This document contains a pricing schedule for a federal contract solicitation to repair pavement at Hill Air Force Base. The solicitation requests pricing for repairing the West Apron near Building 1 and Facility 5000, including replacing concrete slabs and reworking base materials. Pricing is also requested for repairing the Transient Apron in accordance with contract documents, drawings, and UFC standards. Unit pricing is requested for CLIN items including project management, environmental monitoring, asbestos inspection, concrete and asphalt repairs by job, and options for unstable soil replacement and additional asbestos removal. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Sacramento for opportunity number W91238-20-R-0055 to repair and replace pavement at Hill Air Force Base.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91238-20-R-0055 Hill Air Force Base
West and Transient Apron Paving
Pricing Schedule
CLIN # Description Unit Total Price
0001 Provide and includes all environmental-related protective and general requirements; monitoring, survey and Asbestos/LBP (lead based paint) inspection prior to starting this project, in accordance with this contract and all associated documents, drawings, and specifications.
1 JOB $
0002 The Contractor shall perform improvements to repair West Apron near Building 1, Facility 5000, and adjacent shoulder (Facility 5129). Replace existing Portland cement concrete (PCC) slabs in the east half of section, along with full rework of structural base materials, as required for seasonal frost conditions, all in accordance with current UFC standards. Work also includes a few slabs in adjacent section A24B1, providing anchored tie-downs and pavement markings on new apron pavement and replacement of existing shoulder asphalt pavement, along with rework of the shoulder base. The extent of electrical work to be performed is the installation of static grounding points on the apron. The demolition includes but not limited to removal of existing apron PCC slabs and asphalt shoulder.
1 JOB $______________________
0003 Contractor shall Provide all labor, management, supervision, tools, materials, equipment, and transportation necessary to Repair Transient Apron, in accordance with this contract and all associated documents, drawings, UFC standards, and specifications.
1 JOB $___________________________
TOTAL BASE $___________________
Option Item
1001 Unstable Soil Replacement 5,000 CY $___________________
1002 Asbestos Removal 1 JOB $___________________
GRAND TOTAL (BASE + OPTION) $