23110058.12 Task: OW
Reserve Capacity Calculations MOTCO Pier 3 US Army ERDC M:\2011\23110058.12
Designed By: CJL Date:
Checked By: RAW Date:
10/4/2012 11/27/2012
Project No.:
Proj. Descrip.:
Proj. File Path:
132 P 417 MBD 50% 3 14.13 30
134 H 423 MBD 1 2 6.28 31
135 G 425 MBD 1 1.5 3.5325 32
138 J 437 MBD 50% 2 6.28 33
138.8 S.5 440 MBD 1.7 4 25.12 34
140 P 445 MBD 50% 2 6.28 35
142 H 448 MBD 3 1.5 3.5325 36
143 J 453 MBD 0.4 4 25.12 37
143 T 454 MBD 100% 1 1.57 38
144 S 458 MBD 0.1 2 6.28 39
144 T 459 MBD 50% 5 39.25 40
146 H 463 MBD 50% 3 14.13 41
148 J 465 MBD 1 3 14.13 42
149 H 468 MBD 0.5 6 56.52 43
149.8 S.2 473 MBD 0.5 3 14.13 44
150.8 S.2 474 MBD 1 3 14.13 45
152 J 476 MBD 75% 5 39.25 46
156 S 484 MBD 50% 3 14.13 47
156.8 P.2 485 MBD 1 3 14.13 48
160 S 500 MBD 1 4 25.12 49
161 G 501 MBD 1.4 3 14.13 50
161 T 502 MBD 0.3 3 14.13 51
165 P 506 MBD 0.5 2 6.28 52
166 T 512 MBD 0.2 3 14.13 53
169 J 516 MBD 2 6.28 54
170 P 518 MBD 2 3 14.13 55
170 T 519 MBD 0.2 3 14.13 56
173 P 526 MBD 6 3 14.13 57
173 S 527 MBD 1 2 6.28 58
173 T 528 MBD 1 2 6.28 59
180 H 546 MBD 1 1 1.57 60
181 T 551 MBD 0.7 1 1.57 61
182 T 553 MBD 1 2 6.28 62
184 P 557 MBD 2 2 6.28 63
E-137
MOTCO Pier 3 US Army ERDC M:\2011\23110058.12
Designed By: CJL Date:
Checked By: RAW Date:
10/4/2012 11/27/2012
Project No.:
Proj. Descrip.:
Proj. File Path:
184.8 P.2 559 MBD 1 3 14.13 64
186 G 565 MBD 3 3 14.13 65
186.8 P.2 567 MBD 2 4 25.12 66
187 S 569 MBD 3 3 14.13 67
188.8 P.2 574 MBD 50% 4 25.12 68
189.8 P.2 576 MBD 50% 1.5 3.5325 69
190 T 577 MBD 50% 2 6.28 70
190.8 P.2 580 MBD 1 2 6.28 71
191 G 581 MBD 0.2 1.5 3.5325 72
194 H 588 MBD 1 4 25.12 73
194 P 589 MBD 3 2 6.28 74
194.8 P.2 591 MBD 100% 1 1.57 75
197 S 599 MBD 3 3 14.13 76
198 J 600 MBD 1 2 6.28 77
199.8 P.2 606 MBD 50% 1 1.57 78
201 G 611 MBD 6 56.52 79
201 S 613 MBD 1 3 14.13 80
201 T 615 MBD 50% 1 1.57 81
202 J 620 MBD 0.25 1 1.57 82
203 H 625 MBD 50% 1 1.57 83
203 P 627 MBD 3 3 14.13 84
203.8 P.2 629 MBD 100% 1 1.57 85
204 T 631 MBD 5 39.25 86
205 G 632 MBD 100% 1 1.57 87
206 G 638 MBD 50% 1 1.57 88
207 H 643 MBD 0.4 .5 0.3925 89
207.8 P.2 646 MBD 100% 1 1.57 90
208 S 651 MBD 100% 1 1.57 91
209 G 653 MBD 1 1 1.57 92
209 J 655 MBD 1 1 1.57 93
210 G 658 MBD 2 3 14.13 94
210 S 661 MBD 0.3 1 1.57 95
210.8 P.2 662 MBD 100% 1.5 3.5325 96
211 G 663 MBD 1 2 6.28 97
211.8 P.2 665 MBD 100% 2 6.28 98
212 G 666 MBD 1 1 1.57 99
E-138
MOTCO Pier 3 US Army ERDC M:\2011\23110058.12
Designed By: CJL Date:
Checked By: RAW Date:
10/4/2012 11/27/2012
Project No.:
Proj. Descrip.:
Proj. File Path:
212 P 669 MBD 1 1.57 100
214 G 676 MBD 50% 3 14.13 101
214 P 677 MBD 50% 1 1.57 102
215 H 681 MBD 1.25 1 1.57 103
216 G 683 MBD 50% 3 14.13 104
218 G 686 MBD 1 6 56.52 105
219 G 690 MBD 1 2 6.28 106
219 P 694 MBD 100% 1 1.57 107
219.8 P.2 695 MBD 100% 0.5 0.3925 108
220 H 697 MBD 1.5 6 56.52 109
221 S 699 MBD 100% 1 1.57 110
222 S 701 MBD 4 25.12 111
222 T 702 MBD 50% 1 1.57 112
224 H 706 MBD 1 1.5 3.5325 113
225 G 708 MBD 1 3 14.13 114
225 J 709 MBD 0.5 3 14.13 115
225 P 710 MBD 100% 1 1.57 116
225.8 P.2 711 MBD 1 1 1.57 117
226 G 712 MBD 50% 3 14.13 118
226.8 H.8 715 MBD 100% 1 1.57 119
227 H 717 MBD 0.5 2 6.28 120
227.8 P.2 720 MBD 100% 1 1.57 121
228 G 721 MBD 100% 1.5 3.5325 122
228 H 722 MBD 50% 2 6.28 123
233 H 729 MBD 3 3 14.13 124
234 G 733 MBD 1 3 14.13 125
239 H 740 MBD 0.2 3 14.13 126
242 AH 743 MBD 1 1.57 127
243 AH 744 MBD 100% 1 1.57 128
243 J 745 MBD 5 39.25 129
245 AC 749 MBD 1 2 6.28 130
Sum of Section Loss = 1675.975 Average Section Loss = 12.89212
E-139
MOTCO Pier 3 US Army ERDC M:\2011\23110058.12
Designed By: CJL Date:
Checked By: RAW Date:
10/4/2012 11/27/2012
Project No.:
Proj. Descrip.:
Proj. File Path:
Area of 14 in diameter Pile = 153.86 in2
Area - Worst case marine borer damage section loss = 125.2127 in2
Radius of worst case pile section = 6.314797 Diameter of worst case pile section = 12.62959
% reduction of pile section for analysis = 10% vs.
Figure 1. Assumed Loss Area, in2 Figure 2. Actual Loss Area, in2
Assumption: The loss area was obtained by using the marine borer damage depths from the 2012 MOTCO Pier 3 underwater inspection report. The assumed loss area is half of a circle area using the MBD depths as a radius, see Figure 1. The actual loss of section would be much less because the widths of the MBD tend to be less than the depths at the affected areas, see Figure 2. This conservative assumed section loss was used due to a large variation in widths of each area of MDB and also to account for other defects such as checks, splits, and fungal damage.
E-140
Project No.: 23110058.12 Task: OW Proj. Descrip.: Load Rating
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Analysis Criteria Purpose
Reference Manuals National Design Specification for Wood Construction 2012 Edition (NDS) NDS Design Values for Wood Construction Supplement, 2012 Edition (NDS SUP) AASHTO Standard Specification for Highway Bridges 17th Edition (AASHTO) AASHTO Manual for Bridge Evaluation, 2nd Edition (MBE)
Parameters Loads: Dead loads, HS20 Truck, 124T Locomotive, TJ5000 with bombcart, TEREX TFC 45 Analysis Method: Allowable Stress Software: Microsoft Excel 2010 See pages E-1 to E-148 for reserve capacity calculations.
The purpose of this analysis is to determine the current operational load capacity of Pier 3. The vehicles analyzed include the HS-20 truck, a 124 Ton Locomotive (SW1200), a TJ5000 tractor/bombcart with a 23,000 lb container on the front and a 40,000 lb container on the rear, and an unloaded Terex TFC 45 Super Stacker.
E-141
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Assumptions Element Densities
Asphalt = 140 lbs/ft3 AASHTO Table 3.3.6 Timber = 50 lbs/ft3 AASHTO Table 3.3.6
Rail Weight = 80 lbs/yard ASCE 80 See page E-9 for utility pipe weights.
● Berthing and Mooring loads are carried by the fender system, outboard crane rail, and outboard concrete upper deck and therefore not considered in this analysis
● The rail loads are carried equally by each member of the track stringers due to the distribution of the load through the 6x12 transverse deck boards
● Deck boards are analyzed as a simple span for max moment and max shear equations
● The sum of the stringer loads is distributed evenly across the pile caps
● Average pile lengths along each row are used to model a representative cross section of the bents for analysis
● A pile with the maximum load and a pile with the maximum average length are used to determine the allowable stress for the piles
● The pile caps are considered continuous over the piles
● Reduced design values are used based on lab results, refer to the Evaluation of Timber Pilings, Appendix D
● All dimensions are field measured, see Appendix C Drawings 3.1-6, 3.1-7
● Only the timber portions of the Main Approach and Main Platform are analyzed
● CD value of 1 is obtained by using a 10 year cumulative live load (NDS Table 2.3.2)
● Timber railing loads (and utilities supported by them) are uniformly distributed along the length of the pier caps
● Two locomotives are used at MOTCO. By inspection, only the EMD SW1200 (124 Tons) was analyzed
● No stream flow, earthquake, temperature, creep, shrinkage or wind effects are considered (MBE 6B.6.7)
● By inspection the longitudinal pile caps and half bent caps will not control and therefore are not analyzed
● Per the laboratory evaluation, the timber species of the piles is Douglas Fir Larch (North)
● Refer to page E-142 to E-148 for assumed pile section losses
● All vehicle specifications provided by SDDCTEA
● Only wheel loads were analyzed due to the close stringer spacing
● By inspection, rail cars were not analyzed
● A minimum spacing of 4' between vehicles was assumed
● TJ5000 tractor/bombcart with a 23,000 lb container on the front and a 40,000 lb container on the rear
● Unloaded Terex TFC 45 Super Stacker
E-142
Project No.: 23110058.1 Task: OW
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
HS-20 (36 TONS)
14' 14'-30'
8K 32K 32K 16K 16K
EMD SW1200 LOCOMOTIVE (124 TONS)
22'
62K 62K 62K 62K 31K 31K
EMD GP-10 LOCOMOTIVE (120 TONS)
WILL NOT CONTROL BY INSPECTION
31'
60K 60K 60K 60K 30K 30K
TJ5000 WITH BOMBCART (23K AND 40K CONTAINERS) (45.3 TONS)
32'
13.2K 30K 23.7K 23.7K 11.9K 11.9K
TEREX TFC 45 SUPER STACKER (UNLOADED) (68.6 TONS)
62.4K 74.8K 37.4K 37.4K
6'
8' 8' 4'-8"
9' 9' 4'-8"
10' 4' 6'
19'-8" 9'-11"
E-143
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Results
HS-20 (36 TONS)
Controlling Element Controlling
Design Rating Factor
(RF)
Weight X RF
(TONS)
OK or N.G.
Deck Boards Moment 1.15 41.40 OK 12' Track Stringers Moment 1.50 54.00 OK 12' Int. Stringers Moment 0.33 11.88 N.G.
Pile Caps (Section A-A) Shear 1.63 58.68 OK Pile Caps (Section B-B) Shear 1.50 54.00 OK
Piles (Section A-A) Compression 1.95 70.20 OK Piles (Section B-B) Compression 1.75 63.00 OK
Deck Boards Moment 1.15 41.40 OK 12' Track Stringers Moment 1.49 53.64 OK 12' Int. Stringers Moment 0.34 12.24 N.G.
Pile Caps Shear 1.73 62.28 OK Piles Compression 9.39 338.04 OK
Deck Boards Moment 1.15 41.40 OK 6' Track Stringers Shear 1.75 63.00 OK 6' Int. Stringers Shear 0.55 19.80 N.G.
Pile Caps Shear 1.75 63.00 OK Piles Compression 9.39 338.04 OK
Deck Boards Shear 1.47 52.92 OK 12' Stringers Moment 0.45 16.20 N.G.
Pile Caps Shear 1.49 53.64 OK Piles Compression 4.02 144.72 OK
Section
Main Approach
Main Platform within 18'-6" of the South
Crane Rail (12' Bent Spacing)
Main Platform within 26'-0" of the South
Crane Rail (6' Bent Spacing)
Upper Platform
E-144
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
EMD SW1200 LOCOMOTIVE (124 TONS)
Controlling Element Controlling
Design Rating Factor
(RF)
Weight X RF
(TONS)
OK or N.G.
12' Track Stringers Shear 0.70 86.80 N.G.
Pile Caps (Section A-A) Shear 0.54 66.96 N.G.
Pile Caps (Section B-B) Shear 0.49 60.76 N.G.
Piles (Section A-A) Compression 1.28 158.72 OK Piles (Section B-B) Compression 2.75 341.00 OK 12' Track Stringers Shear 0.68 84.32 N.G.
Pile Caps Shear 0.97 120.28 N.G.
Piles Compression 6.18 766.32 OK
6' Track Stringers Shear 0.90 111.60 N.G.
Pile Caps Shear 0.97 120.28 N.G.
Piles Compression 6.18 766.32 OK
Main Approach
Main Platform within 18'-6" of the South
Crane Rail (12' Bent Spacing)
Main Platform within 26'-0" of the South
Crane Rail (6' Bent Spacing)
Section
E-145
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
TJ5000 WITH BOMBCART (23K AND 40K CONTAINERS) (45.3 TONS)
Controlling Element Controlling
Design Rating Factor
(RF)
Weight X RF
(TONS)
OK or N.G.
Deck Boards Moment 1.54 87.16 OK 12' Track Stringers Moment 1.45 82.07 OK 12' Int. Stringers Moment 0.32 18.11 N.G.
Pile Caps (Section A-A) Shear 1.25 70.75 OK Pile Caps (Section B-B) Shear 1.16 65.66 OK
Piles (Section A-A) Compression 1.49 84.33 OK Piles (Section B-B) Compression 2.11 119.43 OK
Deck Boards Moment 1.54 87.16 OK 12' Track Stringers Shear 1.41 79.81 OK 12' Int. Stringers Moment 0.33 18.68 N.G.
Pile Caps Shear 1.66 93.96 OK Piles Compression 7.22 408.65 OK
Deck Boards Moment 1.54 87.16 OK 6' Track Stringers Shear 1.97 111.50 OK 6' Int. Stringers Shear 0.55 31.13 N.G.
Pile Caps Shear 1.66 93.96 OK Piles Compression 7.22 408.65 OK
Deck Boards Shear 1.98 112.07 OK 12' Stringers Shear 0.37 20.94 N.G.
Pile Caps Shear 0.57 32.26 N.G.
Piles Compression 3.09 174.89 OK
Main Platform within 18'-6" of the South
Crane Rail (12' Bent Spacing)
Main Platform within 26'-0" of the South
Crane Rail (6' Bent Spacing)
Upper Platform
Main Approach
Section
E-146
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
TEREX TFC 45 SUPER STACKER (UNLOADED) (68.6 TONS)
Controlling Element Controlling
Design Rating Factor
(RF)
Weight X RF
(TONS)
OK or N.G.
Deck Boards Moment 0.49 33.57 N.G.
12' Track Stringers Moment 0.99 67.82 N.G.
12' Int. Stringers Moment 0.22 15.07 N.G.
Pile Caps (Section A-A) Shear 0.75 51.38 N.G.
Pile Caps (Section B-B) Shear 0.75 51.38 N.G.
Piles (Section A-A) Compression 1.94 132.89 OK Piles (Section B-B) Compression 2.75 188.38 OK
Deck Boards Moment 0.49 33.57 N.G.
12' Track Stringers Shear 0.96 65.76 N.G.
12' Int. Stringers Moment 0.15 10.28 N.G.
Pile Caps Shear 0.80 54.80 N.G.
Piles Compression 9.37 641.85 OK
Deck Boards Moment 0.49 33.57 N.G.
6' Track Stringers Moment 0.75 51.38 N.G.
6' Int. Stringers Shear 0.23 15.76 N.G.
Pile Caps Shear 0.80 54.80 N.G.
Piles Compression 9.37 641.85 OK
Deck Boards Moment 0.63 43.16 N.G.
12' Stringers Moment 0.19 13.02 N.G.
Pile Caps Shear 0.88 60.28 N.G.
Piles Compression 4.02 275.37 OK
Main Platform within 18'-6" of the South
Crane Rail (12' Bent Spacing)
Main Platform within 26'-0" of the South
Crane Rail (6' Bent Spacing)
Upper Platform
Section
Main Approach
E-147
DECK
MAIN APPROACH/MAIN PLATFORM
E-148
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Moment
Member Properties A = 63.25 in.2
Sy=(bd2/6) = 57.98 in.3 d = 5.5 in.
Live Load Bending Stress
W= HS-20 = 16K/31" = 0.52 kip/in
SW1200 = NA kip/in TJ5000 = 11.9K/31" = 0.38 kip/in
TFC45 = 37.4K/31" = 1.21 kip/in
M=WL2/8
HS-20 = 62.00 kip-in
SW1200 = NA kip-in TJ5000 = 46.11 kip-in TFC45 = 144.93 kip-in fb,LL=M/Sy Rating Factor HS-20 = 1.07 ksi < 1.23 OK 1.15
SW1200 = NA ksi NA TJ5000 = 0.80 ksi < 1.23 OK 1.54 TFC45 = 2.50 ksi > 1.23 N.G. 0.49
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.23 ksi Page E-16
Main Approach and Main Platform Deck Boards
W
L = 31"
E-149
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Shear
V=(W(L-2d))/2 per AISC Table 3-23/NDS 3.4.3
HS-20 = 5.16 kips SW1200 = NA kips
TJ5000 = 3.84 kips TFC45 = 12.06 kips fV,LL = 3V/2A Rating Factor HS-20 = 0.12 ksi < 0.15 OK 1.23
SW1200 = NA ksi NA TJ5000 = 0.09 ksi < 0.15 OK 1.66 TFC45 = 0.29 ksi > 0.15 N.G. 0.53
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.15 ksi Page E-18
Main Approach and Main Platform Deck Boards
E-150
DECK
UPPER PLATFORM
E-151
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Moment
Member Properties A = 63.25 in.2
Sy=(bd2/6) = 57.98 in.3 d = 5.5 in.
Live Load Bending Stress
W= HS-20 = 16K/24" = 0.67 kip/in
SW1200 = NA kip/in TJ5000 = 11.9K/24" = 0.50 kip/in
TFC45 = 37.4K/24" = 1.56 kip/in
M=WL2/8
HS-20 = 48.00 kip-in
SW1200 = NA kip-in TJ5000 = 35.70 kip-in TFC45 = 112.20 kip-in fb,LL=M/Sy Rating Factor HS-20 = 0.83 ksi < 1.23 OK 1.48
SW1200 = NA ksi NA TJ5000 = 0.62 ksi < 1.23 OK 1.99 TFC45 = 1.94 ksi < 1.23 OK 0.63
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.23 ksi Page E-22
Upper Platform Deck Boards
W
L = 24"
E-152
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Shear
V=(W(L-2d))/2 per AISC Table 3-23/NDS 3.4.3
HS-20 = 4.33 kips SW1200 = NA kips
TJ5000 = 3.22 kips TFC45 = 10.13 kips fV,LL = 3V/2A Rating Factor HS-20 = 0.10 ksi < 0.15 OK 1.47
SW1200 = NA ksi NA TJ5000 = 0.08 ksi < 0.15 OK 1.98 TFC45 = 0.24 ksi > 0.15 N.G. 0.63
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.15 ksi Page E-24
Upper Platform Deck Boards
E-153
MAIN APPROACH STRINGERS
E-154
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Track Stringers 12' Span Moment
Member Properties A = 312 in.2
Sy=(bd2/6) = 676.00 in.3 d = 13 in. b Live Load Stress (HS-20) P=16kips
P
L= 144"
MLL = PL/4
= 576 kip-in
Live Load Stress (TFC 45) P=37.4kips
MLL = PL/4
= 1346.4 kip-in
Live Load Stress (SW1200) P=31kips a=96"
P P x=24"
L= 144" when a (96") > 0.586L (84.35") AISC Table 3-23 MmaxLL = PL/4
= 1116 kip-in d a x
E-155
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Track Stringers 12' Span Moment
Live Load Stress (TJ5000) P=11.9kips a=48" x=48" when a (48") < 0.586L (84.35") AISC Table 3-23 MmaxLL = (P/2L)(L-a/2)2
= 595 kip-in fb,LL=M/Sy Rating Factor HS-20 = 0.85 ksi < 1.28 OK 1.50
SW1200 = 1.65 ksi > 1.28 N.G. 0.78 TJ5000 = 0.88 ksi < 1.28 OK 1.45 TFC45 = 1.99 ksi > 1.28 N.G. 0.64
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.28 ksi Page E-28
E-156
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Track Stringers 12' Span Shear
Live Load Stress (HS-20) 16 kips
L= 144"
VLL = P kip = 16.00 kip
Live Load Stress (TFC 45) P=37.4kips
VLL = P kip = 37.40 kip
Live Load Stress (SW1200) P=31kips a=96"
P P x=0"
L= 144"
VmaxLL = P(2-a/L) AISC Table 3-23 = 41.33 kip-in
E-157
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Track Stringers 12' Span Shear
Live Load Stress (TJ5000) P=11.9kips a=48" x=0"
VmaxLL = P(2-a/L) AISC Table 3-23 = 19.83 kip-in fV,LL = 3V/2A Rating Factor HS-20 = 0.08 ksi < 0.14 OK 1.82
SW1200 = 0.20 ksi > 0.14 N.G. 0.70 TJ5000 = 0.10 ksi < 0.14 OK 1.47 TFC45 = 0.18 ksi > 0.14 N.G. 0.78
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.14 ksi Page E-30
E-158
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Intermediate Stringers 12' Span Moment
Member Properties A = 78 in.2
Sy=(bd2/6) = 169.00 in.3 d = 13 in. b Live Load Stress (HS-20) P=16kips
P
L= 144"
MLL = PL/4
= 576 kip-in
Live Load Stress (TFC 45) P=37.4kips
MLL = PL/4
= 1346.4 kip-in d d
E-159
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Intermediate Stringers 12' Span Moment
Live Load Stress (TJ5000) P=11.9kips a=48"
P P x=48"
L= 144" when a (48") < 0.586L (84.35") AISC Table 3-23 MmaxLL = (P/2L)(L-a/2)2
= 595 kip-in fb,LL=M/Sy Rating Factor HS-20 = 3.41 ksi > 1.12 N.G. 0.33
SW1200 = NA ksi NA TJ5000 = 3.52 ksi > 1.12 N.G. 0.32 TFC45 = 7.97 ksi > 1.12 N.G. 0.14
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.12 ksi Page E-33
E-160
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Intermediate Stringers 12' Span Shear
Live Load Stress (HS-20) 16 kips
L= 144"
VLL = P kip = 16.00 kip
Live Load Stress (TFC 45) P=37.4kips
VLL = P kip = 37.40 kip
E-161
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Intermediate Stringers 12' Span Shear Live Load Stress (TJ5000) P=11.9kips a=48" P P x=0"
L= 144"
VmaxLL = P(2-a/L) AISC Table 3-23 = 19.83 kip-in fV,LL = 3V/2A Rating Factor HS-20 = 0.31 ksi > 0.13 N.G. 0.42
SW1200 = NA ksi NA TJ5000 = 0.38 ksi > 0.13 N.G. 0.34 TFC45 = 0.72 ksi > 0.13 N.G. 0.18
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.13 ksi Page E-35
E-162
MAIN PLATFORM STRINGERS
(LOWER)
E-163
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Track Stringers 12' Span Moment
Member Properties A = 312 in.2
Sy=(bd2/6) = 676.00 in.3 d = 13 in. b Live Load Stress (HS-20) P=16kips
P
L= 144"
MLL = PL/4
= 576 kip-in
Live Load Stress (TFC 45) P=37.4kips
MLL = PL/4
= 1346.4 kip-in d
E-164
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Track Stringers 12' Span Moment
Live Load Stress (SW1200) P=31kips a=96"
P P x=24"
L= 144" when a (96") > 0.586L (84.35") AISC Table 3-23 MmaxLL = PL/4
= 1116 kip-in
Live Load Stress (TJ5000) P=11.9kips a=48" x=48" when a (48") < 0.586L (84.35") AISC Table 3-23 MmaxLL = (P/2L)(L-a/2)2
= 595 kip-in fb,LL=M/Sy Rating Factor HS-20 = 0.85 ksi < 1.27 OK 1.49
SW1200 = 1.65 ksi > 1.27 N.G. 0.77 TJ5000 = 0.88 ksi < 1.27 OK 1.44 TFC45 = 1.99 ksi > 1.27 N.G. 0.64
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.27 ksi Page E-39
E-165
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Track Stringers 12' Span Shear
Live Load Stress (HS-20) 16 kips
L= 144"
VLL = P kip = 16.00 kip
Live Load Stress (TFC 45) P=37.4kips
VLL = P kip = 37.40 kip
Live Load Stress (SW1200) P=31kips a=96"
P P x=0"
L= 144"
VmaxLL = P(2-a/L) AISC Table 3-23 = 41.33 kip-in
E-166
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Track Stringers 12' Span Shear
Live Load Stress (TJ5000) P=11.9kips a=48" x=0"
VmaxLL = P(2-a/L) AISC Table 3-23 = 19.83 kip-in fV,LL = 3V/2A Rating Factor HS-20 = 0.08 ksi < 0.14 OK 1.75
SW1200 = 0.21 ksi > 0.14 N.G. 0.68 TJ5000 = 0.10 ksi < 0.14 OK 1.41 TFC45 = 0.19 ksi > 0.14 N.G. 0.75
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.14 ksi Page E-41
E-167
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Track Stringers 6' Span Moment
Member Properties A = 312 in.2
Sy=(bd2/6) = 676.00 in.3 d = 13 in. b Live Load Stress (HS-20) P=16kips
P
L= 72"
MLL = PL/4
= 288 kip-in
Live Load Stress (TFC 45) P=37.4kips
MLL = PL/4
= 673.2 kip-in
Live Load Stress (SW1200) P=31kips
MmaxLL = PL/4 = 558 kip-in
E-168
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Track Stringers 6' Span Moment
Live Load Stress (TJ5000) P=11.9kips
MmaxLL = PL/4 = 214.2 kip-in fb,LL=M/Sy Rating Factor HS-20 = 0.43 ksi < 1.37 OK 3.22
SW1200 = 0.83 ksi < 1.37 OK 1.66 TJ5000 = 0.32 ksi < 1.37 OK 4.32 TFC45 = 1.00 ksi < 1.37 OK 1.38
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.37 ksi Page E-44
E-169
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Track Stringers 6' Span Shear
Live Load Stress (HS-20) P
L= 72"
VLL = P kip = 16.00 kip
Live Load Stress (TFC 45) P=37.4kips
VLL = P kip = 37.40 kip
Live Load Stress (SW1200) P=31kips
VmaxLL = P AISC Table 3-23 = 31.00 kip
E-170
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Track Stringers 6' Span Shear Live Load Stress (TJ5000) P=11.9kips a=48" P P x=0"
L= 72"
VmaxLL = P(2-a/L) AISC Table 3-23 = 15.87 kip-in fV,LL = 3V/2A Rating Factor HS-20 = 0.08 ksi < 0.15 OK 1.88
SW1200 = 0.16 ksi > 0.15 N.G. 0.97 TJ5000 = 0.08 ksi < 0.15 OK 1.97 TFC45 = 0.19 ksi > 0.15 N.G. 0.80
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.15 ksi Page E-46
E-171
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Intermediate Stringers 12' Span Moment
Member Properties A = 78 in.2
Sy=(bd2/6) = 169.00 in.3 d = 13 in. b Live Load Stress (HS-20) P=16kips
P
L= 144"
MLL = PL/4
= 576 kip-in
Live Load Stress (TFC 45) P=37.4kips
MLL = PL/4
= 1346.4 kip-in
Live Load Stress (TJ5000) P=11.9kips a=48"
P P x=48"
L= 144" when a (48") < 0.586L (84.35") AISC Table 3-23 MmaxLL = (P/2L)(L-a/2)2
= 595 kip-in d a x
E-172
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Intermediate Stringers 12' Span Moment fb,LL=M/Sy Rating Factor HS-20 = 3.41 ksi > 1.17 N.G. 0.34
SW1200 = NA ksi NA TJ5000 = 3.52 ksi > 1.17 N.G. 0.33 TFC45 = 7.97 ksi > 1.17 N.G. 0.15
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.17 ksi Page E-49
E-173
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Intermediate Stringers 12' Span Shear
Live Load Stress (HS-20) 16 kips
L= 144"
VLL = P kip = 16.00 kip
Live Load Stress (TFC 45) P=37.4kips
VLL = P kip = 37.40 kip
E-174
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Intermediate Stringers 12' Span Shear Live Load Stress (TJ5000) P=11.9kips a=48" P P x=0"
L= 144"
VmaxLL = P(2-a/L) AISC Table 3-23 = 19.83 kip-in fV,LL = 3V/2A Rating Factor HS-20 = 0.31 ksi > 0.13 N.G. 0.42
SW1200 = NA ksi NA TJ5000 = 0.38 ksi > 0.13 N.G. 0.34 TFC45 = 0.15 ksi > 0.13 N.G. 0.88
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.13 ksi Page E-51
E-175
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Intermediate Stringers 6' Span Moment
Member Properties A = 90 in.2
Sy=(bd2/6) = 225.00 in.3 d = 13 in. b Live Load Stress (HS-20) P=16kips
P
L= 72"
MLL = PL/4
= 288 kip-in
Live Load Stress (TFC 45) P=37.4kips
MLL = PL/4
= 673.2 kip-in
Live Load Stress (TJ5000) P=11.9kips
MmaxLL = PL/4 = 214.2 kip-in fb,LL=M/Sy Rating Factor HS-20 = 1.28 ksi < 1.35 OK 1.05
SW1200 = NA ksi NA TJ5000 = 0.95 ksi < 1.35 OK 1.42 TFC45 = 2.99 ksi > 1.35 N.G. 0.45
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.35 ksi Page E-54
E-176
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Intermediate Stringers 6' Span Shear
Live Load Stress (HS-20) 16 kips
L= 72"
VLL = P kip = 16.00 kip
Live Load Stress (TFC 45) P=37.4kips
VLL = P kip = 37.40 kip
Live Load Stress (TJ5000) P=11.9kips a=48"
P P x=0"
L= 72"
VmaxLL = P(2-a/L) AISC Table 3-23 = 15.87 kip-in fV,LL = 3V/2A Rating Factor HS-20 = 0.27 ksi > 0.15 N.G. 0.55
SW1200 = NA ksi NA TJ5000 = 0.26 ksi > 0.15 N.G. 0.55 TFC45 = 0.62 ksi > 0.15 N.G. 0.23
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.15 ksi Page E-56
E-177
UPPER PLATFORM STRINGERS
E-178
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Upper Platform Stringers 12' Span Moment
Member Properties A = 82.5 in.2
Sy=(bd2/6) = 206.25 in.3 d = 15 in. b Live Load Stress (HS-20) P=16kips
P
L= 144"
MLL = PL/4
= 576 kip-in
Live Load Stress (TFC 45) P=37.4kips
MLL = PL/4
= 1346.4 kip-in
E-179
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Upper Platform Stringers 12' Span Moment Live Load Stress (TJ5000) P=11.9kips a=48" P P x=48"
L= 144" when a (48") < 0.586L (84.35") AISC Table 3-23 MmaxLL = (P/2L)(L-a/2)2
= 595 kip-in fb,LL=M/Sy Rating Factor HS-20 = 2.79 ksi > 1.26 N.G. 0.45
SW1200 = NA ksi NA TJ5000 = 2.88 ksi > 1.26 N.G. 0.44 TFC45 = 6.53 ksi > 1.26 N.G. 0.19
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.26 ksi Page E-60
E-180
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Upper Platform Stringers 12' Span Shear
Live Load Stress (HS-20) 16 kips
L= 144"
VLL = P kip = 16.00 kip
Live Load Stress (TFC 45) P=37.4kips
VLL = P kip = 37.40 kip
Live Load Stress (TJ5000) P=11.9kips a=48"
P P x=0"
L= 144"
VmaxLL = P(2-a/L) AISC Table 3-23 = 19.83 kip-in
E-181
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Upper Platform Stringers 12' Span Shear fV,LL = 3V/2A Rating Factor HS-20 = 0.29 ksi > 0.14 N.G. 0.48
SW1200 = NA ksi NA TJ5000 = 0.38 ksi > 0.14 N.G. 0.37 TFC45 = 0.68 ksi > 0.14 N.G. 0.21
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.14 ksi Page E-62
E-182
PILE CAPS
E-183
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section A-A Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment
Member Properties A = 175.5 in.2
Sy=(bd2/6) = 394.88 in.3 d = 13.5 in. b Live Load Stress (HS-20) w= 0.778 kip/in a = 12in b = 24in
R1
Assume a truck with an axle directly over the bent and a truck 4' behind 16 4 w = (16kips +4*.67kips)/24in
R1 = 9.335kips
R
MLL = R1(a+R1/2w) AISC Table 3-23 = 168.024 kip-in d
48 in a b
48 in
4'
12' 12'
E-184
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section A-A Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment Live Load Stress (SW1200) Assume a locomotive with the rear axle directly over the bent and another locomotive 6' behind
31 31 31
R
R = 31+(.33x31)+(.5x31) = 56.73 w = R/24in = 2.364 kips/in
R1 = w/24in = 28.365
MLL = R1(a+R1/2w) AISC Table 3-23 = 510.570 kip-in
6' 8'
E-185
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section A-A Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment Live Load Stress (TJ5000) Assume a bombcart with the rear axle directly over the bent and a TJ5000 4' behind.
11.9 11.9 6.6
R
R = 11.9 + (.67 x 11.9) + (.67 x 6.6) Reaction at the bent = 24.295 w = R/24in = 1.012 kips/in
R1 = 12.148
MLL = R1(a+R1/2w) AISC Table 3-23 = 218.655 kip-in
4' 4'
E-186
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section A-A Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment
Live Load Stress (TFC 45)
R = 37.4 w = R/24in
= 1.558 kips/in R1 = 18.700
MLL = R1(a+R1/2w) AISC Table 3-23
= 336.600 kip-in fb,LL=M/Sy Rating Factor HS-20 = 0.43 ksi < 1.12 OK 2.63
SW1200 = 1.29 ksi > 1.12 N.G. 0.87 TJ5000 = 0.55 ksi < 1.12 OK 2.02 TFC45 = 0.85 ksi < 1.12 OK 1.31
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.12 ksi Page E-69
E-187
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section A-A Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Shear
Live Load Stress (HS-20)
VLL = R1 kip = 9.34 kip
Live Load Stress (SW1200)
VLL = R1 kip = 28.37 kip
Live Load Stress (TJ5000)
VLL = R1 kip = 12.15 kip
Live Load Stress (TFC 45)
VLL = R1 kip = 18.70 kip
E-188
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section A-A Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Shear fV,LL=3V/2A Rating Factor HS-20 = 0.08 ksi < 0.13 OK 1.63
SW1200 = 0.24 ksi > 0.13 N.G. 0.54 TJ5000 = 0.10 ksi < 0.13 OK 1.25 TFC45 = 0.16 ksi > 0.13 N.G. 0.81
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.13 ksi Page E-71
E-189
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section B-B Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment
Member Properties A = 175.5 in.2
Sy=(bd2/6) = 394.88 in.3 d = 13.5 in. b
Live Load Stress (HS-20) w = (16kips + 2.67kips)/24in R1 = 9.335kips w= 0.778 kip/in a = 12in b = 24in
R1
Assume a truck with an axle directly over the bent and a truck 4' behind See Main Approach Pile Cap Section A-A for vehicle position.
MLL = R1(a+R1/2w) AISC Table 3-23 = 168.024 kip-in d
21" 31" 48" 54.33' Full Section Width
24 in
48 in
12 in
E-190
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section B-B Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment Live Load Stress (SW1200) Assume a locomotive with the rear axle directly over the bent and another locomotive 6' behind See Main Approach Pile Cap Section A-A for vehicle position.
R = 31+(.33x31)+(.5x31) = 56.73 w = R/24in = 2.364 kips/in
R1 = 28.365
MLL = R1(a+R1/2w) AISC Table 3-23 = 510.570 kip-in
Live Load Stress (TJ5000) Assume a bombcart with the rear axle directly over the bent and a TJ5000 4' behind.
See Main Approach Pile Cap Section A-A for vehicle position.
R = 11.9 + (.67 x 11.9) + (.67 x 6.6) Reaction at the bent = 24.295 w = R/24in = 1.012 kips/in
R1 = 12.148
MLL = R1(a+R1/2w) AISC Table 3-23 = 218.655 kip-in
E-191
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section B-B Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment Live Load Stress (TFC 45)
R = 37.4 w = R/24in
= 1.558 kips/in R1 = 18.700
MLL = R1(a+R1/2w) AISC Table 3-23
= 336.600 kip-in fb,LL=M/Sy Rating Factor HS-20 = 0.43 ksi < 1.14 OK 2.68
SW1200 = 1.29 ksi > 1.14 N.G. 0.88 TJ5000 = 0.55 ksi < 1.14 OK 2.06 TFC45 = 0.85 ksi < 1.14 OK 1.34
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.14 ksi Page E-82
E-192
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section B-B Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Shear
Live Load Stress (HS-20)
VLL = R1 kip = 9.34 kip
Live Load Stress (SW1200)
VLL = R1 kip = 28.37 kip
Live Load Stress (TJ5000)
VLL = R1 kip = 12.15 kip
Live Load Stress (TFC45)
VLL = R1 kip = 18.70 kip fV,LL=3V/2A Rating Factor HS-20 = 0.08 ksi < 0.12 OK 1.50
SW1200 = 0.24 ksi > 0.12 N.G. 0.49 TJ5000 = 0.10 ksi < 0.12 OK 1.16 TFC45 = 0.16 ksi > 0.12 N.G. 0.75
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.12 ksi Page E-84
E-193
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Lower Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment
Member Properties A = 175.5 in.2
Sy=(bd2/6) = 394.88 in.3 d = 13.5 in. b
Live Load Stress (HS-20) Assume a truck with an axle directly over the bent and a truck 4' behind
R1 = 8.66kips w= 0.727 kip/in a = 12in b = 24in
R1
Because the 12' intermediate stringers have rating factors lower than 1, only the 6' bent spacing under the track stringers will be will be considered.
d b
48 in a
E-194
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Lower Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment Assume a truck with an axle directly over the bent and a truck 4' behind
16 4 w = (16kips +4*.33kips)/24in
R
MLL = R1(a+R1/2w) AISC Table 3-23 = 155.856 kip-in
Live Load Stress (SW1200) Assume a locomotive with the rear axle directly over a bent.
P = 31 kips R = P
= 31 w = R/24in
= 1.292 kips/in R1 = 15.500
MLL = R1(a+R1/2w) AISC Table 3-23
= 279.000 kip-in
4'
6' 6'
E-195
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Lower Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment Live Load Stress (TJ5000) Assume a bombcart with the rear axle directly over the bent and a TJ5000 4' behind.
11.9 11.9 6.6
R
R = 11.9 + (.33 x 11.9) + (.33 x 6.6) Reaction at the bent = 18.005 w = R/24in = 0.750 kips/in
R1 = 9.003
MLL = R1(a+R1/2w) AISC Table 3-23 = 162.045 kip-in
4' 4'
6' 6'
E-196
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Lower Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Moment Live Load Stress (TFC 45)
R = 37.4 w = R/24in
= 1.558 kips/in R1 = 18.700
MLL = R1(a+R1/2w) AISC Table 3-23
= 336.600 kip-in fb,LL=M/Sy Rating Factor HS-20 = 0.39 ksi < 1.27 OK 3.22
SW1200 = 0.71 ksi < 1.27 OK 1.80 TJ5000 = 0.41 ksi < 1.27 OK 3.09 TFC45 = 0.85 ksi < 1.27 OK 1.49
Remaining Bending Capacity for Live Load (Piles A-G) fb,LL = F'b - fb,DL
= 1.27 ksi Page E-97
E-197
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Lower Pile Cap (14" x 14" nominal, 13" x 13.5" field measured) Shear
Live Load Stress (HS-20)
VLL = R1 kip = 8.660 kip
Live Load Stress (SW1200)
VLL = R1 kip = 15.500 kip
Live Load Stress (TJ5000)
VLL = R1 kip = 9.003 kip
Live Load Stress (TFC 45)
VLL = R1 kip = 18.700 kip fV,LL=3V/2A Rating Factor HS-20 = 0.07 ksi < 0.13 OK 1.73
SW1200 = 0.13 ksi > 0.13 N.G. 0.97 TJ5000 = 0.08 ksi < 0.13 OK 1.66 TFC45 = 0.16 ksi > 0.13 N.G. 0.80
Remaining Shear Stress for Live Load (Piles G-T) fV,LL = F'V - fV,DL
= 0.13 ksi Page E-100
E-198
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Upper Pile Cap (14" x 14" nominal, 11.5" x 13" field measured) Moment
Member Properties A = 149.5 in.2
Sy=(bd2/6) = 323.92 in.3 d = 13 in. b
Live Load Stress (HS-20) Assume wheel load evenly distributed across pile spacing.
Assume a truck with an axle directly over the bent and a truck 4' behind See Main Approach Pile Cap Section A-A for vehicle position.
w= 0.389 kip/in
R1
MLL = WL2/8
= 112.032 kip-in d
48 in
E-199
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Upper Pile Cap (14" x 14" nominal, 11.5" x 13" field measured) Moment
Live Load Stress (TJ5000) Assume wheel load evenly distributed across pile spacing.
Assume a bombcart with an axle directly over the bent and a TJ5000 4' behind See Main Approach Pile Cap Section A-A for vehicle position.
W = R/24 = 1.01
MLL = WL2/8
= 291.540 kip-in
Live Load Stress (TFC 45)
R = 37.4 w = R/24in
= 1.558 kips/in R1 = 18.700
MLL = R1(a+R1/2w) AISC Table 3-23
= 336.600 kip-in fb,LL=M/Sy Rating Factor HS-20 = 0.35 ksi < 1.35 OK 3.90
SW1200 = NA NA
TJ5000 = 0.90 ksi < 1.35 OK 1.50 TFC45 = 1.04 ksi < 1.35 OK 1.30
Remaining Bending Capacity for Live Load fb,LL = F'b - fb,DL
= 1.35 ksi Page E-113
E-200
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Upper Pile Cap (14" x 14" nominal, 11.5" x 13.5" field measured) Shear
Live Load Stress (HS-20)
VLL = WL/2 kip = 9.335 kip
Live Load Stress (TJ5000)
VLL = WL/2 kip = 24.295 kip
Live Load Stress (TFC 45)
VLL = R1 kip = 18.700 kip fV,LL=3V/2A Rating Factor HS-20 = 0.09 ksi < 0.14 OK 1.49
SW1200 = NA
TJ5000 = 0.24 ksi > 0.14 N.G. 0.57 TFC45 = 0.16 ksi > 0.14 N.G. 0.88
Remaining Shear Stress for Live Load fV,LL = F'V - fV,DL
= 0.14 ksi Page E-115
E-201
PILES
E-202
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section A-A Pile
Member Properties A = 125.22 in.2
Live Load Stress (HS-20) fc,LL = PLL/A PLL = 18.667 kips from two HS20s spaced 4' apart
= 0.149 ksi
Live Load Stress (SW1200) fc,LL = PLL/A PLL = 28.365 kips from two Locomotives spaced 6' apart
= 0.227 ksi
Live Load Stress (TJ5000) fc,LL = PLL/A PLL = 24.295 kips from two bombcarts spaced 4' apart
= 0.194 ksi
Live Load Stress (TFC 45) fc,LL = PLL/A PLL = 18.7 kips
= 0.149 ksi fC,LL=P/A Rating Factor HS-20 = 0.15 ksi < 0.29 OK 1.95
SW1200 = 0.23 ksi < 0.29 OK 1.28 TJ5000 = 0.19 ksi < 0.29 OK 1.49 TFC45 = 0.15 ksi < 0.29 OK 1.94
Remaining Compression Stress for Live Load fC,LL = F'C - fC,DL
= 0.29 ksi Page E-123
E-203
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Approach Section B-B Pile
Member Properties A = 125.22 in.2
Live Load Stress (HS-20) fc,LL = PLL/A PLL = 18.667 kips from two HS20s spaced 4' apart
= 0.149 ksi
Live Load Stress (SW1200) fc,LL = PLL/A PLL = 28.365 kips from two Locomotives spaced 6' apart
= 0.227 ksi
Live Load Stress (TJ5000) fc,LL = PLL/A PLL = 24.295 kips from two bombcarts spaced 4' apart
= 0.194 ksi
Live Load Stress (TFC 45) fc,LL = PLL/A PLL = 18.7 kips
= 0.149 ksi fC,LL=P/A Rating Factor HS-20 = 0.15 ksi < 0.41 OK 2.75
SW1200 = 0.23 ksi < 0.41 OK 1.81 TJ5000 = 0.19 ksi < 0.41 OK 2.11 TFC45 = 0.15 ksi < 0.1 OK 2.75
Remaining Compression Stress for Live Load fC,LL = F'C - fC,DL
= 0.41 ksi Page E-126
E-204
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Lower Section Pile
Member Properties A = 125.22 in.2
Live Load Stress (HS-20) fc,LL = PLL/A PLL = 18.667 kips from two HS20s spaced 4' apart
= 0.149 ksi
Live Load Stress (SW1200) fc,LL = PLL/A PLL = 28.365 kips from two Locomotives spaced 6' apart
= 0.227 ksi
Live Load Stress (TJ5000) fc,LL = PLL/A PLL = 24.295 kips from two bombcarts spaced 4' apart
= 0.194 ksi
Live Load Stress (TFC45) fc,LL = PLL/A PLL = 18.7
= 0.149 ksi fC,LL=P/A Rating Factor HS-20 = 0.15 ksi < 1.40 OK 9.39
SW1200 = 0.23 ksi < 1.40 OK 6.18 TJ5000 = 0.19 ksi < 1.40 OK 7.22 TFC45 = 0.15 ksi < 1.40 OK 9.37
Remaining Compression Stress for Live Load fC,LL = F'C - fC,DL
= 1.40 ksi Page E-129
E-205
MOTCO Pier 3 US Army ERDC
Proj. File Path: M:\2011\23110058.12
Designed By: CJL Date: 3/12/2013 Checked By: RAW Date: 3/14/2013
Main Platform Upper Section Pile
Member Properties A = 125.22 in.2
Live Load Stress (HS-20) fc,LL = PLL/A PLL = 18.667 kips from two HS20s spaced 4' apart
= 0.149 ksi
Live Load Stress (TJ5000) fc,LL = PLL/A PLL = 24.295 kips from two bombcarts spaced 4' apart
= 0.194 ksi
Live Load Stress (TFC45) fc,LL = PLL/A PLL = 18.7
= 0.149 ksi fC,LL=P/A Rating Factor HS-20 = 0.15 ksi < 0.60 OK 4.02
SW1200 = NA NA
TJ5000 = 0.19 ksi < 0.60 OK 3.09 TFC45 = 0.15 ksi < 0.60 OK 4.02
Remaining Compression Stress for Live Load fC,LL = F'C - fC,DL
= 0.60 ksi Page E-132
E-206
Appendix F
Repair Cost Estimates
Project: Pier 3 Level III Inspection
Location: Military Ocean Terminal Concord (MOTCO) at Port Chicago in Concord, CA
Date : 03/2013 Estimator: J. Ikaika Kincaid
F-1
Description Repair Priority
Quantity Material
& UOM
Material Total Labor (Days)
Labor Total Total Contigency Project Total Rounded Total
Replace the perimeter walkway around Building A22. R 1,035 SF 49,680$ 20 74,520$ 124,200$ 31,050$ 155,250$ 155,250$
Replace the broken utility hangers from Bents 66 to 72.
U 72 LF 2,304$ 1 3,456$ 5,760$ 1,440$ 7,200$ 7,200$
Enclose or otherwise protect the exposed transformers in the electrical room.
U 1 LS 2,560$ 2 3,840$ 6,400$ 1,600$ 8,000$ 8,000$
Remove and replace the broken concrete fender pile and timber chock top at Bent 31.5.
R 1 LS 4,800$ 3 7,200$ 12,000$ 3,000$ 15,000$ 15,000$
Replace the rotten portions of the handrails and curbs along the pedestrian walkway.
R 900 LF 28,800$ 10 43,200$ 72,000$ 18,000$ 90,000$ 90,000$
Replace the perimeter walkway around Building 102. R 480 SF 23,040$ 10 34,560$ 57,600$ 14,400$ 72,000$ 72,000$
Seal the cracks throughout the pavement. L 900 LF 9,600$ 5 14,400$ 24,000$ 6,000$ 30,000$ 30,000$ Patch all potholes in pavement. L 1 LS 3,520$ 2 5,280$ 8,800$ 2,200$ 11,000$ 11,000$
Replace the severely decayed portions of timber fascia along the south edge of the upper platform.
L 1 LS 3,200$ 2 4,800$ 8,000$ 2,000$ 10,000$ 10,000$
Repair or replace all missing and broken utility hanger supports, junction box covers, loose wires, and corroded hardware. Clean and repaint corroded areas of conduits and hardware.
H 1 LS 4,800$ 2 7,200$ 12,000$ 3,000$ 15,000$ 15,000$
Install a high-density polyethylene (HDPE) jacket/wrap system on all the timber piles along the Main Approach and Platform. Remove all existing urethane wrap repairs prior to installing new jacket.
H 3883 EA 2,485,120$ 260 3,727,680$ 6,212,800$ 1,553,200$ 7,766,000$ 7,766,000$
Install a high-density polyethylene (HDPE) jacket/wrap system on all the timber piles along the Walkway. Remove all existing urethane wrap repairs prior to installing new jacket.
L 183 EA 117,120$ 13 175,680$ 292,800$ 73,200$ 366,000$ 366,000$
Repair the beams and pile caps that have overstressing cracks.
H 50 LF 4,000$ 2 6,000$ 10,000$ 2,500$ 12,500$ 12,500$
Recommendations and Cost Estimate for Pier 3 - Table 7-1
Project: Pier 3 Level III Inspection
Location: Military Ocean Terminal Concord (MOTCO) at Port Chicago in Concord, CA
Date : 03/2013 Estimator: J. Ikaika Kincaid
F-2
Description Repair Priority
Quantity Material
& UOM
Material Total Labor (Days)
Labor Total Total Contigency Project Total Rounded Total
Install shims on the piles that are currently non-bearing with the pile cap.
H 43 EA 2,752$ 2 4,128$ 6,880$ 1,720$ 8,600$ 8,600$
Seal the transverse hairline cracks in the top of the crane rails with a penetrating concrete sealer.
L 1 LS 1,280$ 1 1,920$ 3,200$ 800$ 4,000$ 4,000$
Replace broken/missing fender system hardware. H 1 LS 2,560$ 1 3,840$ 6,400$ 1,600$ 8,000$ 8,000$
Repair the spalled areas on the fender piles. L 1 LS 3,200$ 1 4,800$ 8,000$ 2,000$ 10,000$ 10,000$ Repair spalled and delaminated areas on the piles, pile caps, and curbs.
L 1 LS 16,000$ 7 24,000$ 40,000$ 10,000$ 50,000$ 50,000$
Install guardrail along the west side of the road leading up to the concrete approach.
H 120 LF 3,840$ 2 5,760$ 9,600$ 2,400$ 12,000$ 12,000$
Replace the timber sheeting and fill the eroded area at the southeast corner at the entrance to the concrete approach.
H 1 LS 2,560$ 1 3,840$ 6,400$ 1,600$ 8,000$ 8,000$
Replace the rotten deck planks along the pedestrian walkway.
R 400 SF 2,560$ 1 3,840$ 6,400$ 1,600$ 8,000$ 8,000$
8,666,550$ 8,666,550$ Pier 3 - Pile Repair Cost Estimate
Note: The estimates for the pile jacket/wrap repairs shown above, including labor days, are based on an approximate 10-person work/dive team. The estimates do not take into account any work-window restrictions, such as during missions or time-of-year in-water construction restrictions in Suisun Bay. Nevertheless, the total number of work days required can vary greatly depending on the time limits specified in a contract and the manpower assigned by a particular contractor. However, the tighter the constraints on the contractor, the higher the contractor's price may become.
It is also important to note that the piles that remain unprotected during the construction period would still be “very susceptible” to continued attack from marine borers.