Revised.PWS.dated.22Dec2015.pdf
PDF 67 KB Posted
- Attached to
- Mobile Home Demo/Removal at Success Lake
- Solicitation number
- W91238-16-Q-0004
About this file
Revised PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions.Answers.pdf | ||
| Amendment_1.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| exhibit_D.Map.pdf | ||
| Solicitation_W91238-16-Q-0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Revised 22 December 2015
1. PROJECT DATA
1.1.PROJECT TITLE AND LOCATION: Removal of Vacated Mobile Homes, Lakeside Mobile Home
Park, Success Dam Safety Assurance Project (DSAP), Success Dam, California
1.2. AUTHORIZATION: Flood Control Act of 1944 (Public Law 78-534, Chapter 665, Section 10, page 901), December 22, 1944.
1.3. SCOPE: The contractor will remove the fifty seven (57) vacated mobile homes, including the contents within and surrounding loose materials, from the Lakeside Mobile Home Park. Removal will be by towing, trailer, or other method(s) that comply with applicable federal, state, and local requirements and EM 385-1-1. After removal, the contractor will salvage and/or dispose of the trailers per the Section 3 below. Salvaged materials will be owned by the contractor. On-site demolition/modifications will be minimal, and conducted only to allow for a mobile home removal.
1.4. DRAWINGS TITLES: Lakeside Mobile Home Park Site Plan
1.5. CRITERIA: Department of Transportation's hazardous materials regulations at 49 CFR Parts 171-
2. BACKGROUND
The Lakeside Mobile Home Park was acquired as part of a dam safety project for neighboring Success Dam. Fifty seven (57) mobile homes (aka trailers) were acquired by the Government along with the land associated with the trailer park. Residents of the park have been relocated, the trailers, including associated abandoned household goods, garbage, and rubbish, must be cleared from the property so that it can be utilized as part of the Success Dam project.
3. DESCRIPTION OF WORK AND SERVICES
Task 0 –Determination of Lead-Based Paint, Asbestos, Household Chemicals. The Contractor will survey each trailer for the presence of lead-based paint, asbestos, and household chemicals that require special disposal. The Contractor will provide the results of this survey to the Government.
Household chemicals that require special disposal will be removed and disposed of properly prior to trailer removal.
Task 1 –Mobile Home Removal. Remove all mobile homes and associated goods, garbage, and rubbish from the property in compliance with all local, state, federal laws, EM 385-1-1, and Chapter 3 of the Tulare County Code. A mobile home unit or trailer unit constitutes not only the structure but any rubbish, garbage, trash, or non-natural debris in a surrounding zone that is defined as within fifteen (15) feet of the structure in any direction. Should there be overlapping fifteen foot surrounding zones for two adjacent trailers, the surrounding zone comprising a unit will constitute one half of the distance between the structures within the area of overlap. Removal costs will reflect salvage value. Salvaged materials will be owned by the contractor.
https://hazmatonline.phmsa.dot.gov/services/publication_documents/HowToUse0507.pdf
The Contractor will disconnect all utilities (verify that electric power, water, and natural gas are shut off prior to work) and remove the fifty seven vacated mobile homes from the Lakeside Mobile Home Park.
The contractor shall coordinate with the appropriate utilities companies to the extent necessary to cap off the existing above-ground utilities infrastructure. Utilities will be capped and sealed and left in a safe condition.
On-site demolition/modifications will be minimal, and conducted only to allow for a mobile home removal; i.e. to the extent practicable, mobile homes will be removed from the site intact and demolished/disposed of offsite. Site will be free from loose debris resulting from trailer removals. If liquid spills occur, ground will be remediated according to federal, state, and local laws. The Contractor will comply with all applicable federal, state, and local laws, ordinances, and regulations with respect to the care, handling, storage, shipment, resale, export, disposal, or other use of the material removed. In addition to the above requirements, the contractor will comply with the requirements of EM 385-1-1, 2014, and Chapter 3 of the Tulare County Code .The Contractor will hold the Government harmless from any and all debts, liabilities, judgments, costs, demands, suits, actions, or other claims of any nature arising from or incident to the handling, use, storage, shipment, resale, export, or other disposition and use of the hazardous property purchased. It is probable that lead based paint and/or asbestos are present within some mobile home units; the Contractor represents, warrants, and certifies to the United States Government that they will use and ultimately dispose of any hazardous materials or property removed as stipulated under applicable federal, state, local, and international laws and regulations. The Contactor will comply with the Department of Transportation's hazardous materials regulations at 49 CFR Parts 171-180. The contractor shall comply with Tulare County’s established recycling regulations, which define what material may be recycled from building demolition, and which landfills are approved for recycling and disposal of materials. The Contractor, or his/her authorized agent, certifies on the shipping document, based on his/her own examination, that the materials are properly classified, described, packaged, marked, and labeled and are in proper condition for transportation in accordance with the hazardous materials regulations.
Service hours shall be limited to the normal daylight working hours, Monday through Saturday.
Compliance with the limited hours would minimize short-term construction noise effects on sensitive receptors to less than significant.
Transportation of material off-site for disposal/recycling shall be directed eastbound on State Route 178 towards Ridgecrest in order to avoid the more congested westbound State Route 178 into Bakersfield.
Task 2 - Progress Reporting. Contractor to inform the Contracting Officer Representative (COR) via email of a mobile home removal within two business days.
4. SUBMITTALS
Contractor to provide a work schedule. The Contractor shall not release any information or opinion related to this work without written authorization from the Government.
The Contractor is to provide an Abbreviated Accident Prevention Plan as outlined in EM 385-1-1, 2014 Appendix A 15 days prior to the commencement of work.
5. OVERALL PERIOD OF PERFORMANCE
All work and services shall be completed within 75 calendar days after the effective date of the contract action. No on-site work will begin until after acceptance of the AAP.
6. AUTHORITIES STATEMENT
No person other than the Government Contracting Officer has the authority to make any changes to this contract action that impact cost or schedule. Authority from the Contracting Officer to the Contractor to make changes that impact cost or schedule will be in the form of an official, signed modification.
7. PAYMENT AND INVOICES:
Invoices shall be submitted to:
Original invoice only WITHOUT additional information or supporting documentation:
USAED, FINANCE CENTER
ATTN: CEFC-AO-P
5270 Integrity Drive Millington, TN 38054-5005
One copy each of the invoice WITH all required information including any necessary supporting documentation:
Phillip S. Deffenbaugh
PO Box 44270 34443 Sierra Drive Lemon Cove, CA 93244-0346
b. Contract Payments: The Government shall pay the Contractor upon submission of proper invoices for services delivered and accepted for the portion of the work actually performed under the contract.
NOTE: All invoices shall reflect contract number and the final invoice must be marked “FINAL”.
9. PERFORMANCE EVALUATION MEETING
A. The issuance of a Contract Discrepancy Report (CDR) may be cause for the scheduling of a meeting among the Contractor, Contracting Officer (KO), and the Contracting Officer’s Representative (COR). A mutual effort will be made to resolve all problems identified. The Government will prepare written minutes of the meeting. The Contractor, KO, and the COR will sign minutes of the meeting(s).
B. Should the Contractor not concur with the minutes, they will state in writing to the
Contracting Officer within ten calendar days any areas to which they do not concur, explaining the reasons for non-concurrence. The Contracting Officer will review and consider the reasons submitted for the Contractor’s non-concurrence and make a decision.
The Contracting Office will notify the Contractor of the decision in writing within ten calendar days.
10. REMEDIAL ACTIONS
A. The COR will verbally advise or give a written inspection report to the Contractor of discrepancies the first time they occur and ask the Contractor to correct the problem. A notation will be made on the COR checklist of the date and the time the deficiency was discovered and the date and time the Contractor was notified.
B. If the Government created any of the discrepancies, these will not be counted against the Contractor’s performance. When the Government has caused the Contractor to perform in an unsatisfactory manner, the COR will forward a written notice to the responsible organizational element requesting corrective action be taken.
C. When the Contractor is not meeting the limits of satisfactory performance, a CDR will be issued to the Contractor. The seriousness of the failures should govern whether to issue CDR at the end of the period, or as soon as the limits of satisfactory performance are exceeded.
D. When a CDR is issued for a service, the COR will direct re-performance at no additional cost to the Government.
E. If the Contractor does not achieve satisfactory performance by the end of the next period or agreed suspense date, another CDR will be issued and the COR will direct re-performance again at no additional cost to the Government.
F. A third CDR will be the cause for a Cure Notice. However, the Contracting Officer may issue a Cure Notice or Show Cause letter at any time he/she deems appropriate. Depending on the overall performance of the Contractor, an unsatisfactory reply to the Cure Notice should require a Show Cause letter to be issued, followed by consideration of termination of the contract.
11. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
(1) OBJECTIVE: Accident Prevention Plan
Performance Standard Acceptable Quality Level
(AQL)
Method and Frequency of Inspection
Remedy
Accident Prevention Plan
100% required Review by, and approved by COR and Project Collateral Duty Safety Officer prior to the start of fieldwork
Remedy: The CONTRACTOR shall develop an Accident Prevention Plan (APP) as outlined in EM 385 1-1, Appendix A.
Contract services will not be permitted to start if failing to meet AQL
(2) OBJECTIVE: Task 0 –Determination of Lead-Based Paint, Asbestos, Household Chemicals
Performance Standard Acceptable Quality Level
(AQL)
Method and Frequency of Inspection
Remedy
For each trailer, the contractor shall:
1. Survey for lead-based paint, asbestos, and household chemicals that require special disposition
2. Submit to the Government the results of the survey
100% required Review by, and approved by COR and Project Collateral Duty Safety Officer prior to the start removal/demolition
Remedy: the CONTRACTOR shall develop a plan for completion of all inspection items. The CONTRACTOR shall have an opportunity to re-perform services outlined in paragraph 3 until survey results are satisfactory. 10% deduction from invoice for failing to meet AQL.
(23) OBJECTIVE: Task 1 - Mobile Home Removal
Quality Level
(AQL)
Method and Frequency of Inspection
Remedy
For each trailer, the contractor shall:
1. Disconnect and cap all utilities;
2. Demolish site only minimum required for trailer removal;
3. Remove trailer;
4. Remove loose debris resulting from trailer removal; and
5. Remediate liquid spills (if required).
100% required weekly Remedy: The CONTRACTOR shall develop a plan for completion of all inspection items. The CONTRACTOR shall have an opportunity to re-perform services outlined in paragraph 3 until Mobile Home Removal is satisfactory. 10% deduction from invoice for failing to meet AQL.
(34) OBJECTIVE: Task 2- Progress Reporting
Quality Level
(AQL)
Method and Frequency of Inspection
Remedy
For each trailer, the contractor shall:
1. Inform the COR via email within two days of its removal; and
2. Include the removal in a progress report that includes the status of all trailers in the project.
95% required on timeliness and accuracy weekly Remedy: The CONTRACTOR shall develop a plan for progress reporting. The CONTRACTOR shall have an opportunity to re-submit progress reports IAW services outlined in paragraph 4 until progress reports are satisfactory. 10% deduction from invoice for failing to meet AQL
| 1. PROJECT DATA |
| 2. BACKGROUND |
| 4. SUBMITTALS |
| 5. OVERALL PERIOD OF PERFORMANCE |
| 6. AUTHORITIES STATEMENT |
| 7. PAYMENT AND INVOICES: |
| 10. REMEDIAL ACTIONS |