Amendment 0004 Drawings

View the file

Other files for this federal contract opportunity

Other files attached to USDA Forest Service Kern River Ranger District Engine Station Relocation, newest first.
File Type Posted
W91238-16-R-0022-0004.pdf PDF
2019_AMENDMENT_0004__SUMMARY.pdf PDF
W91238-16-R-0022-0003.pdf PDF
2019_AMENDMENT_0003__SUMMARY.pdf PDF
AMENDMENT_0003_DRAWINGS.pdf PDF
W91238-16-R-0022-0002.pdf PDF
W91238-16-R-0022-0001.pdf PDF
Summary_of_Changes_to_the_Specs_and_Drawings_-W91238-16-R-0022-0001.pdf PDF
Fire_Station_Site_Visit_Sign-in_Sheet.pdf PDF
Revised_Specs_and_Drawings_-_W91238-16-R-0022-0001.pdf PDF
Solicitation_-_W91238-16-R-0022.pdf PDF
A01.10_Geotechnical_Report_15_June_15.pdf PDF
A01.10_Specifications_2019_2_Mar_16.pdf PDF
Drawings_-_W91238-16-R-0022.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PF

J

JJ

TRAINING

DAY ROOM

TOILET

TOILET

RESTROOM 105

RESTROOM

STORAGE 107

HALLWAY

C O

M M

ENGINE BAY

CACHE

WEIGHT ROOM

ENG ADMIN

WP

WP

VEC-1

AC-1

SS

-2

SS

-1

C U

-1

UH-1

ICE MAKER

+48"

WASHER

DRYER

UH-1

D

RACK

TTB. SEE

NOTE 2.

EF-2

F-1

EF-1EF-1

EF-2

GFI

+48"

GFI

+48"

GFI

+48"

GFI

+48"

SS

SS

EWC

+42"

+42"

+42"

REF.

S

GARBAGE

DISPOSAL

FACP

,45

,47

,35

,39

56,58

61,63,65

67,69,71

44 44 44

42 42

38 68,70,72

62,64,66

WP

26242424

16 16

18 18

WH-1

CP-1

12 10 2 4 6 20

PANEL

"F"

CR

DRI

DRI

CR

CR DRI

PC

IS

C

51,53

8 G

FI

G

FI

G

FI

GFI

GFI

+48"

GFI

+48"

GFI

+48"

G

FI

GFI

31 G

FI

+4 8"31 G

FI

+4

8"

METER/MAIN CABINET WITH METER. SEE

POWER ONE-LINE DIAGRAM ON SHEET E-601.

400A DOUBLE-THROW MANUAL TRANSFER

SWITCH. SEE POWER ONE-LINE DIAGRAM

ON E-601.

GFI

GFI

GFI

GFI32,34

GFI

GFI

GFI

GFI

ROLL-UP DOOR

MOTORS. SEE

NOTE 3.

ROLL-UP DOOR

MOTORS. SEE NOTE 3.

SEE

NOTE 5.

SEE

NOTE 5.

SEE NOTE 1,

TYPICAL.

SEE

NOTE 4.

TV

+96"

+96"

SEE

NOTE 4.

GFI

S

S S

SS

PA

RACK

S

S

S

EH-1

CO/NO2 SENSOR/ALARM

WP

73,75

3#10 & 1#12 GND, 1/2" C

2#6 & 1#10 GND, 3/4" C

C

2#10 & 1#12 GND, 1/2" C

GFI

WP

+48"

+48"

GFI GFI

GFI

WP

3#12 & 1#12 GND, 1/2"C

3#12 & 1#12 GND, 1/2"C

CATV CABINET

ADVANCED

METER

ENCLOSURE

WPWPWP

WP WPWP

WP

WP

WP

WP

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

E-110

PO

W

ER

A

N D

S

IG

N A L

F

LO

O R

P L A

N

U

SD

A F O

R

ES

T

SE

R

VI

C E

KE

R

N R

IV

ER

SA

C

R

AM

EN

TO

D

IS

TR

IT

SA

C

R

AM

E N

TO

, C A L

IF

O

R N

IA

SA

C

R

AM

EN

TO

D

IS

TR

IT

'J ' S

TR

EE

T

SA

C R

AM

EN

TO

, C

A

4-

B.

P

IT

T

J.

F

R

ES

C

AS

/s / S co tt

L.

B ar m an

F.

L

U M

F

EB

KE

1-

-0

3E

-1

_F ire

St at io n.

rv t

KE

1-

-0

3E

P2

PR

O

JE

C

T N

O

SP

EC

N O

AM-04

E

LE

C

TR

IC

AL

E

-1

POWER AND SIGNAL FLOOR PLAN

SCALE: 1/4" =1'-0"

02 4 8134

SCALE: 1/4"=1'-0"

PLAN NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

M

O

VE

A C

-1 , A

D

JU

ST

M

ET

ER

/M

AI

N A

N D

M

AN

U

AL

T R

AN

SF

ER

SW

IT

C

H , A

D D

W P

TO

E

XT

ER

IO

R

E Q

U

IP

M

EN

T

A

PR

R

EV

IS

E N

O

TE

S

FO

R M

ET

ER

/M

AI

N C

AB

IN

ET

A

N D

M

AN

U

AL

TR

AN

SF

ER

S W

IT

C

H

A

PR

NOTES:

1. ALL CIRCUITS ARE FED FROM PANEL “F”. SEE PANEL SCHEDULE ON E-601.

2. TTB IN COMM ROOM 110 SHALL BE 3/4” THICK PLYWOOD WITH 3 COATS OF

INSULATING VARNISH, 8’ TALL.

3. FOR THE THREE ROLL-UP DOORS IN THE ENGINE BAY, PROVIDE WIRELESS

REMOTE CONTROL IN ADDITION TO THE UP-DOWN-STOP PUSHBUTTON

CONTROL WIRED CONTROL. PROVIDE THREE EACH WIRELESS REMOTE

CONTROL DEVICES FOR EACH ROLL-UP DOOR. PROVIDE 3#12 & 1#12 GND IN

1/2" C FOR EACH MOTOR FEED.

4. PROVIDE FLUSH CEILING MOUNTED OUTLETS FOR WIRELESS ACCESS POINT

LOCATIONS.

5. RETAINING WALL AT EAST END OF CACHE RM 112 AND WEIGHT RM 113

EXTENDS UP TO +27”. MOUNT RECEPTACLES AND COMM OUTLETS AT THESE

LOCATIONS AT +36” SO AS TO BE ABOVE RETAINING WALL.

VOICE/DATA

RACK IN

COMM RM. 110

PA SYSTEM

CENTRAL CONSOLE

IN COMM RM. 110

S

S

S

S

S

S

S

S

PUBLIC ADDRESS (PA) SYSTEM NOTES

PROVIDE A COMPLETE AND OPERATIONAL PA SYSTEM FOR THE BUILDING.

THE PA SYSTEM SHALL BE A ONE WAY SYSTEM WITH CEILING MOUNTED SPEAKERS. EACH SPEAKER SHALL HAVE MANUALLY ADJUSTABLE VOLUME CONTROL BUILT-IN. ALL SPEAKERS SHALL BE CONNECTED TO AND POWERED FROM THE CENTRAL PA SYSTEM CONTROL CONSOLE. THE SYSTEM SHALL HAVE PROVISIONS SUCH THAT THE CENTRAL CONSOLE CAN ACCESS ANY SPEAKER TYPE TELEPHONES INSTALLED IN THE TELEPHONE

SYSTEM AND SUCH THAT THE PA SYSTEM CAN BE ACCESSED FROM ANY IN-HOUSE TELEPHONE.

1.

2.

PA SYSTEM RISER DIAGRAM

AN

D

P A

SY

ST

EM

R

IS

ER

D

IA

G R

AM

2#12 & 1#12 GND, 1/2"C

SCHEDULE OF PANEL "F"

SERVICE

LOAD (VA)

CB

CKT

PHASE

CKT

CB

LOAD (VA)

SERVICE

LTG. REC. OTHER # # LTG. REC. OTHER

LIGHTING, RMS. 101-110 1190 20/1 1 A 2 20/1 1800 CONV. MICROWAVE-DAY RM 106

LTG.-N. ENGINE BAY 111, CACHE 112 918 20/1 3 B 4 20/1 1440 COFFEE POT-DAY RM 106

LTG.-S. ENGINE BAY 111, WEIGHT RM 113 1005 20/1 5 C 6 20/1 1800 CONV. TOASTER OVEN-DAY RM 106 SITE LTG-POV AREA, ENG. BAY ENTRY 695 20/1 7 A 8 20/1 1020 REC. & ELEC WAT. COOLER-DAY RM 106

SITE LTG-ENTRY SIGN, SURGE AREA 719 20/1 9 B 10 20/1 1656 GARBAGE DISPOSAL-DAY RM 106

IRRIGATION CTRL, SITE LTG-KIOSK/

SHADE STRUCTURE/S. OF BLDG 1035 120 20/1 11 C 12 20/1 1392 REFRIGERATOR-DAY RM 106

EXTERIOR LIGHTING WALLPACKS 786 20/1 13 A 14 20/1 1080 RECEPT.-TRAINING RM 101, EXTERIOR

SPARE 20/1 15 B 16 20/1 900 RECEPT.-TRNG 101, TOILETS 102/103

EXH. FANS-TOILETS 102/103, RESTRMS 408 15/1 17 C 18 20/1 1080 REC.-RESTRMS 104/105, STORAGE 109

WH-1 PROPANE HOT WATER HTR-MEZZ. 60 15/1 19 A 20 20/1 900 REC.-HALL 107, COMM 110, DAY RM 106

CP-1 CIRC. PUMP-MEZZ. OVER 104/105 101 15/1 21 B 22 20/1 720 REC. (QUADPLEX)-COMM RM 110

FIRE ALARM CTRL. PANEL-DAY RM 106 500 20/1 23 C 24 20/1 1080 RECEPT.-DAY RM 106

FLOOR RECEPT.-TRAINING RM 101 720 20/1 25 A 26 20/1 900 RECEPT.-ENGINE ADMIN 108

WORK BENCH REC.-ENGINE BAYS 111 W 360 20/1 27 B 28 20/1 720 FLOOR RECEPT.-ENGINE ADMIN 108

REC. (QUADPLEX)-COMM RM 110 720 20/1 29 C 30 20/1 1200 WASHER-ENGINE BAY 111

WORK BENCH REC.-ENGINE BAYS 111 S 540 20/1 31 A 32

30/2

DRYER-ENGINE BAY 111

SS-1 HEAT PUMP OUTSIDE ENGINE BAY

(FOR COMM ROOM 110)

30/2

33 B 34 2496

1364 35 C 36 20/1 1548 ICEMAKER-ENGINE BAY 111

SS-2 HEAT PUMP OUTSIDE ENGINE BAY

(FOR WEIGHT ROOM 113)

30/2

37 A 38 20/1 1080 60 RECEPT.-N ENGINE BAY 111, EXTERIOR,

CO/NO2 SENSOR/ALARM

1260 39 B 40 20/1 1080 RECEPT.-S ENGINE BAY 111, EXTERIOR

F-1 FURNACE-MEZZ. OVER 104/105 624 15/1 41 C 42 20/1 1080 REC.-CACHE 112, WEIGHT RM 113

CU-1 CONDENSING UNIT OUTSIDE

ENGINE BAYS

25/3

43 A 44 20/1 900 RECEPT.-WEIGHT RM 113

1201 45 B 46 20/1 SPARE

1201 47 C 48 20/1 500 ACCESS CONTROL SYSTEM PANEL

UH-1 UNIT HEATER, ENGINE BAYS

111-WEST 444 15/1 49 A 50 20/1 1260 RECEPT.-CACHE 112, EXTERIOR

OUTLET FOR WELDER OUTSIDE ENGINE

BAYS

50/2

51 B 52 20/1 SPARE

3120 53 C 54 20/1 500 PA SYSTEM CENTRAL CONSOLE

UH-1 UNIT HEATER, ENGINE BAYS

111-EAST 444 15/1 55 A 56

40/2

1727 AIR COMPRESSOR OUTSIDE ENGINE

BAYS 111

SPARE 20/1 57 B 58 1727

SLIDING GATE OPERATOR-EAST HALF 648 15/1 59 C 60 20/1 360 REC.-WIRELESS ACCESS POINTS-RM 101

TRAINING AND RM 106 DAY ROOM

VEC-1 VEHICLE EXHAUST

CAPTURE-ENGINE BAYS 111

15/3

61 A 62

15/3

MOTORIZED ROLL-UP DOOR-ENGINE

BAYS 111-NORTHWEST745 63 B 64 273

745 65 C 66 273

MOTORIZED ROLL-UP DOOR-ENGINE

BAYS 111-SOUTHEAST

15/3

67 A 68

15/3

MOTORIZED ROLL-UP DOOR-ENGINE

BAYS 111-NORTHEAST273 69 B 70 273

273 71 C 72 273

EH-1 ELEC. UNIT HEATER-CACHE 112

20/2 73 A 74

20/3

HOSE TOWER HOIST1531 75 B 76 1201

SLIDING GATE OPERATOR-WEST HALF 648 15/1 77 C 78 1201

INPUT FROM RENEWABLE ENERGY

SOURCE 40/3

79 A 80

20/3 TRANSIENT VOLTAGE SURGE

SUPPRESSOR (TVSS)81 B 82

83 C 84

VOLTS: 120/208 LOAD SUMMARY:

PHASE: 3 CONN. KVA D.F. DEMAND KVA PHASE VA:

BUS: 400A LIGHTING 6.348 --- 6.012 A 24859

AIC: 22K RECEPT. 32.328 --- 21.164 B 24078

MAINS: 300A OTHER 34.959 --- 25.785 C 24698

MOUNTING: RECESSED 15% SPARE 11.045 0.6 6.627 DEMAND AMPS:

TOTAL 84.680 --- 59.588 165.4

MAIN POWER PANEL "F"

(E) OH POWER LINE

(N) XFMR (TO BE

PROVIDED BY OTHERS)

112.5KVA, 3 PHASE,

4 WIRE 208/120V

R

POWER ONE-LINE DIAGRAM

400 AMP, 3 PHASE, 4 WIRE @ 208/120

VOLTS, 22K AIC

PORTABLE EMERGENCY

GENERATOR BY OTHERS

(N.I.C.)

(N) 3 PHASE, 208V, 400A DOUBLE-

THROW MANUAL TRANSFER

SWITCH, NEMA 3R, 100K AIC

300A / 3P

#2

4#350kcmil &

#2 GND IN 4" C

#6

VISC

PANEL

3#1 AWG & 1#

8 GND IN 4" C

120/208V, 1

PHASE, 2 POLE, 3

WIRE, 100 AMP,

NEMA 3R, 10K AIC,

100A MCB

RISER POLE

FOR BRANCH CIRCUIT BREAKERS, SEE

SCHEDULE OF PANEL "F" ON THIS

SHEET.

40A 3P

RENEWABLE

ENERGY

SOURCE

SEE NOTES 1, 2 AND 3.

V

A

METER MAIN SERVICE

DISCONNECT, NEMA 3R, 400

AMP, 3 PHASE, 4 WIRE @

208/120 VOLTS, 22K AIC

300A/3P

SEE NOTE 5.

G

300A/3P 100A/2P

SEE NOTE 4.

CONDUIT PER SHEET ES-101, CONDUCTORS

FURNISHED AND INSTALLED BY SOUTHERN

CALIFORNIA EDISON.

SEE NOTE 4.

SEE NOTE 4.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

E-601

PO

W

ER

O

N E -

LI

N

E D

IA

G

R

AM

S

AN

D P

AN

E L

SC

H

ED

U

LE

U

SD

A F O

R

ES

T

SE

R

VI

C E

KE

R

N R

IV

ER

SA

C

R

AM

EN

TO

D

IS

TR

IT

SA

C

R

AM

E N

TO

, C A L

IF

O

R N

IA

SA

C

R

AM

EN

TO

D

IS

TR

IT

'J ' S

TR

EE

T

SA

C R

AM

EN

TO

, C

A

4-

B.

P

IT

T

J.

F

R

ES

C

AS

/s / S co tt

L.

B ar m an

F.

L

U M

F

EB

KE

1-

-0

3E

-6

_F ire

St at io n.

rv t

KE

1-

-0

P2

PR

O

JE

C

T N

O

SP

EC

N O

AM-04

E

LE

C

TR

IC

AL

E

-6

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AD

D C

IR

C

U

IT

F O

R H

O

SE

T O

W

ER

H O

IS

T

M

AR

R

EV

IS

E N

O

TE

S

FO

R C

O N

D U

C

TO

R S

FR

O

M T

R

AN

SF

O

R M

ER

T

O M

ET

ER

M

AI

N A

N D

F O

R M

AN

U

AL

T

R

AN

SF

ER

S W

IT

C

H

A

PR

1.

2.

3.

4.

5.

NOTES:

WIND TURBINES IS AN OPTION AND SHALL BE INCLUDED IN THE

CONTRACT ONLY IF THIS OPTION IS EXERCISED BY THE

CUSTOMER.

PHOTOVOLTAIC ARRAY IS AN OPTION AND SHALL BE INCLUDED

IN THE CONTRACT ONLY IF THIS OPTION IS EXERCISED BY THE

CUSTOMER. PHOTOVOLTAIC INSTALLATION SHALL COMPLY WITH

NEC ARTICLE 690.

SEE SHEET E-101 FOR LOCATION OF THE WIND TURBINES AND

THE SOLAR PV ARRAY. ALSO SEE NOTES 7 AND 8 ON THAT

SHEET. WIND TURBINE INSTALLATION SHALL COMPLY WITH NEC

ARTICLE 694.

SEE NOTES ON SHEET ES-101 FOR WORK TO BE COORDINATED

WITH SOUTHERN CALIFORNIA EDISON FROM OVERHEAD LINE

CONNECTION POINT THROUGH METER MAIN SERVICE DISCONNECT

AT FIRE STATION.

PROVIDE ADVANCED METER ENCLOSURE WITH ADVANCED

METERING AND ASSOCIATED COMMUNICATIONS CABLING AND

THREE EACH 300:5 AMP CURRENT TRANSFORMERS FOR

ADVANCED METERING FUNCTION ADJACENT TO PANEL 'F" IN

HALLWAY ROOM 107. 1.

PANEL SCHEDULE "F" NOTES:

PROVIDE SWITCHING DUTY RATED CIRCUIT BREAKERS FOR ALL BRANCH BREAKERS IN PANEL.