2020 0424 OF 1419 Tule River Abstract of Offers.pdf
PDF 212 KB Posted
- Attached to
- Tule River Phase I
- Solicitation number
- W91238-20-B-0004TuleRiverPhase1
About this file
This abstract of offers documents bids received in response to Solicitation Number W91238-20-B-0004 for the Tule River Phase I project. The U.S. Army Corps of Engineers, Sacramento District, sought bids for the road relocation of an existing road located at Success Dam and Reservoir in Tulare County, California. Two bids were received by the April 24, 2020 deadline from Central Environmental Inc. for $27,470,438 and Suulutaaq Inc. for $26,990,428.46. The government estimate range was $26,990,428.46 to $33,053,508. The scope of work includes right abutment spillway cut, road relocation, and temporary stockpiles of materials.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
USACE Sacramento District ATTN: Contracting Division 1325 J Street Sacramento, CA 95814-2922
5. PROJECT TITLE
Tule River Road Relocation
Tule River Road Realignment Construction
Spot Anchors
Horizontal Spot Drains
Shotcrete Detail
TOTAL Bid Price
Job
Job
Job
Job
26,605,870.00
808,322.00
38,188.00
18,058.00
$27,470,438.00
26,605,870.00
808,322.00
38,188.00
18,058.00
$27,470,438.00
23,957,234.21
1,427,392.00
794,864.00
810,938.25
$26,990,428.46
23,957,234.21
1,427,392.00
794,864.00
810,938.25
$26,990,428.46
29,441,448.00
1,704,960.00
969,600.00
937,500.00
$33,053,508.00
29,441,448.00
1,704,960.00
969,600.00
937,500.00
$33,053,508.00
1. SOLICITATION NUMBER
W9123820B0004 1 1
Gregory L. Treible, Contracting Officer
Central Environmental Inc. Suulutaaq Inc.
20% 20%
04 04
04/24/202003/16/2020
04/24/2020