PROJECT: MARYSVILLE RING LEVEE ‐ PHASE 2A South

TABLE: QUANTITIES FOR SOUTH LEVEE

CONSTRUCTION METHOD: Deep Mix Method

DESIGN: FINAL

DATE: March 15, 2018

See Specification Section 01 22 00 "Measurement and Payment" for Description Details

LINE ITEM

NO.

DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $

0002 PROTECT UTILITIES IN‐PLACE 1 JOB $

0003 TEMPORARY SAFETY FENCE 1 JOB $

0004 CLEARING AND GRUBBING 1 JOB $

0005 STRIPPING 28,500 * SQUARE YARD $

0006 SURFACE DEFORMATION MONITORING 1 JOB $

0007 AC/AB DEMOLITION FOR LEVEE 2,020 * SQUARE YARD $

0008 STONE REVETMENT REMOVAL AND DISPOSAL 300 * TON $

0009 EXCAVATION 59,920 * BCY $

0010 CUTOFF WALL 196,800 * SQUARE FEET $

0011 GENERAL LEVEE FILL 29,520 * ECY $

0012 IMPERVIOUS LEVEE FILL FROM EXCAVATION 16,190 * ECY $

0013 IMPORTED IMPERVIOUS LEVEE FILL 15,760 * ECY $

0014 AGGREGATE BASE COURSE (AB) FOR LEVEE 1,100 * TON $

0015 BITUMINOUS CONCRETE PAVEMENT FOR LEVEE 200 * TON $

0016 PIPE GATES 1 JOB $

0017 GRASS SEEDING AND EROSION CONTROL 18 * ACRE $

STORM WATER POLLUTION PREVENTION PLAN (SWPPP),

DESIGN, DEVELOPMENT, AND IMPLEMENTATION

1 JOB $

0019 TEMPORARY TRAFFIC CONTROL 1 JOB $

0020 HAUL OFF EXCESS EXCAVATED MATERIAL 14,000 * TON $

0021 WASTE OF EXCAVATED MATERIAL 2,060 * TON $

0022 STAGING AREA A RESTORATION 1 JOB $

LINE ITEM

NO.

DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

0023 AC/AB DEMOLITION IN STAGING AREA A 3,831 * SQUARE YARD $

BITUMINOUS CONCRETE PAVEMENT FOR STAGING AREA A

RESTORATION

410 * TON $

AGGREGATE BASE COURSE FOR STAGING AREA A

RESTORATION

1,280 * TON $

0026 STAGING AREA B RESTORATION 1 JOB $

0027 AC/AB DEMOLITION IN STAGING AREAS C 3,986 * SQUARE YARD $

BITUMINOUS CONCRETE PAVEMENT FOR STAGING AREA C

RESTORATION

420 * TON $

AGGREGATE BASE COURSE FOR STAGING AREA C

RESTORATION

1,330 * TON $

0030 MONITOR WELLS 1 JOB $

0031 GUARDRAIL 135 * LF $

0032 BICYCLE SIGN RELOCATION 1 JOB $

0033 STAFF GUAGES RELOCATION 1 JOB $

0034 DEMONSTRATION SECTION 1 JOB $

0035 PARKING LOT STRIPING 1 JOB $

POTHOLING FOR SEWER AND WATER LINES INSIDE

STAGING AREAS

8 * EA $

POTHOLING FOR ELECTRICAL AND COMMUNICATION

LINES INSIDE STAGING AREAS

20 * EA $

0038 IMPORTED TOP SOIL 8,000 * SQUARE YARD $

OPTION ITEM (PRICE REQUIRED)

0039 CONSTRUCTION STANDBY 1 ** DAY $

TOTAL PRICE ($)

* Quantity is an estimated amount.

** This bid item can be execised up to 15 times.