2020 0420 AMD 0004 Cut Sheet 3 Spec 01 22 00.00 10.pdf
PDF 12 KB Posted
- Attached to
- Tule River Phase I
- Solicitation number
- W91238-20-B-0004TuleRiverPhase1
About this file
This specification covers a road relocation project for the Tule River Phase I federal contract opportunity solicited by the Department of the Army Corps of Engineers Sacramento District. The scope of work includes relocating an existing road at Success Dam and Reservoir in Tulare County, California to a new location along the right abutment cut above the gross pool. Key tasks involve constructing the right abutment spillway cut, relocating the road, and creating temporary stockpiles for excavated materials. Payment will be made for equipment, materials, and labor necessary for items such as an all-weather haul road and grazing lease driveway including excavation, fill, blasted rock material, culverts, and signage. Traffic striping is also included.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tule River Spillway Raise Enlargement Project Spec 2287 Phase I
1.1.7.2 Measurement
Unit of Measure: Job (JA)
1.1.8 Haul Road
1.1.8.1 Payment
Payment will be made for all equipment, materials and labor necessary to construct an all-weather Haul Road including excavation, compacted fill, blasted rock material, and culvert as indicated. A natural stream crossing is shown on the plans, design and construction to provide a culvert crossing, including incidental work required to complete the construction of haul road that are not included in another bid item.
1.1.8.2 Measurement
Unit of Measure: Job (JA)
1.1.9 Grazing Lease Driveway
1.1.9.1 Payment
Payment will be made for all equipment, materials and labor necessary to construct an all-weather Grazing Lease Driveway including excavation, compacted fill, AB driveway, riprap swale, geotextile, concrete roadway, and delineators as indicated, including incidental work required to complete the construction of Grazing Lease Driveway . that are not included in another bid item.
1.1.9.2 Measurement
Unit of Measure: Job (JA)
1.1.10 Traffic Signage
1.1.10.1 Payment
Payment will be made for all equipment, materials and labor necessary for the construction of Traffic Signage as indicated, including incidental work required to complete the traffic signage that are not included in another bid item.
1.1.10.2 Measurement
Unit of Measure: Job (JA)
1.1.11 Traffic Striping
1.1.11.1 Payment
Payment will be made for all equipment, materials and labor necessary for the construction of Traffic Striping as indicated, including incidental work required to complete the construction of traffic striping that are not included in another bid item.
SECTION 01 22 00.00 10 Page 7 AE Final Draft Submittal
NOT FOR CONSTRUCTION
File details come from the government source that posted it. Updated .