- Mobile Home Demo/Removal at Success Lake
- Solicitation number
- W91238-16-Q-0004
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| Revised.PWS.dated.22Dec2015.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| exhibit_D.Map.pdf | ||
| Solicitation_W91238-16-Q-0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers to W91238-16-Q-0004 Success Lake Trailer Removal
1. Our company thinks that it is unsafe to remove any of the trailers as units to be towed and/or trailered elsewhere on a public roadway as stated on the RFP so that we can perform the least amount of work “on-site”. Can the mobile-home trailers be demolished onsite and loaded into high-side covered end dumps and disposed of properly since this would be the safest and most efficient way to remove these units?
a. Per the PWS, onsite demolition should be minimal. The Government recognizes that some of the trailers are so derelict that they will not stay in one piece if picked up, but on-site demolition should be kept to a minimum.
2. Has the gov’t performed a hazardous survey on these mobile-home trailers or properties and all affected structures that are a part of this demolition SOW? If there are surveys, can we please have a copy so that we can price out the proper abatement that needs to be done prior to the demolition?
a. The Government has not performed a survey. This amendment added a requirement to the PWS for the Contractor to perform this survey and to provide the survey results to the Government.
3. Does the Government provide any documentation, i.e. Titles tax releases’, for disposal purposes?
a. The Government does not have clear titles on ALL the trailers, however USACE Office of Counsel and Contracting Officer have agreed that, along with the extensive passage of time and lack of habitation, the cashed relocation checks by the former residents constitute an executed contract with the Government and thus Government ownership. SPK has obtained the cleared checks for all relocations (i.e. all trailers)
4. SOW mentions hazardous materials, what kind of hazardous materials are present?
a. Please see the answer to #2
5. Does the Government have analysis on any suspected hazardous materials?
a. Please see the answer to #2
6. Can demo be don’t on site or do the home have to be removed prior to demolition?
a. Please see the answer to #1
7. Does the contractor have to remove the concrete sidewalks/driveways as part of the contract?
a. No, only the mobile home unit and/or trailers, all debris within 15 feet and service to utilities (cap, seal and leave in safe condition)
8. Will periodic billing be allowed?
a. Invoices can be submitted what a Contract Line Item Number (CLIN) is complete. Interim payments will be based on % of completion, which will be reviewed and approved by the Government. Invoices may be submitted no more than twice per month.
9. Are photos available showing the structures?
a. No.
10. Are there photos showing the foundations of the structures?
a. No
11. Do the units have furniture in them? Will others remove this furniture?
a. “Furniture” is a broad term. Some trailers may be empty but it should not be assumed that all will be in that condition. Anything that has been left in the units must be removed by the Contractor.
Questions and Answers to W91238-16-Q-0004 Success Lake Trailer Removal
12. When is the question cutoff date?
a. Questions will not be accepted after the 28th of December.
13. Can you send details on each unit, as in 1. Pictures; 2. Make, model and year; 3. Single or double wide.
a. This information is not available.
14. Do the concrete slabs have to be moved?
a. Please see answer to question 7.
15. Does the septic system tanks have to be pumped, crushed, and back filled?
a. No
16. Does the outhouse building have to be demolished including slabs, septic system?
a. No.
17. Do we have to remove the existing utility poles?
a. No.