A07.01_4-Atch_2_Supplemental_CT_Requirements_B362.pdf

PDF 17 KB Posted

Attached to
Repairs of Bldg. 362 at Sierra Army Depot (SIAD)
Solicitation number
W91238-17-R-0032
Issued by

About this file

Atch-2_Supplemental CT Requirements

View the file

Other files

File Type Posted
SF30-_Amend_0004_Final_W91238-17-R-0032.pdf PDF
Amend_0006_W91238-17-R-0032_(003).pdf PDF
1-Atch_1_-_Rev_2_SOW_362_Amd_0006.docx DOCX document
Amend_0005_W91238-17-R-0032.pdf PDF
Solicitation_Rev_2_17-R-0032.pdf PDF
Solicitation_Rev_17-R-0032.pdf PDF
Atch_4_ACKNOWLEDGEMENT_362_Amd_0004.pdf PDF
SF_30_Amend_0004_Draft_W91238-17-R-0032.pdf PDF
Rev_SOW_362_22_May_2017.pdf PDF
Appendix_7_-_Structural_Repairs.pdf PDF
Rev_Appendices_1-5_B362.pdf PDF
Amend_0003_Extend_Repairs_for_Bldg_362_@_SIAD.pdf PDF
Atch_10_-_STRUCTURAL_AS-BUILT.pdf PDF
Amend_0002_Repairs_for_Bldg_362_@_SIAD.pdf PDF
Atch_8_-_B-362_Elevations.pdf PDF
Atch_11_-_Thermocycler_Furnace.pdf PDF
Site_Visit_Sign-in_Sheet_B-362.pdf PDF
Atch_9_-_Siding_Mock-Up.pdf PDF
Atch_7_-_B-351_Bollards.pdf PDF
Atch_6_-_PPQ_0_Form.pdf PDF
Atch_5_-_Pre-Award_Survey.pdf PDF
Amend_0001_Repairs_for_Bldg_362_@_SIAD.pdf PDF
A07.01_6-Atch_4_Order_Acknowledgement_362_Rev.pdf PDF
A07.01_1-Atch_1_Statement_of_Work_362.pdf PDF
A07.01_Solicitation_Final_17-R-0032.pdf PDF
A07.01_2-Appendices_1-5_B362.pdf PDF
A07.01_5-Atch_3_Davis_Bacon_Wage_Determination_4-24.pdf PDF
A07.01_0-Cover_Letter_B362.pdf PDF
A07.01_3-Appendix_6_Photos.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Building 362 Rehabilitation Sierra Army Depot, Herlong, CA January 30, 2017

SUPPLEMENTAL CONTRACT REQUIREMENTS

1. Performance Period. Refer to FAR 52.211-10, Commencement, Prosecution, And Completion of Work. The time duration of performance period is 300 (Base Bid) + 45 (Option

1) + 15 (Option 2) = 360 (Total if all Options exercised) calendar days after Notice to Proceed date.

2. Liquidated Damages. Refer to FAR 52.211-12, Liquidated Damages-Construction.

Liquidated damages for this work are $1,217.00 for each day of delay.

3. Evaluation of Options. Refer to FAR 52.217-5, Evaluation of Options. Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

4. Authorities. Only a warranted Contracting Officer (either PCO or ACO) acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer. The Government Contracting Officer/Administrative Contracting Officer has the authority to make any changes to this contract action that impact cost or schedule. Authority from the Contracting Officer/Administrative Contracting Officer to the contractor to make changes that impact cost or schedule will be in the form of an official, signed modification.

5. Wage Determination. General Decision Number CA170009, 01/27/2017, Lassen County, California, or its most current modification at the time of award are hereby applicable to work performed under this contract. The most current decision or its modification can be found by clicking on hyperlink http://www.wdol.gov/dba.aspx for such information.

6. Time Extensions For Unusually Severe Weather. Refer to FAR 52.249-10, Default (Fixed- Priced Construction). All weather delays will need to be submitted and approved by the Contracting Officer Representative.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

(20) (17) (17) (13) (06) (03) (01) (01) (04) (10) (15) (20) http://www.wdol.gov/dba.aspx

SUPPLEMENTAL CONTRACT REQUIREMENTS

File details come from the government source that posted it. Updated .