Atch_5_-_Pre-Award_Survey.pdf

PDF 33 KB Posted

Attached to
Repairs of Bldg. 362 at Sierra Army Depot (SIAD)
Solicitation number
W91238-17-R-0032
Issued by

About this file

Atch 5 - Pre-Award Survey

View the file

Other files

File Type Posted
SF30-_Amend_0004_Final_W91238-17-R-0032.pdf PDF
Amend_0006_W91238-17-R-0032_(003).pdf PDF
1-Atch_1_-_Rev_2_SOW_362_Amd_0006.docx DOCX document
Amend_0005_W91238-17-R-0032.pdf PDF
Solicitation_Rev_2_17-R-0032.pdf PDF
Solicitation_Rev_17-R-0032.pdf PDF
Atch_4_ACKNOWLEDGEMENT_362_Amd_0004.pdf PDF
SF_30_Amend_0004_Draft_W91238-17-R-0032.pdf PDF
Rev_SOW_362_22_May_2017.pdf PDF
Appendix_7_-_Structural_Repairs.pdf PDF
Rev_Appendices_1-5_B362.pdf PDF
Amend_0003_Extend_Repairs_for_Bldg_362_@_SIAD.pdf PDF
Atch_10_-_STRUCTURAL_AS-BUILT.pdf PDF
Amend_0002_Repairs_for_Bldg_362_@_SIAD.pdf PDF
Atch_8_-_B-362_Elevations.pdf PDF
Atch_11_-_Thermocycler_Furnace.pdf PDF
Site_Visit_Sign-in_Sheet_B-362.pdf PDF
Atch_9_-_Siding_Mock-Up.pdf PDF
Atch_7_-_B-351_Bollards.pdf PDF
Atch_6_-_PPQ_0_Form.pdf PDF
Amend_0001_Repairs_for_Bldg_362_@_SIAD.pdf PDF
A07.01_6-Atch_4_Order_Acknowledgement_362_Rev.pdf PDF
A07.01_1-Atch_1_Statement_of_Work_362.pdf PDF
A07.01_Solicitation_Final_17-R-0032.pdf PDF
A07.01_2-Appendices_1-5_B362.pdf PDF
A07.01_5-Atch_3_Davis_Bacon_Wage_Determination_4-24.pdf PDF
A07.01_4-Atch_2_Supplemental_CT_Requirements_B362.pdf PDF
A07.01_0-Cover_Letter_B362.pdf PDF
A07.01_3-Appendix_6_Photos.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Award Survey of Prospective Contractors

CONSTRUCTION CONTRACTOR DATA DATE:

Firm Name and Telephone Number Main Office Address (Street, City, and State)

Branch Offices Services Rendered � Construction � Design � Consultant

Organization � Individual � Joint Venture � Partnership � Corporation

Date Organized Date Incorporated:

State:

Names of Officers and Other Key Personnel

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below) Partners:

Officers:

Other Key:

Remainder: Subtotal Permanent:

Maximum Personnel at Any Time:

Date:

Total:

II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF

(DATE): Present Value ($) Current Assets:

Acquisition Cost ($) Current Liabilities:

Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION

WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE

(LIST MOST RECENT FIRST)

V—LARGEST JOB EVER

CONTRACTED

(If Other Than in Past Six Years)

$ LARGEST JOB IN PAST 6 YRS Contract Amount:

Date:

Description:

Owner:

$ Contract Amount:

Date:

Description:

Owner:

Avg. Annual Income

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING

SIGNATURE

� See attachment for explanations or detailed description of item(s) reported above.

CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS

List below the construction projects your firm currently has under way, including recent awards. Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.

CONTRACT

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

COMPLETE

CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS

List below the principal construction projects your firm has completed within the past six years, including all DoD contracts.

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

SUBLET

CONSTRUCTION CONTRACTOR DATA – SCHEDULE C –

CONSTRUCTION AND/OR TECHNICAL EQUIPMENT

List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.

QUANTITY

DESCRIPTION

CONDITION

YEARS OF

SERVICE

PRESENT

STATUS