ACKNOWLEDGEMENT_Standard_Magazine_Rehab_Amd_0001.pdf
PDF 33 KB Posted
- Solicitation number
- W91238-17-R-0044
About this file
Revised Acknowledgement
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4 Acknowledgement Statement Standard Magazine Rehabilitation Sierra Army Depot, Herlong, CA May 5, 2017 Amendment 0001 July 11, 2017
The offeror agrees to perform the work required at the prices specified and in strict accordance with the terms of the contract.
1. Name, Address, and DUNS Number of Contractor
2. Telephone Number
3. Contract No.:
4. Title of Project: Standard Magazine Rehabilitation
5. Name and Title of Person Authorized to Sign Offer:
Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:
6. Signature:
7. Offer Date:
8. Amendments (Number & Date of Acknowledgement):
9. The offeror agrees to perform the required work at the prices specified below in strict accordance with the terms and conditions of this RFP, if the offer is accepted in writing within ___90__ calendar days after the date offers are due.
10. Proposed Period of Performance: 365 calendar days
11. (a)-Note that your statement must include your acknowledgment of all amendments; and (b)-This is a Job pricing. Provide price breakout as follows:
Standard Magazine Rehabilitation Sierra Army Depot, Herlong, CA May 5, 2017
CLIN Breakout Schedule
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC.
NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS
AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL
ATTACHMENTS THERETO.
UNIT OF TOTAL
CLIN DESCRIPTION QUANTITY MEASURE PRICE
BASE BID
0001 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation to rehabilitate Standard Magazine Building 430 426 at Sierra Army Depot, Herlong, CA in accordance with all RFP documents, drawings and specifications.
0002 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation to rehabilitate Standard Magazine Building 427 at Sierra Army Depot, Herlong, CA
0003 Provide all labor, management, 1 JOB $_______________ equipment and transportation to rehabilitate Standard Magazine Building 428 at Sierra Army Depot, Herlong, CA
0004 Provide all labor, management, 1 JOB $_______________ equipment and transportation to rehabilitate Standard Magazine Building 429 at Sierra Army Depot, Herlong, CA
Standard Magazine Rehabilitation Sierra Army Depot, Herlong, CA May 5, 2017
0005 Provide all labor, management, 1 JOB $_______________ equipment and transportation to rehabilitate Standard Magazine Building 438 at Sierra Army Depot, Herlong, CA
0006 Provide all labor, management, 1 JOB $_______________ equipment and transportation to rehabilitate Standard Magazine Building 439 at Sierra Army Depot, Herlong, CA
0007 Provide all labor, management, 1 JOB $_______________ equipment and transportation to rehabilitate Standard Magazine Building 440 at Sierra Army Depot, Herlong, CA
0008 Provide all labor, management, 1 JOB $_______________ equipment and transportation to rehabilitate Standard Magazine Building 435 441 at Sierra Army Depot, Herlong, CA
0009 Provide all labor, management, 1 JOB $_______________ equipment and transportation to perform Contractor Manpower Reporting at Sierra Army Depot, Herlong, CA drawings and specifications
Standard Magazine Rehabilitation Sierra Army Depot, Herlong, CA May 5, 2017
OPTION 1
0010 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation to rehabilitate Standard Magazine Building 426 430 at Sierra Army Depot, Herlong, CA
OPTION 2
0011 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation to rehabilitate Standard Magazine Building 441 435 at Sierra Army Depot, Herlong, CA
OPTION 3
0012 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation to rehabilitate Standard Magazine Building 442 at Sierra Army Depot, Herlong, CA
OPTION 4
0013 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation to rehabilitate Standard Magazine Building 443 at Sierra Army Depot, Herlong, CA
Standard Magazine Rehabilitation Sierra Army Depot, Herlong, CA May 5, 2017
TOTAL PRICE BASE BID (ITEMS 0001 – 0009) $_______________
TOTAL PRICE OPTIONS 1 – 4 (ITEMS 0010 – 0013) $_______________
TOTAL PRICE BASE BID PLUS OPTIONS (ITEMS 0001 – 0013)
END OF CLIN SCHEDULE
Standard Magazine Rehabilitation Sierra Army Depot, Herlong, CA May 5, 2017
1. Prices must be submitted on all individual items of this CLIN Schedule. Failure to do so may cause the proposal to be determined "unacceptable".
2. If a modification to a price is submitted which provides for a job adjustment to the total price, the application of the job adjustment to each item in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the job adjustment shall be applied on a pro rata basis to every item in the CLIN Schedule.
3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted CLIN Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".
4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
5. The successful offeror grants the options listed in the Pricing Schedule to the Government.
The options may be exercised up to 90 calendar days after receipt of notice to proceed (NTP).
6. Exercise of the option occurs upon mailing of written notice to the Contractor. Exercise will be made by the Contracting Officer. The price for exercise of the option includes all work and effort associated with the scope of that item. The proposed additional time for contract completion will be allowed when the option is exercised.
ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
File details come from the government source that posted it. Updated .