Table of trenches for JFP trench task order.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A1.15_Boel_Easment_Map description.pdf | ||
| A1.15_Borel_Maps.pdf | ||
| Attachment_cancellation.docx | DOCX document | |
| D01.09_Bid_Schedule.docx | DOCX document | |
| D01.09_FDR_Geotech_P2_Exploration_Maps_20160721.pdf | ||
| D01.11_RFP_Signed.pdf | ||
| D01.09_PWS_Folsom_Trenching.docx | DOCX document | |
| D01.09_FDR_Geotech_P2_JFP_Reveg_Seed_Mix.pdf | ||
| A2.1_Solicitatiion_Released.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Folsom Dam Raise, Phase 2, Proposed Trenches
Location Type Area D1-T-1 Trench Abutment D1-T-2 Trench Toe, Upstream D1-T-3 Trench Toe, Upstream D1-T-4 Trench Toe, Upstream D1-T-5 Trench Toe, Upstream D1-T-6 Trench Toe, Upstream D1-T-7 Trench Toe, Downstream D1-T-8 Trench Toe, Downstream D1-T-9 Trench Toe, Upstream D1-T-10 Trench Toe, Upstream D1-T-11 Trench Toe, Upstream D1-T-12 Trench Abutment D2-T-1 Trench Abutment D2-T-2 Trench Toe, Downstream D2-T-3 Trench Toe, Upstream D2-T-4 Trench Toe, Downstream D2-T-5 Trench Toe, Downstream D2-T-6 Trench Toe, Upstream D2-T-7 Trench Toe, Downstream D2-T-8 Trench Toe, Upstream D2-T-9 Trench Toe, Downstream D2-T-10 Trench Toe, Upstream D2-T-11 Trench Abutment D2-T-12 Trench Abutment D3-T-1 Trench Abutment D3-T-2 Trench Toe, Downstream D3-T-3 Trench Toe, Upstream D3-T-4 Trench Toe, Upstream D3-T-5 Trench Toe, Upstream D3-T-6 Trench Toe, Upstream D3-T-7 Trench Abutment D5-T-3 Trench Toe, Upstream D5-T-4 Trench Toe, Upstream D5-T-5 Trench Toe, Upstream D6-T-3 Trench Toe, Upstream D6-T-4 Trench Toe, Upstream D7-T-1 Trench Abutment D7-T-2 Trench Embankment, Upstream D7-T-3 Trench Embankment, Upstream D7-T-4 Trench Embankment, Upstream D7-T-5 Trench Abutment D7-T-6 Trench Toe, Downstream D7-T-7 Trench Toe, Downstream D7-T-10 Trench Slope, downstream D7-T-11 Trench Slope, downstream D7-T-12 Trench Slope, downstream D8-T-1 Trench Abutment D8-T-2 Trench Toe through Fill, Upstream D8-T-3 Trench Toe through Fill, Upstream D8-T-4 Trench Toe through Fill, Upstream D8-T-5 Trench Abutment D8-T-6 Trench Toe, Downstream D8-T-7 Trench Toe, Downstream D8-T-8 Trench Toe, Downstream
Phase 2_trench_locations