2019_AMENDMENT_0003__SUMMARY.pdf
PDF 11 KB Posted
- Attached to
- USDA Forest Service Kern River Ranger District Engine Station Relocation Federal contract opportunity
- Solicitation number
- W91238-16-R-0022
About this file
Amendment 0003 Summary of Changes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2019_AMENDMENT_0004__SUMMARY.pdf | ||
| W91238-16-R-0022_AMENDMENT_0004_Sheets.pdf | ||
| W91238-16-R-0022-0004.pdf | ||
| W91238-16-R-0022-0003.pdf | ||
| AMENDMENT_0003_DRAWINGS.pdf | ||
| W91238-16-R-0022-0002.pdf | ||
| Summary_of_Changes_to_the_Specs_and_Drawings_-W91238-16-R-0022-0001.pdf | ||
| Fire_Station_Site_Visit_Sign-in_Sheet.pdf | ||
| Revised_Specs_and_Drawings_-_W91238-16-R-0022-0001.pdf | ||
| W91238-16-R-0022-0001.pdf | ||
| Solicitation_-_W91238-16-R-0022.pdf | ||
| A01.10_Geotechnical_Report_15_June_15.pdf | ||
| A01.10_Specifications_2019_2_Mar_16.pdf | ||
| Drawings_-_W91238-16-R-0022.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICIATION NO. W91238-16-R-0022
1 of 1 Amendment 0003
USDA FOREST SERVICE, KERN RIVER RANGER DISTRICT, ENGINE STATION
RELOCATION
AMENDMENT 0003 - SUMMARY:
A) DRAWINGS:
REPLACE 9 SHEETS OF THE FOLLOWING DRAWINGS:
1) C-131 SITE PLAN (“AM-01” added lower right corner)
2) E-001 LEGEND AND ABBREVATIONS (“AM-01” added lower right corner)
3) E-101 ELECTRICAL SITE PLAN (“AM-01” added lower right corner)
4) E-110 POWER AND SIGNAL FLOOR PLAN AND PA SYSTEM RISER DIAGRAM
5) E-601 POWER ONE-LINE DIAGRAMS AND PANEL SCHEDULE (“AM-01” added lower right corner)
6) ES101 FIRE STATION ELECTRICAL UTILITY SERVICES SITE PLAN
7) ES102 FIRE STATION ELECTRICAL UTILITY SERVICE DETAILS
8) M-101 FIRESTATION HVAC PLAN
9) P-101 FIRESTATION PLUMBING PLAN
File details come from the government source that posted it. Updated .