.4 GENERAL REQUIREMENTS

Minimize environmental pollution and damage that may occur as the result of construction operations. Protect the environmental resources within the Project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. Comply with all applicable environmental Federal, State, local laws, regulations, and mitigation requirements. Any delays resulting from failure to comply with environmental laws and regulations will be the Contractor's responsibility.

1.4.1 Subcontractors

Ensure compliance with this Section by Subcontractors.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SECTION 01 57 19 Page 13 Amendment 0006

SD-01 Preconstruction Submittals

Preconstruction Survey

Solid Waste Management Permit; G

Solid Waste Management Plan; G

Regulatory Notifications; G

Environmental Protection Plan; DO

Environmental Manager Qualifications; G

Stormwater Notice of Intent; G

Non-Hazardous Solid Waste Disposal Plan; G

Dirt and Dust Control Plan; G

Spill Control Plan; G

Waste Water Management Plan; G

Air Pollution Control Plan; G

Contaminant Prevention Plan; G

Cultural Resources Protection Plan; G

Traffic Control Plan; G

Haul Route Plan; G

SD-06 Test Reports

Inspection Reports

Solid Waste Management Report; G

Non-Hazardous Solid Waste Diversion Report

SD-07 Certificates

Employee Training Records; G

Erosion and Sediment Control Inspector Qualifications

SD-11 Closeout Submittals

Stormwater Pollution Prevention Plan Compliance Notebook; G

Waste Determination Documentation; G

Stormwater Notice of Termination; G

Hazardous Waste/Debris Management; G

SECTION 01 57 19 Page 14 Amendment 0006

Disposal Documentation for Hazardous and Regulated Waste; G

Assembled Employee Training Records; G

Solid Waste Management Permit; G

Solid Waste Management Report; G

Hazardous Waste/Debris Management; G

Regulatory Notifications; G

Sales Documentation; G

1.6 ENVIRONMENTAL PROTECTION REQUIREMENTS

Provide and maintain, during the life of the Contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during construction practice.

Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the Project. Protect the environmental resources within the Project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. Comply with Federal, State, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution.

Tests and procedures assessing whether construction operations comply with Applicable Environmental Laws may be required. Qualified laboratories must perform the analytical work; and where required by law, the laboratories must be certified.

1.6.1 Conformance with the Environmental Management System

Perform Work under this Contract consistent with the policy and objectives identified in the installation's Environmental Management System (EMS).

Perform Work in a manner that conforms to objectives and targets of the environmental programs and operational controls identified by the EMS.

Support Government personnel when environmental compliance and EMS audits are conducted by escorting auditors at the Project Site, answering questions, and providing proof of records being maintained. Provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS non-conformance or environmental non-compliance associated with the contracted services, tasks, or actions occurs, take corrective and preventative actions. In addition, employees must be aware of their roles and responsibilities under the installation EMS and of how these EMS roles and responsibilities affect Work performed under the Contract.

Coordinate with the installation's EMS coordinator to identify training needs associated with environmental aspects and the EMS, and arrange training or take other action to meet these needs. Provide training documentation to the Contracting Officer. The Installation Environmental Office will retain associated environmental compliance records. Make EMS Awareness training completion certificates available to Government auditors during EMS audits and include the certificates in the Employee Training Records. See Paragraph "Employee Training Records".

SECTION 01 57 19 Page 15 Amendment 0006

1.6.2 Protection Features

This paragraph supplements the Contract Clause "Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements". Prior to start of any on-site construction activities, the Contractor and the Contracting Officer will make a joint condition survey. Immediately following the survey, prepare a brief report including a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the Drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the Site of Work and adjacent to the assigned storage area and access route) as applicable. Both the the Contractor and the Contracting Officer will sign this survey report upon mutual agreement as to its accuracy and completeness. Protect those environmental features included in the survey report and any indicated on the Drawings, regardless of interference which their preservation may cause to the Work under the Contract.

1.7 SPECIAL ENVIRONMENTAL REQUIREMENTS

Comply with the special environmental requirements listed in AFI 32 and OO-ALC HAFB Supplement 1. Contractor is required to show all tipping fee receipts to verify that solid waste were disposed of in the appropriate landfill. All excess soils and construction debris shall be transported to a permitted landfill off base. Surplus material or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber shall be removed from Government property and properly disposed of in accordance with all applicable laws and regulations.

1.8 QUALITY CONTROL

1.8.1 Preconstruction Survey And Protection Of Features

This paragraph supplements the Contract Clause "Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements". Prior to start of any on-site construction activities, perform a Preconstruction Survey of the Project Site with the Contracting Officer, and take photographs showing existing environmental conditions in and adjacent to the Site. Submit a report for the record. Include in the report a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the Drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the Site of Work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. The Contractor and the Contracting Officer will sign this survey report upon mutual agreement regarding its accuracy and completeness. Protect those environmental features included in the survey report and any indicated on the Drawings, regardless of interference that their preservation may cause to the Work under the Contract.

1.8.2 Regulatory Notifications

Provide regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Government will also provide public notification (such as storm water permitting), coordinate with the Contracting Officer. Submit copies of regulatory notifications to the Contracting Officer. Typically, provide regulatory notifications

SECTION 01 57 19 Page 16 Amendment 0006 for the following (this listing is not all-inclusive): Demolition, renovation, NPDES defined Site Work, construction, removal or use of a permitted air emissions source, and remediation of controlled substances (asbestos, hazardous waste, lead paint).

1.8.3 Environmental Brief

Attend an environmental brief included in the preconstruction meeting.

Provide the following information: Types, quantities, and use of hazardous materials that will be brought onto the installation; and types and quantities of wastes/wastewater that may be generated during the Contract. Discuss the results of the Preconstruction Survey at this time.

Prior to initiating any work on-site, meet with the Contracting Officer and installation Environmental Office to discuss the proposed Environmental Protection Plan (EPP). Develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural and cultural resources, required reports, required permits, permit requirements (such as mitigation measures), and other measures to be taken.

1.8.4 Environmental Manager

Appoint in writing an Environmental Manager for the Project Site. The Environmental Manager is directly responsible for coordinating contractor compliance with Federal, State, local, and installation requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements (including hazardous waste handling, storage, manifesting, and disposal); implement the EPP; ensure environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program requirements; ensure compliance with Hazardous Materials (storage, handling, and reporting) requirements; and coordinate any remediation of regulated substances (lead, asbestos, PCB transformers). This can be a collateral position; however, train the person in this position to adequately accomplish the following duties: Ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure Contractor personnel are trained in 40 CFR requirements in accordance with their position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out. Submit Environmental Manager Qualifications to the Contracting Officer.

1.8.5 Employee Training Records

Prepare and maintain Employee Training Records throughout the term of the Contract meeting applicable 40 CFR requirements. Provide Employee Training Records in the Environmental Records Binder. Submit these Assembled Employee Training Records to the Contracting Officer at the conclusion of the Project, unless otherwise directed.

Train personnel to meet EPA requirements. Conduct environmental protection/pollution control meetings for personnel prior to commencing construction activities. Contact additional meetings for new personnel and when Site conditions change. Include in the training and meeting agenda: Methods of detecting and avoiding pollution; familiarization with statutory and contractual pollution standards; installation and care of devices, vegetative covers, and instruments required for monitoring

SECTION 01 57 19 Page 17 Amendment 0006 purposes to ensure adequate and continuous environmental protection/pollution control; anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants; recognition and protection of archaeological sites, artifacts, waters of the United States, and endangered species and their habitat that are known to be in the area.

Provide copy of the Erosion and Sediment Control Inspector Qualifications as defined by EPA and certification as required by the State of Utah.

1.8.6 Non-Compliance Notifications

The Contracting Officer will notify the Contractor in writing of any observed non-compliance with Federal, State or local environmental laws or regulations, permits, and other elements of the Contractor's EPP. After receipt of such notice, inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the Work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the Contract, or in accordance with the Federal Acquisition Regulation or Federal Law.

1.9 ENVIRONMENTAL PROTECTION PLAN

The purpose of the EPP is to present an overview of known or potential environmental issues that must be considered and addressed during construction. Incorporate construction related objectives and targets from the installation's EMS into the EPP. Include in the EPP measures for protecting natural and cultural resources, required reports, and other measures to be taken. Meet with the Contracting Officer or Contracting Officer Representative to discuss the EPP and develop a mutual understanding relative to the details for environmental protection including measures for protecting natural resources, required reports, and other measures to be taken. Submit the EPP within 15 days after execution of notice to proceed and not less than 10 days before the preconstruction meeting. Define issues of concern within the EPP as outlined in this Section. Address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Identify and discuss topics or issues which are not identified in this Section, but are considered necessary after those items formally identified in this Section. The Environmental Engineer must meet the respective Experience Matrix requirements of SECTION 01 45 00 QUALITY CONTROL. Develop, enforce, and revise the EPP throughout the Project to include any reporting requirements, changes in Site conditions, or Contract modifications that change the Project Scope of Work in a way that could have an environmental impact. No requirement in this Section will relieve the Contractor of any applicable Federal, State, and local environmental protection laws and regulations.

Conduct an EPP meeting one week after NTP is executed by the Contracting Officer. Request and schedule the meeting to be held at the Resident Office. The following contractor representatives must be present: The Project Manager (or appropriate technical person), and the environmental staff. Prepare to discuss implementation of the initial EPP; the process for future subsequent additions and revisions to the plan as necessary, including any reporting requirements; and methods for administration of the Environmental Plans. This meeting is required prior to Government approval of the EPP submittal.

SECTION 01 57 19 Page 18 Amendment 0006

The EPP includes, but is not limited to, the following elements:

1.9.1 General Overview and Purpose

1.9.1.1 Descriptions

A brief description of each specific plan required by environmental permit or elsewhere in this Contract such as Storm Water Pollution Prevention Plan, Spill Control Plan, Solid Waste Management Plan, Waste Water Management Plan, Air Pollution Control Plan, Contaminant Prevention Plan, a Historical, Archaeological, Cultural Resources, Biological Resources and Wetlands Protection Plan, Traffic Control Plan, Water Quality Management Plan, Non-Hazardous Solid Waste Disposal Plan.

1.9.1.2 Duties

The duties and level of authority assigned to the person(s) on the Job Site who oversee environmental compliance, such as who is responsible for adherence to the EPP, who is responsible for spill cleanup and training personnel on spill response procedures, who is responsible for manifesting hazardous waste to be removed from the Site (if applicable), and who is responsible for training the Contractor's environmental protection personnel.

a. Name(s) and qualifications of person(s) within the Contractor's organization who is (are) responsible for ensuring adherence to the

EPP.

b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the Site, if applicable.

c. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.

d. Description of the Contractor's environmental protection personnel training program.

1.9.1.3 Procedures

A copy of any standard or Project-specific operating procedures that will be used to effectively manage and protect the environment on the Project Site.

1.9.1.4 Communications

Communication and training procedures that will be used to convey environmental management requirements to Contractor employees and Subcontractors.

1.9.1.5 Contact Information

Emergency contact information (office phone number, cell phone number, and e-mail address).

1.9.2 General Site Information

1.9.2.1 Drawings

Drawings showing locations of proposed temporary excavations or

SECTION 01 57 19 Page 19 Amendment 0006 embankments for haul roads, stream crossings, jurisdictional wetlands, material storage areas, structures, sanitary facilities, storm drains and conveyances, and stockpiles of excess soil.

1.9.2.2 Work Area

Work Area Plan showing the proposed activity in each portion of the area and identify the areas of limited use or non-use. Include measures for marking the limits of use areas, including methods for protection of features to be preserved within authorized Work Areas and methods to control runoff and to contain materials on-site, and a Traffic Control Plan.

1.9.2.3 Traffic Control Plan

Develop a Traffic Control Plan before start of construction activities and submit for approval. Include measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather. Also include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff. Submit a Haul Route Plan submittal per Base Facility Standards for approval. Provide temporary traffic control devices as required with the FHWA MUTCD, as amended for use in Utah .

As appropriate, include slow-moving-vehicle warning signs, barriers for separating construction and non-construction traffic, use of traffic-control flagmen, and any additional measures required for the sole convenience of non-construction traffic to safely pass through and around construction areas and access points thereto.

Implement the following measures:

a. Control traffic during mobilization, de-mobilization, and hauling activities, leading from the primary access road(s) and extending beyond the ingress and egress locations to the construction area.

This includes the use of flagmen, signs, and/or limiting speeds to 15 mph as best management practices.

b. Schedule heavy truck traffic, unloading and hauling during non-peak periods. Schedule worker shift changes so as not to coincide with existing background traffic peak periods. Commence required bulk hauling of construction materials as soon as on-site storage and staging areas are developed. Spread out the the required bulk hauling over a longer period of time to minimize impacts to the existing facilities. Include video or photos of the private and public roads used for construction access and hauling in the Preconstruction Survey and Protection of Features. Document the same features and submit post-construction survey after completion of construction. Repair all roads damaged during construction activities and daily sweep clean any mud or dirt it leaves on paved roads.

c. Coordinate emergency response vehicle routes with local emergency response agencies regarding any routes affected by construction traffic or closures. If additional haul routes are proposed, utilize routes where existing roadways would result in the least amount of impact to existing background traffic.

d. Expand existing intersections used for Project access as required by the Contracting Officer, and County and City to reduce traffic conflicts and congestions and increase road safety for Project and background traffic.

SECTION 01 57 19 Page 20 Amendment 0006

e. Encourages or facilitates ride-sharing among construction personnel to reduce worker commute trips entering and exiting the Project Area.

1.9.2.4 Documentation

A letter signed by an officer of the firm appointing the Environmental Manager and stating that person is responsible for managing and implementing the Environmental Program as described in this Contract.

Include in this letter the Environmental Manager's authority to direct the removal and replacement of non-conforming Work.

1.9.3 Management of Natural Resources

a. Land resources.

b. Tree protection.

c. Replacement of damaged landscape features.

d. Temporary construction.

e. Stream crossings.

f. Fish and wildlife resources.

g. Wetland areas.

1.9.4 Protection of Historical and Archaeological Resources

a. Objectives.

b. Methods.

1.9.5 Storm Water Management and Control

A copy of the approved Project SWPPP submittal per Section 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL and Request for Proposal (RFP) requirements. Provide an Erosion and Sediment Control Plan which identifies the type and location of the erosion and sediment controls.

Include monitoring and reporting requirements to assure that the control measures are in compliance with the Erosion and Sediment Control Plan, Federal, State, and local laws and regulations.

a. Ground cover.

b. Erodible soils.

c. Temporary measures:

(1) Structural Practices.

(2) Temporary and permanent stabilization.

d. Effective selection, implementation and maintenance of Best Management Practices (BMPs).

SECTION 01 57 19 Page 21 Amendment 0006

1.9.6 Protection of the Environment from Waste Derived from Contractor Operations

Control and disposal of solid and sanitary waste. Control and disposal of hazardous waste. Take sufficient measures to prevent spillage of hazardous and toxic materials during dispensing. Segregate hazardous waste from other materials and wastes, protect it from the weather by placing it in a safe covered location, and take precautionary measures such as berming or other appropriate measures against accidental spillage.

This item consist of the management procedures for hazardous waste to be generated. The elements of those procedures will coincide with the Installation Hazardous Waste Management Plan. The Contracting Officer will provide a copy of the Installation Hazardous Waste Management Plan.

As a minimum, include the following:

a. List of the types of hazardous wastes expected to be generated.

Hazardous wastes are defined in 40 CFR 261 , or are as defined by applicable State and local regulations. Hazardous materials are defined in 49 CFR 171 - 178 .

b. Procedures to ensure a written waste determination is made for appropriate wastes that are to be generated.

c. Sampling/Analysis Plan, including laboratory method(s) that will be used for waste determinations and copies of relevant laboratory certifications.

d. Methods and proposed locations for hazardous waste accumulation/storage (that is, in tanks or containers).

e. Management procedures for storage, labeling, transportation, and disposal of waste (treatment of waste is not allowed unless specifically noted).

f. Management procedures and regulatory documentation ensuring disposal of hazardous waste complies with Land Disposal Restrictions ( 40 CFR 268

g. Management procedures for recyclable hazardous materials such as lead-acid batteries, used oil, and similar.

h. Used oil management procedures in accordance with 40 CFR 279 ;

Hazardous waste minimization procedures.

i. Plans for the disposal of hazardous waste by permitted facilities; and Procedures to be employed to ensure required employee training records are maintained.

1.9.7 Non-Hazardous Solid Waste Disposal Plan

Non-hazardous solid waste disposal plan identifying methods and locations for solid waste disposal including clearing debris and schedules for disposal. See the Paragraph "Non-Hazardous Solid Waste Diversion Report" for additional information.

a. Identify any Subcontractors responsible for the transportation and disposal of solid waste. Submit licenses or permits for solid waste disposal sites that are not a commercial operating facility.

SECTION 01 57 19 Page 22 Amendment 0006

b. Attach evidence of the disposal facility's acceptance of the solid waste to this plan during the construction.

c. A recycling and solid waste minimization plan with a list of measures to reduce consumption of energy and natural resources. Detail in the plan the Contractor's actions to comply with and to participate in Federal, State, regional, and local Government sponsored recycling programs to reduce the volume of solid waste at the source.

1.9.8 Spill Control Plan

Develop a Site-specific Spill Control Plan to identify containment equipment, location and methodology to contain spills. The Spill Control Plan supplements the requirements of EM 385-1-1 . Include in the Spill Control plan the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68 , 40 CFR 302 , 40 CFR 355 ,…

This is the start of the file's text. The full file is on GovTribe.