Maps for JFP trenching task order.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A1.15_Boel_Easment_Map description.pdf | ||
| A1.15_Borel_Maps.pdf | ||
| Attachment_cancellation.docx | DOCX document | |
| D01.09_FDR_Geotech_P2_Exploration_Table-1.pdf | ||
| D01.09_Bid_Schedule.docx | DOCX document | |
| D01.11_RFP_Signed.pdf | ||
| D01.09_PWS_Folsom_Trenching.docx | DOCX document | |
| D01.09_FDR_Geotech_P2_JFP_Reveg_Seed_Mix.pdf | ||
| A2.1_Solicitatiion_Released.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
!A
!A
#0
!A !A
!A
#0
#0
#0
#0
#0
#0
#0
!A
#0
#0
!A
#0
#0
TP-05-28
DH-05-20 D1-T-5
D1-B-7
D1-T-7
D1-B-6
D1-T-2 D1-T-3
D1-T-4
D1-T-1
D1-B-2
D1-B-1
D1-T-12
D1-T-10
D1-T-11
D1-T-8
D1-T-6
D1-B-3 D1-B-4
D1-B-5
D1-T-9
0 150 30075 Feet ± Folsom Dam Raise Project
Dike 1 Potential Geotechnical Investigation Locations
!A Potential Boring Location #0 Potential Trench Location E Previous Investigation
Elevation 487 (Top of Dam after raise = 486.34', NAVD88) Elevation 483 (Peak PMF Pool = 483.34', NAVD88)
!A
#0
#0
#0
#0
#0
!A!A
!A
#0
#0
#0
#0
#0#0
#0 D2-T-8
D2-T-9 D2-B-5
D2-T-5 D2-T-6
D2-T-4
D2-T-3
D2-T-2
D2-B-2 D2-T-7
D2-T-1
D2-B-1
D2-T-11
D2-B-3 D2-B-4
D2-T-12
D2-T-10
0 150 30075 Feet
!A Potential Boring Location #0 Potential Trench Location
Elevation 487 (Top of Dam after raise = 486.34', NAVD88) Elevation 483 (Peak PMF Pool = 483.34', NAVD88)
Folsom Dam Raise Project Dike 2
Potential Geotechnical Investigation Locations
#0
!A
#0
#0
!A
!A
#0
#0
#0
#0D3-T-2
D3-T-6
D3-T-5
D3-T-4
D3-B-4
D3-B-3
D3-T-1
D3-T-3
D3-B-1 D3-B-2
D3-T-7
0 300 600150 Feet ±!A Potential Boring
#0 Potential Trench Elevation 487 (Top of Dam after raise = 486.34', NAVD88) Elevation 483 (Peak PMF Pool = 483.34', NAVD88)
Folsom Dam Raise Project Dike 3
E
E
E
E
#0
#0
#0
#0
#0
#0
#0
#0
!A
!A
!A
!ADH-05-21
DH-05-23
DH-05-22
TP-05-30
TP-05-29
TP-05-31
D4-T-6
D4-T-4
D4-T-2
D4-T-5
D4-T-3
D4-T-8
D4-T-7
D4-T-1
D4-B-2
D4-B-3
D4-B-4
D4-B-1
0 15075 Feet ±
!A Potential Boring #0 Potential Trench E Previous USBR Investigation
Elevation 487 (Top of Dam after raise = 486.34', NAVD88) Elevation 483 (Peak PMF Pool = 483.34', NAVD88)
Folsom Dam Raise Project Dike 4
Potential Geotechnical
Original foundation mapping is displayed under current topography
E
E
E
E
E
E
E
E
E
E
EE
E
EEE
E
E
#0
#0
#0
#0
#0
#0
!A #0
#0
!A
!A
!A
!A !A
!A
FOLCT-4
FOLCT-3
FOLCT-6
TP-05-12
TP-05-33
TP-04-05
TP-04-01
TP-04-02
TP-04-03
TP-04-04
TP-04-06
TP-04-07
DH-04-9
DH-04-8
DH-04-7
FOLCT-1
FOLCT-5
FOLCT-2
2F-04-02
2F-04-01
D5-T-6
D5-T-8
D5-T-5
D5-T-4
D5-T-3
D5-T-2
D5-T-7
D5-B-2
D5-B-7
D5-T-1
D5-B-1
D5-B-3 D5-B-4
D5-B-5 D5-B-6
0 150 30075 Feet
!A Potential Boring #0 Potential Trench !. Previous USACE Investigation E Previous USBR Investigation
Elevation 487 (Top of Dam after raise = 486.34', NAVD88) Elevation 483 (Peak PMF Pool = 483.34', NAVD88)
Folsom Dam Raise Project Dike 5
Potential Geotechnical
EE
E
E
#0
#0
#0
#0
#0
#0
!A !A
!A !A
!A !A
TP-05-34
TP-05-36
TP-05-35
DH-05-25
DH-05-24
D6-B-6D6-B-5
D6-B-4D6-B-3
D6-B-2
D6-B-1
D6-T-6
D6-T-5
D6-T-4
D6-T-2
D6-T-3
D6-T-7
D6-T-1
#0
0 150 30075 Feet
!A Potential Boring #0 Potential Trench E Previous USBR Investigation
Elevation 487 (Top of Dam after raise = 486.34', NAVD88) Elevation 483 (Peak PMF Pool = 483.34', NAVD88)
Folsom Dam Raise Project Dike 6
Potential Geotechincal InvestigationLocations
2F-04-04
2F-04-03 D7-T-8
D7-T-9
D7-B-6
D7-B-8D7-B-7
D7-B-5 D7-B-4
D7-B-3
D7-B-1
D7-B-2
D7-T-7
D7-T-6
D7-T-4
D7-T-3
D7-T-2
D7-T-5
D7-T-1
D7-T-10
D7-T-11
D7-T-12
0 100 20050 FeetPotential Boring Location
Potential Trench Location Elevation 487 (Top of Dam after raise = 486.34', NAVD88) Elevation 483 (Peak PMF Pool = 483.34', NAVD88) Waste Fill (approximate) Previous USACE Investigation
Folsom Dam Raise Project Dike 7
#0 !A #0
#0#0 #0
!A !A
#0#0 #0
#0
#0
D8-T-10 D8-T-9
D8-T-8 D8-T-6 D8-T-7
D8-B-2D8-B-1 D8-T-3
D8-T-2 D8-T-4
D8-T-5 D8-B-3
D8-T-1
0 100 20050 Feet ±!A Potential Boring
#0 Potential Trench Elevation 487 (Top of Dam after raise = 486.34', NAVD88) Elevation 483 (Peak PMF Pool = 483.34', NAVD88) Waste Fill (approximate)
Folsom Dam Raise Project Dike 8
#0
!A
#0
TP-04-08
DH-04-10
RWD-B-1
RWD-T-1
0 150 30075 Feet ±!A Potential Boring
#0 Potential Trench E Previous USBR Investigation
Elevation 483 (Peak PMF Pool = 483.34', NAVD88) Elevation 487 (Top of Dam after raise = 486.34', NAVD88)
Folsom Dam Raise Project
RWD
| Dike_1_20151218 |
| Dike_2_20151218 |
| Dike_3_20151218 |
| Dike_4_20160203 |
| Dike_5_20160208 |
| Dike_6_20160205 |
| Dike_7_20160713 |
| Dike_8_20151228 |
| Dike_RWD_20151218 |
File details come from the government source that posted it. Updated .