Attachment 4 - Pricing Schedule.pdf

PDF 197 KB Posted

Attached to
Hill Air Force Base West & Transient Apron Paving Federal contract opportunity
Solicitation number
W91238-20-R-0055
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document contains a pricing schedule for a federal contract solicitation to repair pavement at Hill Air Force Base. The solicitation requests pricing for repairing the West Apron near Building 1 and Facility 5000, including replacing concrete slabs and reworking base materials. Pricing is also requested for repairing the Transient Apron in accordance with contract documents, drawings, and UFC standards. Unit pricing is requested for CLIN items including project management, environmental monitoring, asbestos inspection, concrete and asphalt repairs by job, and options for unstable soil replacement and additional asbestos removal. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Sacramento for opportunity number W91238-20-R-0055 to repair and replace pavement at Hill Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to Hill Air Force Base West & Transient Apron Paving, newest first.
File Type Posted
Amendment 7 - 01 57 19.pdf PDF
W9123820R0055 - Amendment 7.pdf PDF
W9123820R0055 - Solicitation Amendment 6.pdf PDF
Amendment 6 - Revised Specs Section 01 57 19.pdf PDF
Amendment 6 - Final QnAs.pdf PDF
Amendment 5 - Transient Sheets - Remove Hazard Material Testing.pdf PDF
Amendment 5 - Spec 01 11 00 - Phasing Addition edit.pdf PDF
Amendment 5 - Spec 31 00 00 - Spoils edits and Boring Logs.pdf PDF
Amendment 5 - West Sheets C-150s - Gradient Change.pdf PDF
Amendment 5 - West Sheets C-400s - Gradient Change.pdf PDF
W9123820R0055 - Solicitation Amendment 5.pdf PDF
Amendment 5 - West Sheets C-140 - Fire Riser Change.pdf PDF
Amendment 5 - Transient Sheets - Remove Crack Repairs.pdf PDF
W9123820R0055 - Solicitation Amendment 4.pdf PDF
W9123820R0055 - Solicitation Amendment 3.pdf PDF
HAFB West_Transient Apron Repair Site Walk 7-21-20 (002).pdf PDF
W9123820R0055 - Solicitation Amendment 2.pdf PDF
W9123820R0055 - Solicitation Amendment 1.pdf PDF
W9123820R0055 - Solicitation.pdf PDF
Attachment 7 - Pre-Award Survey.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 8 - Hill AFB Site Visit Visitor Authorization List.pdf PDF
Attachment 2 - Drawings West Apron.pdf PDF
Attachment 3 - Drawings Transient Apron.pdf PDF
Attachment 9 - Utah Resident Office Map.pdf PDF
Attachment 6 - Past Performance Questionnaire.pdf PDF
Attachment 5 - DB Wage Determination.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91238-20-R-0055 Hill Air Force Base

West and Transient Apron Paving

Pricing Schedule

CLIN # Description Unit Total Price

0001 Provide and includes all environmental-related protective and general requirements; monitoring, survey and Asbestos/LBP (lead based paint) inspection prior to starting this project, in accordance with this contract and all associated documents, drawings, and specifications.

1 JOB $

0002 The Contractor shall perform improvements to repair West Apron near Building 1, Facility 5000, and adjacent shoulder (Facility 5129). Replace existing Portland cement concrete (PCC) slabs in the east half of section, along with full rework of structural base materials, as required for seasonal frost conditions, all in accordance with current UFC standards. Work also includes a few slabs in adjacent section A24B1, providing anchored tie-downs and pavement markings on new apron pavement and replacement of existing shoulder asphalt pavement, along with rework of the shoulder base. The extent of electrical work to be performed is the installation of static grounding points on the apron. The demolition includes but not limited to removal of existing apron PCC slabs and asphalt shoulder.

1 JOB $______________________

0003 Contractor shall Provide all labor, management, supervision, tools, materials, equipment, and transportation necessary to Repair Transient Apron, in accordance with this contract and all associated documents, drawings, UFC standards, and specifications.

1 JOB $___________________________

TOTAL BASE $___________________

Option Item

1001 Unstable Soil Replacement 5,000 CY $___________________

1002 Asbestos Removal 1 JOB $___________________

GRAND TOTAL (BASE + OPTION) $

File details come from the government source that posted it. Updated .