PERFORMANCE WORK STATEMENT

Folsom Dam Raise Geotechnical Trenching Investigation, Phase 2 9 September 2016

PROJECT:

The work to be accomplished in this Performance Work Statement (PWS) consists of geotechnical investigations at Folsom Dam, Dikes 1, 2, 3, 5, 6, 7 & 8. Work consists of trenching at 54 locations. The quantities and technical details are described in Sections 2 and 3 of this PWS

CONTRACTORS:

Mr. Andrew TaberMr. Chad Walker
Taber ConsultantsGulf Shore Construction Services
3911 W. Capital Ave.3508 Tulane Ave Ste 200
West Sacramento, CA 95691New Orleans, La 70119-7016
Ph: 916-371-1690Ph: 916-939-4117
Email: ataber@taberconsultants.comEmail: Cwalker@GulfShoreServices.com

ADDITIONAL CONTRACTORS

GOVERNMENT POINTS OF CONTACT

Lead Geotechnical Engineer:Project Manager:
Kevin HazletonMrs. Katie Charan
U.S. Army Corps of Engineers (USACE)U.S. Army Corps of Engineers
ATTN: CESPK-ED-G (Hazelton)ATTN: CESPK-JFP (Charan)
1325 J Street1325 J Street
Sacramento, CA 95814-2928Sacramento, CA 95814-2928
Ph: 916-557-7531Ph: 916-420-1067
Email: kevin.j.hazleton@usace.army.milEmail: katie.j.charan@usace.army.mi
COR:Contract Specialist:
John KempTilden Brooks
U.S. Army Corps of Engineers (USACE)U.S. Army Corps of Engineers
ATTN: CESPK-ED-GG (Kemp)ATTN: CESPK-CT-B (Brooks)
1325 J Street1325 J Street
Sacramento, CA 95814-2928Sacramento, CA 95814-2928
Ph: 916-557-6642Ph: 916-557-7929
Fax: 916-557-6823Fax:
Email: John.E.Kemp@usace.army.milEmail:tilden.l.brooks@usace.army.mil

Government Technical POC / Project Geologist:

Jim Drysdale U.S. Army Corps of Engineers Attention: CESPK-ED-GG (Drysdale) 1325 J Street Sacramento, CA 95814-2928 Phone: (916) 557-5235 Fax: (916) 557-6823 Email: jim.drysdale@usace.army.mil

LOCATION

The project area is located at the Folsom Lake project site Folsom, CA. Investigation locations are Dikes 1, 2, 3, 5, 6, 7 and 8. Proposed locations are identified on the table and figures presented in Appendix 1. Note: Figures shown in Appendix 1 include a larger set of locations covering the entire geotechnical investigation. Only the locations shown in Table 1 require trenching as part of this PWS. The locations will be confirmed in the field by the Project Geologist and/or Geotechnical Engineer during the execution of the work. The Contractor will be required to meet at the Folsom Resident Office and will then be escorted by the Project Geologist and/or Geotechnical Engineer to the various sites for exploration activities. The Folsom Resident Office is located at 598 E Natoma Street, Folsom, CA 95630; take Folsom Prison Road to access the resident office.

GENERAL REQUIREMENTS

The objective of this task order is obtain in-situ geologic data need to characterize the foundation adjacent to existing embankments. The data will be used to support stability and seepage analysis, and dam raise design. Trenching will occur near specified dikes in order to identify and characterize potentially weak soils, seepage paths, and foundation lithology.

The Contractor shall provide a backhoe capable of digging to depths of 15 feet, and an excavator capable of digging to depths of 25 feet. Many of the trenching sites are located in areas of rough, uneven terrain so the equipment should be capable of driving across rocky or sandy areas. USACE Geologists will log, map and photograph the trenches and borings.

EXPLORATION SUMMARY

This task order contains the following tasks as summarized below:

Backhoe Trenching Exploration Forty-eight (48) trenches/test pits are to be excavated to a maximum depth of 6 feet and length of 10 feet or less. Trenches are to be explored using standard backhoe equipment.

Excavator Trenching Exploration Six (6) trenches to maximum depth of 20 feet and length of 10 feet or less are to be excavated with an excavator in locations identified by USACE technical personnel. These trenches are located where large cobbles and boulders would otherwise impair operation of a standard backhoe.

ENVIRONMENTAL BEST MANAGEMENT PRACTICES

The following BMPs shall be followed for all work during this geotechnical investigation to limit potential impacts to water quality and minimize the potential for hazardous materials spills. The operation of trenching equipment shall be done in a manner that prevents spoil materials from being released into Folsom Lake. The contractor shall fallow all applicable environmental regulations to this project.

Dust Control The contractor shall be responsible for providing effective dust control measures at all areas affected by their operations. The contractor shall maintain effective dust control measures and conform to applicable environmental laws and regulations. All work areas used by the contractor shall be watered frequently to prevent dust. Watering and other approved dust control measures shall be controlled to prevent surface water run-off. The contractor shall control dust and prevent dust from leaving work areas.

Sufficiently water all soil excavated or graded to prevent excessive dust. Watering would occur as needed with complete coverage of disturbed soil areas. Dust control watering would take place as necessary on unpaved/untreated roads and on disturbed soil areas with active operations to prevent fugitive dust.

At a minimum, the measures shall ensure the following:

· That the visible dust plumes are not transported off the Project site or within 400- feet of any regularly occupied structure not part of the Project;

· That the visible dust plumes generated from activities do not cause a traffic obscuration hazard on public roads;

· Minimize areas disturbed by clearing, earth moving, or excavation activities; and

· Stabilize stockpiles of soil or other fine loose material by watering or other appropriate method to prevent windblown fugitive dust.

Water can be obtained from Folsom Lake at the Granite Bay Boat Launch. Contractor is responsible for providing all pumps, hosing, and other equipment necessary to extract water directly from the lake.

Leaks and Spills The Contractor shall plan and design measures to prevent and control potential leaks/spills of petroleum products such as fuels and lubricating materials. Refueling shall be performed away from water-bodies. Absorbent pads and containment booms for petro-chemical clean-up shall be kept in a container near any portable fuel storage and refueling areas. These materials shall be used for first response to any potential spills. The Contractor shall conduct daily routine checks for dripping oil beneath motors and/or hydraulic pumps, all Contractor’s equipment and vehicles. The Contractor shall package and remove all contaminated soils generated by Contractors actions from Government property. The Contractor shall replace excavated contaminated soils with suitable on site borrow soils compacted to match the density of the adjacent soils.

Trench Backfill Exploratory Trenches shall be backfilled with excavated material in reverse order such that top soil is on top of the excavation or as directed by the USACE Geologist. Trenches shall not be left open. Backfill compaction shall be accomplished such that the material replaced is denser than or as dense as the surrounding embankment material. Trenches and disturbed areas excavated at upstream locations at Dikes 7 and 8 (10 locations) will require reseeding.

Reseeding At locations where an excavator is utilized, the trenches and the immediate area disturbed by the excavator shall be reseeded and mulched by the Contractor.

FIRE PREVENTION

Smoking may be limited to designated areas. All combustion equipment will be clean and in good working order. The exhaust systems and spark arrestors shall be checked and repaired as needed before coming onto the job site. All units will have fire extinguishers on board or in the immediate vicinity of the operation. No work shall be performed or permitted without the Project Geologist on site unless prior approval has been granted.

RECORDING AND PRESERVING HISTORICAL ARCHEOLOGICAL FINDS

All items having any apparent historical or archeological interests that are discovered in the course of any activities under this contract shall be carefully preserved. Such materials include chipped or ground stone, historic debris, building foundations, human bones, and other cultural resources. The Contractor shall leave the archeological find undisturbed and shall immediately report the find to the onsite Geologist so that the proper authorities may be notified. The Contractor shall stop work within 100 feet of the find. If any human remains are discovered during the soil explorations, work shall cease at that location. An archeological representative from the Sacramento District Corps of Engineers must evaluate the find before proceeding. The onsite Geologist will contact the County Coroner and the USACE cultural resources staff immediately. If the remains are of Native American ancestry, procedures regarding such a discovery shall be followed in accordance with the Native American Graves Protection and Repatriation Act.

ENDANGERED SPECIES ACT COMPLIANCE

Trenching explorations may encounter endangered plant or animal species that will require mitigation. If necessary, the Corps of Engineers will identify and mark endangered habitats the contractor will be required to avoid.

DAMAGES

If the Contractor removes equipment from the work site for any reason of the Contractor’s own, with resulting delay in the start and/or performance of the work, the Contractor shall, in the absence of fixed and agreed liquidated damages, pay to the Government actual damages in an amount as determined by the Government in accomplishing the work on which the Contractor’s equipment had been intended for use. Should a trench be lost due to negligence on the part of the Contractor, the trench shall be re-excavated in a manner deemed acceptable by the Project Geologist at no additional expenses to the Government.

CONDITION OF EQUIPMENT

The Contractor will be required to furnish all labor, material, and equipment necessary to perform the services described in section one of this task order. The equipment furnished shall be in good condition and well maintained, complete with all necessary accessories and supplemental equipment, conforming to the manufacturer’s specifications for the type and size required, and with all necessary operating personnel under full time supervision. In order to meet progress schedules, the Government reserves the right to discontinue at any time the use of unsatisfactory equipment and or personnel and to replace with same at the Contractor’s expense.

REFERENCES

The Contractor’s APP, SSHP Appendix and subsequent activities must comply with the following referenced documents (most current version, if different than the date referenced), at a minimum:

· Title 29 Code of Federal Regulations (CFR) 1910, Occupational Safety and Health Standards.

· 29 CFR 1926, Safety and Health Regulations for Construction.

· 8 CCR Chapter 4 Subchapter 7, General Industry Safety Orders.

· EM 385-1-1 U.S. Army Corps of Engineers (USACE), Safety and Health Requirements Manual, (15 September 2008).

· EM 1110-1-1804 Geotechnical Investigations, 1 January 2001

· EM 1110-1-1802 Geophysical Exploration For Engineering And Environmental Investigations, 31 August 95

· NIOSH/OSHA/USCG/EPA, Occupational Safety and Health Guidance Manual for Hazardous Waste Activities (October 1985).

· American Conference of Governmental Industrial Hygienists (ACGIH®), TLVs® and BELs®, Threshold Limit Values for Chemical Substances and Physical Agents & Biological Exposure Indices (2005).

· In addition to the Hazardous Waste Operations and Emergency Response regulation, there are other OSHA ancillary safety and health regulations governing certain aspects for this contract. State and local safety and occupational health regulations.

TASKS AND DELIVERABLES

APP/AHA ACCIDENT PREVENTION PLAN / ACTIVITY HAZARD ANALYSIS (AHA) APPENDIX TO THE APP The Contractor shall use a qualified Safety and Health Manager (SHM) to prepare the written site-specific APP in accordance with the format and requirements of USACE EM 385-1-1. Cover all paragraph and subparagraph elements in Appendix A of USACE EM 385-1-1 "Minimum Basic Outline for Preparation of Accident Prevention Plan". The APP shall include an Activity Hazard Analyses (AHAs) appendix. Where a paragraph or subparagraph element is not applicable to the work to be performed, indicate "Not Applicable" next to the heading. The APP shall be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program (SHP). Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The Contractor, SHM, on-site Project Supervisor, and Site Safety and Health Officer (SSHO) shall sign the APP.

The contractor shall develop an AHA for every operation involving site activities presenting hazards not experienced in previous project operations or where a new work crew or subcontractor shall perform work. The AHA(s) format shall be in accordance with Figure 1-2 of EM 385-1-1. Subsequent AHAs shall be submitted as amendments to the APP. The analysis shall identify and evaluate hazards and outline the proposed methods and techniques for the safe completion of each phase of work. At a minimum, the document shall define the activity being performed, sequence of work, specific safety and health hazards anticipated, control measures (to include personal protective equipment) to eliminate or reduce each hazard to acceptable levels, equipment to be used, inspection requirements, training requirements for all involved, and the competent person in charge of that phase of work. The APP – AHA will be reviewed by the USACE and the Contractor may be required to address one round of review comments. The USACE shall provide comments to the Contractor within 5 business days after receipt of the draft APP – AHA. The fieldwork shall not start until the APP – AHA is approved by the USACE.

MOBILIZATION DEMOBILIZATION FOR ALL EQUIPMENT

Mobilization shall consist of the delivery and setup of all equipment, materials, and supplies necessary to perform the stated work for the duration of this PWS. The equipment shall be in good working order and capable of performing the investigation as defined in Section 2, General Requirements. Demobilization shall consist of the removal from the site of all investigation equipment and restoration of the work site(s) as nearly as possible to the original condition and as described in Section 1. Costs shall contain all incidental costs associated with this statement of work. The contractor is also solely responsible for security against theft, destruction, and/or vandalism of the contractor's property and/or equipment.

WATER TRUCK – INCLUDING EXPERIENCED OPERATOR, NECESSARY PERMITS AND OPERATING EXPENSES The Contractor will need a water truck to support the dust control requirements during trenching. The Contractor shall provide a water truck with a minimum of 2000 gallon-capacity, fully maintained, in good condition and complete with all the necessary accessories and supplemental equipment conforming to the manufacturer’s specifications for the type and size. The water truck will be operated by an experienced operator with all required operator’s license. The general costs for the equipment include the water truck, all operating expenses, all fuel charges and any charges necessary for the water itself necessary to the trenching activities.

BACKHOE - INCLUDING EXPERIENCED OPERATOR, NECESSARY PERMITS AND OPERATING EXPENSES The general requirement is for a medium- to heavy-duty unit, fully maintained, in good condition, and complete with all the necessary accessories and supplemental equipment conforming to the manufacturer’s specifications for the type and size required. The backhoe shall be equipped with all approved safety items, per EM 385-1-1, Safety Manual. The Contractor is responsible for maintaining the backhoe and associated equipment. Any down time associated with the maintenance or repair of any piece of equipment will be solely at the Contractor’s expense. The backhoe shall be operated by an experienced operator capable of operating the equipment for this task. The operator shall have the appropriate, current license(s) to operate the equipment required for this type of work. The maximum depth of test pit excavations is anticipated to be 6 feet. The total number of test pits is 48, each of which will be 10 foot long by 3 foot wide.

Caution tape and cones, or similar demarcation, shall be placed around the working area to restrict access during trenching activities.

Exploratory trenches/test pits shall be backfilled with excavated material in reverse order such that top soil is on top of the excavation or as directed by the USACE Geologist. Trenches shall not be left open. Backfill compaction shall be accomplished such that the material replaced is denser than or as dense as the surrounding embankment material. The excavations will be filled in lifts that optimize compaction and will be subject to approval by the on-site technical lead for the Government. The ground surface will be smoothed to match the existing ground contours.

The Contractor is also solely responsible for security against theft, destruction and/or vandalism of the Contractor’s property and/or equipment.

EXCAVATOR - INCLUDING EXPERIENCED OPERATOR, NECESSARY PERMITS AND OPERATING EXPENSES The general requirement is for a medium- to heavy-duty unit, fully maintained, in good condition, and complete with all the necessary accessories and supplemental equipment conforming to the manufacturer’s specifications for the type and size required. The excavator shall be equipped with all approved safety items, per EM 385-1-1, Safety Manual. The Contractor is responsible for maintaining the excavator and associated equipment. Any down time associated with the maintenance or repair of any piece of equipment will be solely at the Contractor’s expense. The excavator shall be operated by an experienced operator capable of operating the equipment for this task. The operator shall have the appropriate, current license(s) to operate the equipment required for this type of work. Depth of test pit excavation is anticipated to be 20 feet. The total number of excavator test pits is 6, each of which will be 10 feet long by 3 feet wide. This activity is distinct from the backhoe activity in that it is anticipated that an excavator will be needed to remove large granitic cobbles and boulders during the excavation process.

Exploratory trenches/test pits shall be backfilled with excavated material in reverse order such that top soil is on top of the excavation or as directed by the USACE Geologist. Trenches shall not be left open. Backfill compaction shall be accomplished such that the material replaced is denser than or as dense as the surrounding embankment material. The excavations will be filled in lifts that optimize compaction and will be subject to approval by the on-site technical lead for the Government. The ground surface will be smoothed to match the existing ground contours.

The Contractor is also solely responsible for security against theft, destruction and/or vandalism of the Contractor’s property and/or equipment.

The excavator shall have a minimum 25 ft reach and 3-foot and 4-foot wide buckets. A heavy duty bucket capable of excavating boulders from trenches is required. One of the buckets shall have a thumb attachment to remove boulders from trenches.

BACKHOE AND EXCAVATOR STANDBY

The general requirement is for standby time associated with the government representative on site requiring the operator to discontinue activities and await permission to resume while logging or other technical data acquisition activities are completed. Standby time shall not be used for delays caused by the contractor. It is anticipated that up to 1 hour per trench/test pit on average will be utilized to allow time for logging. In addition, it is anticipated that there will be up to 40 hours of standby during which time the Bureau of Reclamation or California State Parks may cause administrative delays in providing access to the exploration sites.

COMPACTION WHEEL ATTACHMENT FOR EXCAVATOR AND/OR BACKHOE

The Contractor shall provide an attachment for the Backhoe and Excavator, each of which can be readily exchanged with the bucket attachment, for the purpose of providing compaction effort.

RESEEDING

Reseeding and mulching will be required at Dike 7 and Dike 8 areas where trenching with excavator is conducted. An estimated 2700 ft2 total area will require reseeding at the six trenches where an excavator will be used. The seed mix will conform to the typical mixed utilized as part of the JFP project (Appendix 1, JFP Seed Mix). Proof of the mix composition must be provided to government representative for approval. A hydroseed mulch cover is be required to secure seed mix.

MEASUREMENT AND PAYMENT

The contract unit price for each item shall constitute full compensation for furnishing all plant, labor, equipment, materials, and supplies, and performing all operations required for the completion of all work included under the item as specified herein, shown on the drawings, or directed by the Contracting Officer.

WORK SCHEDULE

The Project Geologist (USACE government representative) in coordination with the Contractor shall arrange the exact time and place of equipment delivery at least 5 days prior to the start date. Once determined, it shall be necessary that the Contractor be prepared to begin work at the site on that day. Normal work hours will be between 0700 and 1730 hours, on a Monday to Friday schedule. If the Contractor elects to work other hours, days, or overtime hours at the Contractor’s convenience and expense, the Contractor will notify the Project Geologist, so as to adjust the daily work schedule. Overtime is not allowable without the written approval of the Contracting Officer prior to work in accordance with FAR 22.103.

DELIVERABLES

The following shall be delivered to the Project Geologist by the specified dates:

APP/AHA

The draft Accident Prevention Plan with the Activity Hazard Analysis appendix for review and comment. The Contractor will not mobilize to the site until the APP / AHA has been reviewed and approved by the USACE. APP / AHA shall be delivered within 10 business days of contract award.

SECURITY CLEARANCE

Contractor is required to comply with the security procedures established by the US Bureau of Reclamation (USBR) for site access to the dikes and associated structures at Folsom Lake, Folsom, California for the purpose of conducting a geotechnical investigation in support of the Folsom Dam Raise Project.

Within 5 days of contract award, the Contractor shall submit a list of staff personnel who may be executing the field work. The list will include name, phone number, and copy of driver’s license or photo ID.

All on-site personnel will receive an initial Security Brief by the USBR designated appointee prior to conducting operations. All on-site personnel will have Personal Identification Cards on their person at all times and prepared to present positive identification to any California State Park Ranger or County Sheriff Officer upon request.

PERIOD OF PERFORMANCE

All field work and written deliverables will be completed within 120 days of contract award. Execution of field work by end of 2016 is the current objective.

AUTHORITIES AND TECHNICAL DIRECTION

The Contractor shall take no direction from any Government employee or any other person other than the Government Contracting Officer that changes the terms and conditions of this contract action, the scope, or any change that impacts the cost, price or schedule. Changes authorized by the Contracting Officer shall be in the form of a written, official, signed modification to the contract action received by the Contractor before the Contractor shall act upon those changes. The Contractor shall comply with the Changes clause of this contract when the Contractor believes direction has been given from persons other than the Government Contracting Officer that equate to a change by notifying the Contractor Officer as directed by the clause. Any direction given by any Government employee or any other person outside their authority shall be reported to the Contracting Officer. Contracting Officer Representatives (CORs) are limited to the authorities stated in the COR appointment letters. If a COR is appointed under this contract, they shall be appointed by written letter from the Contracting Officer to the Contractor and COR specific to this contract only. COR appointment letters from previous contracts at this installation are not valid for this contract.

PAYMENT AND INVOICES

Invoices: Invoices for payment shall be submitted upon completion of tasks as outlined in the Payment Schedule of this Task Order. Invoices shall be submitted to:

Original invoice only WITHOUT additional information or supporting documentation:

USAED, FINANCE CENTER

ATTN: CEFC-AO-P

5270 Integrity Drive Millington, TN 38054-5005

One copy each of invoices WITH all required information including any necessary supporting documentation:

U.S. Army Corps of Engineers, Sacramento District ATTN: CESPK-CT-B (R. Greenheck) 1325 J Street Sacramento, CA 95814-2922

U.S. Army Corps of Engineers, Sacramento District Attention: CESPK-ED-GG (Mr. John E. Kemp) 1325 J Street Sacramento, CA 95814

Contract Payments: The Government shall pay the Contractor upon submission of proper invoices for services delivered and accepted for the portion of the work actually performed under the contract.

NOTE: All invoices shall reflect contract and Task Order number, and the final invoice must be marked “FINAL”.