W91238-16-R-0022_AMENDMENT_0004_Sheets.pdf
PDF 138 KB Posted
- Attached to
- USDA Forest Service Kern River Ranger District Engine Station Relocation Federal contract opportunity
- Solicitation number
- W91238-16-R-0022
About this file
Amendment 0004 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W91238-16-R-0022-0004.pdf | ||
| 2019_AMENDMENT_0004__SUMMARY.pdf | ||
| W91238-16-R-0022-0003.pdf | ||
| 2019_AMENDMENT_0003__SUMMARY.pdf | ||
| AMENDMENT_0003_DRAWINGS.pdf | ||
| W91238-16-R-0022-0002.pdf | ||
| W91238-16-R-0022-0001.pdf | ||
| Summary_of_Changes_to_the_Specs_and_Drawings_-W91238-16-R-0022-0001.pdf | ||
| Fire_Station_Site_Visit_Sign-in_Sheet.pdf | ||
| Revised_Specs_and_Drawings_-_W91238-16-R-0022-0001.pdf | ||
| Solicitation_-_W91238-16-R-0022.pdf | ||
| A01.10_Geotechnical_Report_15_June_15.pdf | ||
| A01.10_Specifications_2019_2_Mar_16.pdf | ||
| Drawings_-_W91238-16-R-0022.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PF
J
JJ
TRAINING
DAY ROOM
TOILET
TOILET
RESTROOM 105
RESTROOM
STORAGE 107
HALLWAY
C O
M M
ENGINE BAY
CACHE
WEIGHT ROOM
ENG ADMIN
WP
WP
VEC-1
AC-1
SS
-2
SS
-1
C U
-1
UH-1
ICE MAKER
+48"
WASHER
DRYER
UH-1
D
RACK
TTB. SEE
NOTE 2.
EF-2
F-1
EF-1EF-1
EF-2
GFI
+48"
GFI
+48"
GFI
+48"
GFI
+48"
SS
SS
EWC
+42"
+42"
+42"
REF.
S
GARBAGE
DISPOSAL
FACP
,45
,47
,35
,39
56,58
61,63,65
67,69,71
44 44 44
42 42
38 68,70,72
62,64,66
WP
26242424
16 16
18 18
WH-1
CP-1
12 10 2 4 6 20
PANEL
"F"
CR
DRI
DRI
CR
CR DRI
PC
IS
C
51,53
8 G
FI
G
FI
G
FI
GFI
GFI
+48"
GFI
+48"
GFI
+48"
G
FI
GFI
31 G
FI
+4 8"31 G
FI
+4
8"
METER/MAIN CABINET WITH METER. SEE
POWER ONE-LINE DIAGRAM ON SHEET E-601.
400A DOUBLE-THROW MANUAL TRANSFER
SWITCH. SEE POWER ONE-LINE DIAGRAM
ON E-601.
GFI
GFI
GFI
GFI32,34
GFI
GFI
GFI
GFI
ROLL-UP DOOR
MOTORS. SEE
NOTE 3.
ROLL-UP DOOR
MOTORS. SEE NOTE 3.
SEE
NOTE 5.
SEE
NOTE 5.
SEE NOTE 1,
TYPICAL.
SEE
NOTE 4.
TV
+96"
+96"
SEE
NOTE 4.
GFI
S
S S
SS
PA
RACK
S
S
S
EH-1
CO/NO2 SENSOR/ALARM
WP
73,75
3#10 & 1#12 GND, 1/2" C
2#6 & 1#10 GND, 3/4" C
C
2#10 & 1#12 GND, 1/2" C
GFI
WP
+48"
+48"
GFI GFI
GFI
WP
3#12 & 1#12 GND, 1/2"C
3#12 & 1#12 GND, 1/2"C
CATV CABINET
ADVANCED
METER
ENCLOSURE
WPWPWP
WP WPWP
WP
WP
WP
WP
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
A W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
C H
E C
KE
D B
Y:
AN
S I
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
E-110
PO
W
ER
A
N D
S
IG
N A L
F
LO
O R
P L A
N
U
SD
A F O
R
ES
T
SE
R
VI
C E
KE
R
N R
IV
ER
SA
C
R
AM
EN
TO
D
IS
TR
IT
SA
C
R
AM
E N
TO
, C A L
IF
O
R N
IA
SA
C
R
AM
EN
TO
D
IS
TR
IT
'J ' S
TR
EE
T
SA
C R
AM
EN
TO
, C
A
4-
B.
P
IT
T
J.
F
R
ES
C
AS
/s / S co tt
L.
B ar m an
F.
L
U M
F
EB
KE
1-
-0
3E
-1
_F ire
St at io n.
rv t
KE
1-
-0
3E
P2
PR
O
JE
C
T N
O
SP
EC
N O
AM-04
E
LE
C
TR
IC
AL
E
-1
POWER AND SIGNAL FLOOR PLAN
SCALE: 1/4" =1'-0"
02 4 8134
SCALE: 1/4"=1'-0"
PLAN NORTH
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
M
O
VE
A C
-1 , A
D
JU
ST
M
ET
ER
/M
AI
N A
N D
M
AN
U
AL
T R
AN
SF
ER
SW
IT
C
H , A
D D
W P
TO
E
XT
ER
IO
R
E Q
U
IP
M
EN
T
A
PR
R
EV
IS
E N
O
TE
S
FO
R M
ET
ER
/M
AI
N C
AB
IN
ET
A
N D
M
AN
U
AL
TR
AN
SF
ER
S W
IT
C
H
A
PR
NOTES:
1. ALL CIRCUITS ARE FED FROM PANEL “F”. SEE PANEL SCHEDULE ON E-601.
2. TTB IN COMM ROOM 110 SHALL BE 3/4” THICK PLYWOOD WITH 3 COATS OF
INSULATING VARNISH, 8’ TALL.
3. FOR THE THREE ROLL-UP DOORS IN THE ENGINE BAY, PROVIDE WIRELESS
REMOTE CONTROL IN ADDITION TO THE UP-DOWN-STOP PUSHBUTTON
CONTROL WIRED CONTROL. PROVIDE THREE EACH WIRELESS REMOTE
CONTROL DEVICES FOR EACH ROLL-UP DOOR. PROVIDE 3#12 & 1#12 GND IN
1/2" C FOR EACH MOTOR FEED.
4. PROVIDE FLUSH CEILING MOUNTED OUTLETS FOR WIRELESS ACCESS POINT
LOCATIONS.
5. RETAINING WALL AT EAST END OF CACHE RM 112 AND WEIGHT RM 113
EXTENDS UP TO +27”. MOUNT RECEPTACLES AND COMM OUTLETS AT THESE
LOCATIONS AT +36” SO AS TO BE ABOVE RETAINING WALL.
VOICE/DATA
RACK IN
COMM RM. 110
PA SYSTEM
CENTRAL CONSOLE
IN COMM RM. 110
S
S
S
S
S
S
S
S
PUBLIC ADDRESS (PA) SYSTEM NOTES
PROVIDE A COMPLETE AND OPERATIONAL PA SYSTEM FOR THE BUILDING.
THE PA SYSTEM SHALL BE A ONE WAY SYSTEM WITH CEILING MOUNTED SPEAKERS. EACH SPEAKER SHALL HAVE MANUALLY ADJUSTABLE VOLUME CONTROL BUILT-IN. ALL SPEAKERS SHALL BE CONNECTED TO AND POWERED FROM THE CENTRAL PA SYSTEM CONTROL CONSOLE. THE SYSTEM SHALL HAVE PROVISIONS SUCH THAT THE CENTRAL CONSOLE CAN ACCESS ANY SPEAKER TYPE TELEPHONES INSTALLED IN THE TELEPHONE
SYSTEM AND SUCH THAT THE PA SYSTEM CAN BE ACCESSED FROM ANY IN-HOUSE TELEPHONE.
1.
2.
PA SYSTEM RISER DIAGRAM
AN
D
P A
SY
ST
EM
R
IS
ER
D
IA
G R
AM
2#12 & 1#12 GND, 1/2"C
SCHEDULE OF PANEL "F"
SERVICE
LOAD (VA)
CB
CKT
PHASE
CKT
CB
LOAD (VA)
SERVICE
LTG. REC. OTHER # # LTG. REC. OTHER
LIGHTING, RMS. 101-110 1190 20/1 1 A 2 20/1 1800 CONV. MICROWAVE-DAY RM 106
LTG.-N. ENGINE BAY 111, CACHE 112 918 20/1 3 B 4 20/1 1440 COFFEE POT-DAY RM 106
LTG.-S. ENGINE BAY 111, WEIGHT RM 113 1005 20/1 5 C 6 20/1 1800 CONV. TOASTER OVEN-DAY RM 106 SITE LTG-POV AREA, ENG. BAY ENTRY 695 20/1 7 A 8 20/1 1020 REC. & ELEC WAT. COOLER-DAY RM 106
SITE LTG-ENTRY SIGN, SURGE AREA 719 20/1 9 B 10 20/1 1656 GARBAGE DISPOSAL-DAY RM 106
IRRIGATION CTRL, SITE LTG-KIOSK/
SHADE STRUCTURE/S. OF BLDG 1035 120 20/1 11 C 12 20/1 1392 REFRIGERATOR-DAY RM 106
EXTERIOR LIGHTING WALLPACKS 786 20/1 13 A 14 20/1 1080 RECEPT.-TRAINING RM 101, EXTERIOR
SPARE 20/1 15 B 16 20/1 900 RECEPT.-TRNG 101, TOILETS 102/103
EXH. FANS-TOILETS 102/103, RESTRMS 408 15/1 17 C 18 20/1 1080 REC.-RESTRMS 104/105, STORAGE 109
WH-1 PROPANE HOT WATER HTR-MEZZ. 60 15/1 19 A 20 20/1 900 REC.-HALL 107, COMM 110, DAY RM 106
CP-1 CIRC. PUMP-MEZZ. OVER 104/105 101 15/1 21 B 22 20/1 720 REC. (QUADPLEX)-COMM RM 110
FIRE ALARM CTRL. PANEL-DAY RM 106 500 20/1 23 C 24 20/1 1080 RECEPT.-DAY RM 106
FLOOR RECEPT.-TRAINING RM 101 720 20/1 25 A 26 20/1 900 RECEPT.-ENGINE ADMIN 108
WORK BENCH REC.-ENGINE BAYS 111 W 360 20/1 27 B 28 20/1 720 FLOOR RECEPT.-ENGINE ADMIN 108
REC. (QUADPLEX)-COMM RM 110 720 20/1 29 C 30 20/1 1200 WASHER-ENGINE BAY 111
WORK BENCH REC.-ENGINE BAYS 111 S 540 20/1 31 A 32
30/2
DRYER-ENGINE BAY 111
SS-1 HEAT PUMP OUTSIDE ENGINE BAY
(FOR COMM ROOM 110)
30/2
33 B 34 2496
1364 35 C 36 20/1 1548 ICEMAKER-ENGINE BAY 111
SS-2 HEAT PUMP OUTSIDE ENGINE BAY
(FOR WEIGHT ROOM 113)
30/2
37 A 38 20/1 1080 60 RECEPT.-N ENGINE BAY 111, EXTERIOR,
CO/NO2 SENSOR/ALARM
1260 39 B 40 20/1 1080 RECEPT.-S ENGINE BAY 111, EXTERIOR
F-1 FURNACE-MEZZ. OVER 104/105 624 15/1 41 C 42 20/1 1080 REC.-CACHE 112, WEIGHT RM 113
CU-1 CONDENSING UNIT OUTSIDE
ENGINE BAYS
25/3
43 A 44 20/1 900 RECEPT.-WEIGHT RM 113
1201 45 B 46 20/1 SPARE
1201 47 C 48 20/1 500 ACCESS CONTROL SYSTEM PANEL
UH-1 UNIT HEATER, ENGINE BAYS
111-WEST 444 15/1 49 A 50 20/1 1260 RECEPT.-CACHE 112, EXTERIOR
OUTLET FOR WELDER OUTSIDE ENGINE
BAYS
50/2
51 B 52 20/1 SPARE
3120 53 C 54 20/1 500 PA SYSTEM CENTRAL CONSOLE
UH-1 UNIT HEATER, ENGINE BAYS
111-EAST 444 15/1 55 A 56
40/2
1727 AIR COMPRESSOR OUTSIDE ENGINE
BAYS 111
SPARE 20/1 57 B 58 1727
SLIDING GATE OPERATOR-EAST HALF 648 15/1 59 C 60 20/1 360 REC.-WIRELESS ACCESS POINTS-RM 101
TRAINING AND RM 106 DAY ROOM
VEC-1 VEHICLE EXHAUST
CAPTURE-ENGINE BAYS 111
15/3
61 A 62
15/3
MOTORIZED ROLL-UP DOOR-ENGINE
BAYS 111-NORTHWEST745 63 B 64 273
745 65 C 66 273
MOTORIZED ROLL-UP DOOR-ENGINE
BAYS 111-SOUTHEAST
15/3
67 A 68
15/3
MOTORIZED ROLL-UP DOOR-ENGINE
BAYS 111-NORTHEAST273 69 B 70 273
273 71 C 72 273
EH-1 ELEC. UNIT HEATER-CACHE 112
20/2 73 A 74
20/3
HOSE TOWER HOIST1531 75 B 76 1201
SLIDING GATE OPERATOR-WEST HALF 648 15/1 77 C 78 1201
INPUT FROM RENEWABLE ENERGY
SOURCE 40/3
79 A 80
20/3 TRANSIENT VOLTAGE SURGE
SUPPRESSOR (TVSS)81 B 82
83 C 84
VOLTS: 120/208 LOAD SUMMARY:
PHASE: 3 CONN. KVA D.F. DEMAND KVA PHASE VA:
BUS: 400A LIGHTING 6.348 --- 6.012 A 24859
AIC: 22K RECEPT. 32.328 --- 21.164 B 24078
MAINS: 300A OTHER 34.959 --- 25.785 C 24698
MOUNTING: RECESSED 15% SPARE 11.045 0.6 6.627 DEMAND AMPS:
TOTAL 84.680 --- 59.588 165.4
MAIN POWER PANEL "F"
(E) OH POWER LINE
(N) XFMR (TO BE
PROVIDED BY OTHERS)
112.5KVA, 3 PHASE,
4 WIRE 208/120V
R
POWER ONE-LINE DIAGRAM
400 AMP, 3 PHASE, 4 WIRE @ 208/120
VOLTS, 22K AIC
PORTABLE EMERGENCY
GENERATOR BY OTHERS
(N.I.C.)
(N) 3 PHASE, 208V, 400A DOUBLE-
THROW MANUAL TRANSFER
SWITCH, NEMA 3R, 100K AIC
300A / 3P
#2
4#350kcmil &
#2 GND IN 4" C
#6
VISC
PANEL
3#1 AWG & 1#
8 GND IN 4" C
120/208V, 1
PHASE, 2 POLE, 3
WIRE, 100 AMP,
NEMA 3R, 10K AIC,
100A MCB
RISER POLE
FOR BRANCH CIRCUIT BREAKERS, SEE
SCHEDULE OF PANEL "F" ON THIS
SHEET.
40A 3P
RENEWABLE
ENERGY
SOURCE
SEE NOTES 1, 2 AND 3.
V
A
METER MAIN SERVICE
DISCONNECT, NEMA 3R, 400
AMP, 3 PHASE, 4 WIRE @
208/120 VOLTS, 22K AIC
300A/3P
SEE NOTE 5.
G
300A/3P 100A/2P
SEE NOTE 4.
CONDUIT PER SHEET ES-101, CONDUCTORS
FURNISHED AND INSTALLED BY SOUTHERN
CALIFORNIA EDISON.
SEE NOTE 4.
SEE NOTE 4.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
A W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
C H
E C
KE
D B
Y:
AN
S I
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
E-601
PO
W
ER
O
N E -
LI
N
E D
IA
G
R
AM
S
AN
D P
AN
E L
SC
H
ED
U
LE
U
SD
A F O
R
ES
T
SE
R
VI
C E
KE
R
N R
IV
ER
SA
C
R
AM
EN
TO
D
IS
TR
IT
SA
C
R
AM
E N
TO
, C A L
IF
O
R N
IA
SA
C
R
AM
EN
TO
D
IS
TR
IT
'J ' S
TR
EE
T
SA
C R
AM
EN
TO
, C
A
4-
B.
P
IT
T
J.
F
R
ES
C
AS
/s / S co tt
L.
B ar m an
F.
L
U M
F
EB
KE
1-
-0
3E
-6
_F ire
St at io n.
rv t
KE
1-
-0
P2
PR
O
JE
C
T N
O
SP
EC
N O
AM-04
E
LE
C
TR
IC
AL
E
-6
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AD
D C
IR
C
U
IT
F O
R H
O
SE
T O
W
ER
H O
IS
T
M
AR
R
EV
IS
E N
O
TE
S
FO
R C
O N
D U
C
TO
R S
FR
O
M T
R
AN
SF
O
R M
ER
T
O M
ET
ER
M
AI
N A
N D
F O
R M
AN
U
AL
T
R
AN
SF
ER
S W
IT
C
H
A
PR
1.
2.
3.
4.
5.
NOTES:
WIND TURBINES IS AN OPTION AND SHALL BE INCLUDED IN THE
CONTRACT ONLY IF THIS OPTION IS EXERCISED BY THE
CUSTOMER.
PHOTOVOLTAIC ARRAY IS AN OPTION AND SHALL BE INCLUDED
IN THE CONTRACT ONLY IF THIS OPTION IS EXERCISED BY THE
CUSTOMER. PHOTOVOLTAIC INSTALLATION SHALL COMPLY WITH
NEC ARTICLE 690.
SEE SHEET E-101 FOR LOCATION OF THE WIND TURBINES AND
THE SOLAR PV ARRAY. ALSO SEE NOTES 7 AND 8 ON THAT
SHEET. WIND TURBINE INSTALLATION SHALL COMPLY WITH NEC
ARTICLE 694.
SEE NOTES ON SHEET ES-101 FOR WORK TO BE COORDINATED
WITH SOUTHERN CALIFORNIA EDISON FROM OVERHEAD LINE
CONNECTION POINT THROUGH METER MAIN SERVICE DISCONNECT
AT FIRE STATION.
PROVIDE ADVANCED METER ENCLOSURE WITH ADVANCED
METERING AND ASSOCIATED COMMUNICATIONS CABLING AND
THREE EACH 300:5 AMP CURRENT TRANSFORMERS FOR
ADVANCED METERING FUNCTION ADJACENT TO PANEL 'F" IN
HALLWAY ROOM 107. 1.
PANEL SCHEDULE "F" NOTES:
PROVIDE SWITCHING DUTY RATED CIRCUIT BREAKERS FOR ALL BRANCH BREAKERS IN PANEL.