Amendment 5 - West Sheets C-400s - Gradient Change.pdf
PDF 13 MB Posted
- Attached to
- Hill Air Force Base West & Transient Apron Paving Federal contract opportunity
- Solicitation number
- W91238-20-R-0055
About this file
This federal contract opportunity solicitation seeks bids for the Hill Air Force Base West & Transient Apron Paving project. The Department of the Army Corps of Engineers Engineering District Sacramento will award a contract to demolish existing concrete pavement, construct new concrete pavement including a drainage layer and asphalt shoulder overlay, protect existing utilities, and install new airfield pavement striping, aircraft mooring, and grounding points at Hill Air Force Base. Solicitation Number W91238-20-R-0055 has been issued for this project, with bids due by the response date specified in the solicitation document. The selected contractor will be responsible for demolition, construction, utility protection, and installation work that upgrades the base's airfield pavement facilities.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
T A
X I W
A Y
C
T
A
X
I
W
D
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
S P
E
D E
S I G
N
F
I L
G
R A
I G
H T
J U
S T
E D
S
O M
E
S
P O
T
E
L
H
A V
E
C
H A
N G
I G
H T
L
C-400
J O
I N
T
P
L A
N
P
C H
A N
G
P
C H
A N
G K
F
I S
C H
E R
E
G A
B E
L E
T
G O
E B
E L
AMENDMENT 005
H I L L
A
F B
U
T A
H
R E
P A
I
W
S
T
A
P R
B
P
H A
K R
S M
P
B
I N
H
O U
S
I G
N
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J U
W X
X X
X
X X
X
W X
X X
X
X X
X
A N
S I
D
C-400sXXX.DWG
C-401
C-402
C-403 C-404
C-405
C-406
JOINT LEGEND
DOWELED CONTRACTION JOINTS
(SEE DETAIL 7, C-503)
THICKENED EDGE EXPANSION JOINTS
(SEE DETAIL 1 AND 4, C-503)
DOWELED CONSTRUCTION JOINT
(SEE DETAIL 6, C-503)
DOWELED JOINT
(SEE DETAIL 8, C-503)
SAWN CONTRACTION JOINTS
(SEE DETAIL 3, C-503)
INTERFACE JOINTS
(SEE DETAIL 2, C-503)
REINFORCED SLAB
(SEE DETAIL 1, C-505)
FINISH GRADE ELEVATION
TEJ
CTJ
DCJ
IJ
R
NOTES:
1. MAXIMUM JOINT SPACING FOR APRON IS 20'.
2. WHEN PANELS CANNOT BE MADE SQUARE THE LENGTH TO WIDTH WILL BE
WITHIN THE RANGE OF 0.75 TO 1.25.
3. NEW JOINT LINES TO FOLLOW EXISTING JOINT LINES. THE EXCEPTION IS AT
THICKENED EDGE EXPANSION JOINTS AND SLIP JOINTS.
4. CATCH BASINS AND OTHER UTILITY STRUCTURES WITH PCC PAVEMENT
PENETRATIONS SHALL BE ISOLATED FROM THE PAVEMENT WITH A THICKENED
EDGE EXPANSION JOINT. SEE DETAIL 5 SHEET C-502. PROVIDE CORNER
REINFORCEMENT PER PER DETAIL 1 SHEET C-505.
5. STORM DRAIN CATCH BASINS ARE PROVIDED WITH COORDINATES IN THE TABLE
BELOW TO ESTABLISH THE PRECISE LOCATION.
6. ALL ODD SHAPED SLABS, SLABS NOT MEETING THE REQUIREMENTS OF NOTE 2
OF THIS SHEET, AND SLABS THAT HAVE PENETRATIONS SHALL BE REINFORCED
AS INDICATED. SEE LEGEND BELOW FOR SYMBOL IDENTIFYING KNOWN SLABS
TO BE REINFORCED.
7. PCC PAVEMENT JOINT ELEVATIONS SHALL BE AS INDICATED ON C-401
THROUGH C-407.
8. WHEN PANELS MATCHING EXISTING PCC IS EXEMPT FROM PROFILOGRAPH
SMOOTHNESS REQUIREMENT.
9. IF THE CONTRACTOR PROPOSES TO PAVE TWO PANELS WIDE PER PAVING
LANE, THE CONTRACTOR'S PROPOSED PAVING PLAN MUST BE APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND CONTRACTOR MUST
CLEARLY DEMONSTRATE THAT HE HAS THE ADEQUATE EQUIPMENT,
EXPERIENCE, AND CONCRETE PRODUCTION RATE TO SUCCESSFULLY PLACE
THE PAVEMENT PER HIS PROPOSED PLAN. THE COR RESERVES THE RIGHT TO
REJECT THE PAVING PLAN IF THE CONTRACTOR CAN NOT SATISFY THE
EQUIPMENT, EXPERIENCE, AND CONCRETE PRODUCTION REQUIRED.
C-407
N
APRON UTILITY STRUCTURE PENETRATIONS
STRUCTURE NORTHING EASTING ELEVATION NOTES
SD #1 N:14936257.12 E:1370583.62 4782.83
COORDINATES ARE TO CENTER OF 3'X5' CB
STRUCTURE
SD #2 N:14935966.81 E:1370229.21 4782.08
COORDINATES ARE TO CENTER OF 4'X6' CB
STRUCTURE
SD #3 N:14935747.12 E:1369961.98 4781.16
COORDINATES ARE TO CENTER OF 3'X6' CB
STRUCTURE
SD #4 N:14935735.15 E:1369752.12 4780.68
COORDINATES ARE TO CENTER OF 3'X4' CB
STRUCTURE
SD #2
SD #3
SD #4
DJ
SD #1
DCTJ
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 inch = 60 ft.
CTJ
C
J
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
TEJ
T E
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
TEJ
T E
J
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
IJIJ
TEJ
1 D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
MATCH EXISTING ELEVATION
M A
T C
H
E
X I S
T I N
G
E
L E
V A
T I O
N M
A T
H
X I S
T I N
G
E
L E
V A
T I O
N
10 @ 20'=200' 12@18.50'=222'
THERE IS PCC UNDER ASPHALT
IN THIS LOCATION.
T A
X I W
O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
A
I G
H T
J U
S T
E D
S
O M
E
S
P O
T
E
L
H
A V
E
C
H A
N G
I G
H T
L
C-401
O
I N
T
P
L A
N
P
C H
A N
G
P
C H
A N
G K
F
I S
C H
E R
E
G A
B E
L E
T
G O
E B
E L
AMENDMENT 005
H I L L
A
F B
U
T A
H
R E
P A
S
T
A
P R
P
H A
R
S M
P
B
I N
H
O U
S
I G
N
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J U
W X
X X
X
X X
X
W X
X X
X
X X
X
A N
S I
D
C-400sXXX.DWG
N
SHEET C-402
S H
E E
T
C
KEY NOTE:
1. THE NEW PCC WILL BE THICKENED ALONG THE JOINT PER DETAIL 4/C-503
AND EXISTING PCC WILL REMAIN.
JOINT LEGEND
DOWELED CONTRACTION JOINTS
(SEE DETAIL 7, C-503)
THICKENED EDGE EXPANSION JOINTS
(SEE DETAIL 1 AND 4, C-503)
DOWELED CONSTRUCTION JOINT
(SEE DETAIL 6, C-503)
DOWELED JOINT
(SEE DETAIL 8, C-503)
SAWN CONTRACTION JOINTS
(SEE DETAIL 3, C-503)
INTERFACE JOINTS
(SEE DETAIL 2, C-503)
REINFORCED SLAB
(SEE DETAIL 1, C-505)
FINISH GRADE ELEVATION
TEJ
CTJ
DCJ
IJ
R
DJ
DCTJ
NOTES:
1. MAXIMUM JOINT SPACING FOR APRON IS 20'.
2. WHEN PANELS CANNOT BE MADE SQUARE THE LENGTH TO WIDTH WILL BE
WITHIN THE RANGE OF 0.75 TO 1.25.
3. NEW JOINT LINES TO FOLLOW EXISTING JOINT LINES. THE EXCEPTION IS AT
THICKENED EDGE EXPANSION JOINTS AND SLIP JOINTS.
4. CATCH BASINS AND OTHER UTILITY STRUCTURES WITH PCC PAVEMENT
PENETRATIONS SHALL BE ISOLATED FROM THE PAVEMENT WITH A THICKENED
EDGE EXPANSION JOINT. SEE DETAIL 5 SHEET C-502. PROVIDE CORNER
REINFORCEMENT PER PER DETAIL 1 SHEET C-505.
5. STORM DRAIN CATCH BASINS ARE PROVIDED WITH COORDINATES IN THE TABLE
BELOW TO ESTABLISH THE PRECISE LOCATION.
6. ALL ODD SHAPED SLABS, SLABS NOT MEETING THE REQUIREMENTS OF NOTE 2
OF THIS SHEET, AND SLABS THAT HAVE PENETRATIONS SHALL BE REINFORCED
AS INDICATED. SEE LEGEND BELOW FOR SYMBOL IDENTIFYING KNOWN SLABS
TO BE REINFORCED.
7. PCC PAVEMENT JOINT ELEVATIONS SHALL BE AS INDICATED ON C-401
THROUGH C-407.
8. WHEN PANELS MATCHING EXISTING PCC IS EXEMPT FROM PROFILOGRAPH
SMOOTHNESS REQUIREMENT.
9. IF THE CONTRACTOR PROPOSES TO PAVE TWO PANELS WIDE PER PAVING
LANE, THE CONTRACTOR'S PROPOSED PAVING PLAN MUST BE APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND CONTRACTOR MUST
CLEARLY DEMONSTRATE THAT HE HAS THE ADEQUATE EQUIPMENT,
EXPERIENCE, AND CONCRETE PRODUCTION RATE TO SUCCESSFULLY PLACE
THE PAVEMENT PER HIS PROPOSED PLAN. THE COR RESERVES THE RIGHT TO
REJECT THE PAVING PLAN IF THE CONTRACTOR CAN NOT SATISFY THE
EQUIPMENT, EXPERIENCE, AND CONCRETE PRODUCTION REQUIRED.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 inch = 20 ft.
CO
CO
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
T E
J T
E
J CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
C-503
C-503
M A
T C
H
E
X I S
T I N
G
E
L E
V A
T I O
N
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
A
I G
H T
J U
S T
E D
S
O M
E
S
P O
T
E
L
H
A V
E
C
H A
N G
I G
H T
L
C-402
O
I N
T
P
L A
N
P
C H
A N
G
P
C H
A N
G K
F
I S
C H
E R
E
G A
B E
L E
T
G O
E B
E L
AMENDMENT 005
H I L L
A
F B
U
T A
H
R E
P A
S
T
A
P R
P
H A
R
S M
P
B
I N
H
O U
S
I G
N
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J U
W X
X X
X
X X
X
W X
X X
X
X X
X
A N
S I
D
C-400sXXX.DWG
SD #4
SEE NOTE 4
SHEET C-403
S H
E E
T
C
SHEET C-401
N
KEY NOTE:
1. THE NEW PCC WILL BE THICKENED ALONG THE JOINT PER DETAIL 4/C-503
AND EXISTING PCC WILL REMAIN.
JOINT LEGEND
DOWELED CONTRACTION JOINTS
(SEE DETAIL 7, C-503)
THICKENED EDGE EXPANSION JOINTS
(SEE DETAIL 1 AND 4, C-503)
DOWELED CONSTRUCTION JOINT
(SEE DETAIL 6, C-503)
DOWELED JOINT
(SEE DETAIL 8, C-503)
SAWN CONTRACTION JOINTS
(SEE DETAIL 3, C-503)
INTERFACE JOINTS
(SEE DETAIL 2, C-503)
REINFORCED SLAB
(SEE DETAIL 1, C-505)
FINISH GRADE ELEVATION
TEJ
CTJ
DCJ
IJ
R
DJ
DCTJ
NOTES:
1. MAXIMUM JOINT SPACING FOR APRON IS 20'.
2. WHEN PANELS CANNOT BE MADE SQUARE THE LENGTH TO WIDTH WILL BE
WITHIN THE RANGE OF 0.75 TO 1.25.
3. NEW JOINT LINES TO FOLLOW EXISTING JOINT LINES. THE EXCEPTION IS AT
THICKENED EDGE EXPANSION JOINTS AND SLIP JOINTS.
4. CATCH BASINS AND OTHER UTILITY STRUCTURES WITH PCC PAVEMENT
PENETRATIONS SHALL BE ISOLATED FROM THE PAVEMENT WITH A THICKENED
EDGE EXPANSION JOINT. SEE DETAIL 5 SHEET C-502. PROVIDE CORNER
REINFORCEMENT PER PER DETAIL 1 SHEET C-505.
5. STORM DRAIN CATCH BASINS ARE PROVIDED WITH COORDINATES IN THE TABLE
BELOW TO ESTABLISH THE PRECISE LOCATION.
6. ALL ODD SHAPED SLABS, SLABS NOT MEETING THE REQUIREMENTS OF NOTE 2
OF THIS SHEET, AND SLABS THAT HAVE PENETRATIONS SHALL BE REINFORCED
AS INDICATED. SEE LEGEND BELOW FOR SYMBOL IDENTIFYING KNOWN SLABS
TO BE REINFORCED.
7. PCC PAVEMENT JOINT ELEVATIONS SHALL BE AS INDICATED ON C-401
THROUGH C-407.
8. WHEN PANELS MATCHING EXISTING PCC IS EXEMPT FROM PROFILOGRAPH
SMOOTHNESS REQUIREMENT.
9. IF THE CONTRACTOR PROPOSES TO PAVE TWO PANELS WIDE PER PAVING
LANE, THE CONTRACTOR'S PROPOSED PAVING PLAN MUST BE APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND CONTRACTOR MUST
CLEARLY DEMONSTRATE THAT HE HAS THE ADEQUATE EQUIPMENT,
EXPERIENCE, AND CONCRETE PRODUCTION RATE TO SUCCESSFULLY PLACE
THE PAVEMENT PER HIS PROPOSED PLAN. THE COR RESERVES THE RIGHT TO
REJECT THE PAVING PLAN IF THE CONTRACTOR CAN NOT SATISFY THE
EQUIPMENT, EXPERIENCE, AND CONCRETE PRODUCTION REQUIRED.
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CTJ
CTJ
CTJ
TEJ
DJ
D J
D J
DJ
T E
J T
E J
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
TEJ
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
D C
J
MATCH EXISTING ELEVATION
M A
T C
H
E
X I S
T I N
G
E
L E
V A
T I O
N
TEJ
MATCH EXISTING JOINTS
AT DOWELED JOINTS (DJ)
MATCH EXISTING JOINTS
AS SHOWN AT DOWELED
JOINTS (DJ)
M A
T C
H
E
X I S
T I N
G
E
L E
V A
T I O
N
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
A
I G
H T
J U
S T
E D
S
O M
E
S
P O
T
E
L
H
A V
E
C
H A
N G
I G
H T
L
C-403
O
I N
T
P
L A
N
P
C H
A N
G
P
C H
A N
G K
F
I S
C H
E R
E
G A
B E
L E
T
G O
E B
E L
AMENDMENT 005
H I L L
A
F B
U
T A
H
R E
P A
S
T
A
P R
P
H A
R
S M
P
B
I N
H
O U
S
I G
N
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J U
W X
X X
X
X X
X
W X
X X
X
X X
X
A N
S I
D
C-400sXXX.DWG
S H
E E
T
C
SHEET C-402
N
KEY NOTE:
1. THE NEW PCC WILL BE THICKENED ALONG THE JOINT PER DETAIL 4/C-503
AND EXISTING PCC WILL REMAIN.
JOINT LEGEND
DOWELED CONTRACTION JOINTS
(SEE DETAIL 7, C-503)
THICKENED EDGE EXPANSION JOINTS
(SEE DETAIL 1 AND 4, C-503)
DOWELED CONSTRUCTION JOINT
(SEE DETAIL 6, C-503)
DOWELED JOINT
(SEE DETAIL 8, C-503)
SAWN CONTRACTION JOINTS
(SEE DETAIL 3, C-503)
INTERFACE JOINTS
(SEE DETAIL 2, C-503)
REINFORCED SLAB
(SEE DETAIL 1, C-505)
FINISH GRADE ELEVATION
TEJ
CTJ
DCJ
IJ
R
DJ
DCTJ
NOTES:
1. MAXIMUM JOINT SPACING FOR APRON IS 20'.
2. WHEN PANELS CANNOT BE MADE SQUARE THE LENGTH TO WIDTH WILL BE
WITHIN THE RANGE OF 0.75 TO 1.25.
3. NEW JOINT LINES TO FOLLOW EXISTING JOINT LINES. THE EXCEPTION IS AT
THICKENED EDGE EXPANSION JOINTS AND SLIP JOINTS.
4. CATCH BASINS AND OTHER UTILITY STRUCTURES WITH PCC PAVEMENT
PENETRATIONS SHALL BE ISOLATED FROM THE PAVEMENT WITH A THICKENED
EDGE EXPANSION JOINT. SEE DETAIL 5 SHEET C-502. PROVIDE CORNER
REINFORCEMENT PER PER DETAIL 1 SHEET C-505.
5. STORM DRAIN CATCH BASINS ARE PROVIDED WITH COORDINATES IN THE TABLE
BELOW TO ESTABLISH THE PRECISE LOCATION.
6. ALL ODD SHAPED SLABS, SLABS NOT MEETING THE REQUIREMENTS OF NOTE 2
OF THIS SHEET, AND SLABS THAT HAVE PENETRATIONS SHALL BE REINFORCED
AS INDICATED. SEE LEGEND BELOW FOR SYMBOL IDENTIFYING KNOWN SLABS
TO BE REINFORCED.
7. PCC PAVEMENT JOINT ELEVATIONS SHALL BE AS INDICATED ON C-401
THROUGH C-407.
8. WHEN PANELS MATCHING EXISTING PCC IS EXEMPT FROM PROFILOGRAPH
SMOOTHNESS REQUIREMENT.
9. IF THE CONTRACTOR PROPOSES TO PAVE TWO PANELS WIDE PER PAVING
LANE, THE CONTRACTOR'S PROPOSED PAVING PLAN MUST BE APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND CONTRACTOR MUST
CLEARLY DEMONSTRATE THAT HE HAS THE ADEQUATE EQUIPMENT,
EXPERIENCE, AND CONCRETE PRODUCTION RATE TO SUCCESSFULLY PLACE
THE PAVEMENT PER HIS PROPOSED PLAN. THE COR RESERVES THE RIGHT TO
REJECT THE PAVING PLAN IF THE CONTRACTOR CAN NOT SATISFY THE
EQUIPMENT, EXPERIENCE, AND CONCRETE PRODUCTION REQUIRED.
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
J
D J
DJDJ
D J
D J
DJDJ
D J
D J
DJ
DJ
D J
D J
IJ
T E
J T
E J
IJ
IJ
D J
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
DCTJ
DCTJ
DCTJ
D J
DJ
D J
CTJ
CTJ
CTJ
CTJ
CTJ
T E
J T
E J
TEJTEJ
CTJ CTJ
T E
J
T E
J
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
DCTJ
DCTJ
DCTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
TEJ
C T
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J D
C J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJCTJ
CTJCTJ
CTJCTJ
TEJTEJ
4782.98
4783.04
M A
T C
H
E
X I S
T I N
G
E
L E
V A
T I O
N
M A
T C
H
E
X I S
T I N
G
M A
T C
H
E
X I S
T I N
G
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
D C
J
5@18.75'=93.75'
19.76'
MATCH EXISTING JOINTS
AT DOWELED JOINTS (DJ)
MATCH EXISTING JOINTS
AT DOWELED JOINTS (DJ)
M A
T C
H
E X
I S
T I N
G
TEJ
CTJ
D C
J
D C
J
D C
J
CTJ
D C
J
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
A
I G
H T
J U
S T
E D
S
O M
E
S
P O
T
E
L
H
A V
E
C
H A
N G
I G
H T
L
C-404
O
I N
T
P
L A
N
P
C H
A N
G
P
C H
A N
G K
F
I S
C H
E R
E
G A
B E
L E
T
G O
E B
E L
AMENDMENT 005
H I L L
A
F B
U
T A
H
R E
P A
S
T
A
P R
P
H A
R
S M
P
B
I N
H
O U
S
I G
N
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J U
W X
X X
X
X X
X
W X
X X
X
X X
X
A N
S I
D
C-400sXXX.DWG
SHEET C-405
S H
E E
T
C
N
JOINT LEGEND
DOWELED CONTRACTION JOINTS
(SEE DETAIL 7, C-503)
THICKENED EDGE EXPANSION JOINTS
(SEE DETAIL 1 AND 4, C-503)
DOWELED CONSTRUCTION JOINT
(SEE DETAIL 6, C-503)
DOWELED JOINT
(SEE DETAIL 8, C-503)
SAWN CONTRACTION JOINTS
(SEE DETAIL 3, C-503)
INTERFACE JOINTS
(SEE DETAIL 2, C-503)
REINFORCED SLAB
(SEE DETAIL 1, C-505)
FINISH GRADE ELEVATION
TEJ
CTJ
DCJ
IJ
R
DJ
DCTJ
NOTES:
1. MAXIMUM JOINT SPACING FOR APRON IS 20'.
2. WHEN PANELS CANNOT BE MADE SQUARE THE LENGTH TO WIDTH WILL BE
WITHIN THE RANGE OF 0.75 TO 1.25.
3. NEW JOINT LINES TO FOLLOW EXISTING JOINT LINES. THE EXCEPTION IS AT
THICKENED EDGE EXPANSION JOINTS AND SLIP JOINTS.
4. CATCH BASINS AND OTHER UTILITY STRUCTURES WITH PCC PAVEMENT
PENETRATIONS SHALL BE ISOLATED FROM THE PAVEMENT WITH A THICKENED
EDGE EXPANSION JOINT. SEE DETAIL 5 SHEET C-502. PROVIDE CORNER
REINFORCEMENT PER PER DETAIL 1 SHEET C-505.
5. STORM DRAIN CATCH BASINS ARE PROVIDED WITH COORDINATES IN THE TABLE
BELOW TO ESTABLISH THE PRECISE LOCATION.
6. ALL ODD SHAPED SLABS, SLABS NOT MEETING THE REQUIREMENTS OF NOTE 2
OF THIS SHEET, AND SLABS THAT HAVE PENETRATIONS SHALL BE REINFORCED
AS INDICATED. SEE LEGEND BELOW FOR SYMBOL IDENTIFYING KNOWN SLABS
TO BE REINFORCED.
7. PCC PAVEMENT JOINT ELEVATIONS SHALL BE AS INDICATED ON C-401
THROUGH C-407.
8. WHEN PANELS MATCHING EXISTING PCC IS EXEMPT FROM PROFILOGRAPH
SMOOTHNESS REQUIREMENT.
9. IF THE CONTRACTOR PROPOSES TO PAVE TWO PANELS WIDE PER PAVING
LANE, THE CONTRACTOR'S PROPOSED PAVING PLAN MUST BE APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND CONTRACTOR MUST
CLEARLY DEMONSTRATE THAT HE HAS THE ADEQUATE EQUIPMENT,
EXPERIENCE, AND CONCRETE PRODUCTION RATE TO SUCCESSFULLY PLACE
THE PAVEMENT PER HIS PROPOSED PLAN. THE COR RESERVES THE RIGHT TO
REJECT THE PAVING PLAN IF THE CONTRACTOR CAN NOT SATISFY THE
EQUIPMENT, EXPERIENCE, AND CONCRETE PRODUCTION REQUIRED.
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CO
CO
CO
D J
D J
D J
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
T E
J T
E J
T E
J
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
C T
J C
T J
C T
J C
T J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
CTJCTJ
CTJCTJ
CTJCTJ
CTJ
CTJCTJ
CTJCTJ
CTJ
CTJCTJ
CTJCTJ
CTJ
CTJCTJ
CTJ
CTJCTJ
CTJCTJ
CTJ
CTJCTJ
CTJCTJ
CTJCTJ
CTJCTJ
CTJ
CTJ
CTJCTJ
CTJCTJ
CTJ
CTJCTJ
CTJ
CTJ
CTJCTJ
CTJ
CTJCTJ
4782.21
M A
T C
H
E
X I S
T I N
G M
A T
H
X I S
T I N
G
M A
T C
H
E
X I S
T I N
G
J O
I N
D
O W
E L E
D
J O
I N
J
12.5'X12.5' REINFORCED PANELS. SEE NOTE 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
A
I G
H T
J U
S T
E D
S
O M
E
S
P O
T
E
L
H
A V
E
C
H A
N G
I G
H T
L
C-405
O
I N
T
P
L A
N
P
C H
A N
G
P
C H
A N
G K
F
I S
C H
E R
E
G A
B E
L E
T
G O
E B
E L
AMENDMENT 005
H I L L
A
F B
U
T A
H
R E
P A
S
T
A
P R
P
H A
R
S M
P
B
I N
H
O U
S
I G
N
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J U
W X
X X
X
X X
X
W X
X X
X
X X
X
A N
S I
D
C-400sXXX.DWG
SD #3
SEE NOTE 4
SD #2
SEE NOTE 4
SHEET C-404
S H
E E
T
C
SHEET C-406
N
JOINT LEGEND
DOWELED CONTRACTION JOINTS
(SEE DETAIL 7, C-503)
THICKENED EDGE EXPANSION JOINTS
(SEE DETAIL 1 AND 4, C-503)
DOWELED CONSTRUCTION JOINT
(SEE DETAIL 6, C-503)
DOWELED JOINT
(SEE DETAIL 8, C-503)
SAWN CONTRACTION JOINTS
(SEE DETAIL 3, C-503)
INTERFACE JOINTS
(SEE DETAIL 2, C-503)
REINFORCED SLAB
(SEE DETAIL 1, C-505)
FINISH GRADE ELEVATION
TEJ
CTJ
DCJ
IJ
R
DJ
DCTJ
NOTES:
1. MAXIMUM JOINT SPACING FOR APRON IS 20'.
2. WHEN PANELS CANNOT BE MADE SQUARE THE LENGTH TO WIDTH WILL BE
WITHIN THE RANGE OF 0.75 TO 1.25.
3. NEW JOINT LINES TO FOLLOW EXISTING JOINT LINES. THE EXCEPTION IS AT
THICKENED EDGE EXPANSION JOINTS AND SLIP JOINTS.
4. CATCH BASINS AND OTHER UTILITY STRUCTURES WITH PCC PAVEMENT
PENETRATIONS SHALL BE ISOLATED FROM THE PAVEMENT WITH A THICKENED
EDGE EXPANSION JOINT. SEE DETAIL 5 SHEET C-502. PROVIDE CORNER
REINFORCEMENT PER PER DETAIL 1 SHEET C-505.
5. STORM DRAIN CATCH BASINS ARE PROVIDED WITH COORDINATES IN THE TABLE
BELOW TO ESTABLISH THE PRECISE LOCATION.
6. ALL ODD SHAPED SLABS, SLABS NOT MEETING THE REQUIREMENTS OF NOTE 2
OF THIS SHEET, AND SLABS THAT HAVE PENETRATIONS SHALL BE REINFORCED
AS INDICATED. SEE LEGEND BELOW FOR SYMBOL IDENTIFYING KNOWN SLABS
TO BE REINFORCED.
7. PCC PAVEMENT JOINT ELEVATIONS SHALL BE AS INDICATED ON C-401
THROUGH C-407.
8. WHEN PANELS MATCHING EXISTING PCC IS EXEMPT FROM PROFILOGRAPH
SMOOTHNESS REQUIREMENT.
9. IF THE CONTRACTOR PROPOSES TO PAVE TWO PANELS WIDE PER PAVING
LANE, THE CONTRACTOR'S PROPOSED PAVING PLAN MUST BE APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND CONTRACTOR MUST
CLEARLY DEMONSTRATE THAT HE HAS THE ADEQUATE EQUIPMENT,
EXPERIENCE, AND CONCRETE PRODUCTION RATE TO SUCCESSFULLY PLACE
THE PAVEMENT PER HIS PROPOSED PLAN. THE COR RESERVES THE RIGHT TO
REJECT THE PAVING PLAN IF THE CONTRACTOR CAN NOT SATISFY THE
EQUIPMENT, EXPERIENCE, AND CONCRETE PRODUCTION REQUIRED.
10. FOR PAVEMENT ABUTTING EXISTING 25' PANELS NOT BEING REPLACED BY THE
TRANSIENT APRON REPAIR PROJECT, CONTINUOUSLY REINFORCE AS A 25'X25'
PANEL PER DETAIL 6, C-505, THEN SAWCUT CONTRACTION JOINTS TO QUARTER
THE PANEL.
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
C T
J
TEJ
IJ
DJ
D J
D J
DJ
IJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
TEJ
TEJ IJ
T E
J T
E J
T E
J
IJ IJ
TEJ TEJ
DCJ
DCJ
DCJ
DCJ
DCJ
DCJ
DCJ
DCJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
CTJ
C T
J
CTJ
C T
J C
T J
C T
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
D C
J
C T
J C
T J
C T
J
CTJCTJ
CTJ
CTJCTJ
CTJCTJ
CTJ
CTJCTJ
CTJCTJ
CTJ
CTJCTJ
CTJCTJ
CTJ
CTJCTJ
MATCH EXISTING
M A
T C
H
E
X I S
T I N
G
4@19.50'=78' 7@20'=140'
5@18.50'=92.50'
17.35'
4784.58
4784.53
T
A
X
I
W
O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
A
I G
H T
J U
S T
E D
S
O M
E
S
P O
T
E
L
H
A V
E
C
H A
N G
I G
H T
L
C-406
O
I N
T
P
L A
N
P
C H
A N
G
P
C H
A N
G K
F
I S
C H
E R
E
G A
B E
L E
T
G O
E B
E L
AMENDMENT 005
H I L L
A
F B
U
T A
H
R E
P A
S
T
A
P R
P
H A
R
S M
P
B
I N
H
O U
S
I G
N
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J U
W X
X X
X
X X
X
W X
X X
X
X X
X
A N
S I
D
C-400sXXX.DWG
SHEET C-405
S H
E E
T
C
S H
E E
T
C
N
JOINT LEGEND
DOWELED CONTRACTION JOINTS
(SEE DETAIL 7, C-503)
THICKENED EDGE EXPANSION JOINTS
(SEE DETAIL 1 AND 4, C-503)
DOWELED CONSTRUCTION JOINT
(SEE DETAIL 6, C-503)
DOWELED JOINT
(SEE DETAIL 8, C-503)
SAWN CONTRACTION JOINTS
(SEE DETAIL 3, C-503)
INTERFACE JOINTS
(SEE DETAIL 2, C-503)
REINFORCED SLAB
(SEE DETAIL 1, C-505)
FINISH GRADE ELEVATION
TEJ
CTJ
DCJ
IJ
R
DJ
DCTJ
NOTES:
1. MAXIMUM JOINT SPACING FOR APRON IS 20'.
2. WHEN PANELS CANNOT BE MADE SQUARE THE LENGTH TO WIDTH WILL BE
WITHIN THE RANGE OF 0.75 TO 1.25.
3. NEW JOINT LINES TO FOLLOW EXISTING JOINT LINES. THE EXCEPTION IS AT
THICKENED EDGE EXPANSION JOINTS AND SLIP JOINTS.
4. CATCH BASINS AND OTHER UTILITY STRUCTURES WITH PCC PAVEMENT
PENETRATIONS SHALL BE ISOLATED FROM THE PAVEMENT WITH A THICKENED
EDGE EXPANSION JOINT. SEE DETAIL 5 SHEET C-502. PROVIDE CORNER
REINFORCEMENT PER PER DETAIL 1 SHEET C-505.
5. STORM DRAIN CATCH BASINS ARE PROVIDED WITH COORDINATES IN THE TABLE
BELOW TO ESTABLISH THE PRECISE LOCATION.
6. ALL ODD SHAPED SLABS, SLABS NOT MEETING THE REQUIREMENTS OF NOTE 2
OF THIS SHEET, AND SLABS THAT HAVE PENETRATIONS SHALL BE REINFORCED
AS INDICATED. SEE LEGEND BELOW FOR SYMBOL IDENTIFYING KNOWN SLABS
TO BE REINFORCED.
7. PCC PAVEMENT JOINT ELEVATIONS SHALL BE AS INDICATED ON C-401
THROUGH C-407.
8. WHEN PANELS MATCHING EXISTING PCC IS EXEMPT FROM PROFILOGRAPH
SMOOTHNESS REQUIREMENT.
9. IF THE CONTRACTOR PROPOSES TO PAVE TWO PANELS WIDE PER PAVING
LANE, THE CONTRACTOR'S PROPOSED PAVING PLAN MUST BE APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND CONTRACTOR MUST
CLEARLY DEMONSTRATE THAT HE HAS THE ADEQUATE EQUIPMENT,
EXPERIENCE, AND CONCRETE PRODUCTION RATE TO SUCCESSFULLY PLACE
THE PAVEMENT PER HIS PROPOSED PLAN. THE COR RESERVES THE RIGHT TO
REJECT THE PAVING PLAN IF THE CONTRACTOR CAN NOT SATISFY THE
EQUIPMENT, EXPERIENCE, AND CONCRETE PRODUCTION REQUIRED.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CO
CO
CO
CO
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
T E
J
IJ
IJ
I J
T
E
J
I
J
I J
T E
J
T
E
J
DJ DJDJ
DCJ
DCJ
DCJ
DCJ
DCJ
I J
IJ
TEJ TEJ TEJ
DCJ
DCJ
DCJ
DCJ
DCJ
DCJ
DCJ
DCJ
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
C T
J
T
E
J
T
E
J
D
C
J
D
C
J
DCJ
DCJ
DCJ
CTJ
CTJ
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C
T
J
C T
J C
T J
C T
J
C T
J C
T J
C T
J C
T J
C T
J
C T
J C
T J
C T
J C
T J
C T
J
C T
J C
T J
C T
J
C T
J C
T J
C T
J C
T J
C T
J
C T
J C
T J
C T
J C
T J
C T
J
C T
J C
T J
4783.25
4783.15
4783.06
MATCH EXISTING ELEVATION
M A
T C
H
E
X I S
T I N
G
18@20'=360'
4784.58 4784.53
12.5'X12.5' REINFORCED PANELS. SEE NOTE 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
A
I G
H T
J U
S T
E D
S
O M
E
S
P O
T
E
L
H
A V
E
C
H A
N G
I G
H T
L
C-407
O
I N
T
P
L A
N
P
C H
A N
G
P
C H
A N
G K
F
I S
C H
E R
E
G A
B E
L E
T
G O
E B
E L
AMENDMENT 005
H I L L
A
F B
U
T A
H
R E
P A
S
T
A
P R
P
H A
R
S M
P
B
I N
H
O U
S
I G
N
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J U
W X
X X
X
X X
X
W X
X X
X
X X
X
A N
S I
D
C-400sXXX.DWG
SD #1
SEE NOTE 4
S H
E E
T
C
N
JOINT LEGEND
DOWELED CONTRACTION JOINTS
(SEE DETAIL 7, C-503)
THICKENED EDGE EXPANSION JOINTS
(SEE DETAIL 1 AND 4, C-503)
DOWELED CONSTRUCTION JOINT
(SEE DETAIL 6, C-503)
DOWELED JOINT
(SEE DETAIL 8, C-503)
SAWN CONTRACTION JOINTS
(SEE DETAIL 3, C-503)
INTERFACE JOINTS
(SEE DETAIL 2, C-503)
REINFORCED SLAB
(SEE DETAIL 1, C-505)
FINISH GRADE ELEVATION
TEJ
CTJ
DCJ
IJ
R
DJ
DCTJ
NOTES:
1. MAXIMUM JOINT SPACING FOR APRON IS 20'.
2. WHEN PANELS CANNOT BE MADE SQUARE THE LENGTH TO WIDTH WILL BE
WITHIN THE RANGE OF 0.75 TO 1.25.
3. NEW JOINT LINES TO FOLLOW EXISTING JOINT LINES. THE EXCEPTION IS AT
THICKENED EDGE EXPANSION JOINTS AND SLIP JOINTS.
4. CATCH BASINS AND OTHER UTILITY STRUCTURES WITH PCC PAVEMENT
PENETRATIONS SHALL BE ISOLATED FROM THE PAVEMENT WITH A THICKENED
EDGE EXPANSION JOINT. SEE DETAIL 5 SHEET C-502. PROVIDE CORNER
REINFORCEMENT PER PER DETAIL 1 SHEET C-505.
5. STORM DRAIN CATCH BASINS ARE PROVIDED WITH COORDINATES IN THE TABLE
BELOW TO ESTABLISH THE PRECISE LOCATION.
6. ALL ODD SHAPED SLABS, SLABS NOT MEETING THE REQUIREMENTS OF NOTE 2
OF THIS SHEET, AND SLABS THAT HAVE PENETRATIONS SHALL BE REINFORCED
AS INDICATED. SEE LEGEND BELOW FOR SYMBOL IDENTIFYING KNOWN SLABS
TO BE REINFORCED.
7. PCC PAVEMENT JOINT ELEVATIONS SHALL BE AS INDICATED ON C-401
THROUGH C-407.
8. WHEN PANELS MATCHING EXISTING PCC IS EXEMPT FROM PROFILOGRAPH
SMOOTHNESS REQUIREMENT.
9. IF THE CONTRACTOR PROPOSES TO PAVE TWO PANELS WIDE PER PAVING
LANE, THE CONTRACTOR'S PROPOSED PAVING PLAN MUST BE APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND CONTRACTOR MUST
CLEARLY DEMONSTRATE THAT HE HAS THE ADEQUATE EQUIPMENT,
EXPERIENCE, AND CONCRETE PRODUCTION RATE TO SUCCESSFULLY PLACE
THE PAVEMENT PER HIS PROPOSED PLAN. THE COR RESERVES THE RIGHT TO
REJECT THE PAVING PLAN IF THE CONTRACTOR CAN NOT SATISFY THE
EQUIPMENT, EXPERIENCE, AND CONCRETE PRODUCTION REQUIRED.
10. FOR PAVEMENT ABUTTING EXISTING 25' PANELS NOT BEING REPLACED BY THE
TRANSIENT APRON REPAIR PROJECT, CONTINUOUSLY REINFORCE AS A 25'X25'
PANEL PER DETAIL 6, C-505, THEN SAWCUT CONTRACTION JOINTS TO QUARTER
THE PANEL.
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| C-400 JOINT PLAN |
| Sheet 1 |
| C-401 JOINT PLAN |
| Sheet 1 |
| C-402 JOINT PLAN |
| Sheet 1 |
| C-403 JOINT PLAN |
| Sheet 1 |
| C-404 JOINT PLAN |
| Sheet 1 |
| C-405 JOINT PLAN |
| Sheet 1 |
| C-406 JOINT PLAN |
| Sheet 1 |
| C-407 JOINT PLAN |
| Sheet 1 |
File details come from the government source that posted it. Updated .