General notes for Government provided laboratory building for Lake Isabella Quality Assurance testing.

View the file

Other files

File Type Posted
PWS_Attachment_2.pdf PDF
Lab_Equipment_List.docx DOCX document
PWS_Attachment_1.pdf PDF
PWS_Attachment_4.pdf PDF
A2.1_Solicitation_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONCEPT DESIGN

SHEET NOTES:

1. CONCEPT ELECTRICAL DESIGN SHOWN IS ONLY PARTIALLY COMPLETE. LAB EQUIPMENT ITEMS LISTED ON SHEETS E-601 THROUGH E-605 WILL BE PROVIDED FOR THE LAB BY OTHERS. SEVERAL

OF THOSE LAB EQUIPMENT ITEMS THAT REQUIRE ELECTRICAL AND COMMUNICATIONS SUPPORT

ARE NOT LOCATED ON THIS PLAN. DESIGN AND ASSOCIATED LAB CONSTRUCTION SHALL BE

MODIFIED TO LOCATE ALL THE LAB EQUIPMENT IN A PROPER FUNCTIONAL ARRANGEMENT AND

TO ALSO PROVIDE PROPER ELECTRICAL AND COMMUNICATIONS SUPPORT FOR THAT EQUIPMENT .

REFER TO SHEETS E-601 THROUGH E-605 FOR DETAILS ON THE LAB EQUIPMENT REQUIREMENTS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

GFI

AutoCAD SHX Text

GFI

AutoCAD SHX Text W

AutoCAD SHX Text

GFI

AutoCAD SHX Text

GFI

AutoCAD SHX Text

GFI

AutoCAD SHX Text

GFI

AutoCAD SHX Text

COMPACTION AREA CONCRETE PADS

AutoCAD SHX Text

SIEVE SHAKER PAD

AutoCAD SHX Text

SG

AutoCAD SHX Text

OVEN 1

AutoCAD SHX Text

OVEN 2

AutoCAD SHX Text

OVEN 3

AutoCAD SHX Text

PROCESSING AREA

AutoCAD SHX Text

PROCESSING AREA

AutoCAD SHX Text

CONCRETE LAB

AutoCAD SHX Text

GFI

AutoCAD SHX Text

GFI

AutoCAD SHX Text

SOIL LAB

AutoCAD SHX Text

ATTERBERG LIMITS AREA

AutoCAD SHX Text

GILSON AND RATTLER

AutoCAD SHX Text

QA LAB-4

AutoCAD SHX Text

QA LAB-4

AutoCAD SHX Text

QA LAB-4

AutoCAD SHX Text

QA LAB-8

AutoCAD SHX Text

QA LAB-8

AutoCAD SHX Text

QA LAB-8

AutoCAD SHX Text

QA LAB-8

AutoCAD SHX Text

QA LAB-8

AutoCAD SHX Text

QA LAB-10

AutoCAD SHX Text

QA LAB-10

AutoCAD SHX Text

QA LAB-10

AutoCAD SHX Text

QA LAB-4

AutoCAD SHX Text

QA LAB-4

AutoCAD SHX Text

QA LAB-2

AutoCAD SHX Text

QA LAB-2

AutoCAD SHX Text

QA LAB-2

AutoCAD SHX Text

QA LAB-2

AutoCAD SHX Text

QA LAB-2

AutoCAD SHX Text

QA LAB-6

AutoCAD SHX Text

QA LAB-6

AutoCAD SHX Text

QA LAB-6

AutoCAD SHX Text

QA LAB-6

AutoCAD SHX Text

QA LAB-6

AutoCAD SHX Text

QA LAB-2,4,6

AutoCAD SHX Text

QA LAB-8,10

AutoCAD SHX Text

SPLITTERS

AutoCAD SHX Text

RATTLER (ABRASION MACHINE)

AutoCAD SHX Text

GFI

AutoCAD SHX Text

GFI

AutoCAD SHX Text

GFI

AutoCAD SHX Text

SIEVE SHAKERS

AutoCAD SHX Text

SPECIFIC GRAVITY TANK

AutoCAD SHX Text

STONE/CONCRETE SAW, IMER MS500

AutoCAD SHX Text

VIBRATING TABLE

AutoCAD SHX Text

CONCRETE COMPRESSION TEST MACHINE

AutoCAD SHX Text

MICROWAVE

AutoCAD SHX Text

MICROWAVE

AutoCAD SHX Text

SOIL COMPACTOR

AutoCAD SHX Text

QA LAB-32

AutoCAD SHX Text

QA LAB-32

AutoCAD SHX Text

QA LAB-32

AutoCAD SHX Text

QA LAB-32

AutoCAD SHX Text

QA LAB-34

AutoCAD SHX Text

QA LAB-34

AutoCAD SHX Text

QA LAB-34

AutoCAD SHX Text

QA LAB-34

AutoCAD SHX Text

QA LAB-36

AutoCAD SHX Text

QA LAB-36

AutoCAD SHX Text

QA LAB-36

AutoCAD SHX Text

QA LAB-36

AutoCAD SHX Text

QA LAB-26

AutoCAD SHX Text

QA LAB-28

AutoCAD SHX Text

QA LAB-30

AutoCAD SHX Text

QA LAB-30

AutoCAD SHX Text

QA LAB-30

AutoCAD SHX Text

QA LAB-38

AutoCAD SHX Text

QA LAB-38

AutoCAD SHX Text

QA LAB-38

AutoCAD SHX Text

QA LAB-40

AutoCAD SHX Text

QA LAB-40

AutoCAD SHX Text

QA LAB-40

AutoCAD SHX Text

QA LAB-42

AutoCAD SHX Text

QA LAB-42

AutoCAD SHX Text

QA LAB-42

AutoCAD SHX Text

QA LAB-26,28,30

AutoCAD SHX Text

QA LAB-32,34,36

AutoCAD SHX Text

QA LAB-MECH-13,15,17

AutoCAD SHX Text

QA LAB-MECH-19,21,23

AutoCAD SHX Text

QA LAB-MECH-25,27,29

AutoCAD SHX Text

[HP-4-1]

AutoCAD SHX Text

[HP-4-2]

AutoCAD SHX Text

QA LAB-42

AutoCAD SHX Text

QA LAB-38,40

AutoCAD SHX Text

QA LAB

AutoCAD SHX Text

QA LAB-MECH

AutoCAD SHX Text

QA LAB-16,18

AutoCAD SHX Text

QA LAB-12,14

AutoCAD SHX Text

QA LAB-24

AutoCAD SHX Text

QA LAB-20,22

AutoCAD SHX Text

QA LAB-17

AutoCAD SHX Text

QA LAB-17

AutoCAD SHX Text

QA LAB-17

AutoCAD SHX Text

QA LAB-17

AutoCAD SHX Text

[UH-4-1]

AutoCAD SHX Text

[UH-4-1]

AutoCAD SHX Text

[UH-4-1]

AutoCAD SHX Text

[UH-4-1]

AutoCAD SHX Text

AutoCAD SHX Text

QA LAB TECHNICIAN OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

USACE MANAGERS OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

UNISEX TOILET

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

JANITOR

AutoCAD SHX Text

AutoCAD SHX Text

MOIST ROOM

AutoCAD SHX Text

AutoCAD SHX Text

LABORATORY

AutoCAD SHX Text

ROOM SCHEDULE

AutoCAD SHX Text

ISABELLA LAKE DAM

AutoCAD SHX Text

DAM SAFETY MODIFICATION PROJECT - PHASE II

AutoCAD SHX Text

PN 145952

AutoCAD SHX Text

ISABELLA LAKE

AutoCAD SHX Text

CALIFORNIA

AutoCAD SHX Text 0506 E-124

AutoCAD SHX Text

GOVERNMENT TESTING LABORATORY

AutoCAD SHX Text

AutoCAD SHX Text

17 NOV 2016

AutoCAD SHX Text

KE1-25-0506

AutoCAD SHX Text

100% ATR SUBMITTAL

AutoCAD SHX Text

806E-124XXX.DWG

AutoCAD SHX Text 12/16/2016

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text Dwg scale:

AutoCAD SHX Text Plot date:

AutoCAD SHX Text File name:

AutoCAD SHX Text Design file no:

AutoCAD SHX Text Drawing Code:

AutoCAD SHX Text

SACRAMENTO, CALIFORNIA

AutoCAD SHX Text

CORPS OF ENGINEERS

AutoCAD SHX Text

DEPARTMENT OF THE ARMY

AutoCAD SHX Text Submitted by:

AutoCAD SHX Text Reviewed by:

AutoCAD SHX Text Designed by:

AutoCAD SHX Text Dwn by:

AutoCAD SHX Text Date:

AutoCAD SHX Text Spec No.:

AutoCAD SHX Text number:

AutoCAD SHX Text reference

AutoCAD SHX Text Sheet

AutoCAD SHX Text Rev.

AutoCAD SHX Text Symbol

AutoCAD SHX Text Description

AutoCAD SHX Text Sacramento District

AutoCAD SHX Text US Army Corps

AutoCAD SHX Text of Engineers

AutoCAD SHX Text

SACRAMENTO DISTRICT

AutoCAD SHX Text

IN-HOUSE DESIGN

AutoCAD SHX Text

1325 'J' STREET

AutoCAD SHX Text

SACRAMENTO, CA 95814-2922

AutoCAD SHX Text A

AutoCAD SHX Text Border Revised 03/31/05, FCOESHTD2.DWG

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text

POWER AND SIGNAL FLOOR PLAN

AutoCAD SHX Text

(CONCEPT DESIGN)

AutoCAD SHX Text

D. CARULLI

AutoCAD SHX Text

D. CARULLI

AutoCAD SHX Text

S. JONES

AutoCAD SHX Text /s/ John R. Parrish

AutoCAD SHX Text Chief, Mech/Elec Des. Sec.

AutoCAD SHX Text

QUALITY ASSURANCE LAB - POWER AND SIGNAL FLOOR PLAN SCALE: 1/4 = 1'-0"

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text

AutoCAD SHX Text 8'

EQUIPMENT MANUFACTURER MODEL NOTES: OVERALL DIMENSION AND VOLTAGE ELECTRICAL PLUMBING HVAC FP

OVEN

GRIEVE #1 TBH-500

MAX. OPERATING TEMP. 500F; WORKSPACE DIMENSION:

48"WIDE X 48"DEEP X 60"HIGH

2HP BLOWER MOTOR; 24KW ELECTRIC HEATING RATING; 3-PHASE,

60HZ W/EITHER 208V, 230V, 460V OR OTHER ELECTRICAL

CHARACTERISTICS AVAILABLE

EXHAUST NA NA

GRIEVE #2 TBH-500

MAX. OPERATING TEMP. 500F; WORKSPACE DIMENSION:

48"WIDE X 48"DEEP X 60"HIGH

2HP BLOWER MOTOR; 24KW ELECTRIC HEATING RATING; 3-PHASE,

60HZ W/EITHER 208V, 230V, 460V OR OTHER ELECTRICAL

CHARACTERISTICS AVAILABLE

EXHAUST NA NA

GRIEVE #3 SA-400

1HP BLOWER MOTOR; 10KW ELECTRIC HEATING RATING; 3-PHASE,

60HZ W/EITHER 208V, 230V, 460V OR OTHER ELECTRICAL

CHARACTERISTICS AVAILABLE

EXHAUST NA NA

SCALE

OHAUS EP-2102C

OHAUS EP2102C EXPLORER PRO PRECISION BALANCE, 2,100G

CAPACITY, 0.01G READABILITY, AUTOCAL

100-120VAC, 220-240VAC, 50/60 HZ

NA NA NA

OHAUS BALANCE

AC ADAPTER (INCLUDED) OR 4 AA BATTERIES (NOT INCLUDED)

NA NA NA

OHAUS I-10

CAPACITY 199,999LBS

AC ADAPTER: 100, 120, 220, 240 VAC 50/60HZ, 6 ALKALINE "C"

BATTERIES OR OPTIONAL NICAD BATTERIES

NA NA NA

FLOORSCALE 1000LBS IF FAIRBANKS MODEL-AC ADAPTER OR 6 D-CELL BATTERIES NA NA NA

OHAUS AD. PRO

AC ADAPTER (INCLUDED) OR 4 AA BATTERIES (NOT INCLUDED)

NA NA NA

OHAUS EP-22001

•CAPACITY 22000G; AUTOMATIC CALIBRATION 100-120VAC, 220-240VAC, 50/60 HZ

NA NA NA

OHAUS CD11-2EO 25KG

100-132VAC 60HZ ADAPTER; 6 ALKALINE C-CELL BATTERIES

NA NA NA

OHAUS CD11-2EO 25KG

100-132VAC 60HZ ADAPTER; 6 ALKALINE C-CELL BATTERIES

NA NA NA

INTERCOMP CS1500

•500 LB (250 KG) TO 20,000 LB (10,000 KG) CAPACITIES;

•ACCURACY OF ±0.1% OF READING

STANDARD ALKALINE OR RECHARGEABLE D-CELL BATTERIES NA NA NA

INTERCOMP CS1500

•500 LB (250 KG) TO 20,000 LB (10,000 KG) CAPACITIES;

•ACCURACY OF ±0.1% OF READING

STANDARD ALKALINE OR RECHARGEABLE D-CELL BATTERIES NA NA NA

SIEVE SHAKER

ROTAP #1 RX-29

HAS 1/4HP 115/230V 60/50 HZ 1 PHASE MOTOR & 115V OR 230V

ELECTRONIC TIMER IN OPERATIONS MANUAL PARTS LIST

NA NA NA

ROTAP #2 RX-29

HAS 1/4HP 115/230V 60/50 HZ 1 PHASE MOTOR & 115V OR 230V

ELECTRONIC TIMER IN OPERATIONS MANUAL PARTS LIST

SPLITTER

GILSON TESTING SCREEN W/

TRAYS #1

TS-1 /W TRAYS 23X31X43IN WXDXH HYDRAULIC

115V/ 60HZ W/ 1/2HP MOTOR THROUGH STARTING SWITCH

W/OVERLOAD PROTECTION, ALSO HAS HYDRAULIC PUMP SYSTEM TO

SECURE SCREEN TRAYS IN PLACE

GILSON TESTING SCREEN W/

TRAYS #2

TS-1 W/ TRAYS HYDRAULIC

115V/ 60HZ W/ 1/2HP MOTOR THROUGH STARTING SWITCH

W/OVERLOAD PROTECTION, ALSO HAS HYDRAULIC PUMP SYSTEM TO

SECURE SCREEN TRAYS IN PLACE

GILSON UNIVERSAL SPLITTERS

FOR LARGE VOLUME BULK

SP-0 UNIVERSAL

SPLITTER

56X26X41IN APPARENTLY NO POWER REQUIREMENT

GILSON UNIVERSAL SPLITTERS

FOR 2" TO SAND SIZES

SP-2 UNIVERSAL

SPLITTER

22X14.5X20.5IN APPARENTLY NO POWER REQUIREMENT

SPECIFIC

GRAVITY

SPECIFIC GRAVITY TANK KIT H2712

46X31X25 PLATFORM TOP. TANK KIT IS COMPRISED OF A 30

GAL TANK, 18"X24"X18"

200-WATT TANK HEATER AND A CIRCULATING PUMP; 120 VAC 60 HZ 1

PHASE, 3 AMPS

DRAIN

ABRASION LA ABRASION MACHINE H3860A

DIMEN.: 39" X 29" X 37". COMPLIES WITH ASTM C131, C535

MOTOR IS 1HP (746W)-VOLTAGE AND PHASE NOT SPECIFIED; SAFE

LOAD OF CONTACTS: MAX. SWITCHING OUTPUT 30W 100 VA MAX.

SWITCHING VOLTAGE 230V MAX. SWITCHING CURRENT 2A; CATALOG

CUT IMPLIES BOTH SINGLE PHASE AND THREE PHASE MODELS ARE

AVAILABLE DUE TO PHASE ROTATION CAUTION GIVEN FOR THREE

PHASE MODELS, ASSUME VOLTAGE SELECTION INCLUDES USE ON

SYSTEM VOLTAGE OF 120V 1PH. OR 208V 3PH.

MIN/MAX INDEX

DENSITY

VIBRATING TABLE H3756.2F

30"X30". CAPACITY FOR THE TABLE IS 750LBS AND HEIGHT IS

71". THE TABLE SHALL BE MOUNTED TO A CONCRETE FLOOR

OR SLAB HAVING A MASS OF ABOUT 45 KG. COMPLIES WITH

ASTM D 4253, D4254.

230V, 60HZ 12 AMPS 1 PH

SOIL COMPACTOR

CALIFORNIA MODIFIED AUTOMATIC

COMPACTOR

H4169-CA

OVERALL DIMENSIONS: 56"H X 16-1/2"W X 30"D. MAX. HEIGHT IN

OPERATION: 66". COMPLIES WITH ASTM D558, D559, D560, D698,

D1557.

120V 60HZ, ?A.

SOILTEST 5.5LBS/12" MANUAL COMPACTION HAMMER N/A

SOILTEST 10LBS/18" MANUAL COMPACTION HAMMER N/A

ATTERBERG S N/A

IF MOTORIZED PER HUMBOLDT H-4230, PROBABLY 120V 60HZ 1 PH.

FRACTIONAL HP

WEIGHTS

N/A 20 LBS NA NA NA NA

N/A 50 LBS NA NA NA NA

N/A 50 LBS NA NA NA NA

RICE LAKES 2KG-1G NA NA NA NA

THERMOMETER

DIGITAL ERT310-5L ASSUME BATTERIES AT MOST NA NA NA

DIGITAL ERT310-5L ASSUME BATTERIES AT MOST NA NA NA

COMARK DT-33 ASSUME BATTERIES AT MOST NA NA NA

PTC TC4000 ASSUME BATTERIES AT MOST NA NA NA

SIEVE SIZE

CHECKER/GAUGE

N/A N/A N/A NA NA NA

AutoCAD SHX Text

ISABELLA LAKE DAM

AutoCAD SHX Text

DAM SAFETY MODIFICATION PROJECT PHASE II

AutoCAD SHX Text

PN 145952

AutoCAD SHX Text

ISABELLA LAKE

AutoCAD SHX Text

CALIFORNIA

AutoCAD SHX Text 0506 E-601

AutoCAD SHX Text

GOVERNMENT TESTING LABORATORY

AutoCAD SHX Text

AutoCAD SHX Text

NOV 2016

AutoCAD SHX Text

KE1-25-0506

AutoCAD SHX Text

100% ATR SUBMITTAL

AutoCAD SHX Text

806E-601XXX.DWG

AutoCAD SHX Text 12/16/2016

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text Dwg scale:

AutoCAD SHX Text Plot date:

AutoCAD SHX Text File name:

AutoCAD SHX Text Design file no:

AutoCAD SHX Text Drawing Code:

AutoCAD SHX Text

SACRAMENTO, CALIFORNIA

AutoCAD SHX Text

CORPS OF ENGINEERS

AutoCAD SHX Text

DEPARTMENT OF THE ARMY

AutoCAD SHX Text Submitted by:

AutoCAD SHX Text Reviewed by:

AutoCAD SHX Text Designed by:

AutoCAD SHX Text Dwn by:

AutoCAD SHX Text Date:

AutoCAD SHX Text Spec No.:

AutoCAD SHX Text number:

AutoCAD SHX Text reference

AutoCAD SHX Text Sheet

AutoCAD SHX Text Rev.

AutoCAD SHX Text Symbol

AutoCAD SHX Text Description

AutoCAD SHX Text Sacramento District

AutoCAD SHX Text US Army Corps

AutoCAD SHX Text of Engineers

AutoCAD SHX Text

SACRAMENTO DISTRICT

AutoCAD SHX Text

IN-HOUSE DESIGN

AutoCAD SHX Text

1325 'J' STREET

AutoCAD SHX Text

SACRAMENTO, CA 95814-2922

AutoCAD SHX Text A

AutoCAD SHX Text Border Revised 03/31/05, FCOESHTD2.DWG

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text

LABORATORY EQUIPMENT LIST-1

AutoCAD SHX Text

(CONCEPT DESIGN)

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

S. JONES

AutoCAD SHX Text /s/ John R. Parrish

AutoCAD SHX Text Chief, Mech/Elec Des. Sec.

GOVERNMENT TESTING LABORATORY - EQUIPMENT LIST-1 SCALE: NONE

MISCELLANEOUS

WHEEL BARROW, MIN. 5 CU FT

N/A

HOSE BIB

FOR WASH

OFF

NA NA

HEAVY DUTY CARTS (300 TO 400

LBS)

N/A NA NA NA

2 MICROWAVE OVEN

(1500 WATT)

2 HOT PLATE 0.75-1.5 IN DIAM.

9000VPM (RPM?)

EXHAUST VENTILATION FAN WITH

SHUTTER 24"

AIRMASTER FAN

115V, 60HZ, 1/15HP, 1050RPM

LARGE SHOP FAN, 36-IN

DIAMETER, MINIMUM

115V, 60HZ, 1/2HP

-SHOVELS, SQUARE

--- N/A NA NA NA

-SHOVEL, POINTED 2

--- N/A NA NA NA

-PANS, METAL, 1.5 GALLON, 6-INCH

MAX HEIGHT

--- N/A NA NA NA

-PANS, METAL, 1.0 QUART, 3-INCH

MAX HEIGHT

--- N/A NA NA NA

-PAN, PLASTIC, 2 GAL, 7-INCH MAX

HEIGHT

--- N/A NA NA NA

-PAN, PLASTIC, 2 QT, 3-INCH MAX

HEIGHT

--- N/A NA NA NA

-REFUSE CONTAINER WITH LID, 30

GAL

--- N/A NA EXHAUST? NA

-TERRY CLOTH TOWEL, 35 SQ YDS

--- N/A NA NA NA

-PYREX SAUCE PANS, 6"X4"X3"

DEEP

--- N/A NA NA NA

-PYREX BOWLS, 2" DEEP BY 6"

DIAMETER

--- N/A NA NA NA

-PLASTIC BUCKETS WITH

HANDLES, 5-GAL

--- N/A NA NA NA

-COMPRESSOR, SMALL PORTABLE

TYPE TO BE USED FOR CLEANING

--- HUSKY 120V/60HZ/12A NA NA NA

-SCOOPS, SMALL

ELE EL88-7300 N/A

-SCOOPS, LARGE

ELE EL88-7302 N/A

2 -TROWELS ELE EL 88-7400 N/A

4 -WASH BOTTLES FORNEY LA-3148 N/A

2 -WOOD FLOAT --- N/A

-RUBBER GLOVES, LARGE

FORNEY LA-0190 N/A

-ENGINEERS STEEL RULE,

N/A

2 12-INCH X 0.01" DIVISIONS STARRETT CO. N/A

2 -STOP WATCH HUMBOLDT H-2260 N/A

2 -TIMER HUMBOLDT H-4296

EITHER DIGITAL OR DIAL TIMER THAT CONTROLS DUPLEX

RECEPTACLE, ASSUME 120V 60HZ MINIMAL POWER DRAW

1 -TIMER HUMBOLDT H-4294

MANUAL BELL-TYPE TIMER, NO POWER REQUIREMENT

2 -STRAIGHT EDGE FORNEY LA-0267 N/A

2 -STRIKE OFF BAR FORNEY LA-0316-34 N/A

-SAMPLE TRAYS, 18" X 18" X 2"

ELE EL88-7150 N/A

-BEAKERS, 600M1

ELE EL88-6610 N/A

-BEAKERS, 250ML

ELE EL88-6106 N/A

-GRADUATED CYLINDERS, 1000ML

ELE EL88-6030 N/A

-GRADUATED CYLINDERS, 500M1

ELE EL88-6028 N/A

-GRADUATED CYLINDERS, 250M1

ELE EL88-6026 N/A

-GRADUATED CYLINDERS, 100ML

ELE EL88-6024 N/A

-GRADUATED CYLINDERS, 25ML

ELE EL88-6002A N/A

-GRADUATED CYLINDER, 10ML

--- N/A

-THERMOMETER, TRACEABLE

ELE EL88-4420 W/ USES 2 EACH AAA ALKALINE BATTERIES

ELE EL88-4420/12

HEAVY DUTY NEEDLE PROBE ACCESSORY TO THERMOMETER HAS

NO POWER REQUIREMENTS

AutoCAD SHX Text

ISABELLA LAKE DAM

AutoCAD SHX Text

DAM SAFETY MODIFICATION PROJECT PHASE II

AutoCAD SHX Text

PN 145952

AutoCAD SHX Text

ISABELLA LAKE

AutoCAD SHX Text

CALIFORNIA

AutoCAD SHX Text 0506 E-602

AutoCAD SHX Text

GOVERNMENT TESTING LABORATORY

AutoCAD SHX Text

AutoCAD SHX Text

NOV 2016

AutoCAD SHX Text

KE1-25-0506

AutoCAD SHX Text

100% ATR SUBMITTAL

AutoCAD SHX Text

806E-602XXX.DWG

AutoCAD SHX Text 12/16/2016

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text Dwg scale:

AutoCAD SHX Text Plot date:

AutoCAD SHX Text File name:

AutoCAD SHX Text Design file no:

AutoCAD SHX Text Drawing Code:

AutoCAD SHX Text

SACRAMENTO, CALIFORNIA

AutoCAD SHX Text

CORPS OF ENGINEERS

AutoCAD SHX Text

DEPARTMENT OF THE ARMY

AutoCAD SHX Text Submitted by:

AutoCAD SHX Text Reviewed by:

AutoCAD SHX Text Designed by:

AutoCAD SHX Text Dwn by:

AutoCAD SHX Text Date:

AutoCAD SHX Text Spec No.:

AutoCAD SHX Text number:

AutoCAD SHX Text reference

AutoCAD SHX Text Sheet

AutoCAD SHX Text Rev.

AutoCAD SHX Text Symbol

AutoCAD SHX Text Description

AutoCAD SHX Text Sacramento District

AutoCAD SHX Text US Army Corps

AutoCAD SHX Text of Engineers

AutoCAD SHX Text

SACRAMENTO DISTRICT

AutoCAD SHX Text

IN-HOUSE DESIGN

AutoCAD SHX Text

1325 'J' STREET

AutoCAD SHX Text

SACRAMENTO, CA 95814-2922

AutoCAD SHX Text A

AutoCAD SHX Text Border Revised 03/31/05, FCOESHTD2.DWG

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text

LABORATORY EQUIPMENT LIST-2

AutoCAD SHX Text

(CONCEPT DESIGN)

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

S. JONES

AutoCAD SHX Text /s/ John R. Parrish

AutoCAD SHX Text Chief, Mech/Elec Des. Sec.

GOVERNMENT TESTING LABORATORY - EQUIPMENT LIST-2 SCALE: NONE

MISCELLANEOUS

(CONTINUED)

-THERMOMETER, FIELD

ELE EL88-4462 POCKET DIAL THERMOMETER HAS NO POWER REQUIREMENTS

-THERMOMETER, MIN/MAX

ELE EL88-4610

88-4610 NOT FOUND, 88-4612 HAS NO POWER REQUIREMENT

-RODS, 5/8 X 24-INCH

ELE EL34-0132 N/A

-RODS, 3/8" X 12-INCH

ELE EL34-0134 N/A

3 -OVEN MITTS --- N/A

2 -RUBBER MALLETS ELE EL88-7940 N/A

-FORM OIL, 1 GALLON

--- N/A

100 -SAMPLE MARKING PENS --- N/A

-PLASTIC POLY, 6 MIL, 20' X 100'

--- N/A

100 -WHITE PAINT MARKERS --- N/A

100 -BLACK SHARPIE MARKERS --- N/A

500 -SAMPLE TAGS WITH WIRE TIES --- N/A

-DUCT TAPE, 2" WIDTH

--- N/A

-FLASHLIGHTS, 2 D CELL SIZE,

WATER RESISTANT

--- N/A

12 -D CELL BATTERIES --- N/A

-BUBBLE LEVEL, 8-INCH

--- N/A

-WHEEL BARROW, 5 CU FT

--- N/A

-TAPE MEASURE, 25-FT, 1-INCH

BLADE WIDTH

--- N/A

-PLASTIC BUCKETS, 5-GAL

--- N/A

CONCRETE

TESTING

CONCRETE VIBRATOR, 2

SLUMP CONE (2)

ELE EL 2010 N/A

AIR METER, TYPE B (2)

ELE EL 34-3265 DOES NOT APPEAR TO HAVE POWER REQUIREMENT

AIR METER REPLACEMENT PUMP

(2)

ELE EL 34-3265/10

PUMP ASSEMBLY ACCESSORY, DOES NOT APPEAR TO HAVE POWER

REQUIREMENT

AIR METER CALIBRATOR (1)

HUMBOLDT H-2788 DOES NOT APPEAR TO HAVE POWER REQUIREMENT

RESISTANCE PENETROMETER (1)

FORNEY LA4110 DOES NOT APPEAR TO HAVE POWER REQUIREMENT

SPLIT TENSILE BEARING BAR (2)

ELE EL 37-5572 N/A

RECORDING THERMOMETER (1)

FORNEY 120V W/BATTERY BACKUP

RUBBER MALLET (1)

FORNEY N/A

TAMPING ROD, 5/8-INCH (2)

FORNEY LA-0280 N/A

TAMPING ROD, 3/8-INCH (2)

FORNEY LA-0281 N/A

TROWEL (1)

FORNEY N/A

STRAIGHT EDGE (1)

FORNEY N/A

CAPPING FIXTURE FORNEY LA-0101 N/A

PLASTIC CYLINDER MOLDS,

6X12-INCH

FORNEY LA-0211-01 N/A

CYLINDER STRIPPING TOOL (2)

FORNEY LA-0214-T N/A

-PLATEN FOR 6X12-INCH

CYLINDERS

ELE EL37-5500 N/A

-HARDENED STEEL DISKS,

N/A

3/4 TO 1-INCH THICK,

N/A

2-1/2", 3-1/2", 4", AND 6" DIAMETERS

--- N/A

-NEOPRENE PADS, 50 HARDNESS

BUCKET,

FORNEY LA-0149-02 N/A

-NEOPRENE PADS, 60 HARDNESS

FORNEY LA-0149 N/A

-NEOPRENE PADS, 70 HARDNESS

FORNEY LA-0149-01 N/A

-RETAINING RINGS FOR

UN-BONDED CAPS -YIELD BUCKET,

FORNEY LA-0148 N/A

-YIELD BUCKET, 1/2 FT3

ELE EL 34-2862 N/A

AutoCAD SHX Text

ISABELLA LAKE DAM

AutoCAD SHX Text

DAM SAFETY MODIFICATION PROJECT PHASE II

AutoCAD SHX Text

PN 145952

AutoCAD SHX Text

ISABELLA LAKE

AutoCAD SHX Text

CALIFORNIA

AutoCAD SHX Text 0506 E-603

AutoCAD SHX Text

GOVERNMENT TESTING LABORATORY

AutoCAD SHX Text

AutoCAD SHX Text

NOV 2016

AutoCAD SHX Text

KE1-25-0506

AutoCAD SHX Text

100% ATR SUBMITTAL

AutoCAD SHX Text

806E-603XXX.DWG

AutoCAD SHX Text 12/16/2016

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text Dwg scale:

AutoCAD SHX Text Plot date:

AutoCAD SHX Text File name:

AutoCAD SHX Text Design file no:

AutoCAD SHX Text Drawing Code:

AutoCAD SHX Text

SACRAMENTO, CALIFORNIA

AutoCAD SHX Text

CORPS OF ENGINEERS

AutoCAD SHX Text

DEPARTMENT OF THE ARMY

AutoCAD SHX Text Submitted by:

AutoCAD SHX Text Reviewed by:

AutoCAD SHX Text Designed by:

AutoCAD SHX Text Dwn by:

AutoCAD SHX Text Date:

AutoCAD SHX Text Spec No.:

AutoCAD SHX Text number:

AutoCAD SHX Text reference

AutoCAD SHX Text Sheet

AutoCAD SHX Text Rev.

AutoCAD SHX Text Symbol

AutoCAD SHX Text Description

AutoCAD SHX Text Sacramento District

AutoCAD SHX Text US Army Corps

AutoCAD SHX Text of Engineers

AutoCAD SHX Text

SACRAMENTO DISTRICT

AutoCAD SHX Text

IN-HOUSE DESIGN

AutoCAD SHX Text

1325 'J' STREET

AutoCAD SHX Text

SACRAMENTO, CA 95814-2922

AutoCAD SHX Text A

AutoCAD SHX Text Border Revised 03/31/05, FCOESHTD2.DWG

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text

LABORATORY EQUIPMENT LIST-3

AutoCAD SHX Text

(CONCEPT DESIGN)

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

S. JONES

AutoCAD SHX Text /s/ John R. Parrish

AutoCAD SHX Text Chief, Mech/Elec Des. Sec.

GOVERNMENT TESTING LABORATORY - EQUIPMENT LIST-3 SCALE: NONE

CONCRETE

COMPRESSION

TEST MACHINE

ELE 36-0718/02 OVERALL DIMENSIONS 19" X 30" X 42" 220-240V 50/60HZ 1PH. ?A

COMPRESSO-MET

ER-EXTENSOMETE

R -COMPRESSION

TEST MACHINE

HUMBOLDT H-2912

IF W/DIGITAL INDICATOR OR LSCT TRANSDUCER ASSUME 120V 60HZ

SMALL POWER REQUIREMENT

STONE/

CONCRETE SAW,

16-IN DIAMETER

IMER MS500 OVERALL DIMENSION 28"X62"X62"

IF ELECTRIC ENGINE, 5.5HP 230V 60HZ 1PH., IF GAS ENGINE ON

EXTERNAL POWER REQUIREMENT?

HYDROMETER

ELE 151H DOES NOT APPEAR TO HAVE POWER REQUIREMENT

ELE 152H DOES NOT APPEAR TO HAVE POWER REQUIREMENT

HAMILTON BLENDER

13.0 AMPS WORST CASE 120V 60HZ 1PH. (NO SPECIFIC MODEL

NUMBER CITED)

CALIPER

FOWLER PRO-MAX 5225 N/A

SCHERR-TUMICO N/A N/A

ELE EL88-8050 ELE EL88-8050 N/A

SLUMP CONE N/A N/A N/A

SAND CONE SOILSTEST N/A N/A

MOLD & TAMPER

(ASTM C128)

SOILSTEST N/A N/A

AIR METER ELE TYPE B DOES NOT APPEAR TO HAVE POWER REQUIREMENT

UNIT WEIGHT

BUCKET

UBW N/A N/A N/A

SAND BUCKET N/A N/A N/A

AIR METER ELE TYPE B DOES NOT APPEAR TO HAVE POWER REQUIREMENT

SAND

EQUIVALENT

GILSON N/A

DIGITAL COUNTER, SE-2B MODEL HAS 1/8HP DC SEALED GEAR

MOTOR

ORGANIC

IMPURITIES

ELE N/A N/A

AutoCAD SHX Text

ISABELLA LAKE DAM

AutoCAD SHX Text

DAM SAFETY MODIFICATION PROJECT PHASE II

AutoCAD SHX Text

PN 145952

AutoCAD SHX Text

ISABELLA LAKE

AutoCAD SHX Text

CALIFORNIA

AutoCAD SHX Text 0506 E-604

AutoCAD SHX Text

GOVERNMENT TESTING LABORATORY

AutoCAD SHX Text

AutoCAD SHX Text

NOV 2016

AutoCAD SHX Text

KE1-25-0506

AutoCAD SHX Text

100% ATR SUBMITTAL

AutoCAD SHX Text

806E-604XXX.DWG

AutoCAD SHX Text 12/16/2016

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text Dwg scale:

AutoCAD SHX Text Plot date:

AutoCAD SHX Text File name:

AutoCAD SHX Text Design file no:

AutoCAD SHX Text Drawing Code:

AutoCAD SHX Text

SACRAMENTO, CALIFORNIA

AutoCAD SHX Text

CORPS OF ENGINEERS

AutoCAD SHX Text

DEPARTMENT OF THE ARMY

AutoCAD SHX Text Submitted by:

AutoCAD SHX Text Reviewed by:

AutoCAD SHX Text Designed by:

AutoCAD SHX Text Dwn by:

AutoCAD SHX Text Date:

AutoCAD SHX Text Spec No.:

AutoCAD SHX Text number:

AutoCAD SHX Text reference

AutoCAD SHX Text Sheet

AutoCAD SHX Text Rev.

AutoCAD SHX Text Symbol

AutoCAD SHX Text Description

AutoCAD SHX Text Sacramento District

AutoCAD SHX Text US Army Corps

AutoCAD SHX Text of Engineers

AutoCAD SHX Text

SACRAMENTO DISTRICT

AutoCAD SHX Text

IN-HOUSE DESIGN

AutoCAD SHX Text

1325 'J' STREET

AutoCAD SHX Text

SACRAMENTO, CA 95814-2922

AutoCAD SHX Text A

AutoCAD SHX Text Border Revised 03/31/05, FCOESHTD2.DWG

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text

LABORATORY EQUIPMENT LIST-4

AutoCAD SHX Text

(CONCEPT DESIGN)

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

S. JONES

AutoCAD SHX Text /s/ John R. Parrish

AutoCAD SHX Text Chief, Mech/Elec Des. Sec.

GOVERNMENT TESTING LABORATORY - EQUIPMENT LIST-4 SCALE: NONE

SIEVES

SIZE DIAMETER ---

8 8 N/A

16 8 N/A

30 8 N/A

50 8 N/A

100 8 N/A

200 8 N/A

3" 8 N/A

1.5" 8 N/A

0.75 8 N/A

0.375 8 N/A

4 8 N/A

60 8 N/A

40 8 N/A

12 8 N/A

10 8 N/A

0.75 15X24 N/A

0.375 15X24 N/A

4 15X24 N/A

4" 15X24 N/A

3" 15X24 N/A

2" 15X24 N/A

1.5" 15X24 N/A

1" 15X24 N/A

0.75 15X24 N/A

0.5 15X24 N/A

0.375 15X24 N/A

4 15X24 N/A

#200 WASH8 N/A

#16 WASH 8 N/A

OFFICE:

CHAIRS N/A

TABLE N/A

-WRITE ERASE WHITE BOARD,

LARGE, 4' X 6'

N/A

-WRITE ERASE WHITE BOARD,

SMALL, 2' X 3'

N/A

-WRITE ERASE MARKERS N/A

-FIRST AID KIT N/A

AutoCAD SHX Text

ISABELLA LAKE DAM

AutoCAD SHX Text

DAM SAFETY MODIFICATION PROJECT PHASE II

AutoCAD SHX Text

PN 145952

AutoCAD SHX Text

ISABELLA LAKE

AutoCAD SHX Text

CALIFORNIA

AutoCAD SHX Text 0506 E-605

AutoCAD SHX Text

GOVERNMENT TESTING LABORATORY

AutoCAD SHX Text

AutoCAD SHX Text

NOV 2016

AutoCAD SHX Text

KE1-25-0506

AutoCAD SHX Text

100% ATR SUBMITTAL

AutoCAD SHX Text

806E-605XXX.DWG

AutoCAD SHX Text 12/16/2016

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text Dwg scale:

AutoCAD SHX Text Plot date:

AutoCAD SHX Text File name:

AutoCAD SHX Text Design file no:

AutoCAD SHX Text Drawing Code:

AutoCAD SHX Text

SACRAMENTO, CALIFORNIA

AutoCAD SHX Text

CORPS OF ENGINEERS

AutoCAD SHX Text

DEPARTMENT OF THE ARMY

AutoCAD SHX Text Submitted by:

AutoCAD SHX Text Reviewed by:

AutoCAD SHX Text Designed by:

AutoCAD SHX Text Dwn by:

AutoCAD SHX Text Date:

AutoCAD SHX Text Spec No.:

AutoCAD SHX Text number:

AutoCAD SHX Text reference

AutoCAD SHX Text Sheet

AutoCAD SHX Text Rev.

AutoCAD SHX Text Symbol

AutoCAD SHX Text Description

AutoCAD SHX Text Sacramento District

AutoCAD SHX Text US Army Corps

AutoCAD SHX Text of Engineers

AutoCAD SHX Text

SACRAMENTO DISTRICT

AutoCAD SHX Text

IN-HOUSE DESIGN

AutoCAD SHX Text

1325 'J' STREET

AutoCAD SHX Text

SACRAMENTO, CA 95814-2922

AutoCAD SHX Text A

AutoCAD SHX Text Border Revised 03/31/05, FCOESHTD2.DWG

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text

LABORATORY EQUIPMENT LIST-5

AutoCAD SHX Text

(CONCEPT DESIGN)

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

B. PITT

AutoCAD SHX Text

S. JONES

AutoCAD SHX Text /s/ John R. Parrish

AutoCAD SHX Text Chief, Mech/Elec Des. Sec.

GOVERNMENT TESTING LABORATORY - EQUIPMENT LIST-5 SCALE: NONE

DISTRIBUTION STATEMENT A

Approved for public release; distribution is unlimited

REQUEST FOR PROPOSAL (RFP)

ISABELLA LAKE - DAM SAFETY MODIFICATION

PROJECT

DAMS AND SPILLWAYS

LAKE ISABELLA, CALIFORNIA

PROJECT NO. 145952

SPECIFICATION NO. 1966

DESIGN FILE NO. KE1-25-0506, KE1-09-0507, KE1-09-0508, KE1-09-

0509, KE1-09-0510, KE1-09-0511, KE1-09-0512, KE1-09-0516, KE1-

09-0517, KE1-09-2018, KE1-13-0521, KE1-09-0524, KE1-09-0525

Isabella Lake DSMP - Dams and Spillways 1966 March 20, 2017

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00.10 WORK AND SITE ACCESS RESTRICTIONS

01 22 00 MEASUREMENT AND PAYMENT

01 32 01 PROJECT SCHEDULE

01 32 23 SURVEY AND LAYOUT DATA

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.10 QUALITY CONTROL SYSTEM (QCS)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 53 29 TEMPORARY AGGREGATE PROCESSING PLANT

01 57 20 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 58 00 PROJECT IDENTIFICATION

01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS

01 71 10 MOBILIZATION AND DEMOBILIZATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 41 00.16 DEMOLITION FOR RECREATIONAL SITES

02 41 13.26 PIPELINE ABANDONMENT

02 82 13 ASBESTOS ABATEMENT

02 83 13 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00 CONCRETE ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 30 53.16 MISCELLANEOUS CAST-IN-PLACE CONCRETE FOR RECREATIONAL

SITES

03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS

03 35 00 CONCRETE FINISHING

03 37 13 SHOTCRETE

03 39 00 CONCRETE CURING

03 40 00 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

03 52 16.23 LIGHTWEIGHT CELLULAR CONCRETE

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 12 00 STRUCTURAL STEEL

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

PROJECT TABLE OF CONTENTS Page 1

05 50 14 STRUCTURAL METAL FABRICATIONS

05 50 14.16 STRUCTURAL METAL FABRICATIONS FOR RECREATIONAL SITES

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 53.16 TRAFFIC SIGNAGE FOR RECREATIONAL SITES

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

13 34 23.16 PRE-ENGINEERED BUILDINGS FOR RECREATIONAL SITES

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.13 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 14 - CONVEYING EQUIPMENT

14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

DIVISION 26 - ELECTRICAL

26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 20 00.16 INTERIOR DISTRIBUTION SYSTEM FOR RECREATIONAL SITES

26 28 01.16 COORDINATED POWER SYSTEM PROTECTION FOR RECREATIONAL SITES

26 31 00.16 SOLAR PHOTOVOLTAIC (PV) COMPONENTS FOR RECREATIONAL SITES

26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00.16 INTERIOR LIGHTING FOR RECREATIONAL SITES

26 56 00.16 EXTERIOR LIGHTING FOR RECREATIONAL SITES

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

PROJECT TABLE OF CONTENTS Page 2

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 64 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 00 00.16 EARTHWORK FOR RECREATIONAL SITES

31 05 19.16 GEOTEXTILE FOR RECREATIONAL SITES

31 05 19.27 GEOCOMPOSITE STRIP DRAIN

31 05 22 GEOTEXTILES USED AS FILTERS

31 09 13 GEOTECHNICAL INSTRUMENTATION AND MONITORING

31 09 13.11 AUTOMATED DATA ACQUISITION SYSTEM

31 09 15 EARTH EMBANKMENT AND EARTH FOUNDATION DRILLING

REQUIREMENTS

31 11 00.16 CLEARING AND GRUBBING FOR RECREATIONAL SITES

31 11 13 CLEARING, GRUBBING AND STRIPPING

31 23 16 EXCAVATION

31 23 16.19 DRILLING AND BLASTING IN THE DRY

31 23 19.13 DEWATERING

31 23 19.16 DEWATERING FOR RECREATIONAL SITES

31 33 15 ROCK REINFORCEMENT

31 60 00 FOUNDATION PREPARATION

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 01 19.16 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS FOR RECREATIONAL SITES

32 05 33.16 LANDSCAPE ESTABLISHMENT FOR RECREATIONAL SITES

32 11 23.11 AGGREGATE BASE COURSE

32 11 23.16 AGGREGATE BASE COURSE FOR RECREATIONAL SITES

32 12 10.13 BITUMINOUS TACK COATS

32 12 10.16 BITUMINOUS TACK COATS FOR RECREATIONAL SITES

32 12 17 HOT MIX BITUMINOUS PAVEMENT

32 12 17.16 HOT MIX BITUMINOUS PAVEMENT FOR RECREATIONAL SITES

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 13 13.16 PORTLAND CEMENT CONCRETE PAVEMENT FOR RECREATIONAL SITES

32 15 00 AGGREGATE SURFACE COURSE

32 16 13.16 CONCRETE SIDEWALKS AND CURBS AND GUTTERS FOR RECREATIONAL

SITES

32 17 23.16 PAVEMENT MARKINGS FOR RECREATIONAL SITES

32 17 24 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 34 13 FABRICATED PEDESTRIAN BRIDGES

32 92 19.16 SEEDING FOR RECREATIONAL SITES

32 92 33 GRASS SEEDING AND EROSION CONTROL

32 93 00.16 EXTERIOR PLANTS FOR RECREATIONAL SITES

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 11 00.16 WATER DISTRIBUTION FOR RECREATIONAL SITES

33 20 00 WATER WELLS

33 29 13 EXPLORATION, INSTRUMENT, WELL, AND PIEZOMETER HOLE

ABANDONMENT

33 30 00.16 SANITARY SEWERS FOR RECREATIONAL SITES

PROJECT TABLE OF CONTENTS Page 3

33 31 23 SANITARY SEWAGE FORCE MAIN PIPING

33 40 00 STORM DRAINAGE UTILITIES

33 40 00.16 STORM DRAINAGE UTILITIES FOR RECREATIONAL SITES

33 46 16 SUBDRAINAGE SYSTEM

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 71 02.16 UNDERGROUND ELECTRICAL DISTRIBUTION FOR RECREATIONAL SITES

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 31 10 TURBIDITY CONTROL

35 42 38 STONE PROTECTION

35 73 13 EMBANKMENT FOR EARTH DAMS

DIVISION 40 - PROCESS INTERCONNECTIONS

40 05 13.96 WELDING PROCESS PIPING

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 23.19 HOISTS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 PAYMENT

1.2 REFERENCES

1.3 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.4 SUBMITTALS

1.5 SCRAP MATERIAL

1.6 WRITTEN GUARANTEES AND GUARANTOR'S LOCAL REPRESENTATIVE

1.7 PRICING OF CONTRACTOR-FURNISHED PROPERTY

1.8 TEMPORARY ELECTRIC WIRING

1.8.1 Construction Equipment

1.8.2 Circuit Protection

1.9 UTILITIES

1.10 GENERAL SAFETY REQUIREMENTS

1.10.1 General

1.10.2 The Prime Contractor's Superintendent

1.10.3 Activity Hazard Analysis

1.10.4 Violations

1.10.5 Fire Prevention

1.10.5.1 Inspections

1.10.6 Recordkeeping/Reporting Requirements

1.10.7 Accident Reporting

1.11 PLANNED UTILITY OUTAGES AND STREET CLOSURES

1.12 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1.13 EQUIPMENT DATA FORM

1.14 SOIL DENSITY TEST (USING METERS CONTAINING RADIOACTIVE MATERIALS)

1.15 CONTRACTOR SAFETY PERSONNEL REQUIREMENTS

1.16 HAZARDOUS NOISE AREA

1.17 BID ITEM OVERRUN

1.18 COLOR SCHEME FOR CONTRACTOR FACILITIES

1.19 WARRANTY OF CONSTRUCTION

1.20 NON CONTRACT WORK

1.21 DAMAGE TO ROADS

1.21.1 Documentation Regarding Potential Damage to Access Routes

1.21.1.1 Preconstruction Access Road Survey

1.21.1.2 Postconstruction Access Road Survey

1.22 PLANT LAYOUT DRAWINGS

1.23 INSPECTION

1.24 FINAL EXAMINATION AND ACCEPTANCE

1.25 ENVIRONMENTAL LITIGATION

PART 2 PRODUCTS

2.1 GOVERNMENT FURNISHED MATERIALS

01 00 00 - 1

PART 3 EXECUTION

3.1 AFTER AWARD DOCUMENTS

ATTACHMENTS:

CESPK FORM 450

-- End of Section Table of Contents --

01 00 00 - 2

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 PAYMENT

No separate payment will be made for the work covered under this section and all costs in connection therewith will be considered a subsidiary obligation.

1.2 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017) National Electrical Code

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

ER 415-1-15 (1989) Construction Time Extensions for Weather

U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT (CESPK)

CESPK FORM 450 (1992) Contractor Equipment Data Sheet

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1904 Recording and Reporting Occupational Injuries and Illnesses

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1926 Safety and Health Regulations for Construction

1.3 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

01 00 00 - 3

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/

Department of Veterans Affairs-VOW to Hire Heros Act http://benefits.va.gov/vow/

Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation-Hiring Our Heros http://www.hiringourheroes.org/

Guide to Hiring Veterans - Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house _business_council_-_guide_to_hiring_veterans_0.pdf

1.4 SUBMITTALS

Government approval is required for all submittals with a "G" designation;

submittals not having a designation are for information only. The following must be submitted in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Preconstruction Quantity Survey Plan; G

Preconstruction Access Road Survey

Postconstruction Access Road Survey

Activity Hazard Analysis

Qualifications for Safety and Health Person(s); G

SD-11 Closeout Submittals

Worker's Compensation Claims

Submit written summary of worker's compensation claims filed by workers on the project at the 50 percent and 100 percent points of project completion.

1.5 SCRAP MATERIAL

Materials specified to be removed and become the property of the Contractor are designated as scrap, and the Contractor, by signing this contract, hereby acknowledges that he has made due allowance for value, if any, of such scrap in the contract price.

1.6 WRITTEN GUARANTEES AND GUARANTOR'S LOCAL REPRESENTATIVE

Prior to completion of the contract, obtain and furnish to the Contracting Officer written guarantees for all the equipment and/or appliances furnished under the contract. Furnish with each guarantee: The name, address, and telephone number of the guarantor's representative nearest to

01 00 00 - 4 the location where the equipment and/or appliances are installed, who, upon request of the Using Service's representative, will honor the guarantee during the guaranty period and will provide the services prescribed by the terms of the guarantee.

1.7 PRICING OF CONTRACTOR-FURNISHED PROPERTY

At the request of the Contracting Officer, promptly furnish and cause any subcontractors to furnish, in like manner, unit prices and descriptive data required by the Government for property record purposes of fixtures and equipment furnished and installed by the Contractor.

1.8 TEMPORARY ELECTRIC WIRING

1.8.1 Construction Equipment

In addition to the requirements of EM 385-1-1, all temporary wiring conductors installed for operation of construction tools and equipment must be either Type TW or THW contained in metal raceways, or may be multiconductor cord. Secure temporary wiring above the ground or floor in a workmanlike manner and not present an obstacle to persons or equipment.

Open wiring may only be used outside of buildings, and then only in strict accordance with the provisions of the National Electrical Code.

1.8.2 Circuit Protection

In addition to the present requirements in EM 385-1-1 and NFPA 70, all 15 and 20-ampere receptacle outlets used for obtaining power during construction must have ground fault circuit interrupters (GFCI) for personnel protection. Block and brick saws must also be equipped with GFCI. The Contracting Officer may allow an exception to this requirement for circuits for concrete vibrators or circuits operating at other than 60 Hertz normal (in both cases an assured grounding program as described in the NFPA 70, except utilizing the daily inspection frequency of the grounding means of such equipment, may be permitted). The assured grounding program will not be permitted as a substitute for usage of GFCI'S except as described above. All generator-powered 15- and 20-ampere, 60 Hertz receptacle outlets must have GFCI'S, and be properly grounded.

Provide a testing means which will impose a measured fault of 5 milliamperes, plus or minus 1 milliamperes, and result in tripping the GFCI unit.

1.9 UTILITIES

Unless indicated otherwise on Contract drawings, it is anticipated that pole lines, signs, pipelines and private improvements that would interfere with or are to be replaced by new construction will be removed to new locations by the owners in advance of construction operations. Notify the Contracting Officer at least 30 days in advance of the date on which work will be started requiring the removal of such utilities or private improvements. Take care to preserve and protect any such improvements from injury or damage during construction operations. Assume full responsibility for reimbursing the owners for any damage to their properties, utilities, or improvements, or interference with their services caused through construction operations. Should such damage be found to have been caused without the Contractor's fault or negligence an equitable adjustment in the amount due under the contract will be made under the applicable CONTRACT CLAUSES, Section 00 73 00.

01 00 00 - 5

1.10 GENERAL SAFETY REQUIREMENTS

1.10.1 General

For information regarding specific Safety Requirements see Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. Refer to EM 385-1-1, (see Contract Clauses, Section 00 73 00, ACCIDENT PREVENTION) and the Occupational Safety and Health Act (OSHA) Standards for Construction 29 CFR 1926; General Industry Standards 29 CFR 1910; and the National Fire Protection Association Codes are applicable to this contract. In case of conflict the most stringent requirement of the standards is applicable.

1.10.2 The Prime Contractor's Superintendent

The Prime Contractor's superintendent must take an active role in enforcing the safety requirements by participation in safety conferences, hazard analysis (see below), tool box meetings, walk-through inspections, correction of violations, etc., and including that of the subcontractor's work.

1.10.3 Activity Hazard Analysis

Based on the construction schedule, submit a activity hazard analysis of each major phase of work prior to entering that phase of activity. The analysis must include major or high risk hazards, as well as commonly recurring deficiencies that might possibly be encountered for that operation, and identify proposed methods and techniques of accomplishing each phase in a safe manner. The Prime Contractor's superintendent must take active participation in the Job Hazard Analysis, including the subcontractors' work. Prior to start of actual work a meeting must be held with Prime Contractor, Government, and affected subcontractor to review the Activity Hazard Analysis. In addition, job site meetings must be held to indoctrinate foreman and workers on details of this analysis.

1.10.4 Violations

If recurring violations and/or gross violation indicate that the safety performance is unsatisfactory, corrective action must be taken as directed, and at the discretion of the Contracting Officer the retention or some part thereof will be withheld from the progress payment until corrective action has been completed.

1.10.5 Fire Prevention

Cutting or welding will be permitted only in areas that are or have been made fire safe. Where possible, locate all combustibles at least 35 feet horizontally from the work site. Where such location is impracticable, protect combustibles with fire blankets and/or protective welding screens to prevent slag from running out of the work area. Edges of covers at the floor must be tight to prevent sparks from going under them. This precaution is also important at overlaps where several covers are used to protect a large pile. Do not allow any welding/cutting or open flame operations in facilities that are protected by a wet pipe fire sprinkler or an automatic detection system, if the system is out of service. First priority of work will be to return the suppression/detection system to operational condition. Return the fire detection and/or suppression system back to an operational status (if possible) during periods that the facility is unoccupied, and at the end of the work day. Post a fire guard for a 24 hour period (or certify to the Fire Department that the facility

01 00 00 - 6 is safe) after welding, cutting, and open flame operations in a facility when: (a) fire detection and suppression system can not be returned to service; (b) fire detection or suppression systems do not exist. Other fire prevention precautions must be in accordance with the latest National Fire Codes.

1.10.5.1 Inspections

All construction sites are subject to fire and safety inspections without notice. Any violation of fire and safety standards may result in a work stoppage at the expense of the Contractor.

1.10.6 Recordkeeping/Reporting Requirements

On all contract operations, record and report all accident exposure and experience incident work. (This includes exposure and experience of the prime contractor and sub-contractor(s)). As a minimum these records must include exposure work-hours and a log of occupational injuries and illnesses. (OSHA Form 300 or state equivalent as prescribed by 29 CFR 1904 ) Refer to EM 385-1-1, 01.D.04.

1.10.7 Accident Reporting

In addition to the requirements for reporting accidents in accordance with EM 385-1-1, Section 1, submit at the 50% point and 100% of project completion, a written summary of worker's compensation claims filed by workers on the project. The report will include all subcontractors. The main report covering the Prime Contractor claims will be certified as "correct and true" by the Contractor's compensation insurance carrier. The same certification will be required for subcontractor reports.

1.11 PLANNED UTILITY OUTAGES AND STREET CLOSURES

All utility outages and street closures must be of as short a duration as possible and be scheduled as far in advance as possible with the Contracting Officer, in no case less than 14 days before the outage or closure. Obtain from the Contracting Officer in writing a statement or schedule giving the permissible times of outages or closures for particular installations and the maximum time allowed for each. Strictly observe such schedules and the contractor will be held responsible for any violations.

Power outages must be limited to off-duty hours and weekends. Other utilities may be connected and streets closed during normal working hours with the outage duration and street closure as short as possible. Schedule all outages and street closures as far in advance as possible with the Contracting Officer and in no case less than 14days before the outage or closure. Obtain in writing from the Contracting Officer a statement or schedule giving the permissible times of utility outages or road closures for particular installations and the maximum time allowed for such outage.

Strictly observe such schedules and will be held responsible for any violations.

1.12 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

This provision specifies the procedure for the determination of time extensions for unusually severe weather. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

01 00 00 - 7

a. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAYS

WORK DAYS BASED ON (5) DAY WORK WEEK

STATE CALIFORNIA

INSTALLATION/NOAA STATION KERN RIVER PH3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

5 5 5 2 1 0 1 1 1 1 3 4

Upon execution of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.

Refer to ER 415-1-15.

1.13 EQUIPMENT DATA FORM

In conjunction with paragraph, EFARS 52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE, in Section 00 73 00, furnish CESPK FORM 450 for all necessary equipment to perform work requiring adjustment of contract price and submit these forms with the modification proposals. A sample form is at the end of this section.

1.14 SOIL DENSITY TEST (USING METERS CONTAINING RADIOACTIVE MATERIALS)

a. Nuclear methods are not acceptable for soil and soil-aggregate density tests required by this Contract except as stated in Sections 01 35 26

GOVERNMENTAL SAFETY REQUIREMENTS, 31 00 00 EARTHWORK, 32 11 23.11

AGGREGATE BASE COURSE,and 32 15 00 AGGREGATE SURFACE COURSE. Conduct testing for official results as specified in Sections 01 35 26

GOVERNMENTAL SAFETY REQUIREMENTS31 00 00 EARTHWORK, 32 11 23.11

AGGREGATE BASE COURSE,and 32 15 00 AGGREGATE SURFACE COURSE of this contract. If the Contractor proposes to use meters containing radioactive materials to obtain unofficial results for his own convenience, adhere to the following requirements:

b. In accordance with 06.E of EM 385-1-1, obtain a service permit to use, store, operate, or handle a radiation producing machine or radioactive materials on the project site. Obtain the service permit from the

01 00 00 - 8 appropriate through the Contracting Officer. The Contractor should notify the Contracting Officer during the pre-work conference if a radiation producing device will be utilized on the project site in order to determine the permit application requirements, and allow a lead time of 45 days for obtaining a permit.

c. The Contractor is responsible for providing a copy of any Nuclear Regulatory Commission (NRC) licenses per the Code of Federal Regulations 10 CFR "Energy" for all radioactive sources brought onto the project site by the Contractor and/or subcontractors. Provide these licenses to the Contracting Officer, before the radioactive sources is allowed on the project site.

1.15 CONTRACTOR SAFETY PERSONNEL REQUIREMENTS

a. Full-time, on-site, safety coverage by contractors must be required for the life of the contract.

b. Meet the following conditions:

(1) Employ, to cover all hours of work at the project site(s), at least one safety and health person to manage the Contractor's safety program; duties which are not germane to the safety program must not be assigned to this person(s). The principal safety and health person must report to and work directly for the Contractor's top on-site manager, corporate safety office, or other high-level official of equivalent position. The safety and health person(s) must have the authority to take immediate steps to correct unsafe or unhealthful conditions. The employment of a safety and health person(s) must not abrogate the safety and health responsibilities of other personnel.

(2) Qualifications for Safety and Health Person(s).

(a) Safety and Health Person(s) must have a degree in engineering or safety in at least a four year program from an accredited school and must have been engaged in safety and occupational health for at least one (1) year of experience (no time being credited to this one (1) year unless at least fifty (50) percent of the time was devoted to safety and occupational health) and have at least one (1) year experience in construction, or--

(b) Safety and Health Person(s) must have legal registration as a Professional Engineer or a Certified Safety Professional and have been engaged in safety and occupational health for at least…