2019_AMENDMENT_0003__SUMMARY.pdf

PDF 11 KB Posted

Attached to
USDA Forest Service Kern River Ranger District Engine Station Relocation
Solicitation number
W91238-16-R-0022
Issued by

About this file

Amendment 0003 Summary of Changes

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICIATION NO. W91238-16-R-0022

1 of 1 Amendment 0003

USDA FOREST SERVICE, KERN RIVER RANGER DISTRICT, ENGINE STATION

RELOCATION

AMENDMENT 0003 - SUMMARY:

A) DRAWINGS:

REPLACE 9 SHEETS OF THE FOLLOWING DRAWINGS:

1) C-131 SITE PLAN (“AM-01” added lower right corner)

2) E-001 LEGEND AND ABBREVATIONS (“AM-01” added lower right corner)

3) E-101 ELECTRICAL SITE PLAN (“AM-01” added lower right corner)

4) E-110 POWER AND SIGNAL FLOOR PLAN AND PA SYSTEM RISER DIAGRAM

5) E-601 POWER ONE-LINE DIAGRAMS AND PANEL SCHEDULE (“AM-01” added lower right corner)

6) ES101 FIRE STATION ELECTRICAL UTILITY SERVICES SITE PLAN

7) ES102 FIRE STATION ELECTRICAL UTILITY SERVICE DETAILS

8) M-101 FIRESTATION HVAC PLAN

9) P-101 FIRESTATION PLUMBING PLAN

File details come from the government source that posted it. Updated .