AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add Factor 5- Price submission requirements and evaluation methodology, provide a blank pricing schedule for offerors to use for their Factor 5- Price submission and add a list of attachments.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123819R0067
X 9B. DATED (SEE ITEM 11)
24-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Aug-2019
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123819R0067
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 2080
The unit of issue has changed from Jar to Job.
The following have been added by full text:
LIST OF ATTACHMENTS
<Am03> Attachments:
1. Performance Work Statement
2. Wage Determination No. 2015-5623 Rev. 10, Contra Costa County, California, dated
07/16/2019
3. Organizational Experience Form (for use with Factor 1- Organizational Experience)
4. Past Performance Questionnaire with Cover Letter (for use with Factor 4- Past
Performance)
5. Blank Pricing Schedule (for use with Factor 5- Price) <Am03>
The following have been modified:
EVALUATION FACTORS AND METHODO
TECHNICAL FACTORS:
Factor 1 – Organizational Experience:
Provide the attached one‐page project experience form along with up to a one-page narrative (two pages total per project submission) for at least two (2) but no more than three (3) projects involving habitat restoration. At least one (1) of the three projects must be a coastal/tidal influenced restoration with biomonitoring under the auspices of the Comprehensive Environmental Response and the federal Endangered Species Act (ESA).
Project submissions should also address habitat restoration and biomonitoring in areas in which soil remediation activities and remediation of (MEC) munitions and explosives of concern has occurred. The project examples shall be for completed work that is the same/similar to the work to be performed under the Performance Work Statement. The reference projects may have been performed for federal, state, local Government or private clients. These project examples shall be for work that the contractor or proposed subcontractor has completed within the last seven (7) years. The submission for experience is limited to up to three 8 ½” x 11” one‐page summaries and one-page narratives (six pages total) using a font size no smaller than 10. Begin each reference project on a new page. (Form to be used is attached.)
a. Only submit recent projects that were physically completed or accepted by the customer within SEVEN (7) years of the issue date of this solicitation, or which are nearing completion (e.g., are substantially complete).
b. The Government is especially interested in relevant experience related to: vegetation habitat seed collection, containing growing, planting, and establishment activities, habitat monitoring and other services indicated in the PWS. Similarity of project in habitat type created, climate, scope, complexity and size of project are important factors among others determining relevancy.
c. The reference projects submitted to demonstrate experience in each area must have been performed by the team members who will be providing similar services under the prospective contract.
Evaluation of Organizational Experience
Acceptable: Offeror’s proposed Technical Approach clearly meets the minimum requirements of the RFP above for Factor 1.
Unacceptable: Offeror’s proposed Technical Approach does not meet the minimum requirements of the RFP above for Factor 1.
Factor 2 – Key Personnel:
The contractor shall submit resumes, no more than two pages in length each, for the following key personnel proposed for the project, including personnel supplied by subcontractors:
• Safety and Health Manager: The Safety and Health Manager shall be responsible for overall technical management of safety and health related aspects of this contract. The Safety and Health Manager shall have, as a minimum, the following qualifications:
Certification by the American Board of Industrial Hygiene (ABIH) as a Certified Industrial Hygienist (CIH).
Four (4) years’ of working experience relating to the assessment of facilities for safety/health compliance.
• Project Manager: The Project Manager shall be responsible for the management of the
PWS including cost control, schedule and technical quality. The Project Manager shall be competent, experienced and knowledgeable in the requirements included in the PWS.
The Project Manager shall be an employee of the prime contractor and report directly to the Program Manager. The Project Manager shall have, as a minimum, the following qualifications:
• A four year college degree from an accredited school in engineering, construction management, geology, chemistry, biology, environmental science, or a related field.
• Three (3) years’ relevant management experience.
• Two (2) years’ experience interacting with media outlets.
• Senior/Principal Project Biologist: The Senior/Principal Biologist(s) shall provide technical review for monitoring, surveys, and oversight. The Senior/Principal Biologist(s) shall guide staff biologists in the completion of data evaluation. The Senior/Principal Biologist(s) shall have, as a minimum, the following qualifications:
• A four year college degree in biology, botany, ecology, or related field.
• Five (5) years’ experience in monitoring or plant surveying.
• Five (5) years’ experience providing construction oversight monitoring.
• Five (5) years’ experience with landscape construction and landscape mitigation/restorations.
• Restoration Specialist: The restoration specialist is responsible for planning and implementing vegetation restoration projects. The restoration specialist shall have, as a minimum, the following qualifications:
• A four year college degree in biology, botany, hydrology, geology with emphasis in geomorphology, or related field, or experience
• Demonstrable experience in restoration projects
• Two (2) years’ experience related to restoration.
• Horticulturist: The horticulturist is responsible for plant and vegetation management. The horticulturist shall have, as a minimum, the following qualifications:
• A college degree in horticulture natural resource management, biology, or botany.
• Demonstrable experience in horticulture.
• Two (2) years’ experience related to plant or vegetation management.
• Foreman/Field Supervisor/Quality Control (QC) Engineer: The Foreman/Field
Supervisor/QC Engineer is responsible to ensure compliance with the requirements identified in the PWS and the Contractor QC Plan. The Foreman/Field Supervisor/QC Engineer shall have, as a minimum, the following qualifications:
• Demonstrable experience in the specialized area identified in the PWS
• Three (3) years’ of field experience.
• Contracts Manager: The contracts manager shall have, as a minimum, the following
• A four year college degree, preferably in an accounting or business major.
• Demonstrable experience with federal Government contracts.
• Two (2) years’ experience related to contracts management.
• MEC Field Manager: The MEC Field Manager shall have, as a minimum, the following
• Certification as a UXO Tech
• Three (3) years’ experience with ordnance remedial operations and MEC-related support activities
• Principal/Senior Planner: The planner is responsible for coordinating the evaluation of facilities or sites as it may relate to development of specific planning areas. The Principal/Senior Planner shall have, as a minimum, the following qualifications:
• A four year college degree in planning with emphasis in planning and community involvement, or related field.
• Demonstrable experience in community analyses.
• Five (5) years’ experience related to planning.
Each resume shall demonstrate specific project experience directly related to the work required under this PWS, indicate where the person will be located and demonstrate what responsibilities the person will have on this project. List the major work elements to be performed by each person and identify whether the person is prime or subcontractor personnel.
The resumes also must include the individuals’ experience working within the limits of, and in compliance with, the federal Endangered Species Act; and with endemic species found on
MOTCO.
The resumes must also demonstrate that the applicable personnel have the required US Fish and Wildlife Service approval/certification for performing biomonitoring, and also the required Hazardous Waste Operations and Emergency Response (HAZWOPER) training.
Personnel listed include both prime contractor personnel and subcontractor personnel for any contemplated major task being performed by a subcontractor. Major project information submitted shall be with firms with whom the contractor has had successful prime/sub relationships in the past or with whom the Contractor intends to use on this project.
Offerors shall provide a statement to the effect that the resumes provided in the technical proposal reflect the contractor’s /subcontractor’s personnel who will perform the work. In the case of JV the resume shall clearly state the share agreement of each partner.
Note that changes in Key Personnel after award will be subject to Contracting Officer approval.
Evaluation of Key Personnel
Acceptable: Offerors’ submitted resumes clearly meet the minimum requirements of this Request for Proposals (RFP) above for Factor 2.
Unacceptable: Offerors’ submitted resumes do not clearly meet the minimum requirements of the RFP above for Factor 2.
Factor 3 – Technical Approach:
The contractor shall submit an outline, no more than 15 pages in length, detailing the proposed technical approach for completing all tasks required by the PWS. Title sheets, indices, and tables of contents are EXCLUDED from the page limitation.
This information shall include the following: the Contractor’s work schedule; the major work elements to be self‐performed by the offeror’s in‐house work force, the major work elements to be performed by each subcontractor, and how the work will be accomplished; and a discussion of assumptions made in resourcing non‐labor maintenance requirements. Provide a description of offeror’s understanding of the challenges anticipated.
The Government considers the following major work elements as "Key":
• Habitat Restoration and Monitoring
• Noxious Weed Eradication & Control
• Plant Acquisition (seed collection & propagation)
Evaluation of Technical Approach
Acceptable: Offeror’s proposed Technical Approach clearly meets the minimum requirements of the RFP above for Factor 3.
Unacceptable: Offeror’s proposed Technical Approach does not meet the minimum requirements of the RFP above for Factor 3.
Factor 4 – Past Performance –Habitat Restoration and Enhancement Projects (for this factor the offeror must use the form titled “Past Performance Questionnaire with Cover Letter”):
Offeror shall demonstrate an acceptable past performance record. Provide at least two (2), but no more than three (3) questionnaires for previous projects using the Past Performance Questionnaire with Cover Letter, attached separately. The Government may contact the offeror’s references for information and may review performance ratings on file for prior Government projects the offeror may have performed.
The Governments past performance evaluation will include an assessment of past performance on relevant contracts (as defined above). The evaluation will assess whether the offeror has obtained an overall satisfactory past performance rating on relevant contracts, to determine the ability of the offeror to accomplish the work specified under the RFP. Key focus areas will include the following:
a. Quality
b. Schedule/Timeliness of Performance
c. Customer Satisfaction
d. Management/Personnel/Labor
e. Cost/Financial management
f. Safety/Security
Past performance will be based on the Government’s knowledge of performance under current and previous contracts, information provided by references directly to the Government or through other means, or based on any other reasonable basis. If past performance information is not available for the offeror; the offeror shall be assigned a neutral rating which is neither favorable nor unfavorable. The POCs may be contacted to assess the performance work statement performed and to evaluate performance of the projects listed under the previous experience, if necessary. Each past performance questionnaire is limited to seven (7) 8 1/2” x 11” pages.
Past Performance Evaluation Ratings Table Rating Description
Acceptable Based on the offeror’s past performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable Based on the offeror’s past performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
<Am03> PRICE (NON-TECHNICAL) FACTOR:
Factor 5- Price
Offerors shall submit a price proposal comprised of the following:
A cover letter signed by an official authorized to bind the offeror to the proposed prices, and authorized to negotiate on behalf of the offeor if negotiations are conducted.
The pricing arrangement is firm fixed price (FFP). The Offeror shall submit a price for each line item entry on the pricing schedule provided by the Government, including base CLINs and option CLINs. Proposed Unit Prices and Total Costs in this pricing schedule shall include ALL costs for the corresponding line item.
Offerors must also provide a price breakout on a separate tab or in a separate document. The breakout for each Contract Line Item Number (CLIN) shall show the price components that comprise the line item total for that CLIN, such as labor categories, hourly labor rates per category, number of hours per labor category, and other direct costs, if any, as well as the material type, unit of measurement, and the quantity of units. Any wait time or standby time will also need to be identified using the aforementioned price breakouts. Offerors must provide all applicable subcontractor quotes.
Evaluation of Price
Price will not be rated as Acceptable or Unacceptable but will be a factor in making the final determination for award.
Price for this task order will be determined by adding the offeror’s proposed firm-fixed prices for all CLINS to establish the overall project price. Offerors will be required to price all line items in the blank pricing schedule. The pricing schedules will be checked for minor clerical errors or mathematical mistakes; any errors discovered may be resolved through clarification. The Government will perform a price analysis on the lowest priced, technically acceptable proposal received. The Government MAY perform price analyses on additional proposals in order to establish a fair and reasonable price based on adequate price competition. Price analysis will be performed in accordance with FAR 15.404-1 to determine completeness, reasonableness and understanding of the work. Completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the solicitation. Price reasonableness will be established using price competition information, historical price information, comparison with the Independent Government Estimate (IGE) and/or any other pricing tools necessary.
By submission of an offer the Offeror/Prime Contractor affirms that in the event it is awarded the contract, at least 50 percent of the cost incurred for personnel shall be expended on employees of the concern in accordance with FAR 52.219-14 -- Limitations on Subcontracting. <Am03>
(End of Summary of Changes)